PART 9 — HOUSING AND SMALL BUILDINGSUpdated for the 2024 Ontario Building Code

9.18.6.1.Ground Cover in Unheated Crawl Spaces

(1) Where a crawl space is unheated, a ground cover shall be provided consisting of not less than (a) 50 mm of asphalt, (b) 100 mm of 15 MPa Portland cement concrete, (c) Type S roll roofing, or (d) 0.10 mm polyethylene. (2) Joints in sheet-type ground cover required in Sentence (1) shall be lapped not less than 100 mm and weighted down.

Understand this provision in seconds

BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.

Try BUILDAiD Beta

Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.