PART 8 — SEWAGE SYSTEMSUpdated for the 2024 Ontario Building Code

8.2.1.2.Site Evaluation

(1) A site evaluation shall be conducted on every site where a new or replacement sewage system is to be installed. (See Note A-8.2.1.2.(1)) (2) The percolation time shall be determined by (a) conducting percolation tests, or (b) classifying the soil according to one of the following methods, (i) the Unified Soil Classification System as described in MMAH Supplementary Standard SB-6, “Percolation Time and Soil Descriptions,” or (ii) the Soil Texture Classification as described in Chapter 3 of USDA, “Soil Survey Manual.” (See Note A-8.2.1.2.(2)) (3) Where the percolation time is determined by a percolation test, there shall be a minimum of 3 locations selected, suitably spaced to accurately evaluate the leaching bed area, with the highest percolation time of the tests being used. (See Note A-8.2.1.2.(3))

Understand this provision in seconds

BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.

Try BUILDAiD Beta

Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.