Division C, Section 1.2 — Design and General Review
Full text of Section 1.2 (Design and General Review) — Division C, Part 1 (General) of the 2024 Ontario Building Code, with every article reproduced below.
1.2.1.Design
1.2.1.1.Application permalink →
(1) Article 1.2.1.2. applies with respect to a building described in clause 11(3)(a) or (b) of the Architects Act or
subsection 12(4) or clause 12(5)(a) of the Professional Engineers Act.
1.2.1.2.Design by Architect or Professional Engineer permalink →
(1) A foundation of a building shall be designed by a professional engineer where,
(a) the foundation is to be constructed below the level of the footings of an adjacent building and within the angle of
repose of the soil, as drawn from the bottom of the footings, or
(b) underpinning of a foundation is to be undertaken.
(2) A sprinkler protected glazed wall assembly described in Article 3.1.8.20. of Division B shall be designed by a
professional engineer.
(3) A shelf and rack storage system described in Section 3.16. of Division B shall be designed by a professional
engineer.
(4) The time-based egress analysis for a shelf and rack storage system described in Sentence 3.16.1.7.(7) of Division B
shall be prepared or provided by an architect or a professional engineer or a combination of both.
(5) The supporting framing structure and anchorage system for a tent occupying an area greater than 225 m 2 shall be
designed by a professional engineer.
(6) A sign structure attached in any manner to a building shall be designed by an architect or a professional engineer or
a combination of both where it is,
(a) a projecting sign that weighs more than 115 kg, or
(b) a roof sign that has any face that is more than 10 m 2.
(7) A projecting sign attached in any manner to a parapet wall shall be designed by an architect or a professional
engineer or a combination of both.
1.2.2.General Review
1.2.2.1.General Review by Architect or Professional Engineer permalink →
(1) The construction, including, for greater certainty, enlargement or alteration, of every building or part of it described
in Table 1.2.2.1. shall be reviewed by an architect or a professional engineer or a combination of both as set out in
Column 3 of the Table.
(2) A person who intends to construct or have constructed a building or part of it required by Sentences (1) and (4) to
(9) to be reviewed by an architect or a professional engineer or a combination of both, shall ensure that an architect,
professional engineer or both are retained to undertake the general review of the construction of the building in
accordance with the performance standards of the Ontario Association of Architects or the Association of Professional
Engineers of Ontario, as applicable, to determine whether the construction is in general conformity with the plans,
sketches, drawings, graphic representations, specifications and other documents that form the basis for the issuance of a
permit under section 8 of the Act or any changes to it authorized by the chief building official.
(3) The architect, professional engineer or both who have been retained to undertake the general review of the
construction of a building, shall forward copies of written reports arising out of the general review to the chief building
official or registered code agency, as the case may be.
(4) The construction of a foundation of a building shall be reviewed by a professional engineer where,
(a) the foundation is to be constructed below the level of the footings of an adjacent building and within the angle of
repose of the soil, as drawn from the bottom of the footings, or
(b) underpinning of a foundation is to be undertaken.
(5) The construction of a sprinkler protected glazed wall assembly described in Article 3.1.8.20. of Division B shall be
reviewed by a professional engineer.
(6) The construction of a shelf and rack storage system described in Section 3.16. of Division B shall be reviewed by a
professional engineer.
(7) The construction of a supporting framing structure and anchorage system for a tent occupying an area greater than
225 m2 shall be reviewed by a professional engineer.
(8) The construction of a sign structure shall be reviewed by an architect or a professional engineer or a combination of
both, where the sign is,
(a) a ground sign that exceeds 7.5 m in height above the adjacent finished ground,
(b) a projecting sign that weighs more than 115 kg, or
(c) a roof sign that has any face that is more than 10 m2.
(9) The construction of a projecting sign attached in any manner to a parapet wall shall be reviewed by an architect,
professional engineer or a combination of both.
(10) The construction of a demountable stage or demountable support structure regulated by Section 3.17. of Division B
shall be reviewed by a professional engineer.
Table 1.2.2.1.
General Review(4)
Forming Part of Sentence 1.2.2.1.(1)
Building Classification by Major Occupancy(5) Building Description General Review by:
Architect and
Assembly occupancy only Every building
professional engineer(1)
Assembly occupancy and any other major occupancy except Architect and
Every building
industrial professional engineer(1)
Architect and
Care, care and treatment or detention occupancy only Every building
professional engineer(1)
Care, care and treatment or detention occupancy and any other Architect and
Every building
major occupancy except industrial professional engineer(1)
Every building that exceeds 3 storeys in Architect and
building height professional engineer(1)
Residential occupancy only, other than retirement homes Every building that exceeds 600 m2 in gross
area and that contains a residential
Architect(2)
occupancy other than a dwelling unit or
dwelling units
Every building that exceeds 600 m2 in gross
area and contains a dwelling unit above Architect(2)
another dwelling unit
Residential occupancy only, other than retirement homes Every building that exceeds 600 m2 in
building area, contains 3 or more dwelling
Architect(2)
units and has no dwelling unit above
another dwelling unit
Residential occupancy, other than retirement homes, and any
Every building that exceeds 600 m2 in gross Architect and
other major occupancy except assembly, care, care and
area or 3 storeys in building height professional engineer(1)
treatment, detention or industrial occupancy
Architect and
Retirement home only Every building
professional engineer(1)
Architect and
Retirement home and any major occupancy except industrial Every building
professional engineer(1)
Every building that exceeds 600 m2 in gross Architect and
Business and personal services occupancy only
area or 3 storeys in building height professional engineer(1)
Business and personal services occupancy and any other major
Every building that exceeds 600 m2 in gross Architect and
occupancy except assembly, care, care and treatment, detention
area or 3 storeys in building height professional engineer(1)
or industrial occupancy
Every building that exceeds 600 m2 in gross Architect and
Mercantile occupancy only
area or 3 storeys in building height professional engineer(1)
Mercantile occupancy and any other major occupancy except
Every building that exceeds 600 m2 in gross Architect and
assembly, care, care and treatment, detention or industrial
area or 3 storeys in building height professional engineer(1)
occupancy
Industrial occupancy only and where there are no subsidiary Every building that exceeds 600 m2 in gross Architect or professional
occupancies area or 3 storeys in building height engineer(3)
Column 1 2 3
Table 1.2.2.1. (Cont’d)
General Review(4)
Forming Part of Sentence 1.2.2.1.(1)
Building Classification by Major Occupancy(5) Building Description General Review by:
Architect and
Industrial occupancy and one or more other major occupancies The non-industrial portion of every building professional engineer(1)
where the portion of the area occupied by one of the other major
or subsidiary occupancies exceeds 600 m2 Architect or professional
The industrial portion of every building
engineer(3)
Industrial occupancy and one or more other major occupancies
Every building that exceeds 600 m2 in gross Architect or professional
where no portion of the area occupied by one of the other major
area or 3 storeys in building height engineer(3)
or subsidiary occupancies exceeds 600 m2
Agricultural occupancy only and where there are no subsidiary Every building that exceeds 600 m2 in gross Architect or professional
occupancies area or 3 storeys in building height engineer(3)
The non-agricultural portion of every Architect and
Agricultural occupancy and one or more other major occupancies building professional engineer(1)
where the portion of the area occupied by one of the other major
or subsidiary occupancies exceeds 600 m2 Architect or professional
The agricultural portion of every building
engineer(3)
Agricultural occupancy and one or more other major occupancies
Every building that exceeds 600 m2 in gross Architect or professional
where no portion of the area occupied by one of the other major
area or 3 storeys in building height engineer(3)
or subsidiary occupancies exceeds 600 m2
Column 1 2 3
Notes to Table 1.2.2.1.:
(1) An architect shall provide general review services within the practice of architecture and a professional engineer shall provide general
review services within the practice of professional engineering.
(2) An architect may engage a professional engineer to provide general review services within the practice of professional engineering.
(3) Only a professional engineer may provide general review services within the practice of professional engineering.
(4) Requirements for general review by an architect or a professional engineer or a combination of both for the construction, including, for
greater certainty, enlargement or alteration, of a building are set out in the Architects Act and the Professional Engineers Act.
(5) For purposes of Table 1.2.2.1., a retirement home is deemed to be a separate major occupancy.
This provision includes a table — formatting is preserved from the source; refer to the official code for the authoritative layout.
1.2.2.2.Restriction for General Review permalink →
(1) Only an architect may carry out or provide the general review of the construction of a building,
(a) that is constructed in accordance with a design prepared or provided by an architect, or
(b) in relation to services that are provided by an architect in connection with the design in accordance with which the
building is constructed.
(2) Only a professional engineer may carry out or provide the general review of the construction of a building,
(a) that is constructed in accordance with a design prepared or provided by a professional engineer, or
(b) in relation to services that are provided by a professional engineer in connection with the design in accordance with
which the building is constructed.
1.2.2.3.Demolition of a Building permalink →
(1) The applicant for a permit respecting the demolition of a building shall retain a professional engineer to undertake
the general review of the project during demolition, where,
(a) the building exceeds 3 storeys in building height or 600 m² in building area,
(b) the building structure includes pre-tensioned or post-tensioned members,
(c) it is proposed that the demolition will extend below the level of the footings of any adjacent building and occur
within the angle of repose of the soil, as drawn from the bottom of such footings, or
(d) explosives or a laser are to be used during the course of demolition.
Understand any provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.