PART 8 — SEWAGE SYSTEMSUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
8.2.2.2.Tanks
(1) A tank that is used as a treatment unit in a Class 4 sewage system or a holding tank in a Class 5 sewage system shall
conform to the requirements of CSA B66, “Design, material, and manufacturing requirements for prefabricated septic
tanks and sewage holding tanks.”
(2) Material standards, access and construction methods and practices for a tank used for other Classes of sewage
systems shall conform to the requirements of CSA B66, “Design, material, and manufacturing requirements for
prefabricated septic tanks and sewage holding tanks.”
(3) Sentence (2) does not apply to a tank that is an integral part of a prefabricated Class 1 sewage system.
(4) Access openings shall be located to facilitate the pumping of all compartments and the servicing of the inlet and
outlet of each compartment not accessible by removal of the tank top or part of it.
(5) A tank shall not be covered by soil or leaching bed fill having a depth greater than the maximum depth of burial that
the tank is designed to withstand.
(6) A tank shall be securely anchored when located in an area subject to flooding or where ground water levels may
cause hydrostatic pressures.
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.