PART 9 — HOUSING AND SMALL BUILDINGSUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
9.26.7.2.Starter Strip
(1) A starter strip shall be installed along the lower edge of the roof so that it extends approximately 12 mm beyond the
eaves and rake of the roof and fastened along the bottom edge with nails spaced not more than 300 mm o.c.
(2) Starter strips shall be
(a) at least Type M mineral-surfaced roll roofing not less than 300 mm wide,
(b) shingles of the same weight and quality as those used as a roof covering with tabs facing up the roof slope, or
(c) pre-manufactured starter strips installed with sealant at the eaves.
(3) Starter strips need not be provided where eave protection of not less than Type M mineral-surfaced roll roofing is
provided or self-sealing composite membranes consisting of polyethylene and bituminous material is provided.
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.