PART 3 — FIRE PROTECTION, OCCUPANT SAFETY AND ACCESSIBILITYUpdated for the 2024 Ontario Building Code

3.1.9.5.Openings Through a Membrane Ceiling

(1) A membrane ceiling forming part of an assembly assigned a fire-resistance rating on the basis of MMAH Supplementary Standard SB-2, “Fire Performance Ratings,” is permitted to be penetrated by openings leading into ducts within the ceiling space provided (a) the ducts are sheet steel, and (b) the number of openings and their protection conform to the requirements of MMAH Supplementary Standard SB-2, “Fire Performance Ratings.” (2) Fire stop flaps in ceiling membranes required in Sentence (1) shall conform to CAN/ULC-S112.2, “Standard Method of Fire Test of Ceiling Firestop Flap Assemblies.”

Understand this provision in seconds

BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.

Try BUILDAiD Beta

Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.