PART 8 — SEWAGE SYSTEMSUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
8.2.1.6.Clearances for a Class 4 or 5 Sewage System
(1) Except as provided in Sentences 8.2.1.4.(1) and (2), a treatment unit shall not be located closer than the minimum
horizontal distances set out in Table 8.2.1.6.-A.
Table 8.2.1.6.-A
Minimum Clearances for Treatment Units
Forming Part of Sentence 8.2.1.6.(1)
Object Minimum Clearance, m
Structure 1.5
Well 15
Lake 15
Pond 15
Reservoir 15
River 15
Spring 15
Stream 15
Property Line 3
(2) Except as provided in Sentences 8.2.1.4.(1) and (2), the centre line of a distribution pipe or leaching chamber shall
not be located closer than the minimum horizontal distances set out in Table 8.2.1.6.-B and these distances shall be
increased when required by Sentence 8.7.4.2.(11).
(3) Except as provided in Sentences 8.2.1.4.(1) and (2), a holding tank shall not be located closer than the minimum
horizontal distances set out in Table 8.2.1.6.-C.
Table 8.2.1.6.-B
Minimum Clearances for Distribution Piping and Leaching Chambers
Forming Part of Sentence 8.2.1.6.(2)
Object Minimum Clearance, m
Structure 5
Well with a watertight casing to a depth of at
least 6 m
Any other well 30
Lake 15
Pond 15
Reservoir 15
River 15
Spring not used as a source of potable water 15
Stream 15
Property Line 3
Table 8.2.1.6.-C
Minimum Clearances for Holding Tanks
Forming Part of Sentence 8.2.1.6.(3)
Object Minimum Clearance, m
Structure 1.5
Well with a watertight casing to a depth of at
least 6 m
Any other well 15
Spring 15
Property Line 3
This provision includes a table — formatting is preserved from the source; refer to the official code for the authoritative layout.
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.