PART 8 — SEWAGE SYSTEMSUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
8.2.1.4.Clearances (See Note A-8.2.1.4.)
(1) Unless it can be shown to be unnecessary, where the percolation time is 10 min or greater, the location of all
components within a sewage system shall be in conformance with the clearances listed in Article 8.2.1.5. or 8.2.1.6.
(2) Unless it can be shown to be unnecessary, where the percolation time is less than 10 min, the clearances listed in
Articles 8.2.1.5. and 8.2.1.6. for wells, lakes, ponds, reservoirs, rivers, springs or streams shall be increased to compensate
for the lower percolation time.
(3) No building shall be constructed closer to any part of a sewage system than the clearances listed in Article 8.2.1.5. or
8.2.1.6.
(4) If more than one sewage system is located on a lot or parcel of land, there shall be no overlap of any part of the
systems.
← Previous8.2.1.3. Sewage System Design FlowsNext →8.2.1.5. Clearance Distances for Class 1, 2 and 3 Sewage
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.