9.20.14.1.Laying Temperature of Mortar and Masonry
(1) Mortar and masonry shall be maintained at a temperature not below 5°C during installation and for not less than
48 h after installation.
(2) No frozen material shall be used in mortar mix.
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.