PART 6 — HEATING, VENTILATING AND AIR-CONDITIONINGUpdated for the 2024 Ontario Building Code

6.8.1.2.Openings in Air Duct Systems

(1) Air duct systems shall have no openings other than those required for the proper operation and maintenance of the system. (2) Access openings shall be provided in duct systems to allow the removal of material that may accumulate in plenums and ducts.

Understand this provision in seconds

BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.

Try BUILDAiD Beta

Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.