7.4.10.9.Hydraulic Loads on Horizontal Storm Drains
(1) The hydraulic load that is drained to a storm building drain, a storm building sewer or a combined building sewer
shall conform to Table 7.4.10.9.
Table 7.4.10.9.
Maximum Permitted Hydraulic Load Drained to a Storm Building Drain or Sewer, or a Combined Building Sewer
Forming Part of Sentence 7.4.9.5.(2) and Article 7.4.10.9.
Maximum Hydraulic Load, L
Nominal Pipe Size of Drain
Slope(1)
or Sewer, NPS
1 in 400 1 in 200 1 in 133 1 in 100 1 in 68 1 in 50 1 in 25
3 n/a n/a n/a n/a n/a 2 770 3 910
4 n/a n/a n/a 4 220 5 160 5 970 8 430
5 n/a n/a 6 760 7 650 9 350 10 800 15 300
6 n/a n/a 10 700 12 400 15 200 17 600 24 900
8 n/a 18 900 23 200 26 700 32 800 37 800 53 600
10 n/a 34 300 41 900 48 500 59 400 68 600 97 000
12 37 400 55 900 68 300 78 700 96 500 112 000 158 000
15 71 400 101 000 124 000 143 000 175 000 202 000 287 000
Notes to Table 7.4.10.9.:
(1) Slope is the ratio of rise to run, in whatever measurement units are chosen.
This provision includes a table — formatting is preserved from the source; refer to the official code for the authoritative layout.
← Previous7.4.10.8. Hydraulic Loads on Sanitary Building Drains or SNext →7.4.10.10. Hydraulic Loads to Roof Gutters
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.