PART 3 — FIRE PROTECTION, OCCUPANT SAFETY AND ACCESSIBILITYUpdated for the 2024 Ontario Building Code

3.13.4.4.Egress Capacity

(1) For a rapid transit station, the required aggregate egress capacity from each platform shall be determined by dividing the platform occupant load determined in accordance with Sentences 3.13.4.1.(2) to (6) by the required platform clearance time determined in accordance with Sentence (3). (2) Where two platforms are considered as one platform as provided in Sentence 3.13.4.3.(2), the required egress capacity for each platform shall be determined separately. (3) The required platform clearance time shall be 4 min less the travel time between the platform and the entry into the protected route based on travel speeds of (a) 38 m/min for horizontal travel, and (b) 21 m/min or vertical rise. (4) For each means of egress, the required egress capacity at the platform shall be maintained for the entire length of the means of egress. (5) Except as provided in Sentence (6), where two or more means of egress converge, the required egress capacity beyond that point shall be cumulative. (6) The egress capacity in Sentence (5) need not be cumulative after converging where it can be shown that the platform clearance time in Sentence (3) is not exceeded.

Understand this provision in seconds

BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.

Try BUILDAiD Beta

Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.