All Ontario Building Code answers
Every question on BUILDAiD in one alphabetical list — 222 answers, each with its citation from the 2024 Ontario Building Code (O. Reg. 163/24). Browsing by code section instead? Start at the Ontario Building Code FAQ.
Are drinking fountains required by the Ontario Building Code?OBC Division B, Subsection 3.7.4.
Are guards required on the edges of temporary stages in Ontario?OBC Division B, Section 3.17; guard provisions of Division B Part 3
Can a bedroom or sleeping room have no window under the Ontario Building Code?OBC Division B, Section 3.7.
Can an exit pass through a lobby under the Ontario Building Code?OBC Division B, Article 3.4.4.2.
Can steel studs be used for load-bearing walls in Ontario houses?OBC Division B, Section 9.24.
Do I need a rainscreen or air gap behind siding in Ontario?OBC Division B, Subsection 9.27.2.
Do portable classrooms need a fire alarm system in Ontario?OBC Division B, Section 3.9.
Do rapid transit stations in Ontario have to be accessible?OBC Division B, Section 3.13 and Section 3.8 (Barrier-Free Design)
Do self-storage buildings need sprinklers under the Ontario Building Code?OBC Division B, Section 3.10 and Subsection 3.2.2
Do storage racks in Ontario need to be designed for earthquakes?OBC Division B, Section 3.16 (Shelf and Rack Storage Systems) and Part 4 (Structural Design)
Does an outdoor public pool need a fence or enclosure in Ontario?OBC Division B, Section 3.11 (Public Pools)
Does every plumbing fixture need a trap in Ontario?OBC Division B, Section 7.4 (Traps) and Section 7.5 (Venting)
Does foundation dampproofing go on the inside or outside of the wall in Ontario?OBC Division B, Subsection 9.13.2.
Does framing lumber need to be grade stamped in Ontario?OBC Division B, Article 9.3.2.1.
Does polyethylene have to go on the warm side of the wall in Ontario?OBC Division B, Subsections 9.25.4. and 9.25.5.
How are building height and building area determined under the Ontario Building Code?OBC Division A, Article 1.4.1.2.
How big does a fireplace hearth extension need to be in Ontario?OBC Division B, Subsection 9.22.5.
How deep do foundations have to be for frost protection in Ontario?OBC Division B, Subsection 9.12.2.
How deep must you excavate below frost for foundations in Ontario?OBC Division B, Subsection 9.12.2.
How do you build a wall or floor that meets STC 50 in Ontario?OBC Division B, Subsection 9.11.2. and Supplementary Standard SB-3
How do you calculate occupant load under the Ontario Building Code?OBC Division B, Subsection 3.1.17.
How does high rack storage affect sprinkler requirements in Ontario?OBC Division B, Section 3.16; sprinkler design per Subsection 3.2.5 and NFPA 13
How does Section 3.18 relate to Part 11 renovation rules in Ontario?OBC Division B, Section 3.18 and Part 11 (Renovation)
How does spatial separation limit windows near property lines in Ontario?OBC Division B, Subsection 3.2.3.
How does the Ontario Building Code relate to the Ontario Electrical Safety Code for house wiring?OBC Division B, Subsection 9.34.1.
How far above the ground does siding have to be in Ontario?OBC Division B, Subsection 9.27.2.
How far apart must exits be located under the Ontario Building Code?OBC Division B, Article 3.4.2.3.
How far must a septic system be from a well or house in Ontario?OBC Division B, Subsection 8.2.1. (clearance tables)
How high does a chimney have to extend above the roof in Ontario?OBC Division B, Subsection 9.21.4.
How high must a deck guard or railing be in Ontario?OBC Division B, Subsection 9.8.8.
How is a septic tank sized in Ontario?OBC Division B, Article 8.6.2.2. (tank sizing) and Table 8.2.1.3. (design flows)
How is major occupancy classified under the Ontario Building Code?OBC Division B, Subsection 3.1.2.
How is required exit width calculated under the Ontario Building Code?OBC Division B, Article 3.4.3.2.
How is the design snow load calculated in Ontario?OBC Division B, Article 4.1.6.2.
How is the occupant limit for an event tent determined in Ontario?OBC Division B, Section 3.14 and Subsection 3.1.17 (Occupant Load)
How is the principal ventilation fan sized by number of bedrooms in Ontario?OBC Division B, Subsection 9.32.3.
How is travel distance measured within a floor area in Ontario?OBC Division B, Subsection 3.3.1.
How long can a dead-end corridor be under the Ontario Building Code?OBC Division B, Article 3.3.1.9.
How many barrier-free entrances does a building need in Ontario?OBC Division B, Article 3.8.1.2.
How many barrier-free suites are required in hotels and apartment buildings in Ontario?OBC Division B, Subsection 3.8.2.
How many exits does a floor area need under the Ontario Building Code?OBC Division B, Subsection 3.4.2.
How many exits does a self-storage building need in Ontario, and what are the travel distance limits?OBC Division B, Section 3.10 (Self-Service Storage Buildings)
How many washroom fixtures does a building need under the Ontario Building Code?OBC Division B, Subsection 3.7.4.
How many wheelchair spaces are required in assembly seating in Ontario?OBC Division B, Subsection 3.8.2.
How much attic ventilation does a roof need in Ontario?OBC Division B, Subsection 9.19.1.
How much clearance does stucco need above the ground in Ontario?OBC Division B, Subsection 9.28.1.
How much settling allowance do log homes need above windows, doors and partitions in Ontario?OBC Division B, Section 9.38.
How much window area is required for natural light in Ontario rooms?OBC Division B, Subsection 9.7.2.
How must brick veneer be supported and tied to a house in Ontario?OBC Division B, Subsections 9.20.6. and 9.20.9.
How must heating and cooling systems be sized for houses in Ontario?OBC Division B, Section 9.33.
How thick do above-grade masonry walls have to be in Ontario?OBC Division B, Subsection 9.20.6.
How thick does a foundation wall need to be in Ontario?OBC Division B, Subsection 9.15.4.
How thick does the subfloor need to be in an Ontario house?OBC Division B, Subsections 9.23.15. and 9.30.2.
How wide must a barrier-free path of travel be in Ontario?OBC Division B, Article 3.8.1.3.
Is a backwater valve required in Ontario?OBC Division B, Article 7.4.6.4.
Is a floor drain required in the basement of a house in Ontario?OBC Division B, Subsection 9.31.6.
Is an HRV required in new homes in Ontario?OBC Division B, Section 9.32 and Supplementary Standard SB-12
Is there a maximum glass size or thickness rule for houses in Ontario?OBC Division B, Subsection 9.6.1.
What are the accessible (barrier-free) toilet stall dimensions in Ontario?OBC Division B, Article 3.8.3.8.
What are the accessible parking requirements for buildings in Ontario?OBC Division B, Subsection 3.8.2.
What are the air barrier requirements in the Ontario Building Code?OBC Division B, Subsection 5.4.1. (and 9.25.3. for houses)
What are the aisle requirements for assembly seating in Ontario?OBC Division B, Subsection 3.3.2.
What are the attic access hatch requirements in Ontario?OBC Division B, Subsection 9.19.2.
What are the attic insulation rules for houses in Ontario?OBC Division B, Subsection 9.25.2. and SB-12
What are the basic foundation design rules for houses in Ontario?OBC Division B, Subsection 9.4.4. and Section 9.15
What are the code requirements for dumbwaiters and material lifts in Ontario?OBC Division B, Section 3.5.
What are the code requirements for log walls in Ontario?OBC Division B, Section 9.38.
What are the code rules for installing vinyl siding in Ontario?OBC Division B, Subsection 9.27.13.
What are the deck requirements for a public pool in Ontario?OBC Division B, Section 3.11 (Public Pools)
What are the drain and suction entrapment safety rules for public pools in Ontario?OBC Division B, Section 3.11 (Public Pools)
What are the egress requirements for basements in Ontario?OBC Division B, Subsections 9.9.9. and 9.9.10.
What are the egress requirements for residential suites under the Ontario Building Code?OBC Division B, Subsection 3.3.4.
What are the egress requirements for transit station platforms in Ontario?OBC Division B, Section 3.13 (Rapid Transit Stations)
What are the elevator requirements under the Ontario Building Code?OBC Division B, Section 3.5.
What are the escalator and moving walk requirements in the Ontario Building Code?OBC Division B, Section 3.5.
What are the exhaust fan requirements for bathrooms and kitchens in Ontario?OBC Division B, Subsection 9.32.3.
What are the exit requirements for portable classrooms in Ontario?OBC Division B, Section 3.9.
What are the exit sign requirements under the Ontario Building Code?OBC Division B, Subsection 3.4.5.
What are the fire department access route requirements under the Ontario Building Code?OBC Division B, Subsection 3.2.5.
What are the flue lining requirements for masonry chimneys in Ontario?OBC Division B, Subsection 9.21.3.
What are the foundation and floor slab requirements for garages in Ontario?OBC Division B, Subsections 9.35.3. and 9.35.4.
What are the incinerator room requirements in the Ontario Building Code?OBC Division B, Subsection 3.6.2.
What are the insulation installation requirements in the Ontario Building Code?OBC Division B, Subsection 9.25.2.
What are the lath and mix requirements for exterior stucco in Ontario?OBC Division B, Subsections 9.28.4. and 9.28.5.
What are the medical gas piping requirements in the Ontario Building Code?OBC Division B, Section 3.7.
What are the minimum living room, dining room and kitchen sizes in Ontario?OBC Division B, Subsections 9.5.4. to 9.5.6.
What are the minimum openable window areas for natural ventilation in Ontario?OBC Division B, Subsection 9.32.2.
What are the notching and drilling limits for floor joists in Ontario?OBC Division B, Subsection 9.23.5.
What are the Ontario Building Code rules for above-grade ICF walls in houses?OBC Division B, Section 9.20.
What are the radon and soil gas control requirements for new houses in Ontario?OBC Division B, Subsection 9.13.4.
What are the required dimensions for exit stairs under the Ontario Building Code?OBC Division B, Subsection 3.4.3.
What are the requirements for exterior doors on houses in Ontario?OBC Division B, Subsections 9.7.5. and 9.5.11.
What are the requirements for heating and air-conditioning ducts in Ontario homes?OBC Division B, Subsection 9.33.6.
What are the requirements for mixed occupancy buildings in Ontario?OBC Division B, Subsection 3.1.3.
What are the requirements for roof signs on buildings in Ontario?OBC Division B, Section 3.15 (Signs)
What are the requirements for steel and wood columns in a basement in Ontario?OBC Division B, Subsections 9.17.3. to 9.17.5.
What are the requirements for vertical service spaces and shafts in Ontario?OBC Division B, Subsection 3.6.3.
What are the roof flashing requirements for valleys, walls and chimneys in Ontario?OBC Division B, Subsection 9.26.4.
What are the special egress rules for care occupancies under the Ontario Building Code?OBC Division B, Subsection 3.3.3.
What are the structural requirements for signs under the Ontario Building Code?OBC Division B, Section 3.15 (Signs) and Part 4 (Structural Design)
What are the surface grading requirements around a house in Ontario?OBC Division B, Subsection 9.14.6.
What are the topsoil removal and backfill rules for building in Ontario?OBC Division B, Subsections 9.12.1. and 9.12.3.
What are the travel distance limits to an exit in small buildings in Ontario?OBC Division B, Subsection 9.9.8.
What are the ventilation and access requirements for crawl spaces in Ontario?OBC Division B, Subsections 9.18.2. and 9.18.3.
What are the ventilation requirements for buildings in Ontario?OBC Division B, Section 6.2 (Ventilation)
What are the wall bracing and sheathing requirements for houses in Ontario?OBC Division B, Subsections 9.23.13. and 9.23.16.
What are the water treatment and recirculation requirements for public spas in Ontario?OBC Division B, Section 3.12 (Public Spas)
What are the weeping tile requirements for house foundations in Ontario?OBC Division B, Subsection 9.14.3.
What clearance and exit requirements apply to tents in Ontario?OBC Division B, Section 3.14 (Tents and Air-Supported Structures)
What clearance does a masonry chimney need from combustible materials in Ontario?OBC Division B, Subsection 9.21.5.
What clearances and damper requirements apply to fireplaces in Ontario?OBC Division B, Section 9.22.
What compliance alternatives exist for existing buildings under the Ontario Building Code?OBC Division B, Section 3.18 and Part 11 (Renovation); Division A alternative solutions provisions
What concrete strength is required for house foundations in Ontario?OBC Division B, Article 9.3.1.6.
What counts as a public pool under the Ontario Building Code?OBC Division B, Section 3.11 (Public Pools)
What counts as a public spa or hot tub under the Ontario Building Code?OBC Division B, Section 3.12 (Public Spas)
What counts as a storey and building height under Part 9 in Ontario?OBC Division B, Subsection 9.2.1. and Division A definitions
What design loads apply to houses under Part 9 in Ontario?OBC Division B, Subsection 9.4.2.
What does 'grade' mean in the Ontario Building Code?OBC Division A, Article 1.4.1.2. (definitions applied through Part 9)
What does the code require when converting a house to an office or daycare in Ontario?OBC Division B, Section 9.41.
What does the Ontario Building Code require for electrical vaults and transformer rooms?OBC Division B, Subsection 3.6.2.
What does the Ontario Building Code require for elevator machine rooms?OBC Division B, Section 3.5.
What does the Ontario Building Code require for food premises like restaurant kitchens?OBC Division B, Section 3.7.
What egress requirements apply around storage racks in warehouses in Ontario?OBC Division B, Section 3.16 and Subsection 3.4 (Exits)
What emergency and safety equipment must a public pool have in Ontario?OBC Division B, Section 3.11 (Public Pools)
What emergency provisions must a public spa have in Ontario?OBC Division B, Section 3.12 (Public Spas)
What engineering is required for demountable stages and support structures in Ontario?OBC Division B, Section 3.17 (Demountable Stages and Demountable Support Structures)
What fire safety systems are required in rapid transit stations in Ontario?OBC Division B, Section 3.13 (Rapid Transit Stations)
What fire separation does a basement apartment need in Ontario?OBC Division B, 9.10.9. (fire separations) and Part 11 / second-unit provisions for existing houses
What fire separation is required around exits in Ontario?OBC Division B, Subsection 3.4.4.
What fire separation is required between suites in Ontario?OBC Division B, Article 3.3.1.1.
What fire separation is required for service rooms in Ontario?OBC Division B, Subsection 3.6.2.
What fire separations are required for hazardous rooms under the Ontario Building Code?OBC Division B, Subsection 3.3.1.
What fire separations are required in a self-storage building in Ontario?OBC Division B, Section 3.10 (Self-Service Storage Buildings)
What flame resistance standard must tent fabric meet in Ontario?OBC Division B, Section 3.14 (Tents and Air-Supported Structures)
What foundation and anchorage requirements apply to park model trailers in Ontario?OBC Division B, Section 9.39.
What foundation options are allowed for cottages in Ontario?OBC Division B, Section 9.37.
What foundations and anchorage do portable classrooms need in Ontario?OBC Division B, Section 3.9.
What gas-proofing is required between an attached garage and the house in Ontario?OBC Division B, Article 9.10.9.16.
What has to go under a basement floor slab in Ontario?OBC Division B, Subsection 9.16.2.
What height must a stair handrail be in Ontario?OBC Division B, Subsection 9.8.7.
What indoor temperatures must a home heating system be designed to maintain in Ontario?OBC Division B, Subsection 9.33.3.
What inspections are required for demountable stages in Ontario?OBC Division B, Section 3.17; inspection provisions of the Building Code Act and Division C
What is a high building under the Ontario Building Code?OBC Division B, Article 3.2.6.1.
What is a horizontal exit and when can it be used in Ontario?OBC Division B, Subsection 3.4.1.
What is the difference between a carport and a garage under the Ontario Building Code?OBC Division B, Subsection 9.35.1.
What is the difference between a heated and unheated crawl space under the Ontario Building Code?OBC Division B, Section 9.18.
What is the maximum hot water temperature allowed in Ontario?OBC Division B, Article 7.6.5.1.
What is the maximum ramp slope for barrier-free ramps in Ontario?OBC Division B, Article 3.8.3.4.
What is the maximum stair rise and minimum run in Ontario?OBC Division B, Subsection 9.8.4.
What is the maximum travel distance to an exit under the Ontario Building Code?OBC Division B, Article 3.4.2.5.
What is the minimum bedroom size in Ontario?OBC Division B, Subsection 9.5.8. (Bedrooms — spaces in dwelling units)
What is the minimum ceiling height in Ontario?OBC Division B, Subsection 9.5.3. (Ceiling Heights) and Table 9.5.3.1.
What is the minimum concrete thickness for a basement floor slab in Ontario?OBC Division B, Subsection 9.16.4.
What is the minimum corridor width under the Ontario Building Code?OBC Division B, Article 3.3.1.9.
What is the minimum door width between rooms in an Ontario house?OBC Division B, Subsection 9.5.11.
What is the minimum footing size for a house in Ontario?OBC Division B, Subsection 9.15.3.
What is the minimum hallway width in an Ontario house?OBC Division B, Article 9.5.3.1.
What is the minimum roof slope for asphalt shingles and other roofing materials in Ontario?OBC Division B, Subsection 9.26.3.
What kind of finish flooring is required in bathrooms and laundry rooms in Ontario?OBC Division B, Subsection 9.30.1.
What live loads must residential floors be designed for in Ontario?OBC Division B, Article 4.1.5.3. and Table 4.1.5.3.
What loads must a guard (railing) resist under the Ontario Building Code?OBC Division B, Article 4.1.5.14. and Table 4.1.5.14.
What must a universal washroom include under the Ontario Building Code?OBC Division B, Article 3.8.3.12.
What Ontario Building Code rules apply to self-service storage buildings?OBC Division B, Section 3.10 (Self-Service Storage Buildings)
What performance standards do windows have to meet in Ontario?OBC Division B, Subsection 5.10.2. (and 9.7. for houses)
What plumbing fixtures must every dwelling unit have in Ontario?OBC Division B, Subsection 9.31.4.
What reinforcement and concrete requirements apply to suspended slabs in Ontario houses?OBC Division B, Section 9.40.
What rules apply to projecting signs over sidewalks in Ontario?OBC Division B, Section 3.15 (Signs)
What safety features does a public spa need under the Ontario Building Code?OBC Division B, Section 3.12 (Public Spas)
What separation is required between an attached garage and the house in Ontario?OBC Division B, Article 9.10.9.16.
What size does a bedroom egress window need to be in Ontario?OBC Division B, Subsection 9.9.10. (Egress Windows or Doors for Bedrooms)
What size footing does a basement column need in Ontario?OBC Division B, Subsection 9.15.3.
What standard must new windows meet in Ontario (NAFS)?OBC Division B, Subsection 9.7.4.
What STC rating is required between dwelling units in Ontario?OBC Division B, Subsection 9.11.2.
What stud size and spacing does the Ontario Building Code require for walls?OBC Division B, Subsection 9.23.10.
What thickness of drywall is required and how must it be fastened in Ontario?OBC Division B, Subsection 9.29.5.
What triggers change-of-use requirements in a small building in Ontario?OBC Division B, Section 9.41.
What triggers the additional Part 3 requirements for existing buildings in Ontario?OBC Division B, Section 3.18 (Additional Requirements for Existing Buildings)
What upgrades are required when adding a second unit or basement apartment in Ontario?OBC Division B, Section 9.41.
What upgrades are required when changing the use of an existing building in Ontario?OBC Division B, Section 3.18; Part 10 (Change of Use) and Part 11
What water-resistant backing and finish is required around tubs and showers in Ontario?OBC Division B, Subsection 9.29.2.
When are automatic sprinklers required in a building in Ontario?OBC Division B, Subsection 3.2.2.
When are carbon monoxide alarms required in Ontario homes?OBC Division B, Subsection 9.33.4.
When are steel studs allowed in a house under the Ontario Building Code?OBC Division B, Section 9.24.
When are two exits required from a floor area in Ontario?OBC Division B, Sentence 3.4.2.1.(1)
When can exterior stairs be used as exits under the Ontario Building Code?OBC Division B, Subsection 3.4.6.
When can you use Part 9 span tables instead of an engineer in Ontario?OBC Division B, Subsection 9.4.1.
When do the Ontario Building Code portable classroom rules apply?OBC Division B, Section 3.9.
When do the reinforced concrete slab rules apply, such as garage slabs over basements, in Ontario?OBC Division B, Section 9.40.
When does a building need Part 3 design instead of Part 9 in Ontario?OBC Division B, Subsection 9.1.1.
When does a building need to be barrier-free (accessible) in Ontario?OBC Division B, Section 3.8 (Barrier-Free Design)
When does a house need two exits in Ontario?OBC Division B, Subsection 9.9.9.
When does a room or suite need two egress doorways under the Ontario Building Code?OBC Division B, Article 3.3.1.5.
When does a sign need a building permit under the Ontario Building Code?OBC Division B, Section 3.15 (Signs); Division A designated structure provisions
When does a tent need a building permit in Ontario?OBC Division B, Section 3.14 (Tents and Air-Supported Structures); permit exemption criteria in the OBC
When does OBC Section 3.13 apply to rapid transit stations in Ontario?OBC Division B, Section 3.13 (Rapid Transit Stations)
When does Part 8 (septic systems) of the Ontario Building Code apply?OBC Division B, Part 8 (Sewage Systems)
When does the Ontario Building Code apply to demountable event stages?OBC Division B, Section 3.17 (Demountable Stages and Demountable Support Structures)
When does the Ontario Building Code apply to park model trailers?OBC Division B, Section 9.39.
When does warehouse racking need a building permit or engineering in Ontario?OBC Division B, Section 3.16 (Shelf and Rack Storage Systems)
When is a fire alarm system required in a building in Ontario?OBC Division B, Subsection 3.2.4.
When is a firefighters' elevator required in Ontario, and what must it include?OBC Division B, Subsection 3.2.6.
When is a standpipe system required under the Ontario Building Code?OBC Division B, Subsection 3.2.9.
When is a universal washroom required in an Ontario building?OBC Division B, Subsection 3.7.4.
When is noncombustible construction required under the Ontario Building Code?OBC Division B, Subsection 3.2.2.
When is waterproofing required instead of dampproofing for a foundation in Ontario?OBC Division B, Subsections 9.13.2. and 9.13.3.
When must doors swing in the direction of exit travel in Ontario?OBC Division B, Subsection 3.3.1.
Where are power door operators required in Ontario buildings?OBC Division B, Subsection 3.8.3.
Where are smoke alarms required in a house in Ontario?OBC Division B, Subsection 9.10.19.
Where can exhaust ducts and vents discharge in Ontario?OBC Division B, Section 6.2 (and 9.32./9.33. for houses)
Where can fuel-fired appliances be located in a Part 3 building in Ontario?OBC Division B, Subsection 3.6.2.
Where do water depth markings have to go on a public pool in Ontario?OBC Division B, Section 3.11 (Public Pools)
Where is a vapour barrier required in Ontario?OBC Division B, Subsection 5.5.1. (and 9.25.4. for houses)
Where is ice and water shield (eave protection) required on roofs in Ontario?OBC Division B, Subsection 9.26.5.
Where is safety glass required in a house in Ontario?OBC Division B, Subsection 9.6.1.
Where must foundation drains and weeping tile discharge in Ontario?OBC Division B, Subsection 9.14.5.
Which building code relaxations apply to seasonal cottages in Ontario?OBC Division B, Section 9.37.
Which buildings are exempt from barrier-free design requirements in Ontario?OBC Division B, Article 3.8.1.1.
Which buildings fall under Part 3 of the Ontario Building Code?OBC Division A, Subsection 1.1.2.
Which buildings fall under Part 9 of the Ontario Building Code?OBC Division B, Subsection 9.1.1.
Which buildings need an elevator under the Ontario Building Code?OBC Division B, Subsection 3.8.2.
Which fixtures need hot and cold running water in an Ontario home?OBC Division B, Subsection 9.31.3.
Which rooms in a house require lighting outlets in Ontario?OBC Division B, Subsection 9.34.2.
Have a question that isn’t here?
BUILDAiD Assist answers any Ontario Building Code question in seconds — with the exact citation and verbatim code text.