Appendix A explanatory notes for Part 3 of Division B of the 2024 Ontario Building Code. These notes are advisory: they explain the intent behind code provisions and how to apply them.
A-3.2.2.2.(1)Other Designers.
The qualifications for the designer of a public pool located in a building are based on the size and occupancy of the building.
An outdoor public pool is a designated structure. The occupancy of an outdoor public pools depends on the major occupancy
of the building it serves. In the case where the outdoor public pool is a stand-alone structure with ancillary change facilities,
the major occupancy of the pool would be Group A, Division 4 where it is used for social, education, recreational or similar
purposes.
Page 286 Appendix A • Volume 2
Appendix B
Imperial Conversions of Metric Values
Imperial conversions may be determined using the factors listed below.
Conversion Factors
to Convert to Multiply by
°C °F 1.8 and add 32
g oz 0.0353
g lb 0.0022
kg lb 2.2046
kg/m2 lb/ft2 0.20481
kPa lb/in2 0.14503
kPa lb/ft2 20.885
L gal (Imp) 0.21997
L gal (US) 0.26417
L/m2 gal/ft2 (Imp) 0.02044
L/s* gal/min (Imp) 13.198
L/s* gal/min (US) 15.850
L/s** ft3/min 2.1189
L/s•m cfm/ft 0.64584
L/s•m2 cfm/ft2 0.19685
lx ft-candle 0.09290
mm in 0.03937
m ft 3.2808
m2 ft2 10.764
m3 ft3 35.315
m3/h ft /min
3 0.58857
m/s ft/min 196.85
MJ Btu 947.82
m2•°C/W (RSI) ft2•h•°F/Btu (R) 5.6785
N lbf 0.22481
ng/Pa•s•m2 perms 0.01741
W Btu/h 3.4122
Column 1 2 3
Notes:
* liquid volume flowrate
** air volume flowrate
Appendix B 1
SI Units and Their Multiples
The SI prefixes used to form names and symbols of decimal multiples and sub-multiples of SI units are:
Prefix Symbol Magnitude Factor
exa E 1 000 000 000 000 000 000 1018
peta P 1 000 000 000 000 000 1015
tera T 1 000 000 000 000 1012
giga1 G 1 000 000 000 109
mega1 M 1 000 000 106
kilo1 k 1 000 103
hecto2 h 100 102
deca2 da 10 101
deci2 d 0.1 10-1
centi2 c 0.01 10-2
milli1 m 0.001 10-3
micro1 μ 0.000 001 10-6
nano1 n 0.000 000 001 10-9
pico p 0.000 000 000 001 10-12
femto f 0.000 000 000 000 001 10-15
atto a 0.000 000 000 000 000 001 10-18
Column 1 2 3 4
Notes:
(1) most frequently used
(2) avoid if possible
2 Appendix B
Ministry of Municipal Affairs and Housing
Building and Development Branch
MMAH Supplementary Standard SA-1
MMAH Supplementary Standard SA-1
Objectives and Functional Statements
Attributed to the Acceptable Solutions
September 9, 2024
2024 MMAH Supplementary Standard SA-1
COMMENCEMENT
MMAH Supplementary Standard SA-1 comes into force on the 1st day of January 2025.
r1 SA-1 as amended by Ontario Regulation 447/24 comes into force on the 1st day of January 2025.
EDITORIAL
e1 Editorial revisions issued for January 1, 2025.
© Copyright
©
Copyright King’s Printer for Ontario 2024
All rights reserved.
Questions regarding copyright, including reproduction and distribution, may be directed to the Director,
Building and Development Branch of the Ministry of Municipal Affairs and Housing.
2024 MMAH Supplementary Standard SA-1
Contents
1. Scope ............................................................................................................................................ 3
2. Objectives and Functional Statements ......................................................................................... 3
3. Attribution to Acceptable Solutions ............................................................................................... 3
Table 2 Objectives and Functional Statements Attributed to the
Acceptable Solutions in Part 2 of Division B ................................................................................. 4
Table 3 Objectives and Functional Statements Attributed to the
Acceptable Solutions in Part 3 of Division B ................................................................................. 7
Table 4 Objectives and Functional Statements Attributed to the
Acceptable Solutions in Part 4 of Division B ................................................................................. 45
Table 5 Objectives and Functional Statements Attributed to the
Acceptable Solutions in Part 5 of Division B ................................................................................. 55
Table 6 Objectives and Functional Statements Attributed to the
Acceptable Solutions in Part 6 of Division B ................................................................................. 58
Table 7 Objectives and Functional Statements Attributed to the
Acceptable Solutions in Part 7 of Division B ................................................................................. 62
Table 8 Objectives and Functional Statements Attributed to the
Acceptable Solutions in Part 8 of Division B ................................................................................. 76
Table 9 Objectives and Functional Statements Attributed to the
Acceptable Solutions in Part 9 of Division B ................................................................................. 82
Table 10 Objectives and Functional Statements Attributed to the
Acceptable Solutions in Part 10 of Division B ............................................................................... 179
Table 11 Objectives and Functional Statements Attributed to the
Acceptable Solutions in Part 11 of Division B ............................................................................... 180
Table 12 Objectives and Functional Statements Attributed to the
Acceptable Solutions in Part 12 of Division B ............................................................................... 186
SA-1 • Page 1
2024 MMAH Supplementary Standard SA-1
Page 2 • SA-1
2024 MMAH Supplementary Standard SA-1
SA-1 Objectives and Functional
Statements Attributed to the
Acceptable Solutions
1. Scope
This standard specifies, for the purposes of Article 1.2.1.1. of Division A of the Building Code, the objectives and
functional statements that have been attributed to acceptable solutions provided in Division B of the Building Code.
2. Objectives and Functional Statements
The objectives listed in this standard are those set out in Part 2 of Division A of the Building Code.
The functional statements listed in this standard are set out in Part 3 of Division A of the Building Code.
3. Attribution to Acceptable Solutions
For the purposes of compliance with the Building Code, as required in Sentence 1.2.1.1.(2) of Division A of the Building
Code, the objectives and functional statements attributed to the acceptable solutions in Division B shall be the objectives
and functional statements listed in Tables 2 to 12.
SA-1 • Page 3
2024 MMAH Supplementary Standard SA-1
Table 2
Objectives and Functional Statements Attributed to the Acceptable Solutions in Part 2 of Division B
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
2.2.1.2. Prohibition of Occupancy Combinations (2) [F11-OS1.5]
(1) [F02-OS1.2] (3) [F11-OS1.5]
(2) [F02-OS1.2] 2.2.3.5. Silencing of Alarm Signals
2.2.1.4. Separation of Occupancies (1) [F11-OS1.5] [F34, F81-OS1.5]
(1) [F03-OS1.2] 2.2.3.6. Electrical Supervision
(3) [F03-OS1.2] (1) [F82-OS1.2, OS1.5]
2.2.1.5. Fire Separations and Closures 2.2.3.7. Fire Detectors
(1) [F03-OS1.2] (1) (a) [F11-OS1.5]
2.2.1.7. Firewalls (b) [F11-OS1.5]
(1) [F03-OS1.2] [F12-OS1.5] (2) [F02-OS1.2] [F11-OS1.5]
(2) [F03-OS1.2] [F12-OS1.5] 2.2.4.1. Fire Department Access to Buildings
2.1.1.8. Fire Blocks (1) [F12-OS1.2, OS1.5]
(1) [F03-OS1.2] (2) [F12-OS1.2, OS1.5]
(2) [F03-OS1.2] 2.2.4.2. Automatic Sprinkler Systems
(3) [F03-OS1.2] (3) [F11-OS1.5] [F12-OS1.2, OS1.5]
(4) [F03-OS1.2] 2.2.4.3. Portable Fire Extinguishers
2.1.1.9. Additional Fire Separations (1) [F02, F12, F81-OS1.2]
(1) [F03-OS1.2] 2.2.5.1. Minimum Lighting Requirements
(3) (a) [F02-OS1.2] (1) [F30-OS3.1] [F10-OS3.7]
(b) [F02, F03-OS1.2] [F10-OS1.5]
(4) [F02, F03-OS1.2] (2) [F30-OS3.1] [F10-OS3.7]
(5) [F02, F03-OS1.2] [F10-OS1.5]
2.2.1.10. Determination of Fire-Resistance Ratings (3) [F30-OS3.1] [F10-OS3.7]
(1) [F03-OS1.2] [F10-OS1.5]
[F04-OS1.3] 2.2.6.2. Egress Doorways
(2) [F03-OS1.2] (1) [F10-OS1.5]
[F04-OS1.3] (2) [F10-OS1.5]
2.2.1.12. Flame-Spread Rating (3) [F10-OS1.5]
(1) [F02, F03-OS1.2] 2.2.6.3. Travel Distance
(3) [F02, F03-OS1.2] (1) [F10-OS1.5]
2.2.1.13. Foamed Plastics 2.2.6.5. Access to Exits
(1) [F01-OS1.1] [F02-OS1.2] (1) [F30-OS3.1] [F10-OS3.7]
2.2.1.14. Fabrics and Films [F10-OS1.5]
(1) [F02-OS1.2] (2) [F43-OS3.7]
2.2.1.15. Electrical Wiring and Equipment 2.2.6.6. Door Swing
(2) [F01-OS1.1] [F81-OS1.4] (1) [F10-OS3.7]
2.2.1.17. Occupant Load [F10-OS1.5]
(1) [F10-OS1.5] (2) [F10-OS3.7]
2.2.3.1. Determination of Requirement for a Fire Alarm 2.2.6.7. Doors and Door Hardware
System (1) (a), (b), (c) [F10, F12-OS3.7]
(1) [F11-OS1.5] [F13-OS1.2, OS1.5] (d) [F30-OS3.1]
2.2.3.2. Types of Fire Alarm Systems (2) (a) [F03-OS1.2]
(1) [F11-OS1.5] (b) [F44-OS3.4]
2.2.3.3. Design of Fire Alarm Systems 2.2.6.8. Ramps and Stairways
(1) (a) [F03-OS1.2] (1) (a) [F30-OS3.1]
(b) [F11-OS1.2] (2) [F30-OS3.1]
2.2.3.4. Fire Alarm Signals 2.2.6.9. Floor Openings
(1) (b), (c) [F11-OS1.5] (1) [F20-OS3.1]
Page 4 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F30-OS3.1] 2.2.8.6. Gas Traps or Valves
2.2.6.10. Guards (1) [F01-OS1.1]
(1) [F30-OS3.1] [F43-OS3.4]
(2) [F30-OS3.1] (2) [F01-OS1.1]
2.2.6.12. Transparent Doors and Panels [F43-OS3.4]
(1) [F30-OS3.1] [F10-OS3.7] 2.2.8.8. Pesticide Storage Areas
(3) [F30-OS3.1] [F10-OS3.7] (2) (a) [F01-OS1.1]
2.2.7.3. Minimum Number of Exits (a) [F43-OS3.4]
(1) [F10, F12-OS3.7] (b),(c) [F34-OS3.4]
[F10, F12-OS1.5] (3) [F43, F44-OS3.4]
2.2.7.4. Distance Between Exits (4) [F01, F02, F03-OS1.2]
(1) [F10-OS1.5] [F43, F44, F46-OS3.4]
2.2.7.5. Location of Exits 2.3.2.2. Poultry Manure
(1) [F10-OS3.7] (1) [F20-OS2.1]
[F10-OS1.5] (2) [F20-OS2.1]
2.2.7.6. Width and Height of Exits 2.3.2.3. Stored Products
(1) [F10-OS3.7] (1) [F20-OS2.1]
(3) [F10-OS1.5] 2.3.2.4. Farm Machinery and Vehicles
[F10, F30-OS3.7] (1) [F20-OS2.1]
2.2.7.7. Direction of Exit Door Swing (3) [F20-OS2.1] [F20-OS2.4]
(1) [F10-OS1.5] 2.3.2.5. Liquid Manure Storage Tanks
[F10-OS3.7] (0.1) [F43-OS3.4]
2.2.7.8. Exit Door Hardware (1) [F20-OS2.1] [F20-OS2.4]
(1) [F10-OS1.5] (2) [F20-OS2.1]
[F10-OS3.7] (3) [F20-OS2.1]
2.2.7.9. Exit Stairs and Fire Escapes (4) [F20-OS2.1]
(1) [F30-OS3.1] [F10-OS3.7] (5) [F43-OS3.4]
(2) [F10-OS1.5] [F80-OS2.3]
[F10-OS3.7] (6) [F43-OS3.4]
(5) [F10, F12-OS1.5] (7) [F20-OS2.2, OS2.3]
[F30-OS3.1] [F10, F12-OS3.7] [F20-OP2.2, OP2.3, OP2.4]
2.2.8.1. General (8) [F20-OS2.2, OS2.3]
(1) [F01, F02, F03-OS1.1, OS1.2] [F20-OP2.2, OP2.3, OP2.4]
[F43-OS3.4] 2.3.3.1. Unobstructed Slippery Roofs
(2) [F43-OS1.1] (1) [F20-OS2.1]
[F43-OS3.4] 2.3.3.2. Roof Areas of Greenhouses
2.2.8.2. Exhaust Ventilation and Explosion Venting (1) [F20-OS2.1]
(1) [F01-OS1.1] 2.4.2.2. Greenhouses
2.2.8.3. Below-Floor Storage Areas for Liquid Manure (1) [F44, F50-OS3.4]
(2) [F01-OS1.1] 2.4.2.3. Controlled-Atmosphere Storage Areas
(3) (a) [F11-OS1.1, OS1.4] (3) [F50-OS3.4]
(b), (c) [F11-OS1.1, OS1.4] (4) [F50-OS3.4]
(d) [F01, F02-OS1.1] 2.4.2.4. Silos and Grain Storage Bins
(e) [F01, F02-OS1.4] (1) [F01-OS1.1]
(4) [F12-OS1.1] [F01, F02-OS1.2] [F50-OS3.4]
(5) [F03-OS1.2] (2) [F02, F44-OS1.2]
2.2.8.5. Liquid Manure Storage Tanks and Piping Systems (3) [F01-OS1.1]
(3) [F30,F34-OS3.1] [F50-OS3.4]
(4) [F34-OS3.4] 2.4.2.5. Below-Floor Storage of Liquid Manure
(5) [F34, F43-OS3.4] (1) (a) [F01-OS1.1]
(6) [F34, F43-OS3.4] (b) [F40-OS3.4]
SA-1 • Page 5
2024 MMAH Supplementary Standard SA-1
Acceptable
Objectives and Functional Statements
Solutions
(c) [F01-OS1.1]
(c) [F40-OS3.4]
Page 6 • SA-1
2024 MMAH Supplementary Standard SA-1
Table 3
Objectives and Functional Statements Attributed to the Acceptable Solutions in Part 3 of Division B
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
3.1.1.5. Radon 3.1.5.21. Wires and Cables
(1) [F40, F50-OH1.1] (2) [F02-OP1.2]
3.1.1.6. Building in Flood Plains [F02-OS1.2]
(3) [F02-OP1.2]
(1) (a) [F20-OP2.1]
[F02-OS1.2]
(a) [F20-OS2.1, OS2.3]
3.1.5.23. Wires in Computer Room Floors
(a) [F61-OH1.3] (1) [F02-OP1.2]
(b) [F10, F12-OS3.1] [F10, F30-OS3.7] [F02-OS1.2]
3.1.3.1. Separation of Major Occupancies (2) [F02-OP1.2]
(1) [F03-OP1.2] [F02-OS1.2]
[F03-OS1.2] 3.1.6.2. Materials Permitted
(1) [F02-OS1.2]
(2) [F03-OS1.2]
[F02-OP1.2]
(3) [F02, F03, F06-OS1.2] [F10, F05-OS1.5]
3.1.6.3. Structural Mass Timber Elements
[F02, F03, F06-OP1.2] (2) [F04-OS1.3]
3.1.3.2. Prohibition of Occupancy Combinations [F04-OP1.3]
(1) [F02, F03-OS1.2] [F10-OS1.5] (3) [F02-OS1.2]
(2) [F02, F03-OS1.2] [F10-OS1.5] [F02-OP1.2]
3.1.6.4. Encapsulation of Mass Timber Elements
(3) [F41-OH2.1]
(1) [F02-OS1.2]
(5) [F02, F03-OS1.2] [F10-OS1.5]
[F02-OP1.2]
3.1.4.2. Protection of Foamed Plastics (2) [F02-OS1.2]
(1) [F01-OP1.1] [F02-OP1.2] [F02-OP1.2]
[F01-OS1.1] [F02-OS1.2] 3.1.6.5. Determination of Encapsulation Ratings
(1.1) [F01-OP1.1] [F02-OP1.2] (1) [F02-OS1.2]
[F04-OS1.3]
[F01-OS1.1] [F02-OS1.2]
[F02-OP1.2]
(2) [F01-OP1.1] [F02-OP1.2] [F02-OP1.3]
[F01-OS1.1] [F02-OS1.2] 3.1.6.9. Exterior Cladding
3.1.4.3. Wires and Cables (1) [F02-OS1.2]
(1) [F02-OP1.2] [F02-OP1.2]
[F02-OS1.2] (7) [F03-OS1.2]
[F03-OP1.2]
(2) [F02-OP1.2]
(9) [F02, F03-OP3.1] r1
[F02-OS1.2]
3.1.6.17. Penetration by Outlet Boxes
(3) [F02-OP1.2]
(3) [F03-OS1.2]
[F02-OS1.2]
[F03-OP1.2]
3.1.4.5. Fire-Retardant Treated Wood
3.1.7.1. Determination of Ratings
(1) [F02-OP1.2]
(1) [F03-OP1.2] [F04-OP1.3]
[F02-OS1.2]
[F03-OS1.2] [F04-OS1.3]
3.1.4.8. Exterior Cladding
3.1.7.5. Rating of Supporting Construction
(1) [F02, F03-OP3.1]
(1) [F04-OP1.3]
(2) [F02, F03-OP3.1]
[F04-OS1.3]
3.1.5.1. Noncombustible Materials (3) [F04-OP1.3]
(1) [F02-OP1.2] [F04-OS1.3]
[F02-OS1.2] 3.1.8.1. General Requirements
3.1.5.5. Combustible Cladding for Exterior Walls (1) (a) [F03-OP1.2]
(2) [F02, F03-OP3.1] (a) [F03-OS1.2]
SA-1 • Page 7
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F03-OP1.2] Applies to the requirement that openings in (3) [F04-OP1.2]
fire separations be protected with closures, shafts or [F04-OS1.2]
other means. (4) [F03-OP1.2]
[F03-OS1.2] Applies to the requirement that openings in [F03-OS1.2]
fire separations be protected with closures, shafts or (5) [F82-OH1.2] Applies to portion of code text “A tightly
other means. fitted access door shall be installed for each fire damper
3.1.8.2. Combustible Construction Support to provide access for ... the resetting of the release
(1) [F04-OP1.2] device.”
[F04-OS1.2] [F82-OP1.2] Applies to portion of code text “A tightly fitted
3.1.8.3. Continuity of Fire Separations access door shall be installed for each fire damper to
provide access for the inspection of the damper...”
(1) [F03-OP1.2]
[F82-OS1.2] Applies to portion of code text “A tightly fitted
[F03-OS1.2] access door shall be installed for each fire damper to
(2) [F03-OP1.2] provide access for the inspection of the damper...”
[F03-OS1.2] 3.1.8.11. Installation of Smoke Dampers
(3) [F03-OP1.2] (1) [F03-OP1.2]
[F03-OS1.2] [F03-OS1.2]
(4) [F03-OP1.2] (2) [F03-OP1.2]
[F03-OS1.2] [F03-OS1.2]
3.1.8.4. Determination of Ratings (3) [F03-OP1.2]
(1) [F03-OP1.2] [F03-OS1.2]
[F03-OS1.2] (4) [F03-OP1.2]
(2) [F03-OP1.2] [F03-OS1.2]
[F03-OS1.2] (5) [F82-OH1.2] Applies to portion of code text “A tightly
(3) [F03-OP1.2] fitted access door shall be installed for each fire damper
to provide access for ... the resetting of the release
[F03-OS1.2] device.”
(4) [F03-OP1.2] [F82-OP1.2] Applies to portion of code text “A tightly
[F03-OS1.2] fitted access door shall be installed for each fire damper
3.1.8.5. Installation of Closures to provide access for the inspection of the damper...”
(2) [F03-OP1.2] [F82-OS1.2] Applies to portion of code text “A tightly
[F03-OS1.2] fitted access door shall be installed for each fire damper
to provide access for the inspection of the damper...”
(3) [F03-OP1.2]
3.1.8.12. Twenty-Minute Closures
[F03-OS1.2]
(3) [F03-OP1.2]
(4) [F81-OP1.2]
[F03-OS1.2]
[F81-OS1.2]
3.1.8.13. Self-Closing Devices
(6) [F03-OP1.2]
(1) [F03-OP1.2]
[F03-OS1.2]
[F03-OS1.2]
(7) [F03-OP1.2]
3.1.8.14. Hold-Open Devices
[F03-OS1.2]
(1) [F03-OS1.2]
3.1.8.6. Maximum Openings
[F03-OP1.2]
(1) [F03-OP1.2]
(2) [F03-OP1.2]
[F03-OS1.2]
[F03-OS1.2]
(2) [F03-OP1.2]
(3) [F03-OP1.2]
[F03-OS1.2]
[F03-OS1.2]
3.1.8.7. Location of Fire Dampers and Smoke Dampers
(4) [F03-OP1.2]
(1) [F03-OP1.2]
[F03-OS1.2]
[F03-OS1.2]
(5) [F03-OP1.2]
(2) [F03-OP1.2]
[F03-OS1.2] [F03-OS1.2]
3.1.8.10. Installation of Fire Dampers 3.1.8.15. Door Latches
(1) [F04-OP1.2] (1) [F03-OP1.2]
[F04-OS1.2] [F03-OS1.2]
(2) [F03-OP1.2]
[F03-OS1.2]
Page 8 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
3.1.8.16. Wired Glass and Glass Block [F04-OP3.1]
(3) [F04-OP1.2] Applies to portion of Code text: “Glass [F04-OS1.2]
blocks permitted by Sentence (1) shall be ... reinforced (2) [F03, F04-OP1.2]
with steel reinforcement in each horizontal joint.” [F03, F04-OP3.1]
[F04-OS1.2] Applies to portion of Code text: “Glass [F03, F04-OS1.2]
blocks permitted by Sentence (1) shall be ... reinforced (4) [F04-OP1.2]
with steel reinforcement in each horizontal joint.”
[F04-OP3.1]
3.1.8.17. Temperature Rise Limit for Doors
[F04-OS1.2]
(1) [F03-OP1.2]
3.1.10.2. Rating of Firewalls
[F03, F31-OS1.2] [F05-OS1.5]
(1) [F03-OP1.2] Applies to portion of Code text: “A firewall
3.1.8.18. Area Limits for Wired Glass and Glass Block which separates a building or buildings with floor areas
(1) [F31-OS1.2] [F05-OS1.5] containing a Group E or a Group F, Division 1 or 2 major
[F30-OS3.1] occupancy shall be constructed as a fire separation of
(2) [F31-OS1.2] [F05-OS1.5] noncombustible construction having a fire-resistance
rating not less than 4 h ...”
3.1.8.20. Sprinkler Protected Glazed Wall Assembly
[F03-OP3.1] Applies to portion of Code text: “A firewall
(1) [F03-OP1.2] [F04-OP1.3]
which separates a building or buildings with floor areas
[F03-OS1.2] [F04-OS1.3] containing a Group E or a Group F, Division 1 or 2 major
(2) [F03-OP1.2] [F04-OP1.3] occupancy shall be constructed as a fire separation of
[F03-OS1.2] [F04-OS1.3] noncombustible construction having a fire-resistance
(3) [F03, F06-OS1.2] [F05, F06-OS1.5] rating not less than 4 h …”
[F03, F06-OP1.2] [F03-OS1.2] Applies to portion of Code text: “A firewall
which separates a building or buildings with floor areas
3.1.9.1. Fire Stop
containing a Group E or a Group F, Division 1 or 2 major
(1) [F03-OP1.2] [F04-OP1.3] occupancy shall be constructed as a fire separation of
[F03-OS1.2] [F04-OS1.3] noncombustible construction having a fire-resistance
(2) [F03-OP1.2] rating not less than 4 h ...”
[F03-OP3.1] (2) [F03-OP1.2]
[F03-OS1.2] [F03-OP3.1]
(3) [F03-OP1.2] [F03-OS1.2]
[F03-OS1.2] (3) [F80, F04-OP1.2]
(6) [F03-OP1.2] [F80, F04-OP1.3]
[F03-OS1.2] [F80, F04-OS1.2]
(7) [F03-OP1.2] (4) [F80, F04-OP1.2]
[F03-OS1.2] [F80, F04-OP3.1]
3.1.9.3. Penetration by Outlet Boxes [F80, F04-OS1.2]
(1) [F03-OP1.2] 3.1.10.3. Continuity of Firewalls
[F03-OS1.2] (1) [F03-OP1.2] Applies to portion of Code text: “A firewall
(2) [F03-OP1.2] shall extend from the ground continuously through, or
[F03-OS1.2] adjacent to, all storeys of a building or buildings so
separated ...”
(4) [F03-OP1.2]
[F03-OP3.1] Applies to portion of Code text: “A firewall
[F03-OS1.2] shall extend from the ground continuously through, or
3.1.9.4. Combustible Piping Penetrations adjacent to, all storeys of a building or buildings so
(3) [F03-OS1.2] [F02, F04-OS1.3] separated …”
[F03-OP1.2] [F02, F04-OP1.3] [F03-OS1.2] Applies to portion of Code text: “A firewall
(7) [F03-OS1.2] [F02-OS1.3] [F04-OS1.3] shall extend from the ground continuously through, or
[F03-OP1.2] [F02-OP1.3] [F04-OP1.3] adjacent to, all storeys of a building or buildings so
separated ...”
3.1.9.5. Openings Through a Membrane Ceiling
3.1.10.4. Parapets
(1) [F04-OP1.3]
[F04-OS1.3] (1) [F03-OP1.2]
(2) [F04-OP1.3] [F03-OP3.1]
[F04-OS1.3] [F03-OS1.2]
3.1.10.1. Prevention of Firewall Collapse 3.1.10.5. Maximum Openings
(1) [F04-OP1.2] [F03-OP1.2]
SA-1 • Page 9
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F03-OP3.1] [F04-OS1.2]
[F03-OS1.2] (7) [F03-OP1.2]
3.1.10.7. Combustible Projections [F03-OS1.2]
(1) [F03-OP1.2] Applies to portion of Code text: 3.1.12.1. Determination of Ratings
“Combustible material shall not extend across the end of (1) [F02-OP1.2]
a firewall...” [F02-OS1.2]
[F03-OP3.1] Applies to portion of Code text:
(2) [F02-OP1.2]
“Combustible material shall not extend across the end of
a firewall...” [F02-OS1.2]
[F03-OS1.2] Applies to portion of Code text: 3.1.13.2. Flame-Spread Rating
“Combustible material shall not extend across the end of (1) [F02-OP1.2]
a firewall...” [F02-OS1.2]
(2) [F03-OP1.2] 3.1.13.5. Skylights
[F03-OP3.1] (1) [F02-OS1.5]
[F03-OS1.2] 3.1.13.6. Corridors
3.1.11.1. Separation of Concealed Spaces (1) [F02-OS1.2, OS1.5]
(1) [F03-OP1.2] [F02-OP1.2]
[F03-OS1.2] (5) [F02-OS1.2, OS1.5]
3.1.11.2. Fire Blocks in Wall Assemblies [F02-OP1.2]
(1) [F03-OP1.2] (6) [F02-OS1.2]
[F03-OS1.2] [F02-OP1.2]
3.1.11.3. Fire Blocks between Nailing and Supporting 3.1.13.7. High Buildings
Elements (1) [F02-OP1.2]
(1) [F03-OP1.2] [F02-OS1.2]
[F03-OS1.2]
(5) [F02-OP1.2]
(2) [F03-OP1.2]
[F02-OS1.2]
[F03-OS1.2]
3.1.13.9. Underground Walkways
(3) [F03-OP1.2]
(1) [F02-OP3.1]
[F03-OS1.2]
[F02-OS1.2]
(4) [F03-OP1.2]
3.1.13.10. Exterior Exit Passageway
[F03-OS1.2]
(1) [F02-OS1.5]
3.1.11.4. Fire Blocks Between Vertical and Horizontal Spaces
3.1.13.11. Elevator Cars
(1) [F03-OP1.2]
(1) [F02-OP1.2]
[F03-OS1.2]
[F02-OS1.2]
3.1.11.5. Fire Blocks of Horizontal Concealed Spaces
(2) [F02-OP1.2]
(1) [F03, F04-OP1.2]
[F02-OS1.2]
[F03, F04-OS1.2]
3.1.14.1. Fire-Retardant Treated Wood Roof Systems
(2) [F03, F04-OP1.2]
(1) [F02-OP1.2]
[F03, F04-OS1.2]
[F02-OS1.2]
(3) [F03, F04-OP1.2]
(2) [F02-OP1.3]
[F03, F04-OS1.2]
[F02-OS1.2, OS1.3]
(4) [F02, F03-OS1.2]
[F04-OS1.3] 3.1.14.2. Metal Roof Deck Assemblies
[F02, F03-OP1.2] (1) [F02-OP1.2]
[F04-OP1.3] [F02-OS1.2]
3.1.11.6. Fire Blocks of Crawl Spaces 3.1.15.1. Roof Covering Classification
(1) [F03, F04-OP1.2] (1) [F02-OP1.2]
[F03, F04–OS1.2] [F02-OP3.1]
[F02-OS1.2]
3.1.11.7. Fire Block Materials
(1) [F04-OP1.2] 3.1.15.2. Roof Coverings
[F04-OS1.2] (1) [F02-OP1.2]
(6) [F04-OP1.2] [F02-OP3.1]
Page 10 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F02-OS1.2] 3.2.2.2. Special and Unusual Structures
(3) [F02-OP1.2] (1) [F02, F03, F04-OP1.2, OP1.3]
[F02-OP3.1] [F02, F03, F04-OS1.2, OS1.3]
[F02-OS1.2] 3.2.2.6. Multiple Major Occupancies
(4) [F02-OP1.2] (1) [F02, F03, F04-OP1.2, OP1.3]
[F02-OP3.1] [F02, F03, F04-OS1.2, OS1.3]
[F02-OS1.2] 3.2.2.10. Streets
3.1.16.1. Fabric Awnings, Canopies and Marquees (1) [F12-OP1.2]
(1) [F02-OP1.2] [F12-OS1.2, OS1.5]
[F02-OS1.2, OS1.5] 3.2.2.15. Storeys Below Ground
3.1.17.1. Occupant Load Determination (2) (a) [F02, F04-OP1.2, OP1.3]
(1) [F10-OS3.7] (a) [F02, F04-OS1.2, OS1.3]
[F72-OH2.1] [F71-OH2.3] (b), (c) [F03, F04-OP1.2] [F04-OP1.3]
(2) [F10-OS3.7] (b), (c) [F03, F04-OS1.2] [F04-OS1.3]
[F72-OH2.1] [F71-OH2.3] 3.2.2.18. Automatic Sprinkler System Required r1
(4) [F10-OS3.7] (2) [F02, F04-OS1.2, OS1.3]
[F72-OH2.1] [F71-OH2.3] [F02, F04-OP1.2, OP1.3]
3.1.17.2. Public Pools 3.2.2.20. Group A, Division 1, Any Height, Any Area,
(1) [F10-OS3.7] Sprinklered
[F72-OH2.1] [F71-OH2.3] (2) [F02-OP1.2] Applies to portion of Code text: “... the
(2) [F10-OS3.7] building referred to in Sentence (1) shall be of non-
[F72-OH2.1] [F71-OH2.3] combustible construction,”
[F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
3.1.18.1. Drainage “(a) ... the building shall be sprinklered throughout,”
(1) [F60-OH1.1, OH1.2, OH1.3] [F02-OS1.2] Applies to portion of Code text: “... the
[F60-OS2.3] building referred to in Sentence (1) shall be of non-
3.1.19.1. Clearance to Buildings combustible construction,”
(1) [F01-OP1.1] [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
[F01-OS1.1] “(a) ... the building shall be sprinklered throughout,”
[F32-OS3.3] (b), (d) [F03, F04-OP1.2] [F04-OP1.3]
(2) [F01-OP1.1] (b), (d) [F03, F04-OS1.2] [F04-OS1.3]
[F01-OS1.1] (c) [F04-OP1.3]
[F32-OS3.3] (c) [F04-OS1.3]
(3) [F01-OP1.1] 3.2.2.21. Group A, Division 1, One Storey, Limited Area,
[F01-OS1.1] Sprinklered
[F32-OS3.3] (1) (a) [F02, F04-OS1.2, OS1.3] Applies to portion of Code
text: “… the building is sprinklered throughout,”
3.1.20.1. Glass (a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code
(1) [F30-OS2.3, OS3.1] text: “… the building is sprinklered throughout,”
3.2.1.2. Storage Garage Considered as a Separate Building (2) [F02-OP1.2] Applies to portion of Code text: “The building
(1) [F03-OP1.2] referred to in Sentence (1) is permitted to be of heavy
[F03-OS1.2] timber construction or noncombustible construction used
(2) [F03-OP1.2] singly or in combination,”
[F03, F04-OP1.2] [F04-OP1.3] Applies to portion of Code
[F03-OS1.2]
text: “(a) floor assemblies shall be fire separations, (i)
(3) [F03-OP1.2] with a fire-resistance rating not less than 45 min,” and to
[F03-OS1.2] Clause (b).
3.2.1.4. Floor Assembly over Basement [F02-OS1.2] Applies to portion of Code text: “The building
(1) [F04-OP1.3] referred to in Sentence (1) is permitted to be of heavy
[F03-OS1.2] [F04-OS1.3] timber construction or noncombustible construction used
(2) [F04-OP1.2, OP1.3] singly or in combination,”
[F03, F04-OS1.2] [F04-OS1.3] Applies to portion of Code
[F04-OS1.2, OS1.3] text: “(a) floor assemblies shall be fire separations, (i)
3.2.1.5. Fire Containment in Basements with a fire-resistance rating not less than 45 min,” and to
(1) [F02-OP1.2, OP1.3] Clause (b).
[F02-OS1.2, OS1.3]
SA-1 • Page 11
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
3.2.2.22. Group A, Division 1, One Storey, Sprinklered (a), (d) [F03, F04-OS1.2] [F04-OS1.3]
(1) (a) [F02, F04-OS1.2, OS1.3] Applies to portion of Code (b) [F04-OP1.3]
text: “… the building is sprinklered throughout,” (b) [F04-OS1.3]
(a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code 3.2.2.26. Group A, Division 2, up to 2 Storeys, Increased
text: “… the building is sprinklered throughout,” Area, Sprinklered
(2) (a) (d) [F03, F04-OP1.2] [F04-OP1.3] (1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
(a) (d) [F03, F04-OS1.2] [F04-OS1.3] “(a)... the building is sprinklered throughout,”
(b), (c) [F04-OP1.3] [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
(b), (c) [F04-OS1.3] “(a)... the building is sprinklered throughout,”
3.2.2.23. Group A, Division 2, Any Height, Any Area, (2) (a) [F03-OP1.2] Applies to the requirement that
Sprinklered noncombustible floor assemblies be fire separations.
(2) [F02-OP1.2] Applies to portion of Code text: “... the (a) [F03-OS1.2] Applies to the requirement that
building referred to in Sentence (1) shall be of noncombustible floor assemblies be fire separations.
noncombustible construction,” (a), (c) [F03, F04-OP1.2] [F04-OP1.3]
[F02, F04-OP1.2, OP1.3] Applies to portion of Code text: (a), (c) [F03, F04-OS1.2] [F04-OS1.3]
“(a) ... the building shall be sprinklered throughout,”
(b) [F04-OP1.3]
[F02-OS1.2] Applies to portion of Code text: “... the
(b) [F04-OS1.3]
building referred to in Sentence (1) shall be of
noncombustible construction,” 3.2.2.27. Group A, Division 2, up to 2 Storeys, Sprinklered
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: (1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
“(a) ... the building shall be sprinklered throughout,” “(a) the building is sprinklered throughout,”
(b), (d) [F03, F04-OP1.2] [F04-OP1.3] [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
(b), (d) [F03, F04-OS1.2] [F04-OS1.3] “(a) the building is sprinklered throughout,”
(c) [F04-OP1.3] 3.2.2.28. Group A, Division 2, One Storey
(c) [F04-OS1.3] (2) [F03-OP1.2]
3.2.2.24. Group A, Division 2, up to 6 Storeys, Any Area, [F03-OS1.2]
Sprinklered 3.2.2.29. Group A, Division 3, Any Height, Any Area
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text: (2) [F02-OP1.2] Applies to portion of Code text: “... the
“(a)... the building is sprinklered, throughout,” building referred to in Sentence (1) shall be of
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: noncombustible construction,”
“(a)... the building is sprinklered throughout,” [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
“(a) ... the building shall be sprinklered throughout,”
(2) [F02-OP1.2] Applies to portion of Code text: “... the
building referred to in Sentence (1) shall be of [F02-OS1.2] Applies to portion of Code text: “... the
noncombustible construction,” building referred to in Sentence (1) shall be of
noncombustible construction,”
[F02-OS1.2] Applies to portion of Code text: “... the
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
building referred to in Sentence (1) shall be of
“(a) ... the building shall be sprinklered throughout,”
noncombustible construction,”
(b), (e) [F03, F04-OP1.2] [F04-OP1.3]
(a), (c) [F03, F04-OP1.2] [F04-OP1.3]
(b), (e) [F03, F04-OS1.2] [F04-OS1.3]
(a), (c) [F03, F04-OS1.2] [F04-OS1.3]
(c) [F04-OP1.3]
(b) [F04-OP1.3]
(c) [F04-OS1.3]
(b) [F04-OS1.3]
(3) [F02-OP1.2] [F04-OP1.3]
3.2.2.25. Group A, Division 2, up to 2 Storeys
[F02-OS1.2] [F04-OS1.3]
(2) [F04-OP1.3] Applies to portion of Code text: “(c) roof
assemblies shall have, if of combustible construction, a 3.2.2.30. Group A, Division 3, up to 2 Storeys
fire-resistance rating not less than 45 min,” and to Clause (2) [F02-OP1.2] Applies to portion of Code text: “Except as
(d). permitted by Clauses (c) and (d), the building referred to
[F04-OS1.3] Applies to portion of Code text: “(c) roof in Sentence (1) shall be of noncombustible construction,”
assemblies shall have, if of combustible construction, a [F04-OP1.3] Applies to portion of Code text: “(c) roof
fire-resistance rating not less than 45 min,” and to Clause assemblies shall (i) have a fire-resistance rating not less
(d). than 45 min,” and to Clause (d).
(a) [F03-OP1.2] Applies to the requirement that [F02-OS1.2] Applies to portion of Code text: “Except as
noncombustible floor assemblies be fire separations. permitted by Clauses (c) and (d), the building referred to
in Sentence (1) shall be of noncombustible
(a) [F03-OS1.2] Applies to the requirement that
construction,”
noncombustible floor assemblies be fire separations.
(a), (d) [F03, F04-OP1.2] [F04-OP1.3]
Page 12 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F04-OS1.3] Applies to portion of Code text: “(c) roof 3.2.2.36. Group B, Division 1, Any Height, Any Area,
assemblies shall (i) have a fire-resistance rating not less Sprinklered
than 45 min,” and to Clause (d). (2) [F02-OP1.2] Applies to portion of Code text: “... the
(a), (d) [F03, F04-OP1.2] [F04-OP1.3] building referred to in Sentence (1) shall be of
(a), (d) [F03, F04-OS1.2] [F04-OS1.3] noncombustible construction,”
(b) [F04–OP1.3] [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
“(a) ... the building shall be sprinklered throughout,”
(b) [F04-OS1.3]
[F02-OS1.2] Applies to portion of Code text: “... the
(3) [F02-OP1.2] [F04-OP1.3]
building referred to in Sentence (1) shall be of
[F02-OS1.2] [F04–OS1.3] noncombustible construction,”
3.2.2.31. Group A, Division 3, up to 2 Storeys, Sprinklered [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code “(a) ... the building shall be sprinklered throughout,”
text: “(a)...the building shall be sprinklered throughout,” (b), (d) [F03, F04-OP1.2] [F04-OP1.3]
[F02, F04-OS1.2, OS1.3] Applies to portion of Code (b), (d) [F03, F04-OS1.2] [F04-OS1.3]
text: “(a) ...the building shall be sprinklered throughout,” (c) [F04-OP1.3]
(2) [F02-OP1.2] Applies to portion of Code text: “Except as (c) [F04-OS1.3]
permitted by Clause (c) ... the building referred to in
Sentence (1) shall be of noncombustible construction,” 3.2.2.37. Group B, Division 1, up to 3 Storeys, Sprinklered
[F02-OS1.2] Applies to portion of Code text: “Except as (1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
permitted by Clause (c) ... the building referred to in “(a)... the building is sprinklered throughout,”
Sentence (1) shall be of noncombustible construction,” [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
(a), (c) [F03-OP1.2] [F04-OP1.2, OP1.3] “(a)... the building is sprinklered throughout,”
(a), (c) [F03-OS1.2] [F04-OS1.2, OS1.3] (2) [F02-OP1.2] Applies to portion of Code text: “... the
building referred to in Sentence (1) shall be of
(b) [F04-OP1.3]
noncombustible construction,”
(b) [F04-OS1.3]
[F02-OS1.2] Applies to portion of Code text: “... the
3.2.2.32. Group A, Division 3, One Storey, Increased Area building referred to in Sentence (1) shall be of
(2) [F04-OP1.3] Applies to portion of Code text: noncombustible construction,”
“(b) roof assemblies shall have, if of combustible (a), (c) [F03, F04-OP1.2] [F04-OP1.3]
construction, a fire-resistance rating not less than
(a), (c) [F03, F04-OS1.2] [F04-OS1.3]
45 min,” and to Clause (c).
(b) [F04-OP1.3]
[F04-OS1.3] Applies to portion of Code text:
“(b) roof assemblies shall have, if of combustible (b) [F04-OS1.3]
construction, a fire- resistance rating not less than 3.2.2.38. Group B, Division 2, Any Height, Any Area,
45 min,” and to Clause (c). Sprinklered
(a), (c) [F04-OP1.3] (2) [F02-OP1.2] Applies to portion of Code text: “... the
(a), (c) [F04-OS1.3] building referred to in Sentence (1) shall be of
(3) [F02-OP1.2] [F04-OP1.3] noncombustible construction,”
[F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
[F02-OS1.2] [F04-OS1.3] “(a) ... the building shall be sprinklered throughout,”
3.2.2.33. Group A, Division 3, One Storey, Sprinklered [F02-OS1.2] Applies to portion of Code text: “... the
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code building referred to in Sentence (1) shall be of
text: “(a) ...the building is sprinklered throughout,” noncombustible construction,”
[F02, F04-OS1.2, OS1.3] Applies to portion of Code [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
text: “(a) ...the building is sprinklered throughout,” “(a) ... the building shall be sprinklered throughout,”
3.2.2.35. Group A, Division 4 (b), (d) [F03, F04-OP1.2] [F04-OP1.3]
(1) [F02-OP1.2] Applies to portion of Code text: “a building (b), (d) [F03, F04-OS1.2] [F04-OS1.3]
classified as Group A, Division 4 shall be of (c) [F04-OP1.3]
noncombustible construction.” (c) [F04-OS1.3]
[F02-OS1.2] Applies to portion of Code text: “a building
3.2.2.39. Group B, Division 2, up to 3 Storeys, Sprinklered
classified as Group A, Division 4 shall be of
noncombustible construction.” (1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
“(a)... the building is sprinklered throughout,”
(4) [F02, F04-OP1.2, OP1.3]
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
[F02, F04-OS1.2, OS1.3]
“(a)... the building is sprinklered throughout,”
(2) [F02-OP1.2] Applies to portion of Code text: “... the
building referred to in Sentence (1) shall be of
noncombustible construction,”
SA-1 • Page 13
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F02-OS1.2] Applies to portion of Code text: “... the 3.2.2.44. Group B, Division 3, up to 3 Storeys, Sprinklered
building referred to in Sentence (1) shall be of (1) (a) [F02, F04-OS1.2, OS1.3] Applies to portion of Code
noncombustible construction,” text: “… the building is sprinklered throughout,”
(a), (c) [F03, F04-OP1.2] [F04-OP1.3] (a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code
(a), (c) [F03, F04-OS1.2] [F04-OS1.3] text: “… the building is sprinklered throughout,”
(b) [F04-OP1.3] (2) (a), (c) [F03-OS1.2] [F04-OS1.2, OS1.3]
(b) [F04-OS1.3] (a), (c) [F03-OP1.2] [F04-OP1.2, OP1.3]
3.2.2.40. Group B, Division 2, up to 2 Storeys, Sprinklered (b), (c) [F04-OS1.3]
(1) [F02, F04-OS1.2, OS1.3] Applies to portion of Code text: (b), (c) [F04-OP1.3]
“(a)... the building is sprinklered throughout,” 3.2.2.45. Group B, Division 3, up to 2 Storeys, Sprinklered
[F02, F04-OP1.2, OP1.3] Applies to portion of Code text: (1) (a) [F02, F04-OS1.2, OS1.3] Applies to portion of Code
“(a)... the building is sprinklered throughout,” text: “… the building is sprinklered throughout,”
(2) (a), (c) [F03, F04-OP1.2] [F04-OP1.3] (a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code
(a), (c) [F03, F04-OS1.2] [F04-OS1.3] text: “… the building is sprinklered throughout,”
(b) [F04-OP1.3] (2) (a), (c) [F03-OS1.2] [F04-OS1.2, OS1.3]
(b) [F04-OS1.3] (a), (c) [F03-OP1.2] [F04-OP1.2, OP1.3]
3.2.2.41. Group B, Division 2, One Storey, Sprinklered (b), (c) [F04-OS1.3]
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text: (b), (c) [F04-OP1.3]
“(a) ... the building is sprinklered throughout,” 3.2.2.46. Group B, Division 3, up to One Storey, Sprinklered
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: (1) (a) [F02, F04-OS1.2, OS1.3] Applies to portion of Code
“(a) ... the building is sprinklered throughout,” text: “… the building is sprinklered throughout,”
3.2.2.42. Group B, Division 3, Any Height, Any Area, (a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code
Sprinklered text: “… the building is sprinklered throughout,”
(2) [F02-OS1.2] Applies to portion of Code text: “… the 3.2.2.47. Group C, Any Height, Any Area, Sprinklered
building referred to in Sentence (1) shall be of (2) [F02-OP1.2] Applies to portion of Code text: “...the
noncombustible construction,” building referred to in Sentence (1) shall be of
[F02-OP1.2] Applies to portion of Code text: “… the noncombustible construction,”
building referred to in Sentence (1) shall be of [F02-OS1.2] Applies to portion of Code text: “...the
noncombustible construction,” building referred to in Sentence (1) shall be of
(a) [F02, F04-OS1.2, OS1.3] Applies to portion of Code noncombustible construction,”
text: “… the building shall be sprinklered throughout,” (a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code
(a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text: “...the building shall be sprinklered throughout,”
text: “… the building shall be sprinklered throughout,” (a) [F02, F04-OS1.2, OP1.3] Applies to portion of Code
(b), (d) [F03, F04-OP1.2] [F04-OP1.3] text: “...the building shall be sprinklered throughout,”
(b), (d) [F03, F04-OS1.2] [F04-OS1.3] (b), (d) [F03-OP1.2] [F04-OP1.2, OP1.3]
(c) [F04-OP1.3] (b), (d) [F03-OS1.2] [F04-OS1.2, OS1.3]
(c) [F04-OS1.3] (c), (d) [F04-OP1.3]
3.2.2.43. Group B, Division 3, up to 3 Storeys (c), (d) [F04-OS1.3]
(Noncombustible), Sprinklered 3.2.2.48. Group C, up to 12 Storeys, Sprinklered, Encapsulated
(1) (a) [F02, F04-OS1.2, OS1.3] Applies to portion of Code Mass Timber Construction
text: “… the building is sprinklered throughout,” (2) (b), (c) [F04-OS1.3]
(a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code (b), (c) [F04-OP1.3]
text: “… the building is sprinklered throughout,” (a), (c) [F03-OS1.2] [F04-OS1.2, OS1.3]
(2) [F02-OS1.2] Applies to portion of Code text: “… the (a), (c) [F03-OP1.2] [F04-OP1.2, OP1.3]
building referred to in Sentence (1) shall be of 3.2.2.49. Group C, up to 6 Storeys, Sprinklered,
noncombustible construction,” Noncombustible Construction
[F02-OP1.2] Applies to portion of Code text: “… the (1) (a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code
building referred to in Sentence (1) shall be of text: “...the building shall be sprinklered throughout,”
noncombustible construction,” (a) [F02, F04-OS1.2, OP1.3] Applies to portion of Code
(a), (c) [F03-OS1.2] [F04-OS1.2, OS1.3] text: “...the building shall be sprinklered throughout,”
(a), (c) [F03-OP1.2] [F04-OP1.2, OP1.3] (2) [F02-OP1.2] Applies to portion of Code text: “...the
(b), (c) [F04-OS1.3] building referred to in Sentence (1) shall be of
(b), (c) [F04-OP1.3] noncombustible construction,”
Page 14 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F02-OS1.2] Applies to portion of Code text: “...the (2) [F03, F04-OP1.2] [F04-OP1.3] Applies to portion of Code
building referred to in Sentence (1) shall be of text: “(a) ... floor assemblies shall be fire separations
noncombustible construction,” with a fire-resistance rating not less than 1 h,” and to
(a), (c) [F03-OP1.2] [F04-OP1.2, OP1.3] Clause (c).
(a), (c) [F03-OS1.2] [F04-OS1.2, OS1.3] [F03, F04-OS1.2] [F04-OS1.3] Applies to portion of Code
(b), (c) [F04-OP1.3] text: “(a) ... floor assemblies shall be fire separations
(b,) (c) [F04-OS1.3] with a fire-resistance rating not less than 1 h,” and to
3.2.2.50. Group C, up to 4 Storeys, Noncombustible Clause (c).
Construction (b), (c) [F04-OP1.3]
(2) [F02-OP1.2] Applies to portion of Code text: “...the (b), (c) [F04-OS1.3]
building referred to in Sentence (1) shall be of 3.2.2.53. Group C, up to 3 Storeys, Increased Area
noncombustible construction,”
(2) [F03, F04-OP1.2] [F04-OP1.3] Applies to portion of Code
[F02-OS1.2] Applies to portion of Code text: “...the text: “(a) ... floor assemblies shall be fire separations
building referred to in Sentence (1) shall be of with a fire-resistance rating not less than 1 h,” and to
noncombustible construction,” Clause (d).
[F03, F04-OP1.2] [F04-OP1.3] Applies to portion of Code
[F03, F04-OS1.2] [F04-OS1.3] Applies to portion of Code
text: “(a) ... floor assemblies shall be fire separations
text: “(a) ... floor assemblies shall be fire separations
with a fire-resistance rating not less than 1 h,” and to
with a fire-resistance rating not less than 1 h,” and to
Clause (d).
Clause (d).
[F03, F04-OS1.2] [F04-OS1.3] Applies to portion of Code
text: “(a) ... floor assemblies shall be fire separations (b), (d) [F04-OP1.3]
with a fire-resistance rating not less than 1 h,” and to (b), (d) [F04-OS1.3]
Clause (d). (c), (d) [F04-OP1.3]
(b), (d) [F04-OP1.3] (c), (d) [F04-OS1.3]
(b), (d) [F04-OS1.3] 3.2.2.54. Group C, up to 3 Storeys
(c), (d) [F04-OP1.3]
(2) [F03, F04-OP1.2] [F04-OP1.3] Applies to portion of Code
(c), (d) [F04-OS1.3] text: “(a)... floor assemblies shall be fire separations with
3.2.2.51. Group C, up to 6 Storeys, Sprinklered, Combustible a fire-resistance rating not less than 45 min,” and to
Construction Clause (c).
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text: [F03, F04-OS1.2] [F04-OS1.3] Applies to portion of Code
“(a) ...the building shall be sprinklered throughout,” text: “(a) ... floor assemblies shall be fire separations with
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: a fire-resistance rating not less than 45 min,” and to
“(a) ...the building shall be sprinklered throughout,” Clause (c).
(2) [F03, F04-OP1.2] [F04-OP1.3] Applies to portion of Code (b), (c) [F04-OP1.3]
text: “(a) ... floor assemblies shall be fire separations
(b), (c) [F04-OS1.3]
with a fire-resistance rating not less than 1 h,” and to
Clause (e). 3.2.2.55. Group C, up to 3 Storeys, Sprinklered
[F03, F04-OS1.2] [F04-OS1.3] Applies to portion of Code (1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
text: “(a) ... floor assemblies shall be fire separations “(a)... the building is sprinklered throughout,”
with a fire-resistance rating not less than 1 h,” and to [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
Clause (e). “(a)... the building is sprinklered throughout,”
(b), (d), (e) [F04-OS1.3] (2) [F03-OS1.2] [F04-OS1.2, OS1.3] Applies to portion of
(b), (d), (e) [F04-OP1.3] Code text: “(a) ... floor assemblies shall be fire
(c) [F04-OS1.3] Applies to portion of Code text: “... the separations with a fire-resistance rating not less than
roof assembly shall be constructed of noncombustible 45 min,” and to Clause (c).
construction or fire-retardant-treated wood conforming to [F03-OP1.2] [F04-OP1.2, OP1.3] Applies to portion of
Article 3.1.4.5.,” Code text: “(a) … floor assemblies shall be fire
(c) [F04-OP1.3] Applies to portion of Code text: “... the separations with a fire-resistance rating not less than
roof assembly shall be constructed of noncombustible 45 min,” and to Clause (c).
construction or fire-retardant-treated wood conforming to (b), (c) [F04-OP1.3]
Article 3.1.4.5.,”
(b), (c) [F04–OS1.3]
3.2.2.52. Group C, up to 4 Storeys, Sprinklered
3.2.2.55A. Group C, Retirement Home, Any Height, Any Area,
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text: Sprinklered
“(a)... the building is sprinklered throughout,”
(2) [F02-OP1.2] Applies to portion of Code text: “... the
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: building referred to in Sentence (1) shall be of
“(a)... the building is sprinklered throughout,” noncombustible construction,”
SA-1 • Page 15
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F02, F04-OP1.2, OP1.3] Applies to portion of Code text: (2) [F02-OP1.2] Applies to portion of Code text: “... the
“(a)... the building shall be sprinklered,” building referred to in Sentence (1) shall be of
[F02-OS1.2] Applies to portion of Code text: “... the noncombustible construction,”
building referred to in Sentence (1) shall be of [F02-OS1.2] Applies to portion of Code text: “... the
noncombustible construction,” building referred to in Sentence (1) shall be of
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: noncombustible construction,”
“(a)... the building shall be sprinklered throughout,” [F03, F04-OP1.2] [F04-OP1.3] Applies to portion of Code
[F03, F04-OP1.2] [F04-OP1.3] Applies to portion of Code text: “(a)... floor assemblies shall be fire separations with
text: “(b)... floor assemblies shall be fire separations with a fire-resistance rating not less than 1 h,” and to Clause
a fire-resistance rating not less than 2 h,” and to Clause (c).
(d). [F03, F04-OS1.2] [F04-OS1.3] Applies to portion of Code
[F03, F04-OS1.2] [F04-OS1.3] Applies to portion of Code text: “(a) ... floor assemblies shall be fire separations with
text: “(b) ... floor assemblies shall be fire separations with a fire-resistance rating not less than 1 h,” and to Clause
a fire-resistance rating not less than 2 h,” and to Clause (c).
(d). (b), (c) [F04-OP1.3]
(c), (d) [F04-OP1.3] (b), (c) [F04-OS1.3]
(c), (d) [F04-OS1.3] 3.2.2.55E. Group C, Retirement Home, up to 3 Storeys,
3.2.2.55B. Group C, Retirement Home, up to 4 Storeys, Sprinklered, Combustible Construction
Sprinklered, Increased Area (1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text: “(a)... the building is sprinklered throughout,”
“(a)... the building is sprinklered throughout,” [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: “(a)... the building is sprinklered throughout,”
“(a)... the building is sprinklered throughout,” (2) [F02-OP1.2] Applies to portion of Code text: “... the
(2) [F03, F04-OP1.2] [F04-OP1.3] Applies to portion of Code building referred to in Sentence (1) is permitted... or
text: “(a)... floor assemblies shall be fire separations with noncombustible construction,”
a fire-resistance rating not less than 2 h,” and to Clause [F02-OS1.2] Applies to portion of Code text: “... the
(c). building referred to in Sentence (1) is permitted… or
[F03, F04-OS1.2] [F04-OS1.3] Applies to portion of Code noncombustible construction,”
text: “(a) ... floor assemblies shall be fire separations with [F03, F04-OP1.2] [F04-OP1.3] Applies to portion of Code
a fire-resistance rating not less than 2 h,” and to Clause text: “(a)... floor assemblies shall be fire separations with
(c). a fire-resistance rating not less than 45 min,” and to
(b), (c) [F04-OP1.3] Clause (c).
(b), (c) [F04-OS1.3] [F03, F04-OS1.2] [F04-OS1.3] Applies to portion of Code
3.2.2.55C. Group C, Retirement Home, up to 4 Storeys, text: “(a) ... floor assemblies shall be fire separations with
Sprinklered a fire-resistance rating not less than 45 min,” and to
Clause (c).
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
“(a)... the building is sprinklered throughout,” (b), (c) [F04-OP1.3]
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: (b), (c) [F04-OS1.3]
“(a)... the building is sprinklered throughout,” 3.2.2.56. Group D, Any Height, Any Area, Sprinklered
(2) [F03, F04-OP1.2] [F04-OP1.3] Applies to portion of Code (2) [F02-OS1.2] Applies to portion of Code text: “… the
text: “(a)... floor assemblies shall be fire separations with building referred to in Sentence (1) shall be of
a fire-resistance rating not less than 1 h,” and to Clause noncombustible construction,”
(c). [F02-OP1.2] Applies to portion of Code text: “… the
[F03, F04-OS1.2] [F04-OS1.3] Applies to portion of Code building referred to in Sentence (1) shall be of
text: “(a) ... floor assemblies shall be fire separations with noncombustible construction,”
a fire-resistance rating not less than 1 h,” and to Clause (a) [F02, F04-OS1.2, OS1.3] Applies to portion of Code
(c). text: “… the building shall be sprinklered throughout,”
(b), (c) [F04-OP1.3] (a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code
(b), (c) [F04-OS1.3] text: “… the building shall be sprinklered throughout,”
3.2.2.55D. Group C, Retirement Home, up to 3 Storeys, (b), (d) [F03-OS1.2] [F04-OS1.2, OS1.3]
Sprinklered, Noncombustible Construction (b), (d) [F03-OP1.2] [F04-OP1.2, OP1.3]
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text: (c), (d) [F04-OS1.3]
“(a)... the building is sprinklered throughout,” (c), (d) [F04-OP1.3]
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
3.2.2.57. Group D, up to 12 Storeys, Sprinklered, Encapsulated
“(a)... the building is sprinklered throughout,”
Mass Timber Construction
Page 16 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) (b), (c) [F04-OS1.3] 3.2.2.61. Group D, up to 4 Storeys, Sprinklered
(b), (c) [F04-OP1.3] (1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
(a), (c) [F03-OS1.2] [F04-OS1.2, OS1.3] “(a)...the building is sprinklered throughout,”
(a), (c) [F03-OP1.2] [F04-OP1.2, OP1.3] [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
3.2.2.58. Group D, up to 6 Storeys “(a)...the building is sprinklered throughout,”
(2) [F02-OP1.2] Applies to portion of Code text: “The building (2) (a), (c) [F03, F04-OP1.2] [F04-OP1.3]
referred to in Sentence (1) shall be of noncombustible (a), (c) [F03, F04-OS1.2] [F04-OS1.3]
construction,” (b) [F04-OP1.3]
[F04-OP1.3] Applies to portion of Code text: “(c) roof (b) [F04-OS1.3]
assemblies shall have a fire-resistance rating not less
than 1 h,” and to Clause (d). 3.2.2.62. Group D, up to 3 Storeys
[F02-OS1.2] Applies to portion of Code text: “The building (2) [F04-OP1.3] Applies to portion of Code text: “(c) roof
referred to in Sentence (1) shall be of noncombustible assemblies shall have, if of combustible construction, a
construction,” fire- resistance rating not less than 45 min,” and to
[F04-OS1.3] Applies to portion of Code text: “(c) roof Clause (d).
assemblies shall have a fire-resistance rating not less [F04-OS1.3] Applies to portion of Code text: “(c) roof
than 1 h,” and to Clause (d). assemblies shall have, if of combustible construction, a
(a), (d) [F03, F04-OP1.2] [F04-OP1.3] fire- resistance rating not less than 45 min,” and to
Clause (d).
(a), (d) [F03, F04-OS1.2] [F04-OS1.3]
(a) [F03-OP1.2] Applies to the requirement that
(b) [F04-OP1.3]
noncombustible floor assemblies be fire separations.
(b) [F04-OS1.3]
(a) [F03-OS1.2] Applies to the requirement that
3.2.2.59. Group D, up to 6 Storeys, Sprinklered, noncombustible floor assemblies be fire separations.
Noncombustible Construction
(a), (d) [F03, F04-OP1.2] [F04-OP1.3]
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
(a), (d) [F03, F04-OS1.2] [F04-OS1.3]
“(a) ...the building is sprinklered throughout,”
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: (b) [F04-OP1.3]
“(a)... the building is sprinklered throughout,” (b) [F04-OS1.3]
(2) [F02-OP1.2] Applies to portion of Code text: “... the 3.2.2.63. Group D, up to 3 Storeys, Sprinklered
building referred to in Sentence (1) shall be of (1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
noncombustible construction,” “(a)...the building is sprinklered throughout,”
[F02-OS1.2] Applies to portion of Code text: “... the [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
building referred to in Sentence (1) shall be of “(a)...the building is sprinklered throughout,”
noncombustible construction,” (2) (a) [F03-OP1.2] Applies to the requirement that
(a), (c) [F03, F04-OP1.2] [F04-OP1.3] noncombustible floor assemblies be fire separations.
(a), (c) [F03, F04-OS1.2] [F04-OS1.3] (a) [F03-OS1.2] Applies to the requirement that
(b) [F04-OP1.3] noncombustible floor assemblies be fire separations.
(b) [F04-OS1.3] (a), (c) [F03, F04-OP1.2] [F04-OP1.3]
3.2.2.60. Group D, up to 6 Storeys, Sprinklered, (a), (c) [F03, F04-OS1.2] [F04-OS1.3]
(1) (a) [F02, F04-OS1.2, OS1.3] (b) [F04-OP1.3]
(a) [F02, F04-OP1.2, OP1.3] (b) [F04-OS1.3]
(2) (a), (e) [F03-OS1.2] [F04-OS1.3, OS1.2] 3.2.2.64. Group D, up to 2 Storeys
(a), (e) [F03-OP1.2] [F04-OP1.2, OP1.3] (2) [F03, F04-OP1.2] [F04-OP1.3]
(b), (d), (e) [F04-OS1.3] [F03, F04-OS1.2] [F04-OS1.3]
(b), (d), (e) [F04-OP1.3] (a) [F03-OP1.2] Applies to the requirement that
(c) [F04-OS1.3] Applies to portion of Code text: “... the noncombustible floor assemblies be fire separations.
roof assembly shall be constructed of noncombustible (a) [F03-OS1.2] Applies to the requirement that
construction or fire-retardant-treated wood conforming to noncombustible floor assemblies be fire separations.
Article 3.1.4.5.,” 3.2.2.65. Group D, up to 2 Storeys, Sprinklered
(c) [F04-OP1.3] Applies to portion of Code text: “.... the (1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
roof assembly shall be constructed of noncombustible “(a) ...the building is sprinklered throughout,”
construction or fire-retardant-treated wood conforming to
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
Article 3.1.4.5.,”
“(a) ...the building is sprinklered throughout,”
(2) [F03, F04-OP1.2] [F04-OP1.3]
SA-1 • Page 17
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F03, F04-OS1.2] [F04-OS1.3] (2) [F03, F04-OS1.2] [F04-OS1.3]
(a) [F03-OP1.2] Applies to the requirement that (a), (b) [F03, F04-OP1.2] [F04-OP1.3]
noncombustible floor assemblies be fire separations. 3.2.2.72. Group F, Division 1, up to 4 Storeys, Sprinklered
(a) [F03-OS1.2] Applies to the requirement that (2) [F02-OP1.2] Applies to portion of Code text: “... the
noncombustible floor assemblies be fire separations. building referred to in Sentence (1) shall be of
3.2.2.66. Group E, Any Height, Any Area, Sprinklered noncombustible construction,”
(2) [F02-OP1.2] Applies to portion of Code text: “... the [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
building referred to in Sentence (1) shall be of “(a) ... the building shall be sprinklered throughout,”
noncombustible construction,” [F02-OS1.2] Applies to portion of Code text: “... the
[F02-OS1.2] Applies to portion of Code text: “... the building referred to in Sentence (1) shall be of
building referred to in Sentence (1) shall be of noncombustible construction,”
noncombustible construction,” [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
(a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code “(a) ... the building shall be sprinklered throughout,”
text: “... the building shall be sprinklered throughout,” (b), (d) [F03-OS1.2] [F04-OS1.2, OS1.3]
(a) [F02, F04-OS1.2, OS1.3] Applies to portion of Code (b), (d) [F03-OP1.2] [F04-OP1.2, OP1.3]
text: “... the building shall be sprinklered throughout,” (c), (d) [F04-OS1.3]
(b), (d) [F03, F04-OP1.2] [F04-OP1.3] 3.2.2.73. Group F, Division 1, up to 3 Storeys, Sprinklered
(b), (d) [F03, F04-OS1.2] [F04-OS1.3] (1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
(c) [F04-OP1.3] “(a) ... the building is sprinklered throughout,”
(c) [F04-OS1.3] [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
3.2.2.67. Group E, up to 4 Storeys, Sprinklered “(a) ... the building is sprinklered throughout,”
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text: (2) [F02-OP1.2] Applies to portion of Code text: “The building
“(a) ... the building shall be sprinklered throughout,” referred to in Sentence (1) is permitted to be of heavy
timber construction or noncombustible construction used
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
singly or in combination,”
“(a) ... the building shall be sprinklered throughout,”
[F03, F04-OP1.2] [F04-OP1.3]
(2) (a), (c) [F03, F04-OP1.2] [F04-OP1.3]
[F02-OS1.2] Applies to portion of Code text: “The building
(a), (c) [F03, F04-OS1.2] [F04-OS1.3] referred to in Sentence (1) is permitted to be of heavy
(b) [F04-OP1.3] timber construction or noncombustible construction used
(b) [F04-OS1.3] singly or in combination,”
3.2.2.68. Group E, up to 3 Storeys [F03, F04-OS1.2] [F04-OS1.3]
(2) (a), (e) [F03-OS1.2] [F04-OS1.2, OS1.3] 3.2.2.74. Group F, Division 1, up to 2 Storeys, Sprinklered
(a), (e) [F03-OP1.2] [F04-OP1.2, OP1.3] (1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
(b), (d) [F04-OS1.3] “(a) ... the building is sprinklered throughout,”
(b), (d) [F04-OP1.3] [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
“(a) ... the building is sprinklered throughout,”
(c), (d) [F04-OS1.3]
(2) [F03-OP1.2] Applies to portion of Code text:
(c), (d) [F04-OP1.3]
“(a) [noncombustible] floor assemblies shall be fire
3.2.2.69. Group E, up to 3 Storeys, Sprinklered separations,”
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text: [F04-OP1.2, OP1.3]
“(a) ... the building is sprinklered throughout,” [F03-OS1.2] Applies to portion of Code text:
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: “(a) [noncombustible] floor assemblies shall be fire
“(a) ... the building is sprinklered throughout,” separations,”
(2) (a), (d) [F03, F04-OP1.2] [F04-OP1.3] [F04-OS1.2, OS1.3]
(a), (d) [F03, F04-OS1.2] [F04-OS1.3] 3.2.2.76. Group F, Division 2, Any Height, Any Area,
(b), (c) [F04-OP1.3] Sprinklered
(b), (c) [F04-OS1.3] (2) [F02-OP1.2] Applies to portion of Code text: “... the
3.2.2.70. Group E, up to 2 Storeys building referred to in Sentence (1) shall be of
noncombustible construction,”
(2) [F03, F04-OS1.2] [F04-OS1.3] [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
(a), (b) [F03, F04-OP1.2] [F04-OP1.3] “(a)... the building shall be sprinklered throughout,”
3.2.2.71. Group E, up to 2 Storeys, Sprinklered [F02-OS1.2] Applies to portion of Code text: “... the
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text: building referred to in Sentence (1) shall be of
“(a) ... the building is sprinklered throughout,” noncombustible construction,”
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
“(a) ... the building is sprinklered throughout,” “(a)... the building shall be sprinklered throughout,”
Page 18 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(b), (d) [F03, F04-OP1.2] [F04-OP1.3] [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
(b), (d) [F03, F04-OS1.2] [F04-OS1.3] “(a)... the building is sprinklered throughout,”
(c) [F04-OP1.3] (2) [F03, F04-OP1.2] [F04-OP1.3]
(c) [F04-OS1.3] [F03, F04-OS1.2] [F04-OS1.3]
3.2.2.77. Group F, Division 2, up to 4 Storeys, Increased Area, (a) [F03-OP1.2] Applies to the requirement that
Sprinklered noncombustible floor assemblies be fire separations.
(1) (a) [F02, F04-OS1.2, OS1.3] Applies to portion of Code (a) [F03-OS1.2] Applies to the requirement that
text: “… the building is sprinklered throughout,” noncombustible floor assemblies be fire separations.
(a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code 3.2.2.82. Group F, Division 3, Any Height, Any Area,
text: “… the building is sprinklered throughout,” Sprinklered
(2) [F02-OS1.2] Applies to portion of Code text: “… the (2) [F02-OS1.2] Applies to portion of Code text: “… the
building referred to in Sentence (1) shall be of building referred to in Sentence (1) shall be of
noncombustible construction,” noncombustible construction,”
[F02-OP1.2] Applies to portion of Code text: “… the [F02-OP1.2] Applies to portion of Code text: “… the
building referred to in Sentence (1) shall be of building referred to in Sentence (1) shall be of
noncombustible construction,” noncombustible construction,”
(a), (c) [F03-OS1.2] [F04-OS1.2, OS1.3] (a) [F02, F04-OS1.2, OS1.3] Applies to portion of Code
(a), (c) [F03-OP1.2] [F04-OP1.2, OP1.3] text: “… the building shall be sprinklered throughout,”
(b), (c) [F04-OS1.3] (a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code
text: “… the building shall be sprinklered throughout,”
(b), (c) [F04-OP1.3]
(b), (d) [F03-OS1.2] [F04-OS1.2, OS1.3]
3.2.2.78. Group F, Division 2, up to 3 Storeys
(b), (d) [F03-OP1.2] [F04-OP1.2, OP1.3]
(2) (a), (e) [F03-OS1.2] [F04-OS1.2, OS1.3]
(c), (d) [F04-OS1.3]
(a), (e) [F03-OP1.2] [F04-OP1.2, OP1.3]
(c), (d) [F04-OP1.3]
(b), (d) [F04-OS1.3]
3.2.2.83. Group F, Division 3, up to 6 Storeys
(b), (d) [F04-OP1.3]
(2) [F02-OP1.2] Applies to portion of Code text: “The building
[F04-OS1.3] Applies to portion of Code text: “… (c) roof
referred to in Sentence (1) shall be of noncombustible
assemblies shall have, if of combustible construction, a
construction,”
fire-resistance rating not less than 45 min,” and to Clause
(d). [F02-OS1.2] Applies to portion of Code text: “The building
referred to in Sentence (1) shall be of noncombustible
[F04-OP1.3] Applies to portion of Code text: “… (c) roof
construction,”
assemblies shall have, if of combustible construction, a
fire-resistance rating not less than 45 min,” and to Clause (a), (d) [F03-OS1.2] [F04-OS1.2, OS1.3]
(d). (a), (d) [F03-OP1.2] [F04-OP1.2, OP1.3]
3.2.2.79. Group F, Division 2, up to 4 Storeys, Sprinklered (b), (d) [F04-OS1.3]
(1) (a) [F02, F04-OS1.2, OS1.3] Applies to portion of Code (b), (d) [F04-OP1.3]
text: “… the building is sprinklered throughout,” (c), (d) [F04-OS1.3]
(a) [F02, F04-OP1.2, OP1.3] Applies to portion of Code (c), (d) [F04-OP1.3]
text: “… the building is sprinklered throughout,” 3.2.2.84. Group F, Division 3, up to 6 Storeys, Sprinklered
(2) (a), (d) [F03-OS1.2] [F04-OS1.2, OS1.3] (1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
(a), (d) [F03-OP1.2] [F04-OP1.2, OP1.3] “(a)... the building is sprinklered throughout,”
(b), (c) [F04-OS1.3] [F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
(b), (c) [F04-OP1.3] “(a)... the building is sprinklered throughout,”
3.2.2.80. Group F, Division 2, up to 2 Storeys (2) [F02-OP1.2] Applies to portion of Code text: “... the
(2) [F03, F04-OP1.2] [F04-OP1.3] building referred to in Sentence (1) shall be of
noncombustible construction,”
[F03, F04-OS1.2] [F04-OS1.3]
[F02-OS1.2] Applies to portion of Code text: “... the
(a) [F03-OP1.2] Applies to the requirement that
building referred to in Sentence (1) shall be of
noncombustible floor assemblies be fire separations.
noncombustible construction,”
(a) [F03-OS1.2] Applies to the requirement that
(a), (c) [F03, F04-OP1.2] [F04-OP1.3]
noncombustible floor assemblies be fire separations.
(a), (c) [F03, F04-OS1.2] [F04-OS1.3]
3.2.2.81. Group F, Division 2, up to 2 Storeys, Sprinklered
(b) [F04–OP1.3]
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
“(a)... the building is sprinklered throughout,” (b) [F04-OS1.3]
SA-1 • Page 19
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
3.2.2.85. Group F, Division 3, up to 4 Storeys [F02-OS1.2] Applies to portion of Code text: “A building
(2) [F04-OP1.3] Applies to portion of Code text: “(c) roof classified as Group F, Division 3 is permitted to be of
assemblies shall have, if of combustible construction, a heavy timber construction or noncombustible construction
fire-resistance rating not less than 45 min,” and to Clause used singly or in combination,”
(d). 3.2.2.90. Group F, Division 3, One Storey, Sprinklered
[F04-OS1.3] Applies to portion of Code text: “(c) roof (1) [F02-OP1.2] Applies to portion of Code text: “A building
assemblies shall have, if of combustible construction, a classified as Group F, Division 3 is permitted to be of
fire-resistance rating not less than 45 min,” and to Clause heavy timber construction or noncombustible construction
(d). used singly or in combination,”
(a) [F03-OP1.2] Applies to the requirement that [F02, F04-OP1.2, OP1.3] Applies to portion of Code text:
noncombustible floor assemblies be fire separations. “a) ... the building is sprinklered throughout,”
(a) [F03-OS1.2] Applies to the requirement that [F02-OS1.2] Applies to portion of Code text: “A building
noncombustible floor assemblies be fire separations. classified as Group F, Division 3 is permitted to be of
(a), (d) [F03, F04-OP1.2] [F04-OP1.3] heavy timber construction or noncombustible construction
used singly or in combination,”
(a), (d) [F03, F04-OS1.2] [F04-OS1.3]
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text:
(b) [F04-OP1.3] “(a) ... the building is sprinklered throughout,”
(b) [F04-OS1.3] 3.2.2.91. Group F, Division 3, One Storey, Any Area, Low Fire
3.2.2.86. Group F, Division 3, up to 4 Storeys, Sprinklered Load Occupancy
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text: (2) [F02-OP1.2]
“(a) the building is sprinklered throughout,” [F02-OS1.2]
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: 3.2.2.92. Group F, Division 3, Storage Garages up to 22 m
“(a) the building is sprinklered throughout,” High
(2) (a) [F03-OP1.2] Applies to the requirement that (1) [F02-OP1.2] Applies to portion of Code text: “A building
noncombustible floor assemblies be fire separations. used as a storage garage with all storeys constructed as
(a) [F03-OS1.2] Applies to the requirement that open-air storeys and having on other occupancy above it
noncombustible floor assemblies be fire separations. is permitted to have its floor, wall, ceiling and roof
(a), (c) [F03, F04-OP1.2] [F04-OP1.3] assemblies constructed without a fire-resistance rating
(a), (c) [F03, F04-OS1.2] [F04-OS1.3] provided it is a) of noncombustible construction,”
(b) [F04-OP1.3] [F02-OS1.2] Applies to portion of Code text: “A building
(b) [F04-OS1.3] used as a storage garage with all storeys constructed as
open-air storeys and having on other occupancy above it
3.2.2.87. Group F, Division 3, up to 2 Storeys
is permitted to have its floor, wall, ceiling and roof
(2) [F03, F04-OP1.2] [F04-OP1.3] assemblies constructed without a fire-resistance rating
[F03, F04-OS1.2] [F04-OS1.3] provided it is a) of noncombustible construction,”
(a) [F03-OP1.2] Applies to the requirement that 3.2.2.93. Encapsulated Mass Timber Construction, Various r1
noncombustible floor assemblies be fire separations. Occupancies, Heights and Areas, Sprinklered
(a) [F03-OS1.2] Applies to the requirement that (2) (b), (c) [F04-OS1.3]
noncombustible floor assemblies be fire separations. (b), (c) [F04-OP1.3]
3.2.2.88. Group F, Division 3, up to 2 Storeys, Sprinklered (a), (c) [F03-OS1.2] [F04-OS1.2, OS1.3]
(1) [F02, F04-OP1.2, OP1.3] Applies to portion of Code text: (a), (c) [F03-OP1.2] [F04-OP1.2, OP1.3]
“(a)... the building is sprinklered throughout,”
3.2.3.1. Limiting Distance and Area of Unprotected
[F02, F04-OS1.2, OS1.3] Applies to portion of Code text: Openings
“(a)... the building is sprinklered throughout,”
(1), (5), (6), [F03-OP3.1] e1
(2) [F03, F04-OP1.2] [F04-OP1.3] (8) to (10)
[F03, F04-OS1.2] [F04-OS1.3] 3.2.3.5. Wall with Limiting Distance Less Than 1.2 m
(a) [F03-OP1.2] Applies to the requirement that (1) [F03-OP3.1]
noncombustible floor assemblies be fire separations.
(2) [F03-OP3.1]
(a) [F03-OS1.2] Applies to the requirement that
noncombustible floor assemblies be fire separations. 3.2.3.6. Combustible Projections
3.2.2.89. Group F, Division 3, One Storey (1) to (3) [F03-OP3.1] e1
(1) [F02-OP1.2] Applies to portion of Code text: “A building (5) [F03-OP3.1]
classified as Group F, Division 3 is permitted to be of 3.2.3.7. Construction of Exposing Building Face
heavy timber construction or noncombustible construction (1) [F02, F03-OP3.1]
used singly or in combination,” (2) [F02, F03-OP3.1]
(3) [F02, F03-OP3.1]
Page 20 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(4) [F02, F03-OP3.1] (4) [F02, F12-OP3.1]
3.2.3.8. Protection of Exterior Building Face 3.2.3.20. Underground Walkway
(1) [F02, F03-OP3.1] (1) [F01, F02-OP3.1]
3.2.3.9. Protection of Structural Members (2) [F03-OP3.1]
(1) [F04-OP1.3] (3) [F02-OP3.1] Applies to portion of Code text: “An
[F04-OS1.3] underground walkway shall be of noncombustible
3.2.3.10. Unlimited Unprotected Openings construction...”
(1) [F03-OP3.1] [F80-OP2.3] Applies to portion of Code text: “An
underground walkway shall be ... suitable for an
(2) [F03-OP3.1] underground location.”
3.2.3.11. Low Fire Load, One Storey Building (4) (a) [F06-OS1.2] [F05-OS1.5]
(1) (a) [F04-OP3.1] (b) [F12-OS1.2] [F10-OS1.5]
(b) [F03-OP3.1] 3.2.4.1. Determination of Requirement for a Fire Alarm
3.2.3.12. Area Increase for Unprotected Openings System
(1) [F03-OP3.1] (1) [F11-OS1.5] [F13-OS1.5, OS1.2]
3.2.3.13. Protection of Exit Facilities [F13-OP1.2]
(4) [F06-OP1.2] (4) [F11-OS1.5]
[F05, F06-OS1.2] 3.2.4.2. Continuity of Fire Alarm System
3.2.3.14. Wall Exposed to Another Wall (1) [F11-OS1.5]
(1) [F03-OP1.2] (2) [F11-OS1.5]
[F03-OP3.1] (3) [F11-OS1.5]
[F03-OS1.2] (4) [F03-OS1.2] [F10-OS1.5]
(2) [F03-OP1.2] (5) [F11, F13-OS1.2]
[F03-OP3.1] (6) [F11-OS1.5]
[F03-OS1.2] 3.2.4.3. Types of Fire Alarm Systems
3.2.3.15. Wall Exposed to Adjoining Roof (1) (a) [F11-OS1.5]
(1) [F03-OP1.2] (b) [F11-OS1.4] [F13-OS1.5]
[F03-OS1.2] (c), (d), (e) [F11-OS1.5]
3.2.3.16. Protection of Soffits 3.2.4.4. Description of Fire Alarm Systems
(1) [F03-OP1.2] (1) [F11-OS1.5]
[F03-OS1.2] (2) (a), (d) [F11-OS1.4] [F13-OS1.5]
(2) [F03-OP1.2] (b), (c) [F11-OS1.5]
[F03-OS1.2] (3) [F13-OS1.5]
(3) [F03-OP1.2] (4) [F13-OS1.5]
[F03-OS1.2] 3.2.4.5. Installation and Verification of Fire Alarm Systems
(4) [F02-OP1.2] (1) [F12, F13, F81-OS1.2] [F11, F12, F13, F81-OS1.5]
[F02-OS1.2] [F11, F12-OS3.7] Applies to voice communication
3.2.3.17. Canopy Protection for Vertically Separated systems.
Openings (2) [F82-OS1.5]
(1) [F03-OP1.2] 3.2.4.6. Silencing of Alarm Signals
[F03-OS1.2] (1) [F11-OS1.5]
(2) [F03-OP1.2] (2) [F34, F81-OS1.5]
[F03-OS1.2] 3.2.4.7. Signals to Fire Department
(3) [F02-OP1.2] (1) [F13-OP1.2]
[F02-OS1.2] [F13-OS1.2, OS1.5]
3.2.3.18. Covered Vehicular Passageway (2) [F13-OP1.2]
(1) [F03-OP3.1] [F13-OS1.2, OS1.5]
(2) [F03-OP3.1] (3) [F13-OP1.2]
3.2.3.19. Walkway between Buildings [F13-OS1.2, OS1.5]
(1) [F03-OP3.1] (4) [F13, F81-OP1.2]
(2) [F02-OP3.1] [F13, F81-OS1.2, OS1.5]
(3) [F02-OP3.1]
SA-1 • Page 21
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(5) [F13-OP1.2] 3.2.4.16. Manual Stations
[F13-OS1.2, OS1.5] (1) [F11-OS1.5]
(6) [F13-OP1.2] (2) [F02, F12-OS1.2] [F10, F12-OS1.5]
[F13-OS1.2] (3) [F02, F12-OS1.2] [F10, F12-OS1.5]
3.2.4.8. Annunciator and Zone Indication (4) [F11-OS1.5]
(1) [F12-OS1.2, OS1.5] (5) [F11-OS1.5]
(2) [F12-OS1.2, OS1.5] (6) [F11-OS1.5]
(4) [F12-OS1.2, OS1.5] (7) [F81-OS1.2] [F11, F81-OS1.5]
(7) [F12-OS1.2, OS1.5] (8) [F11-OS1.5]
(8) [F12-OS1.2, OS1.5] 3.2.4.17. Alert and Alarm Signals
(9) [F12-OS1.2, OS1.5] (2) [F11-OS1.5]
3.2.4.9. Electrical Supervision (3) [F11-OS1.5]
(1) [F82-OS1.2, OS1.5] 3.2.4.18. Audibility of Alarm Systems
(2) F82-OS1.2] (1) [F11-OS1.5]
F82-OP1.2] (2) [F11-OS1.5]
(3) (a), (d), (e), (f), (g) [F82-OP1.2] (3) [F11-OS1.5]
(a), (d), (e), (f), (g) [F82-OS1.2] (4) [F33-OS3.5]
(5) [F11-OS1.5]
(b), (c) [F82-OS1.5]
(6) [F11-OS1.5]
(4) [F81, F82-OP1.2]
(7) [F11-OS1.5]
[F81, F82-OS1.2]
(8) [F11, F81-OS1.5]
(5) (a), (b) [F81, F82-OP1.2]
(9) [F11, F81-OS1.5]
(a), (b) [F81, F82-OS1.2]
(10) [F11, F81-OS1.5]
(c) [F81, F82 - OS1.5]
(11) [F11-OS1.5]
(6) [F82-OP1.2]
(13) [F11-OS1.5]
[F82-OS1.2]
3.2.4.19. Visible Signals
3.2.4.10. Fire Detectors (1) [F11-OS1.5]
(1) [F11-OS1.5] (3) [F11-OS1.5]
(2) [F11-OS1.5] 3.2.4.20. Smoke Alarms
(3) [F02-OS1.2] [F11-OS1.5] (2) [F81, F11-OS1.5]
(4) [F11-OS1.5] (3) [F11-OS1.5]
3.2.4.11. Smoke and Heat Detectors (4) [F11-OS1.5]
(1) [F11-OS1.5] (6) [F11-OS1.5]
(2) [F11-OS1.5] (9) [F11, F81-OS1.5]
(3) [F12-OS1.5] (10) [F11, F81-OS1.5]
(4) [F10-OS1.5] (12) [F11-OS1.5]
(5) [F11-OS1.5] (13) [F81, F11-OS1.5]
(7) [F11-OS1.4, OS1.5] (14) [F11, F81-OS1.5]
3.2.4.12. Prevention of Smoke Circulation (16) [F11-OS1.5]
(1) [F03-OS1.2] (17) [F74-OA2], [F11-OS1.5]
3.2.4.13. Vacuum Cleaning System Shutdown (19) [F74-OA2], [F11-OS1.5]
(1) [F03-OS1.2] (20) [F11, F81-OS1.5]
3.2.4.14. Elevator Emergency Return 3.2.4.21. Residential Fire Warning Systems
(1) [F10-OS1.5] (1) [F81, F11-OS1.5]
(2) [F11-OS1.5] 3.2.4.22. Two-Way Voice Communication Systems
(3) [F02-OS1.2] (1) [F11, F12-OS3.7]
3.2.4.15. System Monitoring (2) [F11-OS1.5]
(1) [F12-OS1.2] [F11, F12-OS1.5] (3) [F11-OS1.5]
[F12-OP1.2] (4) F11-OS1.5] [F13-OS1.4, OS1.5]
(2) [F13-OS1.2] [F11, F13-OS1.5] (5) [F11-OS1.5]
[F13-OP1.2] (6) [F12-OS3.7]
(7) [F11-OS1.5]
Page 22 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
3.2.4.23. One-Way Voice Communication Systems 3.2.5.9. Standpipe System Design
(1) [F11-OS1.5] (1) [F02-OS1.2]
(2) [F11-OS1.5] [F02-OP1.2]
(3) [F11-OS1.5] (2) [F02-OS1.2]
3.2.5.1. Access to Above Grade Storeys [F02-OP1.2]
(1) [F12-OP1.2] (4) [F02-OS1.2]
[F12-OS1.2, OS1.5] [F02-OP1.2]
(2) [F12-OP1.2] (5) [F02-OS1.2]
[F12-OS1.2, OS1.5] [F02-OP1.2]
(3) [F12-OP1.2] 3.2.5.10. Hose Connection
[F12-OS1.2, OS1.5] (1) [F03-OS1.2] [F05, F06-OS1.5,OS1.2]
3.2.5.2. Access to Basements [F03, F06-OP1.2]
(1) [F12-OP1.2] (2) [F12-OS1.2]
[F12-OS1.2, OS1.5] [F12-OP1.2]
(2) [F12-OP1.2] (3) [F02-OS1.2]
[F12-OS1.2, OS1.5] [F02-OP1.2]
3.2.5.3. Roof Access 3.2.5.11. Hose Station
(1) [F12-OP1.2] (1) [F02-OS1.2]
[F12-OS1.2] [F02-OP1.2]
(2) [F12-OP1.2] (2) [F02-OS1.2]
[F12-OS1.2] [F02-OP1.2]
[F05, F06, F10, F12-OS3.7] (3) [F02, F12-OS1.2]
3.2.5.4. Access Routes [F02, F12-OP1.2]
(1) [F12-OP1.2] (4) [F03-OS1.2]
[F12-OS1.2, OS1.5] [F03-OP1.2]
3.2.5.5. Location of Access Routes (5) [F10-OS1.5]
(1) [F12-OP1.2] (6) [F02-OS1.2]
[F06-OS1.1] [F12-OS1.2, OS1.5] [F02-OP1.2]
(2) [F12-OP1.2] (7) [F01-OS1.1]
[F12-OS1.2] 3.2.5.12. Automatic Sprinkler Systems
(4) [F12-OP1.2] (1) [F02, F81, F82-OP1.2]
[F12-OS1.2] [F02, F81, F82-OS1.2]
3.2.5.6. Access Route Design (2) [F02, F81, F82-OP1.2]
(1) [F12-OP1.2] [F02, F81, F82-OS1.2]
[F12-OS1.2] (3) [F02, F81, F82-OP1.2]
(2) [F12-OP1.2] [F02, F81, F82-OS1.2]
[F12-OS1.2] (4) [F02-OP1.2]
3.2.5.7. Water Supply [F02-OS1.2]
(1) [F02-OP1.2] (5) [F81-OP1.2]
[F02-OP3.1] [F81-OS1.2]
[F02-OS1.2] (6) [F02-OP1.2]
(2) [F02, F12-OP1.2] [F02-OS1.2]
[F02-OP3.1] (7) [F02, F81, F82-OP1.2]
[F02, F12-OS1.2] [F02, F81, F82-OS1.2]
3.2.5.8. Standpipe System (8) [F81-OS3.3, OS3.6]
(1) [F02-OS1.2] (10) [F02, F04 – OP1.2, OP1.3]
[F02-OP1.2] [F02, F04 – OS1.2, OS1.3]
3.2.5.13. Combustible Sprinkler Piping
(2) [F02, F81-OP1.2]
[F02, F81-OS1.2]
(3) [F06-OP1.2]
SA-1 • Page 23
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F06-OS1.2] [F12-OS1.2, OS1.5]
(4) [F06-OP1.2] (4) [F12-OP1.2]
[F06-OS1.2] [F12-OS1.2, OS1.5]
3.2.5.14. Sprinklered Service Space (5) [F12-OP1.2]
(1) [F02-OP1.2] [F12-OS1.2, OS1.5]
[F02-OS1.2] (6) [F12-OP1.2]
(2) [F12-OP1.2] [F12-OS1.2, OS1.5]
[F12-OS1.2] (7) [F11-OS1.5]
(3) [F12-OS1.2] [F11, F12-OS1.5] 3.2.6.5. Elevator for Use by Firefighters
[F12-OP1.2] (1) [F12, F06-OP1.2]
3.2.5.15. Fire Department Connections [F12, F06-OS1.2, OS1.5]
(1) [F12-OP1.2] (2) [F12-OP1.2]
[F12-OS1.2] [F12-OS1.2, OS1.5]
(2) [F12-OP1.2] (3) [F06-OP1.2]
[F12-OS1.2] [F06-OS1.2, OS1.5]
3.2.5.16. Portable Fire Extinguishers (4) [F12-OP1.2]
[F12-OS1.2, OS1.5]
(1) [F02, F12, F81-OP1.2]
(5) [F12-OP1.2]
[F02, F12, F81-OS1.2]
[F12-OS1.2, OS1.5]
(2) [F12-OP1.2]
(6) [F06-OP1.2]
[F12-OS1.2]
[F06-OS1.2, OS1.5]
3.2.5.17. Protection from Freezing
3.2.6.6. Venting to Aid Firefighting
(1) [F81-OP1.2]
(1) [F06-OP1.2]
[F81-OS1.2]
[F06-OS1.2, OS1.5]
3.2.5.18. Fire Pumps
(2) [F30-OS3.1]
(1) [F02, F81-OP1.2]
(3) [F12-OP1.2]
[F02, F81-OS1.2]
[F12-OS1.2, OS1.5]
3.2.6.2. Limits to Smoke Movement
(4) [F03-OS1.2] [F12-OS1.2, OS1.5]
(1) [F02-OP1.2]
[F02-OS1.2, OS1.5] 3.2.6.7. Central Alarm and Control Facility
(2) [F06-OP1.2] (1) [F12-OP1.2]
[F06-OS1.2] [F05, F06-OS1.5] [F12-OS1.2, OS1.5]
(3) [F06-OP1.2] (2) [F12-OP1.2]
[F06-OS1.2] [F05, F06-OS1.5] [F12-OS1.2, OS1.5] [F11-OS1.5]
(4) [F03, F12-OP1.2] 3.2.6.8. Voice Communication System
[F03 F12-OS1.2, OS1.5] (1) [F12, F11-OS3.7]
(5) [F03-OP1.2] 3.2.6.9. Testing
[F03-OS1.2, OS1.5] (1) [F82-OP1.2]
(6) [F03, F12-OP1.2] [F82-OS1.2, OS1.5]
[F03, F12-OS1.2, OS1.5] 3.2.7.1. Minimum Lighting Requirements
(7) [F02-OP1.2] (1) [F30-OS3.1] [F10-OS3.7]
[F02-OS1.2, OS1.5] (2) [F30-OS3.1] [F10-OS3.7]
3.2.6.3. Connected Buildings (4) [F30-OS3.1]
(1) [F03-OP1.2] (5) [F74-OA2]
[F03-OP3.1] (6) [F74-OA2]
[F03-OS1.2, OS1.5] (7) [F10-OS3.7]
3.2.6.4. Emergency Operation of Elevators [F74-OA2]
(1) [F12-OP1.2] [F30-OS3.1]
[F12-OS1.2, OS1.5] (9) [F30-OS3.1] [F10-OS3.7]
(2) [F12-OP1.2] (10) [F30-OS3.1] [F10-OS3.7]
[F12-OS1.2, OS1.5] (11) [F30-OS3.1] [F10-OS3.7]
(3) [F12-OP1.2] [F40-OH2.4]
Page 24 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(12) [F30-OS3.1] [F10-OS3.7] [F12-OS1.2, OS1.5]
[F40-OH2.4] [F36-OS3.6] [F12-OS3.7]
3.2.7.2. Recessed Lighting Fixtures 3.2.7.10. Protection of Electrical Conductors
(1) [F01-OP1.1, OP1.2] (2) [F06-OP1.2]
[F01-OS1.1, OS1.2] [F06-OS1.2, OS1.5]
3.2.7.3. Emergency Lighting (3) [F06-OP1.2]
(1) [F30-OS3.1] [F10-OS3.7] [F06-OS1.2, OS1.5]
(2) [F30-OS3.1] [F10-OS3.7] (4) [F06-OP1.2]
(3) [F30-OS3.1] [F10-OS3.7] [F06-OS1.2, OS1.5]
(4) [F30-OS3.1] [F10-OS3.7] (6) [F06-OP1.2]
3.2.7.4. Emergency Power for Lighting [F06-OS1.2, OS1.5]
(1) [F30-OS3.1] [F10-OS3.7] (8) [F06-OP1.2]
(2) [F30, F81-OS3.1] [F10, F81-OS3.7] [F06-OS1.2, OS1.5]
3.2.7.5. Emergency Power Supply Installation (10) [F06-OS1.4]
(1) [F02, F03, F06, F10, F11, F12, F81-OS1.2, OS1.5] [F06-OP1.2]
[F02, F06, F30, F81-OS3.1] [F10, F11, F12, F81-OS3.7] [F10-OS3.7]
[F02, F03, F06, F81-OP1.2] 3.2.8.1. Application
(2) [F12-OS1.5] (1) [F03, F06-OP1.2]
3.2.7.6. Emergency Power for Hospitals [F03, F06-OS1.2] [F05-OS1.5]
(1) [F02, F03, F06, F10, F11, F12, F81-OS1.2, OS1.5] 3.2.8.2. Exceptions to Special Protection
[F02, F06, F30, F81-OS3.1] [F10, F11, F12, F81-OS3.7] (3) [F03-OP1.2]
[F02, F03, F06, F81-OP1.2] [F03-OS1.2]
3.2.7.7. Fuel Supply Shut-off Valves and Exhaust Pipes (5) [F02, F03-OP1.2]
(1) [F12-OH5] Applies to the requirement for a suitably [F02, F03-OS1.2]
identified shut-off valve outside the building 3.2.8.3. Sprinklers
[F12-OP1.2] Applies to the requirement for a suitably (1) [F02-OS1.2]
identified shut-off valve outside the building [F02-OP1.2]
[F12-OS1.1, OS1.2] Applies to the requirement for a (2) [F02-OS1.2] [F11-OS1.5] [F13-OS1.5, OS1.2]
suitably identified shut-off valve outside the building [F02, F13-OP1.2]
[F12-OS1.2, OS1.5] Applies to the requirement for a
3.2.8.4. Vestibules
suitably identified separate shut-off valve.
(1) [F02-OS1.2] [F11-OS1.5] [F13-OS1.5, OS1.2]
[F81-OS3.1, OS3.7] Applies to the requirement for a
suitably identified separate shut-off valve. [F02, F13-OP1.2]
(2) [F03-OP1.2] 3.2.8.5. Protected Floor Space
[F03-OS1.2] (1) [F05-OS1.2] [F06-OS1.5]
3.2.7.8. Emergency Power for Fire Alarm Systems 3.2.8.6. Draft Stops
(1) [F13-OS1.2] [F11, F13-OS1.5] (1) [F02-OS1.2] [F11-OS1.5] [F13-OS1.5, OS1.2]
[F13-OP1.2] Applies to the requirement for fire alarm [F02, F13-OP1.2]
systems, including those with a voice communication 3.2.8.7. Mechanical Exhaust System
system, to be provided with an emergency power supply. (1) [F03-OS1.5, OS1.2]
(2) [F13-OS1.2] [F11, F13-OS1.5] [F03-OP1.2]
[F13-OP1.2] (2) [F03-OS1.5, OS1.2]
(3) [F13-OS1.2] [F11, F13-OS1.5] [F03-OP1.2]
[F13-OP1.2] 3.2.8.8. Combustible Content Limits
(4) [F13-OS1.2] [F11, F13-OS1.5] (1) [F02-OS1.2]
[F13-OP1.2] [F02-OP1.2]
3.2.7.9. Emergency Power for Building Services 3.2.9.1. Testing
(1) [F02, F03, F12-OP1.2] (1) [F02, F81, F82-OS1.2, OS1.5]
[F02, F03, F12-OS1.2, OS1.5] [F02, F81, F82-OP1.2]
(a) [F36-OS3.6] [F10, F12-OS3.7] 3.3.1.1. Separation of Suites
(b) [F02-OP3.1] (1) [F03-OP1.2]
(2) [F12-OP1.2] [F03-OS1.2]
SA-1 • Page 25
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(3) [F02-OP1.2] (6) [F10-OS3.7]
[F02-OS1.2] (7) [F10-OS3.7]
3.3.1.2. Hazardous Substances, Equipment and Processes (8) [F10-OS1.5]
(1) [F01, F02, F03-OP1.1, OP1.2] (9) [F10-OS1.5]
[F01, F02, F03-OS1.1, OS1.2] [F10-OS3.7]
[F43-OS3.4] (10) [F10-OS1.5]
(3) [F05-OS1.5] [F10-OS3.7]
[F43-OS3.7] (11) [F10-OS1.5]
3.3.1.3. Means of Egress [F10-OS3.7]
(3) [F10-OS3.7] (12) [F10-OS3.7]
(4) [F05, F06, F10, F12-OS3.7] 3.3.1.11. Door Swing
(5) [F10, F12-OS3.7] (1) [F10-OS3.7]
(6) [F05, F06, F10, F12-OS3.7] (2) [F10-OS3.7]
(7) [F05, F06, F10, F12-OS3.7] (3) [F10-OS3.7]
(8) [F05-OS1.5] (4) [F10-OS3.7]
(9) [F05, F06, F10, F12-OS3.7] 3.3.1.12. Sliding Doors
3.3.1.4. Public Corridor Separations (1) (b) [F10-OS3.7]
(1) [F06-OS1.2] [F03, F05, F06-OS1.5] 3.3.1.13. Doors and Door Hardware
[F03, F06-OP1.2] (1) (a), (b) [F10, F12-OS3.7]
(2) [F06-OS1.2] [F03, F05, F06-OS1.5] (c) [F30-OS3.1] [F10-OS3.7]
[F03, F06-OP1.2] (d) [F10-OS3.7]
(3) [F06-OS1.2] [F03, F05, F06-OS1.5] (2) [F10-OS3.7]
[F03, F06-OP1.2] (3) [F10-OS3.7]
(4) (a), (b) [F06, F12-OS1.2] [F03, F05, F06, F10, F12- (4) [F10-OS3.7]
OS1.5] (5) [F10-OS3.7]
(a), (b) [F03, F06, F12-OP1.2] [F73-OA1]
(c) [F03, F06-OS1.2] [F03, F05, F06-OS1.5] (8) [F12-OS3.7]
(c) [F03, F06-OP1.2] (9) [F12-OS3.7]
3.3.1.5. Egress Doorways (10) [F12-OS3.7]
(1) [F10, F05-OS1.5] 3.3.1.16. Tapered Treads in a Curved Flight
(2) [F10, F05-OS1.5] (2) [F30-OS3.1] [F10-OS3.7]
(3) [F10-OS3.7] (3) [F30-OS3.1] [F10-OS3.7]
3.3.1.6. Travel Distance (4) [F30-OS3.1] [F10-OS3.7]
(1) [F10, F05-OS1.5] 3.3.1.17. Capacity of Access to Exits
3.3.1.7. Protection on Floor Areas with a Barrier-Free Path (2) [F10-OS3.7]
of Travel (3) [F10-OS3.7]
(1) [F10-OS3.7]
(4) [F10-OS3.7]
(a) [F06-OS1.5]
(6) [F10-OS3.7]
(1.1) [F05, F10-OS1.5]
3.3.1.18. Guards
(1.2) [F02-OP1.2]
(1) [F30-OS3.1]
[F02-OS1.2]
(2) [F30-OS3.1]
(2) [F03-OS1.2] [F06-OS1.5]
(2.1) [F30-OS3.1]
(4) (a), (b) [F10, F73-OS1.5]
(3) [F30-OS3.1]
(c), (d) [F10-OS1.5]
(4) [F30-OS3.1]
3.3.1.8. Headroom and Protruding Objects
3.3.1.19. Tactile Walking Surface Indicators
(2) [F30, F73-OS3.1]
(1) [F30-OS3.1]
3.3.1.9. Corridors
3.3.1.20. Transparent Doors and Panels
(1) [F10, F12-OS3.7]
(1) [F30-OS3.1] [F10-OS3.7]
(2) [F10, F12-OS3.7]
(2) [F30-OS3.1] [F10-OS3.7]
(3) [F10, F12-OS3.7]
(3) [F20-OS3.1]
(4) (a) [F10, F12-OS3.7]
(4) [F30-OS3.1] [F10-OS3.7]
(b) [F06-OS1.2] [F05, F06-OS1.5]
(6) [F30-OS3.1] [F10-OS3.7]
Page 26 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(8) [F30-OS3.1] (10) [F10-OS3.7]
3.3.1.21. Exhaust Ventilation and Explosion Venting (11) [F10-OS3.7]
(1) [F01-OS1.1] (12) [F10-OS3.7]
(2) [F02-OP1.2] (13) [F03-OS1.2]
[F02-OS1.2] [F10-OS3.7]
(3) [F02-OP1.3] Applies to the requirement for explosion- (14) [F03-OS1.2]
relief devices and vents. [F10-OS3.7]
[F02-OS1.3] Applies to the requirement for explosion- (15) [F10-OS3.7]
relief devices and vents.
(16) [F10-OS3.7]
3.3.1.22. Janitors’ Rooms (17) [F10-OS3.7]
(1) [F03-OP1.2] (18) [F30-OS3.1] [F10-OS3.7]
[F03-OS1.2] (19) [F30-OS3.1] [F10-OS3.7]
(3) [F02-OP1.2] (20) [F30-OS3.1] [F10-OS3.7]
[F02-OS1.2] (21) [F30-OS3.1] [F10-OS3.7]
3.3.1.23. Common Laundry Rooms (22) [F30-OS3.1] [F10-OS3.7]
(1) [F03-OP1.2] (23) [F30-OS3.1] [F10-OS3.7]
[F03-OS1.2] (24) [F30-OS3.1] [F10-OS3.7]
(3) [F02-OP1.2] (25) [F30-OS3.1] [F10-OS3.7]
[F02-OS1.2] (26) [F30-OS3.1] [F10-OS3.7]
3.3.1.24. Obstructions 3.3.2.6. Corridors
(1) [F10-OS3.7] (1) [F06-OS1.2] [F03, F05, F06-OS1.5]
3.3.1.25. Signs in Service Spaces [F03, F06-OP1.2]
(1) [F10-OS3.7] (3) [F06-OS1.2] [F03, F05, F06-OS1.5]
3.3.1.26. Welding and Cutting [F03, F06-OP1.2]
(1) [F02, F03-OP1.2] (4) [F10-OS3.7]
[F02, F03-OS1.2] 3.3.2.7. Doors
3.3.2.2. Fire Separations (1) [F10-OS3.7]
(1) [F03-OS1.2] 3.3.2.8. Fixed Bench-Type Seats without Arms
(3) [F03-OS1.2] Applies where space under tiers of seats is (1) [F10-OS3.7]
sprinklered.
[F10-OS3.7]
[F03-OS1.2] Applies where space under tiers of seats is
3.3.2.10. Handrails in Aisles with Steps
not sprinklered.
(1) [F30-OS3.1] [F10-OS3.7]
(4) [F03-OS1.2]
(2) [F30-OS3.1] [F10-OS3.7]
[F03-OP1.2]
(5) [F03-OS1.2] 3.3.2.11. Outdoor Places of Assembly
[F03-OP1.2] (1) [F10-OS3.7]
(7) [F03-OS1.2] (2) [F10-OS3.7]
[F03-OP1.2] (3) [F10-OS3.7]
(8) [F03-OS1.2] (5) [F10-OS3.7]
(9) [F03-OS1.2] 3.3.2.12. Bleachers
[F03-OP1.2] (1) [F30-OS3.1] [F10-OS3.7]
3.3.2.4. Fixed Seats (2) [F30-OS3.1] [F10-OS3.7]
(1) [F30-OS3.1] [F10-OS3.7] (4) [F30-OS3.1] [F10-OS3.7]
(3) [F10-OS3.7] (5) [F30-OS3.1]
3.3.2.4. Aisles 3.3.2.13. Libraries
(3) [F10-OS3.7] (1) [F03-OP1.2]
(4) [F10-OS3.7] [F03-OS1.2]
(5) [F10-OS3.7] (2) [F02-OP1.2]
(7) [F10-OS3.7] [F02-OS1.2]
(8) [F10-OS3.7] 3.3.2.14. Stages for Theatrical Performances
(9) [F10-OS3.7] (1) [F02-OP1.2]
[F02-OS1.2]
SA-1 • Page 27
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F03-OP1.2] [F02, F06-OP1.2]
[F03-OS1.2] (5) [F10-OS3.7]
(3) [F03-OP1.2] 3.3.3.8. Handrails
[F03-OS1.2] (1) [F30-OS3.1]
(4) [F03-OP1.2] [F73-OA1]
[F03-OS1.2] 3.3.4.2. Fire Separations
(5) [F02, F06-OS1.2] [F06-OS1.5] (1) [F03, F06-OS1.2] [F05, F06-OS1.5]
[F02, F06-OP1.2] [F03, F06-OP1.2]
(6) [F03-OP1.2] (4) [F44-OS1.1] [F02, F03-OS1.2]
[F03-OS1.2, OS1.5] (a), (b) [F02, F03-OP1.2]
3.3.2.15. Risers for Stairs (5) [F01-OS1.1] [F03-OS1.2]
(1) [F30-OS3.1] [F44-OS3.4]
3.3.2.16. Storage Rooms (a) [F03-OP1.2]
(1) [F12-OP1.2] 3.3.4.3. Storage Rooms
[F12-OS1.2] (1) [F02-OP1.2]
3.3.2.17. Safety Glazing [F02-OS1.2]
(1) [F20, F30-OS3.1] (2) [F03-OP1.2]
(2) [F20, F30-OS3.1] [F03-OS1.2]
3.3.3.2. Fire Separations (4) [F12-OP1.2]
(1) [F03-OS1.2] [F12-OS1.2]
[F44-OS3.4] 3.3.4.4. Egress from Dwelling Units
(2) [F03-OS1.2] (2) [F05, F10-OS3.7]
[F03-OP1.2] (3) [F10-OS3.7]
(3) [F03-OS1.5] (4) [F05-OS1.2, OS1.5]
[F03-OP1.2] (5) [F05, F10-OS3.7]
3.3.3.3. Corridors (6) [F05, F10-OS3.7]
(1) [F10-OS3.7] (7) [F05-OS1.2]
(2) [F10, F12-OS3.7] [F10-OS3.7]
(3) [F10-OS1.5] (8) [F05, F10-OS3.7]
[F10, F12-OS3.7] 3.3.4.5. Automatic Locking Prohibition
(4) (a) [F10-OS3.7] (1) [F10-OS3.7]
(b) [F10, F12-OS3.7] 3.3.4.8. Window Protection
3.3.3.4. Doorway Width (1) [F30-OS3.1]
(1) [F10, F12-OS3.7] 3.3.4.9. Stud Wall Reinforcement
3.3.3.5. Hospitals and Long-Term Care Homes (1) [F74-OA2]
(2) [F06-OS1.2] [F05, F06-OS1.5] 3.3.4.10. Resistance to Forced Entry
[F06-OP1.2] (1) [F4.1-OS3.1]
(4) [F03, F06-OP1.2] 3.3.4.11. Retirement Homes
[F05, F06-OS1.2] [F06-OS1.5] (2) [F06-OS1.2] [F05, F06-OS1.5]
(7) [F10-OS1.5] [F06-OP1.2]
(8) [F10-OS1.5] (4) [F03, F06-OP1.2]
(9) [F03, F05-OS1.2] [F06-OS1.5] [F05, F06-OS1.2] [F06-OS1.5]
(12) [F03, F05-OS1.2] [F06-OS1.5]
(6) [F05-OS1.2] [F06-OS1.5]
3.3.3.6. Protection for Special Care and Treatment Facilities
(7) [F10-OS1.5]
(1) [F03-OS1.2]
(8) [F10-OS1.5]
3.3.3.7. Contained Use Areas
(9) [F03-OS1.2]
(2) [F03, F06-OS1.2] [F06-OS1.5]
[F03-OP1.2]
[F03, F06-OP1.2]
(3) [F02, F06-OS1.2] [F06-OS1.5] (10) [F10-OS3.7]
[F02, F06-OP1.2] (11) [F10, F12-OS3.7]
(4) [F02, F06-OS1.2] [F06-OS1.5] (12) [F11, F12-OS3.7]
Page 28 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
3.3.5.2. Fire Extinguishing Systems (f) (g) [F01-OP1.1]
(1) [F03-OP1.2] (2) [F44-OS1.1]
[F03-OS1.2] (3) (a) [F03-OS1.2] [F44-OS1.1]
3.3.5.3. Basements (a) [F03-OP1.2]
(1) [F12-OP1.2] (a) [F44- OS1.2, OS1.5, OS1.1] Applies to gas-tight fire
[F01-OS1.1] [F12-OS1.2, OS1.5] separations.
(2) [F06-OS1.2] [F05, F06-OS1.5,] Applies to the separation (b) [F12-OS1.2] [F02-OS1.3]
of exits from the remainder of the building. (b) [F02-OP1.3]
[F06-OS1.2, OS1.5] Applies to the separation of (4) [F44-OS1.1]
entrances to basements and to rooms containing building [F44-OP1.1]
services from the remainder of the building. [F50-OH1.1]
[F06-OP1.2] Applies to the separation of exits from the (5) [F44, F01-OS1.1]
remainder of the building.
[F44, F01-OP1.1]
[F06-OP1.2] Applies to the separation of entrances from
the remainder of the building. 3.3.6.4. Storage and Dispensing Rooms for Flammable
Liquids and Combustible Liquids
(3) [F44-OS1.1]
(1) [F03-OS1.2]
3.3.5.4. Repair and Storage Garages
[F03-OP1.2]
(2) [F30-OS3.1] [F10, F12-OS3.7]
(2) [F02-OS1.3]
(5) [F30-OS3.1] [F02-OP1.3]
(6) [F30-OS3.1] (4) [F02-OS1.3]
(8) [F02-OP1.2] [F02-OP1.3]
[F02-OS1.2] (6) [F10-OS1.5]
3.3.5.5. Repair Garage Separation (7) [F05, F10-OS1.5]
(1) [F03-OP1.2] (8) [F10-OS1.5]
[F03-OS1.2] 3.3.6.5. Tire Storage
3.3.5.6. Storage Garage Separation (1) [F03-OS1.2]
(1) [F03-OP1.2] [F03-OP1.2]
[F03-OS1.2] 3.3.6.6. Ammonium Nitrate Storage
3.3.5.7. Vestibules (1) (a) [F01-OS1.1] [F02, F12-OS1.2]
(a) [F01-OP1.1] [F02, F12-OP1.2]
(4) [F44-OS1.1]
(b) (c) [F03-OS1.2] [F01-OS1.1]
[F44-OS3.4]
(b) (c) [F03-OP1.2] [F01-OP1.1]
3.3.5.11. Toe-Boards Required
(c) [F44-OH5]
(1) [F30-OS3.1]
(d) [F01-OS1.1] [F02-OS1.2]
3.3.6.2. Storage of Dangerous Goods
(d) [F43-OS3.4]
(1) [F03-OS1.2]
(e) [F01, F81-OS1.1]
[F03-OP1.2]
(f) [F12, F02-OS1.1]
(2) [F03-OS1.2]
(f) [F12, F02-OP1.2]
[F03-OP1.2]
3.3.6.7. Flooring Material
(3) [F01, F02, F03, F81-OS1.1, OS1.2]
(1) [F43-OS3.4]
[F01, F02, F03, F81-OP1.1, OP1.2]
[F44-OH5]
3.3.6.3. Indoor Storage of Compressed Gases
[F01-OS1.1]
(1) (a) [F03-OS1.2] [F44-OS1.1]
3.3.6.8. Fire Separations in Process Plants
(a) [F03-OP1.2]
(1) [F03-OP1.2]
(a) [F44-OS1.2, OS1.5, OS1.1] Applies to gas-tight fire
separations. [F03-OS1.2]
(b) [F12-OS1.2] [F01-OS1.1] [F02-OS1.3] 3.3.6.9. Basements and Pits
(b) [F02-OP1.3] (1) [F01-OS1.1]
(c) [F12-OS1.1] [F01-OP1.1]
(e) [F02-OS1.1] 3.4.1.2. Separation of Exits
(e) [F02-OP1.1] (1) [F05, F06, F10, F12-OS3.7]
(f) (g) [F01-OS1.1] [F06, F12-OP1.2]
SA-1 • Page 29
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F06, F12-OS1.2, OS1.5] [F10, F12-OS3.7]
(2) [F10-OS3.7] [F12-OP1.2]
3.4.1.5. Exterior Exit Passageways (3) [F12-OS1.2]
(1) [F10-OS3.7] [F10, F12-OS3.7]
3.4.1.6. Restricted Use of Horizontal Exits [F12-OP1.2]
(1) [F10-OS3.7] (4) [F12-OS1.2]
(2) [F05, F10-OS3.7] [F10, F12-OS3.7]
3.4.1.7. Slide Escapes [F12-OP1.2]
(1) [F10-OS3.7] (5) [F12-OS1.2]
3.4.1.9. Mirrors near Exits [F10, F12-OS3.7]
(1) [F30-OS3.1] [F10-OS3.7] [F12-OP1.2]
3.4.1.10. Combustible Glazing in Exits 3.4.3.4. Headroom Clearance
(1) [F03, F06-OP1.2] (1) [F12-OP1.2]
[F05, F06-OS1.2] [F06-OS1.5] [F12-OS1.2]
3.4.1.11. Exterior Stairway for Nursing Home [F30-OS3.1] [F10, F12-OS3.7]
(1) [F10-OS3.1, OS3.7] (4) [F12-OP1.2]
3.4.2.1. Minimum Number of Exits [F12-OS1.2]
(1) [F05, F06, F10, F12-OS3.7] [F30-OS3.1] [F10, F12-OS3.7]
[F06, F12-OP1.2] (5) [F12-OP1.2]
[F06, F12-OS1.2] [F12-OS1.2]
(3) [F10-OS3.7] [F30-OS3.1] [F10, F12-OS3.7]
3.4.2.2. Means of Egress from Exiting 3.4.4.1. Fire-Resistance Rating of Exit Separations
(1) [F05-OS1.5] (1) [F03, F06-OS1.2] [F05, F06-OS1.5]
3.4.2.3. Distance Between Exits [F03, F06-OP1.2]
(1) [F05, F10-OS1.5] 3.4.4.2. Exits Through Lobbies
(4) [F10-OS3.7] (1) [F05, F06-OS1.5]
3.4.2.4. Travel Distance (2) [F05, F06, F10, F12-OS1.5]
(3) [F10-OS3.7] 3.4.4.3. Exterior Passageway Exceptions
3.4.2.5. Location of Exits (1) [F05, F06, F10-OS1.5]
(1) [F10-OS3.7] 3.4.4.4. Integrity of Exits
(3) [F10-OS3.7] (1) [F03, F06-OS1.2] [F05, F06-OS1.5]
3.4.2.6. Principal Entrance [F03, F06-OP1.2]
(1) [F10-OS3.7] (2) [F06-OS1.2] [F05, F06-OS1.5]
(2) [F10-OS3.7] [F06-OP1.2]
3.4.3.1. Exit Width Based on Occupant Load (3) [F06-OS1.2] [F05, F06-OS1.5]
(2) [F10-OS3.7] [F06-OP1.2]
(4) [F06-OS1.2] [F05, F06-OS1.5]
3.4.3.2. Exit Width
[F43-OS3.7]
(1) [F10-OS3.7]
[F06-OP1.2]
(2) [F10-OS3.7]
(5) [F03, F06-OP1.2]
(3) [F10-OS3.7]
[F03, F06-OS1.2] [F05, F06-OS1.5]
(6) [F10-OS3.7]
(6) [F12-OS1.2] [F05, F10, F12-OS1.5]
(7) [F10-OS3.7]
[F30-OS3.1] [F31-OS3.2] [F32-OS3.3] [F43-OS3.4]
(8) [F12-OP1.2]
[F10, F12-OS3.7]
[F12-OS1.2]
[F12-OP1.2]
[F30-OS3.1] [F10, F12-OS3.7]
(7) [F06-OS1.2] [F05, F06-OS1.5]
3.4.3.3. Exit Width Reduction
[F06-OP1.2]
(1) [F12-OS1.2]
[F43-OS3.7]
[F30-OS3.1] [F10, F12-OS3.7]
(8) [F06-OS1.2] [F05, F06-OS1.5]
[F12-OP1.2]
[F06-OP1.2]
(2) [F12-OS1.2]
(9) [F06-OS1.2] [F05, F06-OS1.5]
Page 30 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F06-OP1.2] (12) [F30-OS3.1] [F10-OS3.7]
(10) [F81-OS1.5] [F73-OA1]
[F81-OS3.7] (13) [F30-OS3.1] [F10-OS3.7]
[F81-OP1.2] (15) [F30-OS3.1] [F10-OS3.7]
3.4.5.1. Exit Signage (16) [F30-OS3.1] [F10-OS3.7]
(1) [F10-OS3.7] [F73-OA1]
(2) [F10-OS3.7] 3.4.6.6. Guards
(3) [F10, F81-OS3.7] (1) [F30-OS3.1] [F10-OS3.7]
(4) [F10, F81-OS3.7] (2) [F30-OS3.1] [F10-OS3.7]
(4.1) [F10-OS3.7] (4) [F30-OS3.1] [F10-OS3.7]
(5) [F10-OS3.7] (5) [F30-OS3.1]
(6) [F10-OS3.7] (5.1) [F30-OS3.1]
(7) [F10-OS3.7] (6) [F30-OS3.1]
(8) [F10-OS3.7] (7) [F30-OS3.1]
3.4.5.2. Exit Signs with Tactile Information 3.4.6.7. Ramp Slope
(1) [F10-OS3.7] (1) [F30-OS3.1] [F10-OS3.7]
3.4.5.3. Signs for Stairs and Ramps at Exit Level (2) [F10-OS3.7] [F30-OS3.1]
(1) [F10-OS3.7] 3.4.6.8. Treads and Risers
3.4.6.1. Surface Finish of Ramps and Stairs (1) [F30-OS3.1] [F10-OS3.7]
(1) (a), (b) [F30-OS3.1] [F10-OS3.7] (2) [F30-OS3.1] [F10-OS3.7]
(1.1) [F73-OA1] (3) [F30-OS3.1] [F10-OS3.7]
(2) [F12-OS1.2, OS1.5] [F73-OA1]
[F30-OS3.1] [F10, F12-OS3.7] (4) [F30-OS3.1] [F10-OS3.7]
[F12-OP1.2] (5) [F30-OS3.1] [F10-OS3.7]
3.4.6.2. Minimum Number of Risers (6) [F30-OS3.1] [F10-OS3.7]
(1) [F30-OS3.1] (7) [F30-OS3.1] [F10-OS3.7]
(8) [F30-OS3.1]
3.4.6.3. Maximum Vertical Rise of Stair Flights and Required
Landings (9) [F10-OS3.7] [F30-OS3.1]
(1) [F10-OS3.7] (10) [F30-OS3.1]
(2) [F10-OS3.7] [F30-OS3.1] 3.4.6.9. Curved Flights in Exits
(3) [F10, F12-OS3.7] [F30-OS3.1] (1) [F30-OS3.1] [F10-OS3.7]
(2) [F30-OS3.1] [F10-OS3.7]
3.4.6.4. Dimensions of Landings
(3) [F30-OS3.1] [F10-OS3.7]
(1) [F30-OS3.1] [F10, F12-OS3.7]
(4) [F30-OS3.1] [F10-OS3.7]
[F12-OP1.2]
3.4.6.10. Horizontal Exits
[F12-OS1.2, OS1.5]
(1) [F10-OS3.7]
(2) [F30-OS3.1] [F10, F12-OS3.7]
(2) [F10-OS3.7]
[F12-OP1.2]
(4) [F10, F73-OS3.7]
[F12-OS1.2, OS1.5]
(5) [F10-OS3.7]
(4) [F30-OS3.1] [F10, F12-OS3.7]
(7) [F10-OS1.5]
(5) [F30-OS3.1] [F10, F12-OS3.7]
3.4.6.11. Doors
3.4.6.5. Handrails
(1) [F30-OS3.1] [F10-OS3.7]
(1) [F30-OS3.1] [F10-OS3.7]
(2) [F30-OS3.1] [F10-OS3.7]
(2) [F30-OS3.1] [F10-OS3.7]
(3) [F30-OS3.1] [F10-OS3.7] Applies to portion of Code text:
(3) [F30-OS3.1] [F10-OS3.7] “No exit door shall open directly onto a step...”
(4) [F30-OS3.1] [F10-OS3.7] [F10, F81-OS3.7] Applies where there is a danger of
(5) [F30-OS3.1] [F10-OS3.7] blockage from ice or snow.
(7) [F30-OS3.1] [F10-OS3.7] (4) [F10-OS3.7]
(9) [F30-OS3.1] [F10-OS3.7] (5) [F10, F12-OS3.7]
(10) [F30-OS3.1] [F10-OS3.7] (6) [F10-OS3.7]
[F73-OA1] 3.4.6.12. Direction of Door Swing
(11) [F30-OS3.1] [F10-OS3.7] (1) [F10-OS3.7]
SA-1 • Page 31
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F10-OS3.7] 3.4.7.3. Access to Fire Escapes
3.4.6.13. Self-Closing Devices (1) [F10-OS3.7] Applies to portion of Code text: “Access to
(1) [F06-OS1.2] [F05, F06-OS1.5] fire escapes shall be from corridors through doors at floor
[F03, F06-OP1.2] level...”
3.4.6.14. Sliding Doors (2) [F30-OS3.1] [F10-OS3.7]
(2) [F12-OS3.7] 3.4.7.4. Protection of Fire Escapes
3.4.6.15. Revolving Doors (1) [F05, F06-OS1.5]
(1) (a) [F30-OS3.1] [F10-OS3.7] 3.4.7.5. Stairs
(b) [F10, F12-OS3.7] (1) [F10-OS3.7]
(c) [F10-OS3.7] (2) [F10-OS3.7]
(d) [F30-OS3.1] [F10-OS3.7] (3) [F10-OS3.7] Applies to the reduction in width permitted
(e) [F20-OS3.1] under certain conditions.
(2) [F10-OS3.7] (4) [F30-OS3.1] [F10-OS3.7]
(3) (a), (b), (d), (e) [F20, F30-OS3.1] [F10, F81-OS3.7] 3.4.7.6. Guards and Railings
3.4.6.16. Door Release Hardware (1) [F30-OS3.1] [F10-OS3.7]
(1) [F10-OS3.7] (2) [F30-OS3.1] [F10-OS3.7]
(2) [F10-OS3.7] (3) [F30-OS3.1] [F10-OS3.7]
(3) [F10-OS3.7] (4) [F30-OS3.1]
(4) [F10-OS3.7] (5) [F30-OS3.1]
(5) [F10, F81-OS3.7] 3.5.2.1. Required Elevator
(7) [F10-OS3.7] (1) [F12-OS3.7]
[F73-OA1] [F73-OA1]
(10) [F02-OS1.2] (2) [F82-OS3.1, OS3.3, OS3.6]
[F10-OS3.7] 3.5.2.2. Barrier-Free Design
3.4.6.18. Emergency Crossover Access to Floor Areas (1) [F73-OA1]
(1) [F10-OS3.7] 3.5.3.1. Fire Separations for Elevator Hoistways
(3) [F10-OS3.7] (1) [F03-OP1.2]
(4) [F10, F12-OS3.7]
[F03-OS1.2]
[F12-OP1.2]
3.5.3.2. Vertical Service Spaces for Dumbwaiters
[F12-OS1.2, OS1.5]
(1) [F03-OP1.2]
(5) [F10-OS3.7]
[F03-OS1.2]
3.4.6.19. Floor Numbering and Identification of Stair Shafts
3.5.3.3. Fire Separations for Elevator Machine Rooms
(1) [F12-OS1.2]
[F73-OA1] (1) [F03-OP1.2]
[F12-OP1.2] [F03-OS1.2]
[F12-OS1.2] 3.5.4.1. Elevator Car Dimensions
[F10, F12,F73-OS3.7] (1) [F12-OS3.7]
(2) [F12-OP1.2] (3) [F12-OS3.7]
[F12-OP1.2] 3.6.1.4. Storage Use Prohibition
[F10, F12,F73-OS3.7] (1) [F01-OS1.1] [F02-OS1.2]
3.4.7.1. Scope 3.6.1.5. Appliances Installed Outside a Building
(1) [F10, F12-OS3.7] (1) [F03-OS1.2]
(2) [F12-OS1.2] [F10-OS1.5] (a) [F03-OP3.1]
[F30-OS3.1] [F10-OS3.7] (b) [F03-OP1.2]
3.4.7.2. Fire Escape Construction 3.6.1.6. Fixed Access Ladders
(1) [F06-OS1.2] [F05-OS1.5] Applies to the combustibility of (1) [F20-OS2.1]
materials used in the construction of fire escapes. [F30-OS3.1]
[F20-OS3.1] [F10, F12-OS3.7] Applies to the type and
3.6.2.1. Fire Separations around Service Rooms
construction of fire escapes.
(1) [F03-OP1.2, OP1.4]
[F20-OS2.1] Applies to the type and construction of fire
escapes. [F03-OS1.2, OS1.4]
Page 32 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(3) [F01-OP1.1] [F03-OP1.2] [F34-OS3.3]
[F01-OS1.1] [F03-OS1.2] [F81-OP1.1]
(4) [F03-OP1.2, OP1.4] (14) [F01-OS1.1] [F03-OS1.2]
[F03-OS1.2, OS1.4] [F01-OP1.1] [F03-OP1.2]
(5) [F03-OP1.2, OP1.4] (15) [F01-OS1.1] [F03-OS1.2]
[F03-OS1.2, OS1.4] [F01-OP1.1] [F03-OP1.2]
(6) [F03-OP1.2, OP1.4] (16) [F02-OS1.1 OS1.3]
[F03-OS1.2, OS1.4] [F02-OP1.1, OP1.3]
(7) [F03-OP1.2, OP1.4] (17) [F01-OS1.1]
[F01-OP1.1]
[F03-OS1.2, OS1.4]
(18) (a) [F30-OS3.1] [F10-OS3.7]
3.6.2.2. Service Rooms under Exits
(b) (c) [F32-OS3.3]
(1) [F02-OS1.2]
3.6.2.8. Emergency Power Installations
[F05, F06-OS3.7]
(1) [F03, F06-OS1.2] [F03-OS1.4] [F06-OS1.5]
3.6.2.4. Incinerator Rooms
[F03, F06-OP1.2] [F03-OP1.4]
(1) [F02-OS1.2]
3.6.2.9. Storage of Oxygen Containers
3.6.2.5. Combustible Refuse Storage (1) [F01-OS1.1] [F03-OS1.2]
(1) [F03-OP1.2] [F43-OS3.4]
[F03-OS1.2] [F01-OP1.1] [F03-OP1.2]
3.6.2.6. Door Swing for Service Rooms 3.6.3.1. Fire Separations for Vertical Service Spaces
(1) [F10-OS1.5] Applies to portion of Code text: “A swing- (1) [F03-OP1.2]
type door from a service room containing a boiler or [F03-OS1.2]
incinerator shall swing outward from the room ...” (2) [F03-OP1.2]
[F30-OS3.1] Applies to portion of Code text: “A swing- [F03-OS1.2]
type door from a service room containing a boiler or
(3) [F03-OP1.2]
incinerator shall swing ... inward if the door opens onto a
[F03-OS1.2]
corridor or any room used for an assembly occupancy.”
(4) [F03-OP1.2]
3.6.2.7. Electrical Equipment Vaults
[F03-OS1.2]
(1) [F03-OP1.2, OP1.4]
(5) [F03-OP1.2]
[F03-OS1.2, OS1.4]
[F03-OS1.2]
(2) [F02-OP1.2] [F03-OP1.4]
3.6.3.2. Foamed Plastic Protection
[F02-OS1.2] [F03-OS1.4] [F11-OS1.5]
(1) [F02-OS1.2]
(3) [F02, F04-OS1.3]
3.6.3.3. Linen and Refuse Chutes
[F02, F04-OP1.3] (1) (a), (b), (c) [F41-OH2.4, OH2.5]
(4) [F02, F04-OS1.3] (d), (e) [F02-OS1.2]
[F02, F04-OP1.3] (2) [F03-OP1.2]
(5) [F03-OP1.2, OP1.4] [F03-OS1.2]
[F03-OS1.2, OS1.4] (3) [F03-OS1.2]
(7) [F32-OS3.3] (4) (a) [F41-OH2.4, OH2.5]
[F34-OS4.1] (b) [F03-OS1.2]
(8) [F02-OS1.2, OS1.3] (5) (a) [F03, F81-OP1.2]
[F02-OP1.2, OP1.3] (a) [F03, F81-OS1.2]
(9) [F81-OS1.1] (a) [F41, F81-OH2.4, OH2.5]
(10) [F81-OS1.1] (b) [F03-OP1.2]
(11) [F81-OS1.1] (b) [F03-OS1.2]
(12) [F81-OS1.1] (c) [F01, F02-OP1.2]
(b) [F30-OS3.1] (c) [F01, F02-OS1.2]
(d) [F03-OS1.2] (d) [F06-OS1.2] [F05, F06-OS1.5]
(d) [F03-OP1.2] (d) [F06-OP1.2]
(13) [F81-OS1.1] (6) [F02-OP1.2]
[F02-OS1.2]
SA-1 • Page 33
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(7) [F03-OP1.2] 3.6.5.4. Coverings, Lining, Adhesives and Insulation
[F03-OS1.2] (1) [F02-OS1.2]
(8) [F02-OS1.2] (2) [F02-OS1.2]
[F41-OH2.4, OH2.5] (3) [F02-OS1.2]
(9) [F03-OP1.2] (4) [F02-OS1.2]
[F03-OS1.2] (5) [F02-OS1.2]
(10) [F41-OH2.4, OH2.5] Applies to portion of Code text: “The (6) [F02-OS1.2]
room or bin into which a refuse chute discharges shall be (7) [F01, F02-OS1.2]
...impervious to moisture and be equipped with a water
3.6.5.5. Insulation and Coverings
connection and floor drain for washing-down purposes:”
(1) [F01, F02-OS1.2]
[F03, F81-OS1.2] Applies to portion of Code text: “The
room or bin into which a refuse chute discharges shall be (2) [F02-OS1.2]
of sufficient size to contain the refuse between normal (3) [F02-OS1.2]
intervals of emptying ...” (4) [F02-OS1.2]
[F41, F81-OH2.4, OH2.5] Applies to portion of Code text: 3.6.5.6. Clearance of Ducts and Plenums
“The room or bin into which a refuse chute discharges (2) [F02-OS1.2]
shall be of sufficient size to contain the refuse between (3) [F02-OS1.2]
normal intervals of emptying ...”
(4) [F02-OS1.2]
(11) [F01, F02-OS1.2]
(5) [F02-OS1.2]
3.6.3.4. Exhaust Duct Negative Pressure
3.6.5.7. Supply, Return, Intake and Exhaust-Air Openings
(1) [F03-OS1.2]
(1) [F02-OS1.2]
3.6.3.5. Grease Duct Enclosures
3.6.5.8. Return-Air System
(1) [F02, F03-OS1.2]
(1) [F02-OS1.2]
[F03, F02-OP1.2]
(2) [F01, F02-OS1.2]
(2) [F02, F03-OS1.2]
(3) [F01, F02-OS1.2]
[F03, F02-OP1.2]
(4) [F01, F02-OS1.2]
3.6.4.2. Fire Separations for Horizontal Service Spaces
3.7.1.1. Room and Space Height
(2) [F03-OP1.2]
(1) [F30-OS3.1]
[F03-OS1.2]
3.7.1.3. Sleeping Areas in Group B and Child Care Facilities
3.6.4.3. Plenum Requirements
(1) [F30-OS3.1]
(1) [F02-OS1.2]
(2) [F30-OS3.1]
(2) [F03-OP1.2, OP1.3]
(3) [F30-OS3.1]
[F03-OS1.2, OS1.3]
3.7.1.4. Sleeping Areas in Camps
3.6.4.4. Attic or Roof Space Access
(1) [F30-OS3.1]
(1) [F01, F02, F12-OP1.2]
(2) [F30-OS3.1]
[F01, F02, F12-OS1.2]
3.7.2.1. Window Areas
3.6.4.5. Horizontal Service Space Access
(1) [F102-OH7]
(1) [F01, F02, F12-OP1.2]
(2) [F102-OH7]
[F01, F02, F12-OS1.2]
(3) [F102-OH7]
3.6.4.6. Crawl Space Access
3.7.3. Reserved
(1) [F01, F02, F12-OP1.2]
3.7.4.1. Plumbing and Drainage Systems
[F01, F02, F12-OS1.2]
(1) [F72-OH2.1] [F70-OH2.2] [F71-OH2.3]
3.6.5.1. Duct Material
(2) [F72-OH2.1]
(1) [F01, F02-OS1.2]
3.7.4.2. Plumbing Fixtures, General
(2) [F02-OS1.2]
(3) [F72-OH2.1] Applies to portion of Code text: “water
(4) [F02-OS1.2]
closets shall be provided”
(5) [F02-OS1.2]
(5) [F71-OH2.3]
3.6.5.2. Vibration Isolation Connectors (7) [F74-OA2]
(1) [F01, F02-OS1.2] (10) [F30-OS3.1]
(2) [F02-OS1.2] (11) [F71-OH2.3]
3.6.5.3. Tape
(1) [F02-OS1.2]
Page 34 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
3.7.4.3. Plumbing Fixtures for Assembly Occupancies 3.7.4.14. Clearances for Water Closets
(1) [F72-OH2.1] (1) [F30-OS3.1]
(2) [F72-OH2.1] 3.7.4.15. Privacy
(3) [F72-OH2.1] (1) [F101-OH6]
(4) [F72-OH2.1] (2) [F101-OH6]
(5) [F72-OH2.1] 3.7.4.67. Water Temperature Control
(6) [F72-OH2.1] [F71-OH2.3] (1)
(7) [F72-OH2.1] 3.7.4.17. Drinking Water
(8) [F72-OH2.1] (1) [F70-OH2.2]
(b) [F101-OH6] 3.7.4.18. Pharmacies
(10) [F72-OH2.1] (1) [F40-OH2.4]
(11) [F72-OH2.1] 3.7.4.19. Plumbing Fixtures for Mobile Home Facilities
(12) [F72-OH2.1] (1) [F72-OH2.1] [F71-OH2.3]
(13) [F72-OH2.1] (2) [F72-OH2.1]
(14) [F72-OH2.1] (3) [F71-OH2.3] Applies to the minimum number of laundry
(15) [F72-OH2.1] trays or similar facilities, and of bathtubs or showers for
(16) [F72-OH2.1] each sex.
3.7.4.4. Plumbing Fixtures for Care or Detention 3.7.5.1. Electrical Systems
Occupancies (1) [F01-OS1.1]
(1) [F72-OH2.1] [F71-OH2.3] [F32-OS3.3]
(2) [F72-OH2.1] [F71-OH2.3] [F01-OP1.1]
(3) [F72-OH2.1] 3.7.5.2. Medical Gas Piping
3.7.4.5. Plumbing Facilities for Dwelling Units (1) [F43, F81, F82-OS3.4]
(1) [F72-OH2.1] [F70-OH2.2] [F71-OH2.3] (b) [F01, F02-OS1.1]
3.7.4.6. Plumbing Fixtures for Other Residential (b) [F01, F02-OP1.1]
Occupancies 3.7.5.3. Shielding of X-Ray Equipment
(1) [F72-OH2.1] (1) [F44-OS3.4]
(2) [F72-OH2.1] 3.7.6.2. Room Finishes
(3) [F71-OH2.3] (1) [F41-OH2.4]
(4) [F50-OH1.1] (3) [F41-OH2.4]
[F71-OH2.3] 3.7.6.3. Location of Plumbing Fixtures
3.7.4.7. Plumbing Fixtures for Business and Personal (1) [F40-OH2.1, OH2.4]
Services Occupancies
(2) [F72-OH2.1] [F71-OH2.3]
(1) [F72-OH2.1]
3.7.6.4. Lavatories, Appliances and Sinks
3.7.4.8. Plumbing Fixtures for Mercantile Occupancies
(1) [F71-OH2.3]
(1) [F72-OH2.1]
(2) [F40-OH2.4]
(2) [F72-OH2.1]
3.7.6.5. Hot and Cold Water Supply
(4) [F72-OH2.1] [F71-OH2.3]
(1) (a) [F71-OH2.3] [F40-OH2.4]
3.7.4.9. Plumbing Fixtures for Industrial Occupancies
(b) [F70-OH2.2]
(1) [F72-OH2.1]
(c) [F40-OH2.4]
3.7.4.10. Glazing
3.7.6.6. Employee Facilities
(1) [F20-OS3.1]
(1) [F41-OH2.4]
3.7.4.11. Surface Protection [F101-OH6]
(1) [F72-OH2.1] [F40-OH2.4] (2) [F71-OH2.3]
(2) [F72-OH2.1] [F40-OH2.4]
3.7.6.7. Sleeping Quarters
3.7.4.12. Floor Drains (1) [F40-OH2.4]
(1) [F30-OS3.1]
3.8.1.2. Entrances
[F40, F41-OH2.4, OH2.6]
(1) [F73-OA1]
3.7.4.13. Grab Bar Installation (2) [F73-OA1]
(1) [F20-OS3.1] (5) [F73-OA1]
SA-1 • Page 35
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
3.8.1.3. Barrier-Free Path of Travel 3.8.3.1. Accessibility Signs
(1) [F73-OA1] (1) [F74-OA2]
(2) (a), (b) [F30-OS3.1] (2) [F74-OA2]
(a), (b) [F73-OA1] (3) [F74-OA2]
(c) [F30-OS3.1] (4) [F74-OA2]
(c) [F73-OA1] (5) [F74-OA2]
(d), (e) [F30-OS3.1] (6) [F74-OA2]
(d), (e) [F73-OA1] (7) [F73-OA1]
(3) [F73-OA1] [F74-OA2]
(4) [F73-OA1] (8) [F73-OA1]
(5) [F30-OS3.1] [F74-OA2]
(6) [F73-OA1] 3.8.3.2. Exterior Walks
3.8.1.4. Escalators and Moving Walks (1) [F73-OA1]
(1) [F73-OA1] [F30-OS3.1]
(2) [F73-OA1] (3) [F73-OA1]
(3) [F73-OA1] [F30-OS3.1]
3.8.1.5. Controls 3.8.3.3. Doorways and Doors
(1) [F10-OS3.7] (1) [F73-OA1]
[F73-OA1] (2) [F74-OA2]
[F74-OA2] (3) [F10-OS3.7]
(2) [F74-OA2] [F74-OA2]
3.8.2.1. Areas Requiring Barrier-Free Path of Travel (4) [F73-OA1]
(1) [F73-OA1] (4.1) [F73-OA1]
(4) [F74-OA2] (5) [F73-OA1]
(5) [F73-OA1] (6) [F71-OH2.3]
[F74-OA2] [F74-OA1]
(6) [F74-OA2] (7) [F73-OA1]
3.8.2.2. Barrier-Free Paths of Travel to Building Entrances, (9) [F30-OS3.1]
Exterior Passenger Loading Zones, and Access to [F73-OA1]
Parking Areas (10) [F73-OA1]
(1) [F73-OA1] (11) [F30-OS3.1]
(2) [F73-OA1] [F73-OA1]
(3) (a) [F74-OA2] (13) [F73-OA1]
(b) [F73-OA1] (14) [F30-OS3.1]
(c) [F74-OA2] (15) [F30-OS3.1]
3.8.2.3. Washrooms Required to be Barrier-Free (17) [F73-OA1]
(1) [F74-OA2] (18) [F30-OS3.1]
(2) [F72-OH2.1] [F71-OH2.3] (19) [F73-OA1]
(3) [F72-OH2.1] [F71-OH2.3] 3.8.3.4. Ramps
(6) [F72-OH2.1] [F71-OH2.3] (1) (b), (c), (d), (e), (h) [F73-OA1]
[F74-OA2] (b), (c), (d), (f), (g), (h) [F30-OS3.1]
3.8.2.4. Hotels (e)(iii) [F30-OS3.1]
(1) [F73-OA1] (e)(v) [F30-OS3.1]
[F74-OA2] 3.8.3.5. Passenger Elevating Devices
(3) [F74-OA2] (1) [F30-OS3.1] [F10-OS3.7] [F73-OA1] [F74-OA2]
(4) [F74-OA2] 3.8.3.6. Wheelchair Spaces and Adaptive Seating
(5) [F74-OA1] (1) [F30-OS3.1] Applies to portion of Code text: “... level, or
(6) [F74-OA1] level with removable seats ...”
(7) [F74-OA2] [F74-OA2] Applies to entire Sentence except for portion
(8) [F73-OA1] of Code text: “... without infringing on egress from any
row of seating or any aisle requirements ...”
Page 36 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(d) [F10-OS3.7] 3.8.3.12. Universal Washrooms
(2) [F74-OA2] (1) [F72-OH2.1] [F71-OH2.3]
(3) [F73-OA1] [F74-OA2]
3.8.3.7. Assistive Listening Devices (b) [F74-OA2] Applies to portion of Code text: “... a door
(1) [F11-OS3.7] that is capable of being locked from the inside ...”
[F74-OA2] (b) [F10-OS3.7]
(2) [F74-OA2] (g) [F30-OS3.1] Applies to the requirement for a coat
(3) [F74-OA2] hook.
3.8.3.8. Water Closet Stalls and Enclosures (j) [F73-OA1]
(1) [F72-OH2.1] (k) [F131-OR2]
[F74-OA2] (2) [F36-OS3.6]
(c) [F101-OH6] (4) [F20-OS3.1]
(c)(i) [F74-OA2] (5) [F74-OA2.1]
(c)(vii) [F36-OS3.6] [F71-OH2.3]
(e) [F30-OS3.1] Applies to portion of Code text: “... be (b) [F20-OS3.1]
equipped with a coat hook ... projecting not more than 3.8.3.13. Showers and Bathtubs
50 mm from the wall ...” (1) [F74-OA2]
(2) [F74-OA2] (2) [F74-OA2]
(3) [F72-OH2.1] (f)(iii) [F20-OS3.1]
[F74-OA2] (4) [F74-OA2]
(4) [F72-OH2.1] (5) [F74-OA2]
[F74-OA2] [F71-OH2.3]
(5) [F30-OS3.1] (a) [F73-OA1]
[F74-OA2] (b) [F10-OS3.7] [F74-OA2]
(6) [F30-OS3.1] (g) [F74-OA2]
[F74-OA2] (7) [F74-OA2]
(7) [F20-OS3.1] (8) [F74-OA2]
[F74-OA2] 3.8.3.14. Service Counters
(8) [F20-OS3.1] (1) [F74-OA2]
[F74-OA2] (2) [F74-OA2]
(9) [F74-OA2] 3.8.3.15. Shelves or Counters for Telephones
(10) [F74-OA2] (1) [F74-OA2]
(b)(vi) [F36-OS3.6] (2) [F74-OA2]
(d) [F30-OS3.1] (3) [F74-OA2]
3.8.3.9. Water Closets (4) [F74-OA2]
(1) [F72-OH2.1] 3.8.3.16. Drinking Fountains
[F74-OA2] (1) [F74-OA2]
3.8.3.10. Urinals (2) [F74-OA2]
(1) [F74-OA2] (3) [F74-OA2]
(2) [F74-OS2] 3.8.3.16.A. Water-Bottle Filling Station
(b) [F30-OS3.1] (1) [F74-OA2]
(3) [F74-OA2] (2) [F74-OA2]
[F101-OH3.2] 3.8.3.17. Platforms
(4) [F74-OA2] (1) [F30-OS3.1]
3.8.3.11. Lavatories, Mirrors and Washroom Accessories 3.8.3.18. Tactile Attention Indicators
(1) [F71-OH2.3] (1) [F30-OS3.1]
[F74-OA2] (2) [F30-OS3.1]
(d) [F31-OS3.2] 3.9.2.1. Flame-Spread Rating
(2) [F74-OA2] (1) [F02-OP1.2]
(5) [F74-OA2] [F02-OS1.2]
SA-1 • Page 37
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
3.9.3.1. Building Areas [F12-OS1.2]
(1) [F02-OP1.1] 3.10.4. 3. Spatial Separations
[F02-OS1.1] (3) [F03-OP3.1]
3.9.3.2. Spatial Separations [F03-OS1.1]
(1) [F03-OP3.1] (4) [F03-OP3.1]
[F03-OS1.1] [F03-OS1.1]
(2) [F03-OP3.1] 3.10.4.5. Provisions for Firefighting
[F03-OS1.1] (2) [F12-OP1.2]
3.9.3.3. Fire Alarm Systems [F12-OS1.2]
(1) [F12-OS1.2, OS1.5] (3) [F12-OP1.2]
3.9.3.4. Provisions for Firefighting [F12-OS1.2]
(1) [F12-OP1.2] (5) [F02-OP1.2]
[F12-OS1.2, OS1.5] [F02-OP3.1]
3.9.3.5. Portable Fire Extinguishers [F02-OS1.2]
(1) [F02, F12, F81-OP1.2] 3.11.3.1. Construction Requirements
[F02, F12, F81-OS1.2] (4) [F30, F120-OS3.1]
3.9.3.7. Fuel-Fired Appliances (5) [F30, F120-OS3.1]
(1) [F05-OS1.5] (6) [F30, F121-OS3.1]
[F43-OS3.7] (7) [F30, F121-OS3.1]
(2) [F03-OP1.2, OP1.4] (8) [F30, F121-OS3.1]
[F03-OS1.2, OS1.4] (9) (a) [F12, F30, F121-OS3.1] [F123-OS3.7]
3.10.2.1. Occupancy Classification (b), (c) [F122-OH2.3]
(1) [F02, F03-OS1.2] [F10-OS1.5] Applies to portion of Code (10) [F30, F121-OS3.1]
text: “(b) shall not contain a Group F, Division 1 (11) (a) [F123-OS3.7]
occupancy.” (b), (c) [F122-OH2.3]
3.10.2.3. Structural Fire Protection (d) [F122-OH2.3]
(2) [F02, F03, F04-OP1.2] [F02, F04-OP1.3] (d) [F30-OS3.1]
[F02, F03, F04-OS1.2] [F02, F04-OS1.3] (12) [F30, F123-OS3.1]
3.10.2.4. Safety Requirements Within Floor Areas (13) [F40-OH2.3]
(5) [F10-OS1.5] [F30-OS3.1, OS3.7] [F30-OS3.1]
(6) [F10-OS1.5] [F30-OS3.1, OS3.7] (14) [F40-OH2.3]
(7) [F10-OS1.5] [F30-OS3.1]
(8) [F10-OS1.5] [F30-OS3.1, OS3.7] (15) [F30-OS3.1]
(9) [F02, F03-OS1.2] (16) [F122-OH2.3]
(10) [F02, F03-OS1.2] [F30-OS3.1]
3.10.2.5. Exit Requirements (17) [F40, F41, F122-OH2.3]
(2) [F10-OS3.7] (18) [F40, F122-OH2.3]
3.10.2.6. Service Facilities (19) [F30, F120-OS3.1]
(2) [F03-OP1.2] (b) [F74-OA2]
[F03-OS1.2] (20) [F40, F41, F122-OH2.3]
3.10.2.7. Sanitary Facilities (21) [F123-OS3.1]
(2) [F72-OH2.1] [F71-OH2.3] (22) [F123-OS3.1]
3.10.3.2. Spatial Separations (23) [F122-OH2.3]
(2) [F03-OP3.1] [F34-OS3.1]
[F03-OS1.1] (24) [F30, F123-OS3.1]
3.10.3.3. Fire Alarm Systems (25) [F30, F120, F121-OS3.1]
(2) [F11-OS1.5] (26) [F30, F120-OS3.1]
3.10.3.4. Provisions for Firefighting (27) [F30, F36, F120-OS3.1]
(2) [F12-OP1.2] (28) [F30, F36, F120-OS3.1]
[F12-OS1.2] 3.11.3.2. Barrier-Free Path of Travel for Outdoor Pool Deck
(3) [F12-OP1.2] (1) [F74-OA2]
Page 38 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
3.11.3.3. Access into Public Pools (4) [F30, F121-OS3.1]
(1) [F74-OA2] (5) [F30, F123-OS3.1]
(2) [F74-OA2] [F122-OH2.3]
[F121-OS3.1] (6) [F30, F123-OS3.1]
(3) [F74-OA2] (7) [F30, F120-OS3.1]
(4) [F74-OA2] (8) [F30, F34-OS3.1]
(5) [F30-OS3.1] (9) [F122-OH2.3]
(6) [F20-OP2.1] (10) [F30, F123-OS3.1]
3.11.4.1. Diving Boards or Platforms (11) [F12, F123-OS3.1]
(2) [F30-OS3.1] 3.11.8.1. Recirculation Systems
(3) [F30-OS3.1] (1) [F122-OH2.3]
(4) [F30-OS3.1] (3) [F46-OH2.2] [F122-OH2.3]
(6) [F30, F120-OS3.1] (5) [F122-OH2.3]
(7) [F30, F120-OS3.1] (6) [F40, F41-OH2.3]
(8) [F30, F120-OS3.1] [F124-OS3.1]
(9) [F30, F120-OS3.1] (7) [F40, F41-OH2.3]
(10) [F30-OS3.1] (8) [F122-OH2.3]
(11) [F30-OS3.1] (9) [F122-OH2.3]
(12) [F30-OS3.1] [F43, F122-OS3.4]
(13) [F30-OS3.1] (10) [F43, F81-OS3.4]
(14) [F30-OS3.1] (11) [F43, F81-OS3.4]
(15) [F30, F120-OS3.1] (12) [F40, F41-OH2.3]
(16) [F30, F34-OS3.1] (13) [F40, F41-OH2.3]
(17) [F30, F120-OS3.1] (14) [F30, F121, F124 -OS3.1]
3.11.5.1. Ramps into Public Pools (15) [F30, F124-OS3.1]
(1) [F74-OA2] (16) [F30, F120-OS3.1]
(2) [F30, F120-OS3.1] (17) [F30, F124-OS3.1]
(d) [F40, F41-OH2.3, OH2.4] (18) [F30, F121, F124-OS3.1]
(3) [F74-OA2] (20) [F30, F124-OS3.1]
[F30, F120, F121-OS3.1] 3.11.9.1. Dressing Rooms and Sanitary Facilities
(b) [F41-OH2.3] (1) [F72-OH2.1] [F70-OH2.2] [F71-OH2.3]
(d) [F32-OS3.7] [F101-OH6]
(4) [F74-OA2] (5) [F40, F71, F122-OH2.3]
[F30, F120, F121-OS3.1] (6) [F40, F122-OH2.3]
(c) [F34-OS3.7] (7) [F40, F71, F122-OH2.2]
3.11.5.2. Public Pools in Group B, Division 2 or 3 Major (8) [F31-OS3.2]
Occupancies (9) [F41, F45-OH2.3]
(2) [F30, F120-OS3.1] [F30-OS3.1]
(3) [F30, F34-OS3.1] (10) [F40, F41-OH2.3]
(4) [F30, F34-OS3.1] (11) [F40, F41-OH2.3]
3.11.6.1. Construction Requirements (12) [F101-OH6]
(3) [F40, F41-OH2.3, OH2.4] (13) [F40, F41-OH2.3]
(4) [F30, F121-OS3.1] [F101-OH6]
(5) [F30-OS3.1] (14) [F40, F41-OH2.3]
(6) [F122-OH2.3] [F30-OS3.1]
[F123-OS3.1] 3.11.10.1. Lighting and Emergency Provisions
(7) [F30, F124-OS3.1] (1) [F30-OS3.1] [F10-OS3.7]
(8) [F30, F123-OS3.1] (2) [F30-OS3.1] [F10-OS3.7]
(9) [F30, F121-OS3.1] (3) [F30, F123-OS3.1] [F10-OS3.7]
3.11.7.1. Construction Requirements (4) [F30, F123-OS3.1] [F10-OS3.7]
(3) [F30, F121-OS3.1] (5) [F30, F123-OS3.1] [F10-OS3.7]
SA-1 • Page 39
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(7) [F30-OS3.1] (15) [F40, F41, F81-OH2.3]
(8) [F30-OS3.1] [F81-OS3.1]
(9) [F30-OS3.1] [F11-OS3.7] (16) [F30, F124-OS3.1]
(10) [F30-OS3.1] [F11, F12-OS3.7] (17) [F30, F121-OS3.1] [F31-OS3.2]
(11) [F30-OS3.1] [F11, F12-OS3.7] [F31-OH1.2]
(12) [F30, F124-OS3.1] (18) [F40, F41-OH2.3]
(13) [F11, F10, F30-OS3.1] [F30-OS3.1]
(14) [F11-OS3.1] 3.12.5.1. Lighting and Emergency Provisions
3.11.11.1. Service Rooms and Storage Facilities (2) [F13, F30-OS3.1]
(2) [F50-OH1.1] (3) [F30, F124-OS3.1]
[F04-OS1.3] (4) [F11, F30-OS3.1]
[F03-OS2.1] (5) [F30, F124-OS3.1]
[F43, F44-OS3.4] [F10-OS3.7] 3.13.2.1. Requirements for Stations
(3) [F01-OS1.1] (3) [F02-OP1.2] Applies to portion of Code text: “... shall be
[F43-OS3.4] of noncombustible construction,”
(4) [F50-OH1.1] [F02-OS1.2] Applies to portion of Code text: “... shall be
[F40, F41-OH2.3] of noncombustible construction,”
[F43-OS3.4] (a), (c) [F03, F04-OP1.2] [F04-OP1.3]
(5) [F50-OH1.1] (a), (c) [F03, F04-OS1.2] [F04-OS1.3]
[F32, F34-OS3.3] [F34, F43-OS3.4] (b), (c) [F04–OP1.3]
3.12.2.1. Construction Requirements (b), (c) [F04-OS1.3]
(2) [F30, F121-OS3.1] (5) [F02-OP1.2] Applies to portion of Code text: “... shall be
of noncombustible construction,”
(3) [F30, F121-OS3.1]
[F02-OS1.2]
(4) (a), (b) [F12, F30, F121-OS3.1] [F123-OS3.7]
Applies to portion of Code text: “... shall be of
(c), (d) [F122-OH2.3] noncombustible construction,”
(6) [F30, F121-OS3.1] [F03, F04-OS1.2] [F04-OS1.3] Applies to portion of
(7) [F30, F120, F121-OS3.1] Code text: “(a) ... floor assemblies shall be
(8) [F70, F71, F72-OH2.3] fire separations with a fire-resistance rating not less than
(9) [F30, F36-OS3.1] 2 h,” and to Clause (d).
3.12.3.1. Ramps into Public Spas (b), (d) [F04-OP1.3] [F04-OS1.3]
(1) [F123-OS3.1] (c), (d) [F04-OP1.3] [F04-OS1.3]
3.12.3.2. Access into Public Spas (6) [F02-OP1.2] Applies to portion of Code text: “... shall be
of noncombustible construction,”
(2) [F74-OA2]
[F02-OS1.2] Applies to portion of Code text: “... shall be
(3) [F30, F120-OS3.1]
of noncombustible construction,”
[F74-OA2]
[F03, F04-OP1.2] [F04-OP1.3] Applies to portion of
(4) [F74-OA2] Code text: “(a) ... floor assemblies shall be fire
(5) [F74-OA2] separations with a fire-resistance rating not less than
3.12.4.1. Water Circulation Systems 1 h,” and to Clause (d).
(2) [F40, F41-OH2.3] [F03, F04-OS1.2] [F04-OS1.3] Applies to portion of
(3) [F40, F41, F81-OH2.3] [F122-OH2.2] Code text: “(a) ... floor assemblies shall be fire
(4) [F30, F124-OS3.1] separations with a fire-resistance rating not less than
1 h,” and to Clause (d).
(5) [F30, F124-OS3.1]
(b), (d) [F04-OP1.3] [F04-OS1.3]
(6) [F30, F124-OS3.1]
(c), (d) [F04-OP1.3] [F04-OS1.3]
(7) [F30, F81, F121, F124-OS3.1]
(10) [F03-OP1.2] [F03-OS1.2]
(8) [F30, F124-OS3.1]
(11) [F03-OP1.2] [F03-OS1.2]
(10) [F30, F124 - OS3.1]
(11) [F30, F81, F124-OS3.1] 3.13.3.1. Application
(12) [F30, F81, F124-OS3.1] (6) [F10-OS3.7]
(13) [F30, F124-OS3.1] 3.13.3.2. Booths and Kiosks
(14) [F40, F41-OH2.3] (1) [F02-OP1.2] Applies to portion of Code text: “... shall be
of noncombustible construction,”
[F43-OS3.4]
Page 40 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F02-OS1.2] Applies to portion of Code text: “... shall be (6) [F30-OS3.1] [F10-OS3.7]
of noncombustible construction,” (7) [F30-OS3.1] [F10-OS3.7]
(2) [F02, F03-OP1.2] (8) [F30-OS3.1] [F10-OS3.7]
[F02, F03-OS1.2] 3.13.4.6. Egress Facilities
3.13.3.3. Service Rooms and Ancillary Spaces (1) [F10-OS3.7]
(1) [F03-OP1.2] (2) [F10-OS3.7]
[F03-OS1.2] (3) [F10-OS3.7]
(2) [F10-OS1.5] (4) (a), (c) [F10-OS3.7]
(4) [F10-OS1.5] (b) [F81-OS3.7]
3.13.3.4. Leased Areas (5) [F10, F40-OS1.5]
(1) [F02, F03-OP1.2] 3.13.5.3. Fire Detectors
[F02, F03-OS1.2] (1) [F11-OS1.5]
(3) [F10-OS1.5] 3.13.5.4. Central Supervising Station
(4) [F02-OP1.2] (1) [F13, F81-OP1.2]
[F02-OS1.2] [F13, F81-OS1.2, OS1.5]
(5) [F02-OP1.2] 3.13.5.5. Annunciators
[F02-OS1.2] (1) [F12-OS1.2, OS1.5]
(7) (a), (b) [F10-OS1.5] 3.13.5.6. Annunciator Indication
(c) [F10, F36-OS1.5] (1) [F12-OS1.2, OS1.5]
3.13.3.5. Vehicle Terminal (2) [F13, F81-OP1.2]
(1) (a) [F02-OP1.2] [F13, F81-OS1.2, OS1.5]
(a) [F02-OS1.2] (3) [F10, F11-OS1.5]
(b) [F03-OP1.2] (4) [F10, F11-OS1.5]
(b) [F03-OS1.2] 3.13.5.8. Communication Systems
3.13.3.6. Access to Adjacent Building (1) [F11, F12-OS3.7]
(1) [F03-OP1.2] (2) [F11, F12-OS3.7]
[F03-OS1.2] (3) [F11, F12-OS3.7]
(2) [F03-OS1.2] [F10-OS1.5] 3.13.5.9. Emergency Reporting Devices
(3) [F10-OS1.5] (1) [F30-OS3.1] [F11, F12-OS3.7]
(4) [F03-OP1.2] 3.13.5.11. Standpipe and Hose Systems
[F03-OS1.2] [F10-OS1.5] (1) [F02-OP1.2]
(5) [F10-OS1.5] [F02-OS1.2]
3.13.3.7. Emergency Lighting (2) [F12-OP1.2]
(1) [F30-OS3.1] [F10-OS3.7] [F12-OS1.2]
(2) [F30-OS3.1] [F10-OS3.7] (3) [F12-OP1.2]
3.13.4.2. General Requirements [F12-OS1.2]
(2) [F10-OS3.7] (4) [F02, F12-OP1.2]
(4) [F10-OS3.7] [F02, F12-OS1.2]
(5) [F10-OS3.7] (5) [F02, F12-OP1.2]
(7) [F03, F06-OS1.2] [F05, F06-OS1.5] [F02, F12-OS1.2]
[F03, F06-OP1.2] (6) [F02-OP1.2]
3.13.4.3. Number and Location of Means of Egress [F02-OS1.2]
(1) [F05, F10-OS1.2] (7) [F02-OP1.2]
(3) [F05, F10-OS1.5] [F02-OS1.2]
(5) [F10-OS3.7] 3.13.6.2. Washrooms Required
3.13.4.4. Egress Capacity (1) [F72-OH2.1] [F71-OH2.3]
(3) [F30-OS3.1] [F10-OS3.7] (2) [F101-OH6] Applies to portion of Code text: “... provided
(4) [F30-OS3.1] [F10-OS3.7] the door to the room can be locked from the inside.”
(5) [F30-OS3.1] [F10-OS3.7] (4) [F72-OH2.1] [F71-OH2.3]
3.13.4.5. Width of Means of Egress 3.13.7.1. Application
(4) [F10-OS3.7] (1) [F06-OP1.2]
SA-1 • Page 41
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F06-OS1.2] [F05, F06-OS1.5] (3) [F03-OP1.2]
3.13.8.1. Application [F03-OS1.2]
(3) [F73-OA1] (4) [F03-OP1.2]
3.13.8.3. Elevator Requirements [F03-OS1.2]
(1) [F73-OA1] 3.14.2.4. Clearances to Flammable Material
(2) [F73-OA1] (1) [F01-OP1.1] [F03-OP1.2]
3.13.8.4. Emergency Operation of Elevators [F01-OS1.1] [F03-OS1.2]
(1) [F12-OP1.2] 3.14.2.5. Flame Resistance
[F12-OS1.2, OS1.5] (1) F01, [F02-OP1.2]
(2) [F12-OP1.2] [F01, F02-OS1.2]
[F12-OS1.2, OS1.5] 3.14.2.6. Emergency Air Supply
(3) [F12-OP1.2] (1) [F20-OS3.7]
[F12-OS1.2, OS1.5] 3.14.2.7. Electrical Systems
(4) [F12-OP1.2] (1) [F34-OP1.1]
[F12-OS1.2, OS1.5] [F34-OS1.1]
3.13.8.5. Washrooms Required to be Barrier-Free [F34-OS3.3]
(1) [F73-OA1] (2) [F81-OP1.1]
(2) [F74-OA2] [F81-OS1.1]
(3) [F74-OA2] 3.15.4.1. Combustible Sign Faces
(4) [F74-OA2] (1) [F02-OP1.2]
(5) [F74-OA2] [F02-OS1.2]
3.14.1.3. Means of Egress (2) [F02-OP1.2]
(3) [F10, F12-OS3.7] [F02-OS1.2]
3.14.1.4. Clearance to Other Structures (4) [F02-OP1.2]
(1) [F03-OP3.1] [F02-OS1.2]
(2) [F03-OP3.1] (5) [F02-OP1.2]
3.14.1.5. Clearances to Flammable Material [F02-OS1.2]
(1) [F01-OP1.1] [F03-OP1.2] 3.15.5.1. Obstructions not Permitted
[F01-OS1.1] [F03-OS1.2] (1) [F50-OH1.1]
3.14.1.6. Flame Resistance [F102-OH7]
(1) [F01, F02-OP1.2] [F12-OP1.2]
[F01, F02-OS1.2] [F12-OS1.2] [F10, F12-OS1.5]
3.14.1.9. Provision for Firefighting [F30-OS3.7]
(1) [F12-OP1.2] 3.15.5.2. Clearance for Exterior Signs
[F12-OS1.2] (1) [F30-OS3.1]
3.14.1.10. Electrical Systems (2) [F30-OS3.1]
(1) [F34-OP1.1] (4) [F32-OS3.3]
[F34-OS1.1] 3.16.1.2. General
[F34-OS3.3] (1) [F02, F03-OS1.2] [F10-OS1.5]
(2) [F81-OP1.1] [F30-OS3.1] [F36-OS3.6]
[F81-OS1.1] (3) [F10-OS1.5]
3.14.2.2. General (4) [F10-OS1.5]
(1) [F01, F02, F36-OS1.5] Applies to portion of Code text: 3.16.1.3. Construction
“Air-supported structures shall not be used for ... Group (2) [F30-OS3.1]
F, Division 1 major occupancies ... “ (4) [F02, F12, F81-OP1.2]
[F10, F36-OS3.7] Applies to portion of Code text: “Air- [F02, F12, F81-OS1.2]
supported structures shall not be used for Groups B, C,
3.16.1.4. Signs
... major occupancies or for classrooms. “
(1) [F20-OP2.1]
(2) [F02, F03-OS1.2]
[F20-OS2.1]
3.14.2.3. Spatial Separation
(2) [F01-OP1.1]
(1) [F03-OP3.1]
[F01-OS1.1]
Page 42 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
3.16.1.5. Lighting 3.17.2.4. Clearance to Other Structures
(1) [F30-OS3.1] (1) [F03-OP3.1]
(2) [F10-OS3.7] 3.17.2.5. Flame Resistance
3.16.1.6. Sprinkler System (1) [F01, F02-OS1.2]
(1) [F02-OP1.2] [F01, F02-OP1.2]
[F02-OS1.2] 3.17.2.6. Provision for Firefighting
(2) [F02, F81, F82-OP1.2] (1) [F12-OP1.2]
[F02, F81, F82-OS1.2] [F12-OS1.2]
(3) [F02-OP1.2] 3.17.2.7. Electrical Systems
[F02-OS1.2] (1) [F34-OP1.1]
(4) [F81-OP1.2] [F34-OS1.1]
[F81-OS1.2] [F34-OS3.3]
(5) [F81, F82-OP1.2] (2) [F81-OP1.1]
[F81, F82-OS1.2] [F81-OS1.1]
(6) [F13-OP1.2] 3.17.2.8. Structural Provisions
[F13-OS1.2, OS1.5] (2) [F20-OS2.1]
(8) [F02-OP1.2] [F20-OP2.1] [F22-OP2.4]
3.16.1.7. Exits and Means of Egress [F22-OH4]
(1) [F12-OP1.2] (4) [F20-OS2.1]
[F12-OS1.2] [F20-OP2.1]
[F10, F12-OS3.7] [F20-OH4] Applies to footings that support floors and
(4) [F10-OS3.7] other elements that support floors.
(5) [F10-OS3.7] [F20-OS3.1] Applies to footings that support floors and
(6) [F10-OS3.7] other elements that support floors.
(7) [F10-OS3.7] [F20-OS3.7] Applies to footings that support access to
(8) [F10-OS3.7] egress facilities.
(9) [F10-OS3.7] 3.18.2.1. Change of Use and Compensating Construction
(10) [F10-OS3.7] (1) 3.2.6.
Applies to additional requirements for high buildings.
(11) [F10-OS3.7]
[F03, F06, F12, F13, F82-OP1.2]
(12) [F30-OS3.1] [F10-OS3.7] [F03-OP3.1]
(13) [F30-OS3.1] [F10-OS3.7] [F02, F03, F06, F12, F13, F82-OS1.2]
3.16.2.2. Construction [F02, F03, F05, F06, F10, F11, F12, F82-OS1.5]
(1) (a) [F13-OP1.2] [F30-OS3.1] [F11, F12-OS3.7]
(a) [F13-OS1.2] [F11, F13-OS1.5] 3.7.
(b) [F13-OP1.2] Applies to health requirements for buildings.
[F74-OA2]
(b) [F13-OS1.2, OS1.5]
[F50-OH1.1]
(c) [F02-OP1.1] [F40, F72-OH2.1] [F70-OH2.2] [F71-OH2.3]
3.16.3.2. Construction [F40, F41-OH2.4]
(2) [F05-OS1.5] [F101-OH6]
(3) [F10-OS1.5] [F102-OH7]
[F01-OP1.1]
3.17.2.2. Means of Egress
[F01-OS1.1]
(2) [F06, F12-OP1.2] [F20, F30-OS3.1] [F32-OS3.3] [F43, F44-OS3.4]
[F06, F12-OS1.2] 3.11.
[F05, F06, F10, F12-OS3.7] Applies to public pools.
(4) [F10-OS3.7] [F74-OA2]
(6) [F05, F10-OS1.5] [F50- OH1.1]
(8) [F30-OS3.1] [F10-OS3.7] [F72-OH2.1] [F46, F70-OH2.2]
[F40, F41, F45, F71, F122 - OH2.3] [F40, F41-OH2.4]
3.17.2.3. Guards
[F101-OH6]
(1) [F30-OS3.1] [F01-OS1.1] [F04-OS1.3]
(3) [F30-OS3.1] [F10-OS3.7] [F03-OS2.1]
(5) [F30-OS3.1]
SA-1 • Page 43
2024 MMAH Supplementary Standard SA-1
Acceptable
Objectives and Functional Statements
Solutions
[F12, F30, F34, F36, F120, F121, F123, F124-OS3.1]
[F31- OS3.2] [F32, F34 - OS3.3] [F34, F43, F44, F81,
F122-OS3.4] [F10, F11, F12, F34, F123-OS3.7]
3.12.
Applies to public spas.
[F74-OA2]
[F46-OH2.2] [F40, F41, F70, F71, F72, F81, F122 -
OH2.3] [F40, F41-OH2.4]
[F11, F12, F13, F30, F34, F36, F81, F120, F121, F123,
F124-OS3.1] [F43, F81, F122-OS3.4] [F10, F34,
F123-OS3.7]
3.18.2.2. Performance Level and Compensating Construction
(1) [F140-OC]
Page 44 • SA-1
2024 MMAH Supplementary Standard SA-1
Table 4
Objectives and Functional Statements Attributed to the Acceptable Solutions in Part 4 of Division
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
4.1.1.3. Design Requirements [F22-OH4]
(1) [F20-OS2.1] 4.1.3.4. Serviceability
(2) [F22-OH4] (1) [F22-OP2.4]
[F22-OP2.4] [F22-OH4]
(3) [F20-OS2.1] Applies to structural members where (2) [F22-OP2.4]
temporary overloading during construction may result in [F22-OH4]
impairment of that or any other member. (3) [F22-OP2.4]
(5) [F20-OS2.3, OS2.4] [F22-OH4]
[F20-OP2.1] [F22-OP2.4] (4) [F22-OP2.4]
4.1.1.5 Design Basis [F22-OH4]
(2) [F20-OS2.1] [F22-OS2.4, OS2.5] (5) [F22-OH4]
[F20-OP2.1] [F22-OP2.4, OP2.5] [F22-OP2.4]
[F22-OH4] (b), (c), (d) [F22-OP2.4]
4.1.2.1. Loads and Effects (6) [F21-OS2.5]
(1) [F20-OS2.1] [F21-OP2.4, OP2.5]
[F20-OP2.1] [F22-OP2.4] [F22-OH4]
[F22-OH4] 4.1.3.5. Deflection
(2) [F20-OS2.1] (1) [F22-OH4]
(3) [F20-OS2.1] [F22-OP2.4]
4.1.2.2. Loads Not Listed (b), (c), (d) [F22-OP2.4]
(1) [F20-OS2.1] (2) [F22-OS2.3, OS2.4]
[F20-OP2.1] [F22-OP2.4] [F22-OP2.4]
[F22-OH4] (3) [F22-OP2.4]
4.1.3.2. Strength and Stability (5) [F22-OS2.3, OS2.4]
(1) [F20-OS2.1] [F22-OP2.3, OP2.4]
[F20-OP2.1] [F22-OP2.4] 4.1.3.6. Vibration
(2) [F20-OS2.1] [F22-OS2.4, OS2.5] Applies to the stabilizing (1) [F22-OH4]
resistance of the dead load. [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4, OP2.5] (2) [F20-OS2.1]
(3) [F20-OS2.1] [F22-OS2.4, OS2.5] Applies to the stabilizing [F20-OP2.1] [F20, F22-OP2.4]
resistance of the dead load.
[F22-OH4]
[F20-OP2.1] [F22-OP2.4, OP2.5]
(3) [F20-OS2.1]
(4) [F20-OS2.1]
[F20-OP2.1] [F20, F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
[F22-OH4]
(5) [F20-OS2.1] [F22-OS2.4, OS2.5]
4.1.4.1. Dead Loads
[F20-OP2.1] [F22-OP2.4, OP2.5]
(2) [F20-OS2.1]
(8) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
(3) [F20-OS2.1]
(9) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
(5) [F20-OS2.1]
(11) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F22-OS2.4, OS2.5]
(6) [F20-OS2.1] [F22-OS2.4, OS2.5]
(12) [F20-OS2.1]
4.1.5.1. Loads Due to Use of Floors and Roofs
[F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1]
4.1.3.3. Fatigue
[F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1]
[F22-OH4]
[F20-OP2.1] [F22-OP2.4]
4.1.5.2. Uses Not Stipulated
(2) [F20-OS2.1]
(1) [F20-OS2.1]
[F20-OP2.1] [F20, F22-OP2.4]
SA-1 • Page 45
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OP2.1] [F22-OP2.4] (5) [F20-OS2.1]
[F22-OH4] [F20-OP2.1, OP2.4]
4.1.5.3. Full and Partial Loading 4.1.5.12. Bleachers
(1) [F20-OS2.1] (1) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] [F20-OP2.1][F22-OP2.4]
[F22-OH4] (3) [F20-OS2.4]
4.1.5.4. Loads for Occupancy Served 4.1.5.13. Helicopter Landing Areas
(1) [F20-OS2.1] (1) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] [F20-OP2.1] [F22-OP2.4]
[F22-OH4] 4.1.5.14. Loads on Guards and Handrails
4.1.5.5. Loads on Exterior Areas (1) [F20-OS2.1]
(1) [F20-OS2.1] (2) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] (3) [F20-OS2.1, OS2.4]
[F22-OH4] (4) [F22-OS2.4]
(2) [F20-OS2.1] (6) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] (7) [F20-OS2.1]
[F22-OH4] 4.1.5.15. Loads on Vehicle Guardrails
(3) [F20-OS2.1] (1) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] 4.1.5.16. Loads on Walls Acting as Guards
[F22-OH4] (1) [F20-OS2.1]
(4) [F20-OS2.1] 4.1.5.17. Firewalls
[F20-OP2.1] [F22-OP2.4] (1) [F20-OS1.2]
[F22-OH4] [F20-OP1.2]
(5) [F20-OS2.1] [F20-OP3.1]
[F20-OP2.1] [F22-OP2.4] (2) [F04-OS1.2]
[F22-OH4] [F04-OP1.2]
4.1.5.7. More Than One Occupancy [F04-OP3.1]
(1) [F20-OS2.1] 4.1.6.2. Specified Snow Load
[F20-OP2.1] [F22-OP2.4] (1) [F20-OS2.1]
[F22-OH4] [F20-OP2.1] [F22-OP2.4]
4.1.5.8. Variation with Tributary Area (2) [F20-OS2.1]
(1) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (3) [F20-OS2.1]
[F22-OH4] [F20-OP2.1] [F22-OP2.4]
(2) [F20-OS2.1] (5) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] [F20-OP2.1] [F22-OP2.4]
[F22-OH4] (6) [F20-OS2.1]
4.1.5.9. Concentrated Loads [F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1] (7) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] [F20-OP2.1] [F22-OP2.4]
4.1.5.10. Sway Forces in Assembly Occupancies (8) [F20-OS2.1] Applies to portion of Code text: “The
(1) [F20-OS2.1] accumulation factor, Ca, shall be 1.0, …”
[F20-OP2.1, OP2.4] [F20-OP2.1] [F22-OP2.4] Applies to portion of Code text:
4.1.5.11. Crane-Supporting Structures and Impact of Machinery “The accumulation factor, Ca, shall be 1.0, …”
and Equipment (a) to (f) [F20-OS2.1] Applies to roof shapes and
(1) [F20-OS2.1] configurations that call for a higher accumulation factor.
[F20-OP2.1] [F20, F22-OP2.4] (a) to (f) [F20-OP2.1] [F22-OP2.4] Applies to roof shapes
and configurations that call for a higher accumulation
(3) [F20-OS2.1] factor.
[F20-OP2.1, OP2.4] (9) [F20-OS2.1]
(4) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1, OP2.4]
Page 46 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
4.1.6.3. Full and Partial Loading (4) [F20-OS2.1]
(1) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (5) [F20-OS2.1]
(2) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (6) [F20-OS2.1]
4.1.6.4. Specified Rain Load [F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1]
(7) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
(2) [F20-OS2.1]
(9) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
(4) [F20-OS2.1]
4.1.6.11. Snow Loads Due to Sliding
[F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1]
4.1.6.5. Multi-Level Roofs
[F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1]
(3) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
(2) [F20-OS2.1]
4.1.6.12. Valleys in Curved or Sloped Roofs
[F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1]
(3) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
F20-OP2.1] [F22-OP2.4] (2) [F20-OS2.1]
(4) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
F20-OP2.1] [F22-OP2.4] (3) [F20-OS2.1]
(5) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] 4.1.6.13. Specific Weight of Snow
4.1.6.6. Horizontal Gap Between a Roof and a Higher Roof (1) [F20-OS2.1]
(1) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] 4.1.6.14. Snow Removal
4.1.6.7. Areas Adjacent to Roof Projections (1) [F20-OS2.1]
(1) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] 4.1.6.15. Ice Loading of Structures
4.1.6.8. Snow Drift at Corners (1) [F20-OS2.1]
(1) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] 4.1.6.16. Roofs with Solar Panels
(2) [F20-OS2.1] (1) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] [F20-OP2.1] [F22-OP2.4]
4.1.6.9. Gable Roofs (3) [[F20-OS2.1]
(1) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (4) [F20-OS2.1]
(2) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (5) [F20-OS2.1]
(4) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (6) [F20-OS2.1]
4.1.6.10. Arch Roofs, Curved Roofs and Domes [F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1] 4.1.7.1. Specified Wind Load
[F20-OP2.1] [F22-OP2.4] (2) [F20-OS2.1]
(2) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F22-OH4]
[F20-OP2.1] [F22-OP2.4]
(3) [F20-OS2.1]
(3) [F20-OS2.1]
[F20-OP2.1][F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
[F22-OH4]
SA-1 • Page 47
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(4) [F20-OS2.1] (2) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] [F20-OP2.1] [F22-OP2.4]
[F22-OH4] [F22-OH4]
(5) [F20-OS2.1] 4.1.7.5. External Pressure Coefficients
[F20-OP2.1] [F22-OP2.4] (2) [F20-OS2.1]
(6) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] [F22-OH4]
[F22-OH4] (3) [F20-OS2.1]
4.1.7.2. Classification of Buildings [F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1] [F22-OH4]
[F20-OP2.1] [F22-OP2.4] (4) [F20-OS2.1]
[F22-OH4] [F20-OP2.1] [F22-OP2.4]
(2) [F20-OS2.1] [F22-OH4]
[F20-OP2.1] [F22-OP2.4] (5) [F20-OS2.1]
[F22-OH4] (6) [F20-OS2.1]
(3) [F20-OS2.1] (7) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] [F20-OP2.1] [F22-OP2.4]
[F22-OH4] (8) [F20-OS2.1]
4.1.7.3. Static Procedure (9) [F20-OS2.1]
(1) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] 4.1.7.6. External Pressure Coefficients for Low Buildings
[F22-OH4]
(2) [F20-OS2.1]
(2) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
[F22-OH4]
[F22-OH4]
(3) [F20-OS2.1]
(3) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
[F22-OH4]
[F22-OH4]
(4) [F20-OS2.1]
(4) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
[F22-OH4]
[F22-OH4]
(5) [F20-OS2.1]
(5) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
[F22-OH4]
[F22-OH4]
(6) [F20-OS2.1]
(6) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
[F22-OH4]
[F22-OH4]
(7) [F20-OS2.1]
(7) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
[F22-OH4]
[F22-OH4]
(8) [F20-OS2.1]
(8) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
[F22-OH4]
[F22-OH4]
(9) [F20-OS2.1]
(10) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
[F22-OH4]
[F22-OH4]
4.1.7.7. Internal Pressure Coefficient
4.1.7.4. Topographic Factor
(1) [F20-OS2.1]
(1) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
[F22-OH4]
[F22-OH4]
4.1.7.8. Dynamic Procedure
Page 48 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(1) [F20-OS2.1] [F22-OH4]
[F20-OP2.1] [F22-OP2.4] 4.1.8.1. Analysis
[F22-OH4] (2) (a) [F20-OS2.1]
(2) [F20-OS2.1] (a) [F20-OP2.1,OP2.3] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (b) [F20-OS2.1]
[F22-OH4] (b) [F20-OP2.1] [F22-OP2.4]
(3) [F20-OS2.1] (3) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] [F20-OP2.1, OP2.4]
[F22-OH4] (4) [F20-OS2.1]
(4) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (5) [F20-OS2.1]
[F22-OH4] [F20-OP2.1] [F22-OP2.4]
4.1.7.9. Full and Partial Wind Loading (6) [F20-OS2.1]
(1) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (7) [F20-OS2.1]
[F22-OH4] [F20-OP2.1] [F22-OP2.4]
(8) [F20-OS2.1]
4.1.7.10. Interior Walls and Partitions
[F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1]
(9) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
4.1.7.11. Exterior Ornamentations, Equipment and Appendages (10) [F20-OS2.1]
(1) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (11) [F20-OS2.1]
4.1.7.12. Attached Canopies on Low Buildings with a Height [F20-OP2.1] [F22-OP2.4]
H ≤ 20 m (12) [F20-OS2.1]
(2) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (13) [F20-OS2.1]
4.1.7.13. Roof-Mounted Solar Panels on Buildings of Any [F20-OP2.3] [F22-OP2.3, OP2.4]
Height (14) [F20-OS2.1]
(1) [F20-OS2.1] [F20-OP2.3] [F22-OP2.3, OP2.4]
[F20-OP2.1] [F22-OP2.4] 4.1.8.3. General Requirements
(2) [F20-OS2.1] (2) [F20-OS2.1]
[F20-OP2.1, OP2.4]
[F20-OP2.1] [F22-OP2.4]
(3) [F20-OS2.1]
(3) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
(4) [F20-OS2.1] (4) [F20-OS2.1]
(5) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
(6) [F20-OS2.1] (5) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] [F20-OP2.1] [F22-OP2.4]
(7) [F20-OS2.1] (6) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] [F20-OP2.1] [F22-OP2.4]
4.1.7.14. Wind Tunnel Procedure (7) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1]
(8) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
[F22-OH4] 4.1.8.4. Site Properties
(2) [F20-OS2.1] (1) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4] [F20-OP2.1] [F22-OP2.4]
[F22-OH4] (2) [F20-OS2.1]
(3) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (4) [F20-OS2.1]
SA-1 • Page 49
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OP2.1] [F22-OP2.4] 4.1.8.11. Equivalent Static Force Procedure for Structures
(5) [F20-OS2.1] Satisfying the Conditions of Article 4.1.8.7.
[F20-OP2.1] [F22-OP2.4] (2) [F20-OS2.1]
(6) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (3) [F20-OS2.1]
4.1.8.5. Importance Factor and Seismic Category [F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1] (4) [F20-OS2.1]
[F20-OP2.1, OP2.3] [F22-OP2.4] [F20-OP2.1] [F22-OP2.4]
4.1.8.6. Structural Configuration (5) [F20-OS2.1]
(3) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (6) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
4.1.8.7. Methods of Analysis
(7) [F20-OS2.1]
(1) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
(8) [F20-OS2.1]
4.1.8.8. Direction of Loading
[F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1]
(9) (a) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
(a) [F20-OP2.1] [F22-OP2.4]
4.1.8.9. Force Reduction Factors, System Overstrength (b) [F20-OS2.1]
Factors and General Restrictions
(b) [F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.1]
(10) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
(2) [F20-OS2.1]
(11) (a) [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
(a) [F20-OS2.1]
(3) [F20-OS2.1]
(b) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
(b) [F20-OP2.1] [F22-OP2.4]
(4) [F20-OS2.1]
(12) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
4.1.8.10. Additional System Restrictions
4.1.8.12. Dynamic Analysis Procedure
(1) [F20-OS2.1]
(1) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
(2) (a) [F20-OP2.3] [F22-OP2.4]
(2) [F20-OS2.1]
(b) [F20-OP2.3] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
(c) [F20-OP2.3] [F22-OP2.4]
(3) [F20-OS2.1]
(d) [F20-OP2.3] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4]
(3) (a) [F20-OP2.3] [F22-OP2.4]
(4) (a) [F20-OS2.1]
(b) [F20-OP2.3] [F22-OP2.4]
(a) [F20-OP2.1] [F22-OP2.4]
(c) [F20-OP2.3] [F22-OP2.4]
(d) [F20-OP2.3] [F22-OP2.4] (5) [F20-OS2.1]
(4) [F20-OS2.1] [F20-OP2.1, OP2.3] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (7) [F20-OS2.1]
(5) [F20-OS2.1] [F20-OP2.1, OP2.3] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (8) [F20-OS2.1]
(6) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (9) [F20-OS2.1]
(8) [F22-OS2.3, OS2.4] [F20-OP2.1] [F22-OP2.4]
[F22-OP2.3, OP2.4] (10) [F20-OS2.1]
(9) [F22-OS2.1] [F20-OP2.1] [F22-OP2.4]
[F20-OP2.1] [F22-OP2.4] (12) [F20-OS2.1]
(10) (a) [F20-OS2.1] [F20-OP2.1] [F22-OP2.4]
(a) [F20-OP2.1] [F22-OP2.4] 4.1.8.13. Deflections and Drift Limits
(b) [F20-OS2.1] (1) [F22-OS2.3, OS2.4]
(b) [F20-OP2.1] [F22-OP2.4] [F22-OP2.3, OP2.4]
Page 50 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F22-OS2.3, OS2.4] [F20-OP2.4]
[F22-OP2.3, OP2.4] (10) [F20-OS2.2] [F22-OS2.4]
(3) [F22-OS2.3, OS2.4] [F20-OP2.2] [F22-OP2.4]
[F22-OP2.3, OP2.4] 4.1.8.17. Site Stability
4.1.8.14. Structural Separation (1) [F20-OP2.1] [F22-OP2.4]
(1) [F22-OS2.3, OS2.4] [F20-OS2.1]
[F22-OP2.3, OP2.4] 4.1.8.18. Elements of Structures, Non-structural Components
and Equipment
[F22-OP4.3]
(1) [F20, F22-OS2.4]
(2) [F20-OS2.1, OS2.3, OS2.4]
[F20-OP2.3] [F22-OP2.3, OP2.4]
[F20-OP2.1, OP2.3, OP2.4]
(4) [F20, F22-OS2.4]
[F20-OP4.3]
[F20, F22-OP2.3, OP2.4]
(3) [F20-OS2.1, OS2.3, OS2.4] (5) [F20, F22-OS2.1]
[F20-OP2.1, OP2.3, OP2.4] [F20, F22-OP2.1, OP2.4]
[F20-OP4.3] (6) [F20, F22-OS2.4]
(4) [F20-OS2.1, OS2.3, OS2.4] [F20, F22-OP2.3, OP2.4]
[F20-OP2.1, OP2.3, OP2.4] (7) [F20, F22-OS2.4] Applies to portion of Code text:
[F20-OP4.3] “Connections to the structure of elements and components
4.1.8.15. Design Provisions listed in Table 4.1.8.18. shall be designed to support the
(1) [F20-OS2.1] component or element for gravity loads, shall conform to
[F20-OP2.1, OP2.3, OP2.4] the requirements of Sentence 4.1.8.18.(1) …”
(2) [F20-OS2.1] [F20, F22-OP2.3, OP2.4] Applies to portion of Code text:
“Connections to the structure of elements and components
[F20-OP2.1, OP2.3, OP2.4] listed in Table 4.1.8.18. shall be designed to support the
(3) [F20-OS2.1] component or element for gravity loads, shall conform to
[F20-OP2.1, OP2.3, OP2.4] the requirements of Sentence 4.1.8.18.(1)…”
(4) [F20-OS2.1] (a) [F20, F22-OS2.4]
[F20-OP2.1, OP2.4] (a) [F20, F22-OP2.3, OP2.4]
(5) [F20-OS2.1, OS2.4] (b), (c) [F20, F22-OS2.4]
[F20-OP2.1, OP2.4] (b), (c) [F20, F22-OP2.3, OP2.4]
(6) [F20-OS2.1] (d) [F20, F22-OS2.4]
[F20-OP2.1] [F22-OP2.4]
(d) [F20, F22-OP2.3,O P2.4]
(7) [F20-OS2.1]
(e) [F20, F22-OS2.4]
[F20-OP2.1] [F22-OP2.4]
(e) [F20, F22-OP2.3, OP2.4]
4.1.8.16. Foundation Provisions
(9) [F22-OS2.3, OS2.4]
(1) [F20-OS2.2, OS2.4]
[F22-OP2.3, OP2.4]
[F20-OP2.2, OP2.4]
(10) [F22-OS2.1, OS2.3, OS2.4]
(2) [F20-OS2.1]
[F20-OP2.1] [F22-OP2.1, OP2.3, OP2.4]
(5) [F20-OS2.2, OS2.4] (11) [F20-OS2.1] [F22-OS2.4]
[F20-OP2.2, OP2.4] [F20, F22-OP2.3, OP2.4]
(6) (a) [F22-OS2.4] (12) [F20-OS2.1] [F22-OS2.3]
(a) [F22-OP2.4] [F20-OP2.1] [F22-OP2.3]
(b) [F22-OS2.4] (14) [F20, F22-OS2.4]
(b) [F22-OP2.4] (16) [F20, F22-OS2.4]
(c) [F20-OS2.4] [F20-OP2.3] [F22-OP2.3, OP2.4]
(c) [F20-OP2.4] 4.1.8.19. Seismic Isolation
(7) [F20-OS2.1] (2) [F20-OS2.1] [F22-OS2.4]
[F20-OP2.1, OP2.4] [F20-OP2.1] [F22-OP2.4]
(8) (a) [F20-OS2.1] (3) [F20-OS2.1]
(a) [F20-OP2.1] [F20-OP2.1] [F22-OP2.4]
(b) [F22-OS2.4] (4) [F20-OS2.1]
(b) [F22-OP2.4] [F20-OP2.1] [F22-OP2.4]
(9) [F20-OS2.4] 4.1.8.20. Seismic Isolation Design Provisions
SA-1 • Page 51
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(1) [F20-OS2.1] [F20-OP2.2] [F21-OP2.6]
[F20-OP2.1] [F22-OP2.4] [F21-OP4.1, OP4.4]
(2) [F20-OS2.1] 4.2.2.3. Field Review
[F20-OP2.1] [F22-OP2.4] (1) [F20-OS2.2, OS2.6] [F21-OS2.6]
(3) [F20-OS2.1] [F22-OS2.4] [F20-OP2.2] [F21-OP2.5]
[F20-OP2.1] [F22-OP2.4] [F21-OP4.1, OP4.4]
(4) [F20-OS2.1] [F22-OS2.4] 4.2.2.4. Altered Subsurface Condition
[F20-OP2.1] [F22-OP2.4] (1) [F20-OP2.2] [F21-OP2.6]
(5) [F20-OS2.1] [F22-OS2.4] [F21-OP4.1, OP4.4]
[F20-OP2.1] [F22-OP2.4] [F20-OS2.2] [F20, F21-OS2.6]
(6) [F20-OS2.1] [F22-OS2.4] (2) [F20-OP2.2] [F21-OP2.6]
[F20-OP2.1] [F22-OP2.4] [F21-OP4.1, OP4.4]
(7) [F20-OS2.1] [F20-OS2.2] [F20, F21-OS2.6]
[F20-OP2.1] [F22-OP2.4] 4.2.3.2. Preservation Treatment of Wood
(9) [F20-OS2.1] [F22-OS2.4] (1) [F80-OS2.3]
[F20-OP2.1] [F22-OP2.4] [F80-OP2.3]
(10) [F22-OS2.4] (2) [F80-OS2.3]
[F22-OP2.3, OP2.4] [F80-OP2.3]
4.1.8.21. Supplemental Energy Dissipation 4.2.3.4. Prevention of Deterioration of Masonry
(2) [F20-OS2.1] [F22-OS2.4] (1) [F80-OS2.3]
[F20-OP2.1] [F22-OP2.4] [F80-OP2.3]
(4) [F20-OS2.1] 4.2.3.6. Protection Against Chemical Attack
[F20-OP2.1] [F22-OP2.4] (1) [F80-OS2.3]
(5) [F20-OS2.1] [F80-OP2.3]
[F20-OP2.1] [F22-OP2.4] 4.2.3.8. Steel Piles
4.1.8.22. Supplemental Energy Dissipation Design (1) [F20-OS2.3]
Consideration [F20-OP2.3]
(1) [F20-OS2.1] [F22-OS2.4] 4.2.3.9. High Strength Steel Tendons
[F20-OP2.1] [F22-OP2.4] (1) [F20, F80-OS2.5, OS2.6]
(3) [F20-OS2.1] [F22-OS2.4] [F20, F80-OP2.5, OP2.6]
[F20-OP2.1] [F22-OP2.4] [F20, F80-OP4.1, OP4.4]
(4) [F20-OS2.1] [F22-OS2.4] 4.2.3.10. Corrosion of Steel
[F20-OP2.1] [F22-OP2.4] (1) [F80-OS2.3]
(5) [F20-OS2.1] [F22-OS2.4] [F80-OP2.3]
[F20-OP2.1] [F22-OP2.4] [F80-OP4.1]
(6) [F20-OS2.1]
4.2.4.1. Design Basis
[F20-OP2.1] [F22-OP2.4]
(1) [F20-OS2.2] [F20, F21-OS2.6]
(7) [F20-OS2.1] [F22-OS2.4]
[F20-OP2.2] [F21-OP2.5]
[F20-OP2.1] [F22-OP2.4]
[F21-OP4.1, OP4.4]
(8) [F20-OS2.1] [F22-OS2.4]
(5) [F21-OS2.5]
[F20-OP2.1] [F22-OP2.4]
[F21-OP2.4, OP2.5]
4.1.8.23. Additional Performance Requirements for Post-
4.2.4.2. Subsurface Investigation
Disaster Buildings, High Importance Category
Buildings, and a Subset of Normal Importance (1) [F20-OS2.2] [F20, F21-OS2.6]
Category Buildings [F20-OP2.2] [F21-OP2.6]
(2) [F20-OS2.1] [F21-OP4.1, OP4.4]
[F22-OP2.3,OP2.4] 4.2.4.3. Identification
(3) [F20-OS2.1] (1) [F20-OS2.2] [F20, F21-OS2.6]
[F22-OP2.3,OP2.4] [F20-OP2.2] [F21-OP2.6]
(4) [F20-OS2.1] [F21-OP4.1, OP4.4]
4.2.2.1. Subsurface Investigation
(1) [F20-OS2.2] [F20, F21-OS2.6]
Page 52 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
4.2.4.4. Depth of Foundations 4.2.5.7. Protection and Maintenance at Excavations
(1) [F21-OP2.4] Applies to portion of Code text: “... the bearing (1) [F80-OS2.6]
surface of a foundation shall be below the level of potential [F80-OP4.1]
damage, including damage resulting from frost action ...”
4.2.5.8. Backfilling
[F21-OP2.4] Applies to portion of Code text: “... the
foundation shall be designed to prevent damage resulting (1) [F21-OP4.1]
from adfreezing and frost jacking.” (a) [F21-OP2.1, OP2.4]
(2) [F21-OP2.4] (a) [F21-OS2.1]
4.2.4.5. Sloping Ground (2) [F21-OP2.4]
(1) [F21-OS2.2] 4.2.6.2. Support of Shallow Foundations
[F21-OP2.2, OP2.4, OP2.6] (1) [F20-OS2.2]
4.2.4.6. Eccentric and Inclined Loads [F20-OP2.2] [F20, F21-OP2.4]
(1) [F20-OS2.1, OS2.2] 4.2.6.3. Incorrect Placement of Shallow Foundations
[F20-OP2.1, OP2.2, OP2.4] (1) [F20-OS2.2]
4.2.4.7. Dynamic Loading [F20-OP2.2,OP2.4] [F21-OP2.4]
(1) [F20-OS2.2] 4.2.6.4. Damaged Shallow Foundations
[F20-OP2.2, OP2.4, OP2.6] (1) [F20-OS2.1]
[F20-OH4] [F20-OP2.1,OP2.4] [F22-OP2.4]
4.2.4.8. Hydrostatic Uplift 4.2.7.2. Design for Deep Foundations
(1) [F22-OP2.1, OP2.4] (3) [F20-OS2.1, OS2.2] [F21-OS2.5]
4.2.4.9. Groundwater Level Charge [F20-OP2.1, OP2.2] [F21, F22-OP2.4]
(1) [F21-OP4.1] (5) [F20-OS2.1]
4.2.4.10. Permafrost [F20-OP2.1] [F20, F22-OP2.4]
(1) [F20-OS2.2] [F21-OS2.5] (6) [F20-OP2.1, OP2.4]
[F20-OP2.2] [F20, F21-OP2.4] [F21-OP2.6] 4.2.7.3. Tolerance in Alignment and Location
4.2.4.11. Swelling and Shrinking Soils (1) [F20-OS2.1]
(1) [F21-OP2.4, OP2.6] [F20-OP2.1] [F20, F22-OP2.4]
4.2.4.12. Expanding and Deteriorating Rock 4.2.7.4. Incorrect Alignment and Location
(1) [F21-OP2.4, OP2.6] (1) [F20-OS2.1]
4.2.4.13. Construction on Fill [F20-OP2.1,OP2.4] [F22-OP2.4]
(1) (a) [F20-OS2.2] [F21-OS2.5] 4.2.7.5. Installation of Deep Foundations
(b) [F20-OP2.2] [F20, F21-OP2.4] [F21-OP2.6] (1) [F81-OS2.1] [F21-OS2.2, OS2.6]
(c) [F01-OS1.1] (a), (b) [F81-OP2.1] [F21-OP2.2] [F21, F81-OP2.4]
(c) [F21-OP4.1]
4.2.5.2. Excavation Construction
(1) [F21-OP4.1] 4.2.7.6. Damaged Deep Foundation Units
(2) [F20-OS2.6] (1) [F20-OS2.1]
[F20-OP2.3] [F20-OP2.1] [F22-OP2.4]
[F20, F21-OP4.1] 4.2.8.2. Use of Existing Foundations
4.2.5.3. Supported Excavations (1) [F20-OS2.1, OS2.2]
(1) [F20-OS2.6] [F20-OP2.1, OP2.2] [F22-OP2.4]
[F21-OP4.1] 4.3.1.1. Design Basis for Wood
(1) [F20-OS2.1] [F80-OS2.3]
4.2.5.4. Unsupported Excavations
[F20-OP2.1] [F80-OP2.3] [F21, F22, F80-OP2.4]
(1) [F20-OS2.6]
[F21, F22, F80-OH4]
[F21-OP4.1]
4.3.1.2. Glued-Laminated Members
4.2.5.5. Control of Water Around Excavations
(1) [F20-OS2.1]
(1) [F60-OS2.6]
[F20-OP2.1] [F21, F22-OP2.4]
[F60-OP4.1, OP4.4]
[F21, F22-OH4]
4.2.5.6. Loss of Ground
4.3.2.1. Design Basis for Plain and Reinforced Masonry
(1) [F21-OP4.1]
(1) [F20-OS2.1] [F80-OS2.3]
SA-1 • Page 53
2024 MMAH Supplementary Standard SA-1
Acceptable
Objectives and Functional Statements
Solutions
[F20-OP2.1] [F80-OP2.3] [F21, F22, F80-OP2.4]
[F21, F22, F80-OH4]
4.3.3.1. Design Basis for Plain, Reinforced and Prestressed
Concrete
(1) [F20-OS2.1] [F80, F81-OS2.3]
[F20-OP2.1] [F80, F81-OP2.3] [F21, F22, F80, F81-OP2.4]
[F21, F22, F80, F81-OH4]
4.3.4.1. Design Basis for Structural Steel
(1) [F20-OS2.1] [F80-OS2.3]
[F20-OP2.1] [F80-OP2.3] [F20, F22, F80-OP2.4]
[F22, F80-OH4]
4.3.4.2. Design Basis for Cold Formed Steel
(1) [F20-OS2.1] [F80-OS2.3]
[F20-OP2.1] [F80-OP2.3] [F20, F22, F80-OP2.4]
[F22, F80-OH4]
4.3.5.1. Design Basis for Aluminum
(1) [F20-OS2.1] [F80-OS2.3]
[F20-OP2.1] [F80-OP2.3] [F20, F22, F80-OP2.4]
[F22, F80-OH4]
4.3.6.1. Design Basis for Glass
(1) [F20-OS2.1]
[F20-OP2.1]
4.4.1.1. Design Basis for Air-, Cable- and Frame-Supported
Membrane Structures
(1) [F20-OS2.1] [F80-OS2.3]
[F20-OP2.1] [F80-OP2.3] [F22-OP2.4]
[F22-OH4]
4.4.2.1. Design Basis for Storage Garages and Repair
Garages
(1) [F21, F61, F80-OS2.3]
[F21, F61, F80-OP2.3, OP2.4]
[F21, F61, F80-OH4]
4.4.4.1. Guards Over Retaining Walls
(1) [F30-OS3.1]
4.4.5.1. Anchor Systems on Building Exterior
(1) [F30-OS3.1]
(2) [F20-OS2.1]
[F30-OS3.1]
(4) [F81-OS2.3]
Page 54 • SA-1
2024 MMAH Supplementary Standard SA-1
Table 5
Objectives and Functional Statements Attributed to the Acceptable Solutions in Part 5 of Division B
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
5.1.4.1. Structural and Environmental Loads [F20, F21, F22-OH1.1, OH1.2, OH1.3]
(1) [F61-OH4] [F20, F21, F22-OH4]
(a) [F20, F51, F55-OS1.4] Applies where required life (3) [F20-OS2.1] [F21, F22-OS2.3, OS2.4]
safety systems are incorporated in environmental [F20, F21, F22-OH1.1, OH1.2, OH1.3]
separators. [F20, F21, F22-OH4]
(a) [F60, F61, F63-OS2.2, OS2.3] 5.2.2.2. Determination of Wind Load
(a) [F55, F61, F63-OH1.1, OH1.2, OH1.3] (2) [F20-OS2.1] [F22-OS2.3, OS2.4]
(b) [F20-OS2.1] [F21, F22-OS2.3, OS2.4] Applies to [F20, F22-OH1.1, OH1.2, OH1.3]
snow fences and sloped glazing.
[F20, F22-OH4]
(b) [F20-OS3.1] Applies to snow fences and sloped
(3) [F20-OS2.1] [F22-OS2.3, OS2.4]
glazing.
[F20, F22-OH1.1, OH1.2, OH1.3]
(b) [F20, F21, F22-OH1.1, OH1.2, OH1.3]
[F20, F22-OH4]
(b) [F20-OH4]
(4) [F20, F55, F61-OS2.1, OS2.3]
(4) [F20-OS2.1] [F21, F22-OS2.3, OS2.4]
[F20, F55, F61-OH1.1, OH1.2, OH 1.3]
[F20, F21, F22-OH1.1, OH1.2, OH1.3]
(5) (a) [F20-OS2.1] [F21, F22-OS2.3, OS2.4] 5.2.2.3. Design Procedures
(a) [F20, F21, F22-OH1.1, OH1.2, OH1.3] (1) [F20-OS2.1] [F22-OS2.3, OS2.4]
(b) [F20-OS2.1] [F21, F22-OS2.3, OS2.4] [F20, F22-OH1.1, OH1.2, OH1.3]
(b) [F20, F21, F22-OH1.1, OH1.2, OH1.3] [F20, F22-OH4]
(6) [F20, F21, F22-OH1.1, OH1.2, OH1.3] 5.3.1.1. Required Resistance to Heat Transfer
(a) [F20-OS2.1, OS2.3] (1) [F51, F63-OS1.4] Applies where required life safety
(b), (c) [F21, F22-OS2.3] systems are incorporated in environmental separators.
[F63-OS2.3]
(b), (c) [F22-OH4]
[F63-OH1.1] [F51, F63-OH1.2]
5.1.4.2. Resistance to Deterioration
5.3.1.2. Properties to Resist Heat Transfer or Dissipate Heat
(1) [F80, F81-OS1.4] Applies where required life safety
systems are incorporated in environmental separators. (1) (a), (b) [F51, F63-OH1.1]
[F80, F81-OS2.3] (b) [F51, F63-OS1.4] Applies where required life safety
systems are incorporated in environmental separators.
[F80, F81-OS3.1] Applies to floor assemblies.
(b), (d) [F51, F63-OS2.3]
[F80, F81-OH1.1, OH1.2, OH1.3]
(c) [F51-OH1.2]
[F80, F81-OH4] Applies to floor assemblies.
(d) [F30-OS3.1]
5.2.1.1. Exterior Environmental Loads
5.3.1.3. Location and Installation of Materials Providing
(2) [F20-OS2.1] Thermal Resistance
[F20, F40-OH1.1] [F20-OH1.2, OH1.3] (1) [F63-OS2.3]
5.2.1.2. Interior Environmental Loads [F51, F63-OH1.1]
(1) [F51, F55, F61, F63-OS1.4] Applies where required life (2) [F51, F63-OS1.4] Applies where required life safety
safety systems are incorporated in environmental systems are incorporated in environmental separators.
separators.
[F63-OS2.3]
[F55, F61, F63-OS2.3]
[F51, F63-OH1.1, OH1.2]
[F51, F55, F61, F63-OH1.1, OH1.2]
5.4.1.1. Required Resistance to Air Leakage
5.2.1.3. Environmental Load and Transfer Calculations
(1) (a), (b), (c), (e) [F40, F55-OH1.1]
(1) [F51, F61, F63-OS2.3] Applies to heat, air and moisture
(a), (b), (f) [F51, F52, F54, F55-OH1.2]
transfer calculations.
(c) [F55, F61, F63-OH1.3]
[F51, F55, F61, F63-OH1.1, OH1.2] [F51, F61-OH1.3]
Applies to heat, air and moisture transfer calculations. (c), (d) [F55, F61, F62, F63-OS2.3]
[F56-OH3.1] Applies to sound transmission calculations. (d) [F55, F62-OS3.1]
(3) [F20-OS1.4] Applies where required life safety systems (f) [F55, F62-OS1.4] Applies where required life safety
are incorporated in environmental separators. systems are incorporated in environmental separators.
[F20-OS2.1] (2) [F51, F55-OS1.4] Applies where required life safety
[F55, F61, F63-OH1.1, OH1.2] [F55, F61-OH1.3] systems are incorporated in environmental separators.
[F61, F63-OS2.3]
5.2.2.1. Determination of Structural Loads and Effects
(1) [F20-OS2.1] [F21, F22-OS2.3, OS2.4]
SA-1 • Page 55
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F40, F51, F55, F61, F63-OH1.1] [F51, F52, F54, F55, (4) [F61-OS2.3]
F61, F63-OH1.2] [F51, F55, F61, F63-OH1.3] [F61-OH1.1, OH1.2, OH1.3]
(3) [F55-OS1.4] Applies where required life safety systems 5.7.1.2. Required Protection
are incorporated in environmental separators.
(1) [F60-OS2.3]
[F55-OS2.3] [F60-OH1.1, OH1.2, OH1.3]
[F55-OH1.1, OH1.2, OH1.3] (2) [F60-OS2.2, OS2.3]
(4) [F51, F61, F63-OS1.4] Applies where required life safety [F60-OH1.1, OH1.2, OH1.3]
systems are incorporated in environmental separators.
5.7.3.2. Required Protection
[F61, F63-OS2.3]
(1) [F61-OS2.3]
[F51, F55, F61, F63-OH1.1, OH1.2] [F55, F61-OH1.3] [F61-OH1.1, OH1.2, OH1.3]
5.4.1.2. Air Barrier Assembies 5.7.3.3. Waterproofing
(1) [F55-OS1.4] Applies where required life safety systems (1) [F61-OS2.3]
are incorporated in environmental separators. [F61-OH1.1, OH1.2, OH1.3]
[F55-OS2.3] 5.7.3.4. Where Dampproofing is Permitted
[F55-OH1.1, OH1.2, OH1.3] (1) [F61-OS2.3]
(2) [F55-OS1.4] Applies where required life safety systems [F61-OH1.1, OH1.2, OH1.3]
are incorporated in environmental separators. (2) [F61-OS2.3]
[F55-OS2.3] [F61-OH1.1, OH1.2, OH1.3]
[F55-OH1.1, OH1.2, OH1.3] 5.8.1.1. Required Protection
(4) [F55-OH1.1] (1) [F56-OH3.1]
5.5.1.1. Required Resistance to Vapour Diffusion (2) [F56-OH3.1]
(1) [F63-OS2.3] 5.8.1.2. Determination of Sound Transmission Ratings
[F63-OH1.1, OH1.2] (1) [F56-OH3.1]
(2) [F63-OS2.3] (2) [F56-OH3.1]
[F63-OH1.1, OH1.2] 5.8.1.4. Detailed Method for Calculating ASTC
5.5.1.2. Vapour Barrier Properties and Installation (1) [F56-OH3.1]
(1) [F63-OS2.3] (2) [F56-OH3.1]
[F63-OH1.1, OH1.2] (3) [F56-OH3.1]
(2) [F63-OS2.3] (4) [F56-OH3.1]
[F63-OH1.1, OH1.2] (5) [F56-OH3.1]
(3) [F63-OS2.3] (6) [F56-OH3.1]
[F63-OH1.1, OH1.2] (7) [F56-OH3.1]
5.6.1.1. Required Protection from Precipitation 5.8.1.5. Simplified Method for Calculating ASTC
(1) [F61-OS2.3] (1) [F56-OH3.1]
[F61-OH1.1, OH1.2, OH1.3] (2) [F56-OH3.1]
(3) [F56-OH3.1]
5.6.1.2. Installation of Protective Materials
(4) [F56-OH3.1]
(1) [F61-OS2.3]
(5) [F56-OH3.1]
[F61-OH1.1, OH1.2, OH1.3]
(6) [F56-OH3.1]
(2) [F61-OS2.3]
5.9.1.1. Compliance with Applicable Standards
[F61-OH1.1, OH1.2, OH1.3]
(1) [F20, F80-OS2.1] [F20-OS2.2]
5.6.2.1. Sealing and Drainage [F20, F22, F51, F61, F63, F80-OS2.3] [F51-OS2.5]
(1) [F61, F62-OS2.3] F61, F63, F80-OS3.1]
[F61, F62-OH1.1, OH1.2, OH1.3] [F61, F63, F80-OH4] Applies to floor assemblies.
5.6.2.2. Accumulation and Disposal [F55-OH1.1]
(1) [F30-OS3.1] [F20, F22, F51, F54, F55, F61, F63, F80-OH1.1,OH1.2]
(2) [F61-OS2.3] [F55, F61, F80-OH1.3]
[F42-OH2.5]
[F61-OH1.1, OH1.2, OH1.3]
[F61, F63, F80-OH4] Applies to floor assemblies.
(3) [F21-OS2.2] [F60-OS2.3]
[F20, F80-OP2.1, OP2.3] [F22,F80-OP2.4]
[F61-OH1.1, OH1.2, OH1.3]
(b) [F21-OP2.6]
Page 56 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable
Objectives and Functional Statements
Solutions
(a) [F61, F63-OS1.4] Applies where required life safety
systems are incorporated in environmental separators.
5.9.2.2. Applicable Standards
(1) [F20, F55, F61-OS2.3]
[F20, F55, F61, F63-OH1.1, OH1.3]
[F20, F55, F61, F63, F81-OH1.2]
[F20, F55, F61-OP2.3]
5.9.2.4. Heat Transfer
(2) [F63-OS2.3]
[F63-OH1.1, OH1.2]
5.9.3.3. Heat Transfer
(2) [F63-OS2.3]
[F63-OH1.1, OH1.2]
5.9.3.4. Air Leakage
(2) [F55-OS1.4] Applies where required life safety systems
are incorporated in environmental separation.
[F55, F63-OS2.3]
[F55, F63-OH1.1, OH1.2, OH1.3]
5.9.3.5. Water Penetration
(2) [F61-OS2.3]
[F61-OH1.1, OH11.2, OH1.3]
5.9.4.1. Structural Loads, Heat Transfer, Air Leakage, Vapour
Diffusion and Water Penetration
(1) (b) [F61, F62-OS2.3]
(b) [F61, F62-OH1.1, OH1.2, OH1.3]
SA-1 • Page 57
2024 MMAH Supplementary Standard SA-1
Table 6
Objectives and Functional Statements Attributed to the Acceptable Solutions in Part 6 of Division B
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
6.2.1.1 Good Engineering Practice 6.2.2.1. Applicable Standard
(1) [F31, F50, F51, F52, F54, F63-OS3.2, OS3.4] (1) [F81-OS1.1]
(a) to (e) [F31, F51-OP1.1] 6.2.3.1. Solid Fuel Storage Bins
(a) to (c), (e) to (i) [F40, F50, F51, F52, F54, F63-OH1.1] (1) [F30-OH2.1]
(a) to (c), (e) to (h) [F50, F51, F52, F54, F63-OH1.2, (2) [F01-OS1.1]
OH1.3] [F01-OP1.1]
(d) [F01-OS1.1] 6.3.1.1. Required Ventilation
6.2.1.1A. Design Indoor Air Temperatures (2) [F41, F50, F52, F53, F63-OH1.1]
(1) [F51-OH1.2] (3) [F40, F41, F50, F52, F53, F63-OH1.1]
(2) [F51-OH1.2] 6.3.1.1.A. Natural Ventilation
6.2.1.2. Outdoor Design Conditions (1) [F50-OH1.1]
(2) [F40, F50-OH1.1] (2) [F50-OH1.1]
(3) [F40, F43, F44, F50-OH1.1] 6.3.1.2. Crawl Spaces and Attic or Roof Spaces
[F44-OS3.4] (1) [F61, F63, F641-OH1.1, OH1.3]
6.2.1.3. Expansion, Contraction and System Pressure 6.3.1.3. Ventilation of Storage and Repair Garages
(1) [F20-OS3.2] (1) [F44, F50-OS3.4]
6.2.1.4. Structural Movement (2) [F44-OS3.4]
(1) [F23-OS3.1] (3) [F44-OS3.4]
[F50, F51, F63-OH1.1, OH1.2, OH1.3] (4) [F44, F50-OS3.4]
6.2.1.5. Installation Standards (5) [F44, F50-OH1.1]
(1) [F43-OP1.1] [F44, F50-OS3.4]
[F43-OS1.1] (7) [F44, F50-OH1.1]
[F43-OS3.4] [F44, F50-OS3.4]
(2) [F43-OP1.1] (8) [F44, F50-OH1.1]
[F43-OS1.1] [F44, F50-OS3.4]
[F43-OS3.4] (9) [F44, F50-OH1.1]
(3) [F41, F50, F63-OH1.1] [F51, F52-OH1.2] [F44, F50-OS3.4]
[F63-OS2.3] 6.3.1.5. Indoor Air Contaminants
[F44-OS3.4] (1) [F44-OH1.1]
(4) [F41, F50, F63-OH1.1] [F51, F52-OH1.2] [F44-OS3.4]
[F63-OS2.3] (2) [F44-OH1.1]
[F44-OS3.4] (3) [F52-OH1.1]
(5) [F43-OP1.1] 6.3.1.6. Commercial Cooking Equipment
[F43-OS1.1] (1) [F01, F44-OP1.1]
[F43-OS3.4] [F01, F44-OS1.1]
(6) [F51, F63-OH1.2, OH1.3] 6.3.2.2. Drain Pans
[F31, F51-OP1.1] (1) [F41, F44, F50, F82-OH1.1]
[F31, F51, F63-OS3.2, OS3.4] (2) [F40, F41, F44, F50-OH1.1]
(7) [F110-OE] 6.3.2.3. Materials in Air Duct Systems
6.2.1.6. Installation ─ General (2) [F20, F80-OH1.1, OH1.2]
(1) [F82-OS1.1] (3) [F44, F81-OS3.4]
[F82-OS3.4] [F81-OH1.1]
(4) [F20, F80-OH1.1, OH1.2]
[F82-OP1.1]
6.3.2.4. Connections in Air Duct Systems
(2) [F31-OS3.1]
(1) [F81-OH1.1, OH1.2]
(3) [F81-OS3.2, OS3.3, OS3.4]
[F44, F81-OS3.4]
[F81-OS1.1]
6.3.2.5. Duct Coverings, Linings, Adhesives and Insulation
6.2.1.7. Asbestos
(2) [F81-OH1.1, OH1.2]
(1) [F43-OH1.1]
[F81-OS1.1]
[F81-OP1.1]
Page 58 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
6.3.2.6A. Construction and Installation of Ducts and Plenums [F82-OS3.4]
(1) [F20-OH4] 6.3.2.10. Exhaust Ducts and Outlets
[F20-OP2.4] (1) [F44-OH1.1]
[F20-OS2.3] (2) [F44-OH1.1]
(2) [F03-OP1.1] (3) [F81-OH1.1, OH1.2]
[F03-OS1.1] (4) [F81-OH1.1, OH1.2]
(3) [F63-OH1.1] [F51, F52-OH1.2] (5) [F81-OH1.1]
[F01-OS1.1] (6) [F81-OH1.1]
[F20, F63-OS2.3] (7) [F81-OS1.1]
[F20-OS3.1] (8) [F52-OH1.1]
(4) [F43, F63-OH1.1] [F51, F52-OH1.2] [F01-OS1.1]
[F01-OP1.1] [F01-OP1.1]
[F01-OS1.1] (9) [F52-OH1.1]
[F63-OS2.3] (10) [F81-OH1.1]
(5) [F43, F63-OH1.1] [F51, F52-OH1.2] (11) [F44, F81-OH1.1]
[F01-OP1.1] [F44, F81-OS1.1]
[F01-OS1.1] (12) [F44, F81-OH1.1]
[F63-OS2.3] (13) [F44, F81-OH1.1]
(6) [F63-OH1.1] [F51, F52-OH1.2] [F81-OH1.2]
[F01-OP1.1] (14) [F40, F50-OH1.1]
[F01-OS1.1] (15) [F40, F50-OH1.1]
[F63-OS2.3] (16) [F40, F50-OH1.1]
(7) [F63-OH1.1] [F51, F52-OH1.2] 6.3.2.11. Return-Air System
[F63-OS2.3] (3) [F10-OS1.5]
[F20-OS3.1] (4) [F40-OH1.1]
(8) [F80-OH1.1, OH1.2]
[F44-OS1.1]
[F80-OS2.3]
[F10-OS3.7]
(9) [F44, F81-OH1.1] [F81-OH1.2]
(5) [F50, F81-OH1.1]
6.3.2.7. Interconnection of Systems [F44, F81-OS3.4]
(1) [F40-OH1.1]
6.3.2.12. Underground Ducts
[F44-OS1.1]
(1) (a) [F44, F81-OH1.2, OH1.3]
(2) [F44, F81-OH1.1]
(b) [F44, F81-OH1.1]
[F44, F81-OP1.1] (c) [F44, F81-OH1.1]
[F44, F81-OS1.1] (2) [F81-OH1.1, OH1.2, OH1.3]
(3) [F44, F81-OH1.1]
6.3.2.13. Filters
(4) [F40-OH1.1] (1) [F80-OS1.1]
[F44-OS1.1] [F80-OP1.1]
[F10-OS3.7] (2) [F30-OS3.3]
6.3.2.8. Make-up Air [F4381, F4381-OH1.1]
(1) [F50, F81-OH1.1] 6.3.2.14. Cleaning Devices
[F44, F81-OS3.4] (1) [F40, F50-OH1.1]
(2) [F81-OH1.1] (2) [F40, F43, F44, F50-OH1.1]
[F44, F81-OS3.4] [F44-OS3.4]
(3) [F81-OH1.2] 6.3.2.15. Evaporative Heat Rejection System
6.3.2.9. Supply, Return, Intake and Exhaust Air Openings (1) [F40, F41, F50-OH1.1]
(1) [F81-OH1.2] (2) [F40, F41, F50-OH1.1]
[F30-OS3.1] (3) [F40, F41, F50-OH1.1]
(2) [F41, F44, F81-OH1.1] (4) [F40, F41, F50-OH1.1]
[F44, F81-OS3.4] (5) [F40, F41-OH1.1]
(3) [F44, F81-OH1.1] (6) [F40, F41-OH1.1]
[F44, F81-OS3.4] (7) [F40, F41-OH1.1]
(4) [F81-OH1.1] (8) [F46-OH2.2]
(5) [F82, F81-OH1.1] (9) [F40, F41-OH1.1]
SA-1 • Page 59
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(10) [F46, F81-OH2.1] (a) [F02-OP1.2] Applies to portion of Code text: “… be
(11) [F41, F82-OH1.1] constructed of noncombustible materials …”
[F82-OS3.1] (b) [F82-OS1.1] [F02-OS1.2]
6.3.2.16. Evaporative Air Coolers, Misters, Atomizers, Air (b) [F02-OP1.2]
Washers and Humidifiers (3) [F02-OS1.2]
(1) [F44, F50-OH1.1] [F02-OP1.2]
(2) [F40, F41, F50-OH1.1] 6.4.1.2. Appliances Installed Outside the Building
(3) [F40, F41, F50-OH1.1]
(1) [F81-OS1.1]
(4) [F40, F41, F50-OH1.1]
[F81-OH1.1]
[F40, F41, F50, F82-OH1.1]
[F81-OP1.1]
(5) [F40, F41, F50-OH1.1]
(6) [F46-OH2.2] 6.4.2.1. Clearances
6.3.2.17. Fans and Associated Air-Handling Equipment (1) [F01-OS1.1]
(1) [F44, F81-OH1.1] [F01-OP1.1]
[F44, F81-OS3.4] 6.4.3.1. Lining or Backing
(2) [F81-OH1.1] (1) [F01-OS1.1]
6.3.3.1. Requirement for Venting [F01-OP1.1]
(2) [F40, F44, F50-OH1.1] (2) [F01-OS1.1]
6.3.3.2. Masonry or Concrete Chimneys 6.5.1.1. Insulation and Coverings
(2) [F01-OS1.1] (2) [F20, F30-OS3.2, OS3.4]
[F01-OP1.1] (3) [F31-OS3.2]
6.3.3.3. Metal Smoke Stacks
6.6.1.1. Cooling Units
(1) [F01-OS1.1]
(1) [F43, F81-OS3.4]
[F01-OP1.1]
6.7.1.1. Piping Materials and Installation
6.3.3.4. Access Ladders
(1) [F20-OS3.2, OS3.4]
(1) [F20, F80-OS3.1]
(2) [F21-OH1.1]
(2) [F30-OS3.1]
(3) [F20-OS2.2]
6.3.4.2. General Ventilation
6.7.1.2. Clearances
(1) [F01-OS1.1]
(1) [F01-OS1.1]
[F01-OP1.1]
[F02-OP1.2] [F01-OP1.1]
[F81, F82-OS1.1] 6.7.1.3. Surface Temperature
[F02-OS1.2] (1) [F31-OS3.2]
(2) [F11, F81-OS1.1] 6.7.1.4. Protection
6.3.4.3. Enclosure Exhaust Ventilation (1) [F01-OS1.1]
(1) (a), (c), (d) [F01-OS1.1] [F01-OP1.1]
(a) [F02-OS1.2] 6.7.2.1. Storage Bins
(a) [F02-OP1.2] (1) [F30, F31, F43-OS3.2, OS3.4]
(b) [F02-OS1.2] [F81-OS1.1] (2) [F01-OS1.1]
(e) [F12-OS1.1, OS1.2] [F01-OP1.1]
(e) [F12-OP1.1, OP1.2] 6.8.1.1. Access Openings
6.3.4.4. Enclosure Construction (1) [F36-OS3.6]
(1) (a) [F01-OS1.1] Applies to portion of Code text: “… be 6.8.1.2. Openings in Air Duct Systems
constructed of … materials compatible with … the (1) [F44, F81-OS3.4]
dangerous goods vapours and particles being exhausted,” [F81-OH1.1, OH1.2]
(a) [F80-OS1.1] Applies to portion of Code text: “… be (2) [F82-OS1.1]
constructed of … materials … chemically resistant to the
dangerous goods vapours and particles being exhausted,” 6.8.1.3. Odour Removal Equipment
(a) [F02-OS1.2] Applies to portion of Code text: “… be (1) [F82-OH1.1]
constructed of noncombustible materials …” (2) [F82-OH1.1]
(a) [F80-OS3.4] Applies to portion of Code text: “… be 6.9.1.2. Hazardous Gases, Dusts or Liquids
constructed of … materials … chemically resistant to the (1) [F01-OS1.1]
dangerous goods vapours and particles being exhausted,” [F01-OP1.1]
(2) [F01-OS1.1]
Page 60 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable
Objectives and Functional Statements
Solutions
[F01-OP1.1]
6.9.1.3. Commercial Cooking Equipment
(1) [F02, F81-OS1.2]
[F02, F81-OP1.2]
6.9.3.1. Carbon Monoxide Alarms
(2) (a), (b), (d) [F44-OS3.4]
(c) [F81-OS3.4]
(3) [F44-OS3.4]
(4) [F44-OS3.4]
(5) [F44-OS3.4]
6.9.4.1. Ash Storage Bins
(1) [F01-OS1.1]
[F01-OP1.1]
(2) [F01-OS1.1]
[F01-OP1.1]
SA-1 • Page 61
2024 MMAH Supplementary Standard SA-1
Table 7
Objectives and Functional Statements Attributed to the Acceptable Solutions in Part 7 of Division B
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
7.1.1B.2. Floor Drains 7.2.1.2. Restrictions on Re-Use
(1) [F62-OH1.3] (1) [F41, F81-OH1.1] Applies to vent pipes.
[F62-OH2.1] [F81-OH1.3] Applies to water pipes.
[F62, F72-OP5] [F81, F113-OH2.1] [F46, F70-OH2.2]
(3) [F62-OH1.3] [F71, F72-OH2.3] Applies to equipment.
[F62-OH2.1] [F43-OS3.4] Applies to equipment.
[F41-OH2.4] Applies to floor drains in garbage rooms. [F81, F113-OP5] Applies to drainage pipes.
[F62, F72-OP5] [F81-OP5] Applies to water pipes.
7.1.2.1. Sanitary Drainage Systems (2) [F70-OH2.2]
(1) [F72-OH2.1] 7.2.1.5. Withstanding Pressure
(2) [F72-OH2.1] (1) [F20, F81, F113-OE]
[F72-OP5] [F20, F81, F113-OH2.1, OH2.3]
7.1.2.2. Storm Drainage Systems [F20, F81, F113-OP5]
(1) [F72-OP5] 7.2.1.6. Working Pressure of a Water Service Pipe
7.1.2.3. Water Distribution Systems (1) [F20, F81-OH2.3]
(1) [F46, F70-OH2.2] [F20 -OP5]
7.1.2.4. Separate Services 7.2.2.1. Surface Requirements
(1) [F70-OH2.1] (1) [F41-OH2.4]
[F81-OH2.2] Applies to water service pipe. 7.2.2.2. Conformance to Standards
[F81-OH2.6] Applies to drainage pipe. (0.1) [F80, F81-OH2.1, OH2.4]
[F81-OP5] [F80, F81-OP5]
(2) [F81-OH2.2] Applies to water service pipe. (1) [F80, F81-OH2.1, OH2.4]
[F81-OH2.6] Applies to drainage pipe. [F80, F81-OP5]
[F81-OP5] 7.2.2.3. Showers
7.1.2.5. Private Sewers and Private Water Supply (1) [F80-OH2.1]
(1) [F62, F70-OH2.1] [F80-OP5]
[F81-OH2.2] (2) [F80-OH2.1, OH2.4]
[F81-OP5] [F40-OP5]
(2) [F62, F70-OH2.1] (3) [F45-OH2.1]
[F81-OH2.6]
(4) [F45-OH2.1]
[F81-OP5]
7.2.2.4. Concealed Overflows
7.1.3.1. Lighting and Ventilation Requirements (1) [F41, F81-OH2.1, OH2.4]
(1) [F30-OS3.1] Applies to the requirement for lighting. 7.2.2.5. Water Closets in Public Washrooms
[F40, F41, F50-OH1.1] Applies to the requirement for (1) [F40-OH2.4]
ventilation.
7.2.2.6. Lavatories
7.1.3.2. Accessibility
(1) [F41, F81-OH2.1, OH2.4]
(1) [F40-OH2.1] [F71-OH2.3] [F41, F81-OH2.4]
7.2.2.7. Trough Urinals
[F82-OH2.1, OH2.2, OH2.3, OH2.4] Applies to the need for
maintenance. (1) [F40-OH2.1, OH2.4]
[F81-OP5] 7.2.3.1. Traps
7.1.3A.1. Structural Movement (1) [F40, F81-OH1.1]
(2) [F44, F81-OH1.1]
(1) [F23-OS3.1]
(3) [F81-OH2.1, OH2.3, OH2.4,]
[F81-OH1.3, OH2.1, OH2.4, OH2.6]
[ F81-OP5]
7.2.1.1. Exposure of Materials (4) [F81-OH1.1]
(1) [F80-OH2.1, OH2.2, OH2.3, OH2.4] (5) [F81-OH1.1]
[F80-OP5] (6) [F81-OH1.1]
(2) [F80-OH2.1] (8) [F81-OH1.1]
[F80-OP5] [F81-OP5]
Page 62 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
7.2.3.2. Interceptors [F20, F81-OP5]
(1) [F81, F82-OH2.1, OH2.3, OH2.4] (3) [F20, F81-OH2.2]
(2) [F81-OH2.1, OH2.3, OH2.4] [F20, F81-OP5]
(4) [F81-OP5] 7.2.5.5. Polyethylene Pipe Used Underground
7.2.3.3. Tubular Traps (1) [F20, F81-OH2.1, OH2.6]
(1) [F82-OH2.1, OH2.4] [F20, F81-OP5]
[F82-OP5] 7.2.5.6. Crosslinked Polyethylene Pipe and Fittings
7.2.4.1. T and Cross Fittings (1) [F20, F81-OH2.2]
(1) [F81-OH2.1, OH2.4] [F20, F81-OP5]
[F81-OP5] 7.2.5.7. PVC Pipe and Fittings
(2) [F81-OH2.1, OH2.4] (1) [F20, F81-OH2.2]
[F81-OP5] [F20, F81-OP5]
7.2.4.2. Sanitary T Fittings (2) [F20, F81-OH2.2]
(1) [F81-OH2.1, OH2.4] [F20, F81-OP5]
[F81-OP5]
7.2.5.8. CPVC Pipe, Fittings and Solvent Cements
(2) [F81-OH2.1, OH2.4]
(1) [F20, F81-OH2.2]
[F81-OP5]
[F20, F81-OP5]
7.2.4.3. 90° Elbows
(2) [F20, F81-OH2.2]
(1) [F81-OH2.1, OH2.4]
[F20, F81-OP5]
[F81-OP5]
7.2.5.9. Plastic Pipe, Fittings and Solvent Cement Used
7.2.4.4. Fittings Restricted in Use
Underground
(1) [F81-OH2.1, OH2.4]
(1) [F20, F80, F81, F113-OH2.1, OH2.6]
[F81-OP5]
[F20, F80, F81, F113-OP5]
7.2.4.5. Assembled Pipe or Tubing (2) [F20, F80, F81, F113-OH2.1, OH2.6]
(1) [F81-OH2.1, OH2.4]
[F20, F80, F81, F113-OP5]
[F81-OP5]
7.2.5.10. Transition Solvent Cement
7.2.5.1. Fibrocement Pipe and Fittings
(1) [F20, F80, F81, F113-OH2.1, OH2.6]
(1) [F20-OH2.1 ]
[F20, F80, F81, F113-OP5]
[F20-OP5]
(2) [F20, F80, F81, F113-OH2.1, OH2.6]
7.2.5.2. Concrete Pipe and Fittings
[F20, F80, F81, F113-OP5]
(1) [F20, F80, F81-OH2.1, OH2.6]
7.2.5.11. Plastic Pipe, Fittings and Solvent Cement Used in
[F20, F80, F81-OP5] Buildings
(2) [F20, F80, F81-OH2.1, OH2.6] (1) [F20, F43, F81-OH1.1] Applies to venting system.
[F20, F80, F81-OP5] [F20, F80, F81, F113-OH2.1]
(3) [F20, F80, F81-OH2.1, OH2.6] [F20, F80, F81, F113-OP5]
[F20, F80, F81-OP5] (1.1) [F20, F80, F81-OH1.3]
(4) [F20, F80, F81-OH2.1, OH2.6] [F20, F80, F81-OP5]
[F20, F80, F81-OP5] (1.2) [F20-OH1.3]
(5) [F20, F80, F81-OH2.1, OH2.6] [F20-OP5]
[F20, F80, F81-OP5] 7.2.5.12. Polyethylene/Aluminum/Polyethylene Composite Pipe
7.2.5.3. Vitrified Clay Pipe and Fittings and Fittings
(1) [F20, F80, F81-OH2.1, OH2.6] (1) [F20-OH2.1, OH2.2, OH2.3]
[F20, F80, F81-OP5] [F20-OP5]
(2) [F20-OH2.1, OH2.2, OH2.3]
(2) [F20, F80, F81-OH2.1, OH2.6]
[F20-OP5]
[F20, F80, F81-OP5]
(3) [F20-OH2.1, OH2.2, OH2.3]
(3) [F20, F80, F81-OH2.1, OH2.6]
[F20-OP5]
[F20, F80, F81-OP5]
(4) [F20-OH2.1, OH2.2, OH2.3]
7.2.5.4. Polyethylene Pipe and Fittings [F20-OP5]
(1) [F20, F81-OH2.2] 7.2.5.13. Crosslinked Polyethylene/Aluminum/Polyethylene
[F20, F81-OP5] Composite Pipe and Fittings
(2) [F20, F81-OH2.2] (1) [F20, F81-OH2.2]
SA-1 • Page 63
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
[F20, F81-OP5] 7.2.6.7. Steel Pipe
7.2.5.14. Polypropylene Pipe and Fittings (1) [F43, F81-OH1.1] Applies to venting system.
(1) [F20, F81-OH2.2] [F80, F81, F113-OH2.1] Applies to drainage system.
[F20, F81-OP5] [F46, F80, F81-OH2.2] Applies to water piping.
(1) [F20, F43, F81-OH1.1] Applies to venting system. [F80, F81, F113-OP5] Applies to drainage system.
[F20, F80, F81, F113-OH2.1] [F46, F80, F81-OP5] Applies to water piping.
[F20, F80, F81, F113-OP5] (3) [F46, F80, F81-OH2.2]
(2) [F20, F81-OH2.2] [F46, F80, F81-OP5]
[F20, F81-OP5] (4) [F43, F81-OH1.1] Applies to venting system.
7.2.5.15. Polyethylene of Raised Temperature Tube and [F80, F81, F113-OH2.1] Applies to drainage system.
Fittings [F80, F81, F113-OP5] Applies to drainage system.
(1) [F20, F70, F80-OH2.2] (5) [F80, F81, F113-OH2.1]
[F20, F70, F80-OP5] [F80, F81, F113-OP5]
(2) [F80, F81-OH2.1]
(6) [F43, F81-OH1.1] Applies to venting system.
[F20, F70, F80-OP5]
[F80, F81, F113-OH2.1] Applies to drainage system.
7.2.5.16. Cellular Core PVC Pipe and Fittings
[F80, F81, F113-OP5] Applies to drainage system.
(1) [F20-OH2.1, OH2.2, OH2.3]
7.2.6.8. Corrugated Steel Pipe and Couplings
[F20-OP5]
(1) [F20, F80, F81-OH1.3]
(2) [F20-OH2.1]
[F20-OP5] [F20, F80, F81-OP5]
7.2.6.1. Cast-Iron Drainage and Vent Pipe and Fittings (2) [F80, F81-OH1.3]
(1) [F20-OH2.1, OH2.3] [F80, F81-OP5]
(2) [F20-OH2.2] (3) [F80, F81-OH1.3]
7.2.6.2. Maintenance Holes and Catch Basins [F80, F81-OP5]
(1) [F81-OH1.1] (b) [F20-OH1.3]
[F20-OS3.1] (b) [F20-OP5]
7.2.6.3. Threaded Cast Iron Drainage Fittings 7.2.6.9. Sheet Metal Leaders
(1) [F20, F80, F81, F113-OH2.1, OH2.6] (1) [F80, F81-OH1.3]
[F20, F80, F81, F113-OP5] [F80, F81-OP5]
(2) [F20, F81-OH2.2] 7.2.6.10. Stainless Steel Pipe
[F20, F81-OP5] (1) [F80-OH2.1] Applies to drainage systems and venting
7.2.6.4. Cast Iron Water Pipe systems.
(1) [F20, F81-OH2.2] [F46, F80-OH2.2] Applies to water systems.
[F20, F81-OP5] [F80-OP5]
(2) [F20, F81-OH2.2] (2) [F20-OP5]
[F20, F81-OP5] [F80-OH2.1] Applies to drainage systems and venting
(3) [F20, F81-OH2.2] systems.
[F20, F81-OP5] [F46, F80-OH2.2] Applies to water systems.
(4) [F20, F81-OH2.2] 7.2.6.11. Stainless Steel Butt Weld Pipe Fittings
[F20, F81-OP5] (1) [F80-OH2.1] Applies to drainage systems and venting
7.2.6.5. Screwed Cast Iron Water Fittings systems.
[F46, F80-OH2.2] Applies to water systems.
(1) [F20, F81-OH2.2]
[F80-OP5]
[F20, F81-OP5]
(2) [F80-OH2.1] Applies to drainage systems and venting
(2) [F20, F81-OH2.2]
systems.
[F20, F81-OP5]
[F46, F80-OH2.2] Applies to water systems.
(3) [F81-OH2.1]
[F80-OP5]
7.2.6.6. Screwed Malleable Iron Water Fittings
7.2.6.12. Stainless Steel Pipe Flanges
(1) [F20, F81-OH2.2]
(1) [F80-OH2.1] Applies to drainage systems and venting
[F20, F81-OP5] systems.
(2) [F20, F81-OH2.2] [F46, F80-OH2.2] Applies to water systems.
[F20, F81-OP5] [F80-OP5]
(3) [F81-OH2.1] (2) [F80-OH2.1] Applies to drainage systems and venting
systems.
Page 64 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
[F46, F80-OH2.2] Applies to water systems. (5) [F20, F46, F80, F81, F113-OH2.1, OH2.2]
[F80-OP5] [F20, F46, F80, F81, F113-OP5]
7.2.6.13. Stainless Steel Threaded Fittings 7.2.7.5. Solder-Joint Drainage Fittings
(1) [F20-OP5] (1) [F20, F80, F81, F113-OH2.1]
[F80-OH2.1] Applies to drainage systems and venting [F20, F80, F81, F113-OP5]
systems. (2) [F20, F80, F81-OH2.2]
[F46, F80-OH2.2] Applies to water systems. [F20, F80, F81-OP5]
(2) [F20-OP5] 7.2.7.6. Solder-Joint Water Fittings
[F80-OH2.1] Applies to drainage systems and venting
systems. (1) [F20, F46, F80, F81-OH2.2]
[F46, F80-OH2.2] Applies to water systems. [F20, F46, F80, F81-OP5]
7.2.6.14. Stainless Steel Tube (2) [F20, F46, F80, F81-OH2.2]
(1) [F46-OH2.2] [F20, F46, F80, F81-OP5]
[F80-OP5] 7.2.7.7. Flared-Joint Fittings for Copper Tube Water Systems
(2) [F46-OH2.2] (1) [F20, F46, F80, F81-OH2.2]
[F80-OP5] [F20, F46, F80, F81-OP5]
7.2.6.15. Stainless Steel Pipe and Tube (2) [F20, F46, F80, F81-OH2.2]
(1) [F80-OH2.1, OH2.2, OH2.3] [F20, F46, F80, F81-OP5]
7.2.7.1. Copper and Brass Pipe 7.2.7.8. Lead Waste Pipe and Fittings
(1) [F43, F81-OH1.1] Applies to venting system. (1) [F20, F80, F81, F113-OH2.1] Applies to building sewer.
[F20, F46, F80, F81-OH2.2] Applies to water piping.
[F80, F81, F113-OH2.1] Applies to drainage system.
[F46, F80, F81-OH2.2] Applies to water piping. [F20, F80, F81, F113-OP5] Applies to drainage system.
[F20, F46, F80, F81-OP5] Applies to water piping.
[F80, F81, F113-OP5] Applies to drainage system.
[F46, F80, F81-OP5] Applies to water piping. (2) [F81, F113-OH2.1]
(2) [F43, F81-OH1.1] Applies to venting system. [F81, F113-OP5]
[F80, F81, F113-OH2.1] Applies to drainage system. 7.2.8.1. Pipe and Fittings
[F46, F80, F81-OH2.2] Applies to water piping. (1) [F20, F43, F81-OH1.1] Applies to venting system.
[F80, F81, F113-OP5] Applies to drainage system. [F20, F80, F81, F113-OH2.1] Applies to drainage system.
[F46, F80, F81-OP5] Applies to water piping. [F20, F80, F81, F113-OP5] Applies to drainage system.
7.2.7.2. Brass or Bronze Pipe Flanges and Flanged Fittings 7.2.9.1. Cement Mortar
(1) [F43, F81-OH1.1] Applies to venting system. (1) [F20, F43, F81-OH1.1] Applies to venting system.
[F80, F81, F113-OH2.1] Applies to drainage system. [F20, F80, F81, F113-OH2.1] Applies to drainage system.
[F46, F80, F81-OH2.2] Applies to water piping. [F20, F46, F80, F81-OH2.2] Applies to water piping.
[F80, F81, F113-OP5] Applies to drainage system. [F20, F80, F81, F113-OP5] Applies to drainage system.
[F46, F80, F81-OP5] Applies to water piping. [F20, F46, F80, F81-OP5] Applies to water piping.
7.2.7.3. Brass or Bronze Threaded Water Fittings 7.2.9.2. Solder and Fluxes
(1) [F46, F80, F81-OH2.2] (1) [F20, F43, F81-OH1.1] Applies to venting system.
[F46, F80, F81-OP5] [F20, F80, F81, F113-OH2.1] Applies to drainage system.
(2) [F80-OH2.1] [F20, F46, F80, F81-OH2.2] Applies to water piping.
7.2.7.4. Copper Tube [F20, F80, F81, F113-OP5] Applies to drainage system.
(1) [F20, F43, F81-OH1.1] Applies to venting system. [F20, F46, F80, F81-OP5] Applies to water piping.
[F20, F80, F81, F113-OH2.1] Applies to drainage system. (2) [F46-OH2.2]
[F20, F46, F80, F81-OH2.2] Applies to water piping. (3) [F80-OH2.1, OH2.2]
[F20, F80, F81, F113-OP5] Applies to drainage system. (4) [F80-OH2.1, OH2.3]
[F20, F46, F80, F81-OP5] Applies to water piping. 7.2.10.1. Floor Flanges
(2) [F20, F43, F81-OH1.1] Applies to venting system. (1) [F20, F80, F81, F113-OH2.1]
[F20, F80, F81, F113-OH2.1] Applies to drainage system. [F20, F80, F81, F113-OP5]
[F20, F46, F80, F81-OH2.2] Applies to water piping. (2) [F20, F80, F81, F113-OH2.1]
[F20, F80, F81, F113-OP5] Applies to drainage system. [F20, F80, F81, F113-OP5]
[F20, F46, F80, F81-OP5] Applies to water piping.
(3) [F20, F80, F81, F113-OH2.1]
(3) [F80-OH2.1, OH2.4]
[F20, F80, F81, F113-OP5]
(4) [F20, F46, F80, F81, F113-OH2.1, OH2.2]
(4) [F20, F80, F81, F113-OH2.1]
[F20, F46, F80, F81, F113-OP5]
[F20, F80, F81, F113-OP5]
SA-1 • Page 65
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
7.2.10.2. Screws, Bolts, Nuts and Washers 7.2.10.10. Back-Siphonage Preventers and Backflow Preventers
(1) [F80-OH2.1] (1) [F20, F46, F80, F81-OH2.2]
[F80-OP5] [F20, F46, F80, F81-OP5]
7.2.10.3. Cleanout Fittings (2) [F20, F46, F80, F81-OH2.2]
(1) [F80-OH2.1, OH2.3] Applies to drainage systems. [F20, F46, F80, F81-OP5]
[F46-OH2.2] Applies to water systems. 7.2.10.11. Relief Valves
(2) [F43, F81-OH1.1] Applies to venting system. (1) [F20, F46, F80, F81-OH2.2]
[F81-OH2.1] Applies to drainage system. [F20, F31, F46, F80, F81-OP5]
[F81-OP5] Applies to drainage system. [F31-OS3.2]
(3) [F80-OH2.1] 7.2.10.12. Reducing Valves
7.2.10.4. Mechanical Couplings (1) [F20, F46, F80, F81-OH2.2]
(1) [F20, F43, F81-OH1.1] Applies to venting system. [F20, F46, F80, F81-OP5]
[F20, F80, F81, F113-OH2.1] Applies to drainage system. 7.2.10.13. Solar Domestic Hot Water
[F20, F46, F80, F81-OH2.2] Applies to water piping. (1) [F46-OH2.2]
[F20, F80, F81, F113-OP5] Applies to drainage system. [F80, F81-OP5]
[F20, F46, F80, F81-OP5] Applies to water piping. [F81-OS3.2]
(2) [F20, F43, F81-OH1.1] Applies to venting system.
7.2.10.14. Vent Pipe Flashing
[F20, F80, F81, F113-OH2.1] Applies to drainage system.
(1) [F61, F80-OH1.3]
[F20, F80, F81, F113-OP5] Applies to drainage system.
[F61, F80-OP2.3]
7.2.10.5. Saddle Hubs (2) [F61, F80-OH1.3]
(1) [F81-OH2.1]
[F61, F80-OP2.3]
[F81-OP5]
7.2.10.15. Water Hammer Arresters
7.2.10.6. Valves, Supply and Waste Fittings
(1) [F20, F46, F80, F81-OH2.2]
(1) [F80-OP5]
[F20, F46, F80, F81-OP5]
(2) [F131-O1.2]
7.2.10.16. Air Admittance Valves
(6) [F80-OH2.1, OH2.3]
(1) [F20, F43, F81-OH1.1]
(7) [F81-OP5]
7.2.10.17. Drinking Water Treatment Systems
[F46-OH2.2
(1) [F46-OH2.2]
7.2.10.7. Water Temperature Control
[F40-OS3.4]
(1) [F31-OS3.2]
[F70-OP5]
(4) [F31-OS3.2]
7.2.10.18. Flexible Water Connectors
(5) [F31-OS3.2]
(1) [F81-OP5]
7.2.10.7A. Temperature Control Devices
[F46-OH2.2]
(1) [F31-OH1.2]
7.2.11.1. Design, Construction, Installation and Testing
[F31-OS3.2]
(1) [F20, F46, F80, F81-OH2.2]
7.2.10.7B. Showers
[F12-OP1.4]
(1) [F31-OH1.2]
[F20, F46, F80, F81-OP5]
[F30-OS3.1] [F31-OS3.2]
[F12-OS1.4]
(4) [F31-OH1.2]
7.2.11.2. Certification or Conformance
[F31-OS3.2]
(1) [F20, F46, F80, F81-OH2.2]
7.2.10.7C. Linings and Coatings of Domestic Water Tanks
[F20, F46, F80, F81-OP5]
(1) [F20, F46, F80, F81-OH2.1, OP5]
7.2.11.3. Tracer Wire
7.2.10.8. Direct Flush Valves
(1) [F82-OH2.2]
(1) (a), (b), (c) [F130-OR1]
[F82-OP5]
(a), (b) [F80, F81-OP5]
(c), (d) [F80-OH2.1] [F81-OH2.4] 7.2.11.4. Required Check Valve
(d) [F46-OH2.2] (1) [F46-OH2.2]
7.2.10.9. Drinking Fountain Bubblers (2) [F46-OH2.2]
(1) [F40, F46-OH2.4] 7.3.2.1. Caulked Lead Drainage Joints
(2) [F41, F46-OH2.2] (1) [F43, F81-OH1.1] Applies to venting system.
[F130-OR1] [F80, F81-OH2.1] Applies to drainage system.
[F80, F81-OP5] Applies to drainage system.
Page 66 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
(2) [F80-OH2.1] (2) [F20, F43, F81-OH1.1] Applies to bell and spigot joints in
(3) [F80, F81-OH2.1] Applies to drainage system. venting systems.
[F80, F81-OP5] Applies to drainage system. [F20, F81-OH2.1] Applies to bell and spigot joints in
drainage systems.
(4) [F81-OH2.1]
[F20, F46, F81-OH2.2] Applies to water piping.
7.3.2.2. Wiped Joints
[F20, F46, F81-OP5] Applies to water piping.
(1) [F43, F80, F81-OH1.1] Applies to venting system. [F20, F81-OP5] Applies to bell and spigot joints in drainage
[F80, F81-OH2.1] Applies to drainage system. systems.
[F80, F81-OP5] Applies to drainage system. (3) [F20, F81-OH2.1] Applies to bell and spigot joints in
(2) [F43, F80, F81-OH1.1] Applies to venting system. drainage systems.
[F80, F81-OH2.1] Applies to drainage system. [F20, F81-OP5] Applies to bell and spigot joints in drainage
systems.
[F80, F81-OP5] Applies to drainage system.
7.3.2.8. Stainless Steel Welded Joints
(3) [F43, F80, F81-OH1.1] Applies to venting system.
(1) [F20, F81-OH2.1, OH2.2, OH2.3]
[F80, F81-OH2.1] Applies to drainage system.
(2) [F20, F81-OH2.1, OH2.2, OH2.3]
[F80, F81-OP5] Applies to drainage system.
7.3.3.1. Drilled and Tapped Joints
7.3.2.3. Screwed Joints
(1) [F81-OH2.1] Applies to drainage piping.
(1) [F81-OH2.1] Applies to drainage system. [F20, F46, F81-OH2.2] Applies to water piping.
[F46, F81-OH2.2] Applies to water piping.
[F20, F46, F81-OP5] Applies to water piping.
[F81-OP5] Applies to drainage system. [F20, F81-OP5] Applies to drainage piping.
(2) [F46, F81-OH2.2] Applies to water piping. (4) [F81-OH2.1]
7.3.2.4. Solder Joints [F81-OP5]
(1) [F43, F80, F81-OH1.1] Applies to venting system. 7.3.3.2. Extracted Tees
[F80, F81-OH2.1] Applies to drainage system. (1) [F81-OH2.1, OH2.3]
[F20, F46, F81-OH2.2] Applies to water piping.
[F20-OP5]
[F20, F46, F81-OP5] Applies to water piping.
7.3.3.3. Prohibition of Welding of Pipes and Fittings
[F20, F80, F81-OP5] Applies to drainage system.
(1) [F20-OH1.1]
7.3.2.5. Flared Joints
[F20-OH2.1, OH2.2]
(1) [F43, F81-OH1.1] Applies to venting system.
(2) [F80-OH2.2]
[F81-OH2.1] Applies to drainage system.
[F20, F46, F81-OH2.2] Applies to water piping. [F80-OP5]
[F20, F46, F81-OP5] Applies to water piping. 7.3.3.4. Unions and Slip Joints
[F20, F81-OP5] Applies to drainage system. (1) [F81-OH1.1]
(2) [F43, F81-OH1.1] Applies to venting system. [F81-OH2.1]
[F81-OH2.1] Applies to drainage system. (2) [F81-OH1.1]
[F20, F46, F81-OH2.2] Applies to water piping. [F81-OH2.1]
[F20, F46, F81-OP5] Applies to water piping. 7.3.3.5. Increaser or Reducer
[F20, F81-OP5] Applies to drainage system. (1) [F81-OH1.1]
7.3.2.6. Mechanical Joints [F70, F80-OH2.2]
(1) [F43, F81-OH1.1] Applies to venting system. 7.3.3.6. Dissimilar Materials
[F81-OH2.1] Applies to drainage system. (1) [F80-OH1.1]
[F20, F46, F81-OH2.2] Applies to water piping.
[F80-OH2.1]
[F20, F46, F81-OP5] Applies to water piping.
[F20, F81-OP5] Applies to drainage system. [F80-OP5]
7.3.2.7. Cold-Caulked Joints 7.3.3.7. Connection of Roof Drain to Leader
(1) [F20, F43, F81-OH1.1] Applies to bell and spigot joints in (1) [F21, F61, F81-OP5]
venting systems. 7.3.3.8. Connection of Floor Outlet Fixtures
[F20, F81-OH2.1] Applies to bell and spigot joints in (1) [F80-OH2.1]
drainage systems. [F80-OP5]
[F20, F46, F81-OH2.2] Applies to water piping. (2) [F80-OH2.1]
[F20, F46, F81-OP5] Applies to water piping. [F80-OP5]
[F20, F81-OP5] Applies to bell and spigot joints in drainage
(4) [F20-OH2.1]
systems.
[F20-OP5]
[F20-OS3.1]
SA-1 • Page 67
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
(5) [F20, F43-OH2.1] [F20-OP5]
[F20, F30-OS3.1] [F20-OS3.1]
(6) [F81-OH2.1] (2) [F20-OH1.1] Applies to vent piping.
(7) [F21-OH2.1] [F20-OH2.1] Applies to drainage piping.
[F21-OP5] [F20-OH2.2] Applies to water piping.
7.3.3.9. Expansion and Contraction [F20-OP5]
(1) [F21-OH1.1] [F20-OS3.1]
[F21-OH2.1] [F21-OH2.2] 7.3.4.5. Support for Horizontal Piping
[F21-OP5] (1) [F20-OH1.1] Applies to vent piping.
7.3.3.10. Copper Tube [F20, F81-OH2.1] Applies to drainage piping.
(1) [F20-OH1.1] [F20-OH2.2] Applies to water piping.
[F20-OH2.1] [F20-OH2.2] [F20-OP5]
[F20-OP5] [F20-OS3.1]
(2) [F20-OH1.1] (2) [F20-OH1.1] Applies to vent piping.
[F20-OH2.1] [F20-OH2.2] [F20, F81-OH2.1] Applies to drainage piping.
[F20-OH2.2] Applies to water piping.
[F20-OP5]
[F20-OP5]
7.3.3.11. Indirect Connections
[F20-OS3.1]
(1) [F81-OH2.2, OH2.4]
(3) [F20-OH1.1] Applies to vent piping.
(2) [F81-OH2.2, OH2.4]
[F20, F81-OH2.1] Applies to drainage piping.
7.3.3.12. Copper Joints Used Underground [F20-OH2.2] Applies to water piping.
(1) [F20, F80, F81, F113-OP5] Applies to drainage pipe. [F20-OP5]
[F20, F46, F80, F81-OP5] Applies to water pipe.
[F20-OS3.1]
(2) [F80-OP5]
(4) [F81-OP5]
7.3.4.1. Capability of Support
[F81-OS3.1]
(1) [F20-OH1.1]
(5) [F20-OH1.1] Applies to vent piping.
[F20-OH2.1, OH2.2]
[F20, F81-OH2.1] Applies to drainage piping.
[F20-OP5] [F20-OH2.2] Applies to water piping.
[F20-OS3.1] [F20-OP5]
(2) [F20-OH2.1] [F20-OS3.1]
[F20-OP5] (6) [F20-OH1.1] Applies to vent piping.
[F20-OS3.1] [F20, F81-OH2.1] Applies to drainage piping.
(3) [F20-OH2.1] [F20-OH2.2] Applies to water piping.
[F20-OP5] [F20-OP5]
[F20-OS3.1] [F20-OS3.1]
7.3.4.2. Independence of Support 7.3.4.6. Support for Underground Horizontal Piping
(1) [F20-OH2.1] (1) [F20-OE] Applies to drainage piping.
[F20-OP5] [F20, F81-OH2.1] Applies to drainage piping.
[F20-OS3.1] [F20-OH2.2] Applies to water piping.
7.3.4.3. Insulation of Support [F20-OP5]
(1) [F80-OH1.1] [F20-OS3.1]
[F80-OH2.1, OH2.2] (2) [F20-OE] Applies to drainage piping.
[F80-OP5] [F20-OH1.1] Applies to vent piping.
[F80-OS3.1] [F20, F81-OH2.1] Applies to drainage piping.
(2) [F80-OH2.1, OH2.3] [F20-OH2.2] Applies to water piping.
[F80-OS3.1] [F20-OP5]
[F80-OP5] [F20-OS3.1]
7.3.4.4. Support for Vertical Piping 7.3.4.7. Support for Vent Pipe Above a Roof
(1) [F20-OH1.1] Applies to vent piping. (1) [F20-OH1.1]
[F20-OH2.1] Applies to drainage piping. [F61, F81-OP2.3]
[F20-OH2.2] Applies to water piping. [F81-OS3.1]
Page 68 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
7.3.4.8. Compression Fittings (4) [F81-OH1.1] Applies to venting systems.
(1) [F20-OH2.1, OH2.2] [F81-OH2.1] Applies to drainage systems.
[F20-OP5] [F81-OP5] Applies to drainage systems.
[F20-OS3.1] (5) [F81-OH2.1] Applies to drainage systems.
7.3.4.9. Thrust Restraint of Water Service Pipes (6) [F22-OS2.6]
(1) [F20, F81-OH2.2] [F36-OS3.6]
[F20, F81-OP5] 7.3.6.2. Tests of Pipes in Drainage Systems
(2) [F20, F81-OH2.2] (1) [F81-OE] Applies to underground drainage piping.
(3) [F20, F81-OH2.2] [F81-OH2.1]
(4) [F20, F81-OH2.2] [F81-OP5] Applies to drainage systems.
7.3.5.1. Backfill of Pipe Trench 7.3.6.3. Tests of Venting Systems
(1) [F20-OE] (1) [F81-OH1.1]
[F81-OH2.1] 7.3.6.4. Water Pressure Tests
[F81-OP5] (1) [F81-OH1.1] Applies to venting systems.
7.3.5.2. Protection of Non-Metallic Pipe [F81-OH2.1] Applies to drainage systems.
(1) [F20-OE] [F81-OP5] Applies to drainage systems.
[F81-OH2.1] (2) [F81-OH1.1] Applies to venting systems.
[F81-OP5] [F81-OH2.1] Applies to drainage systems.
7.3.5.3. Isolation from Loads [F81-OP5] Applies to drainage systems.
(1) [F20-OE] Applies to underground drainage piping. 7.3.6.5. Air Pressure Tests
[F81-OH2.1] (1) [F81-OH1.1] Applies to venting systems.
[F81-OP5] [F81-OH2.1] Applies to drainage systems.
7.3.5.4. Protection from Frost [F81-OP5] Applies to drainage systems.
(1) [F20-OE] Applies to underground drainage piping. 7.3.6.6. Final Tests
[F81-OH2.1]
(1) [F81-OH1.1] Applies to venting systems.
[F81-OP5]
[F81-OH2.1] Applies to drainage systems.
7.3.5.5. Protection from Mechanical Damage
[F81-OP5] Applies to drainage systems.
(1) [F81-OH1.1] Applies to venting system.
7.3.6.7. Ball Tests
[F81-OH2.1] Applies to drainage system.
(1) [F81-OH2.1]
[F81-OH2.2] Applies to water system.
[F81-OP5] (2) [F81-OH2.1]
7.3.5.6. Protection from Condensation 7.3.7.1. Application of Tests
(1) [F63-OH2.4] (1) [F81-OP5]
[F63-OP2.3] (3) [F81-OP5]
7.3.5.7. Spatial Separation (4) [F81-OP5]
(1) [F46-OH2.2] 7.3.7.2. Tests of Potable Water Systems
[F46-OP5] (1) [F20-OP5]
(2) [F46-OH2.2] 7.3.7.3. Water Tests
[F46-OP5] (1) [F81-OP5]
(4) [F46-OH2.2] (2) [F46-OH2.2]
[F46-OP5] 7.4.2.1. Connections to Sanitary Drainage Systems
7.3.6.1. Tests and Inspection of Drainage or Venting Systems (1) [F81-OH1.1]
(1) (1) [F81-OH1.1] Applies to venting systems. [F41, F43-OH2.1, OH2.4]
[F81-OH2.1] Applies to drainage systems. (2) [F81-OH1.1]
[F81-OP5] Applies to drainage systems. [F43-OH2.1, OH2.4]
(2) [F81-OH1.1] Applies to venting systems. (3) [F81-OH1.1]
[F81-OH2.1] Applies to drainage systems. (4) [F81-OH1.1]
[F81-OP5] Applies to drainage systems. (5) [F81-OH1.1]
(3) [F81-OH1.1] Applies to venting systems. 7.4.2.2. Connection of Overflows from Rainwater Tanks
[F81-OH2.1] Applies to drainage systems. (1) [F40-OE]
[F81-OP5] Applies to drainage systems.
SA-1 • Page 69
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
7.4.2.3. Direct Connections [F111-OE] Applies to drainage systems served by a
(1) [F81-OH2.1] sewage system.
(2) [F81-OH2.1, OH2.4] (4) [F44-OE] Applies to oil interceptors. [F81, F112-OE]
(3) [F81-OH2.4] [F111-OE] Applies to drainage systems served by a
sewage system.
(4) [F81-OH2.4]
[F81-OH2.1]
7.4.3.1. Plumbing Fixtures
[F44-OH5] Applies to oil interceptors.
(1) [F41-OH1.1]
[F01-OP1.1] Applies to oil interceptors.
[F40, F41-OH2.1, OH2.4]
[F01-OS1.1] Applies to oil interceptors.
[F80-OP2.3]
(5) [F44-OE] Applies to oil interceptors. [F81, F112-OE]
7.4.3.2. Restricted Locations of Indirect Connections and [F111-OE] Applies to drainage systems served by a
Traps sewage system.
(1) [F81-OH2.1, OH2.4] [F81-OH2.1]
7.4.3.3. Equipment Restrictions Upstream of Interceptors [F44-OH5] Applies to oil interceptors.
(1) [F81-OH2.1] [F01-OP1.1] Applies to oil interceptors.
7.4.3.4. Fixtures Located in Chemical Storage Locations [F01-OS1.1] Applies to oil interceptors
(1) [F44-OE] (6) [F81, F112-OE]
[F44-OH5] [F111-OE] Applies to drainage systems served by a
[F01-OP1.1] sewage system.
[F81-OP2.3] [F81-OH2.1]
[F01, F81-OS1.1] (7) [F81, F112-OE]
[F111-OE] Applies to drainage systems served by a
[F32-OS3.3] [F44-OS3.4]
sewage system.
7.4.3.5. Macerating Toilet
[F81-OH2.1]
(1) [F72-OH2.3] (8) [F44-OE] Applies to oil interceptors. [F81, F112-OE]
7.4.3.6. Drains Serving Elevator Pits [F111-OE] Applies to drainage systems served by a
(1) [F43-OH1.1] sewage system.
[F43-OH2.1] [F81-OH2.1]
[F62-OP2.3] [F44-OH5] Applies to oil interceptors.
[F62-OP5] [F01-OP1.1] Applies to oil interceptors.
7.4.4.1. Sewage Treatment [F01-OS1.1] Applies to oil interceptors.
(1) [F81-OE] Applies to underground drainage piping. 7.4.4.4. Neutralizing and Dilution Tanks
[F81-OH2.1] (1) [F40-OE]
[F81-OP2.3] [F80-OH2.1]
[F81-OP5] [F40-OH5]
[F44-OS3.4] [F81-OP2.3]
7.4.4.2. Protection for Drainage System [F80-OP5]
(1) [F81-OE] Applies to underground drainage piping. [F40, F80-OS3.4]
[F81-OH2.1] (2) [F40-OE]
[F81-OH5] [F80-OH2.1]
7.4.4.3. Interceptors [F40-OH5]
(1) [F81, F112-OE]. [F81-OP2.3]
[F111-OE] Applies to drainage systems served by a [F80-OP5]
sewage system. [F40, F80-OS3.4]
[F81-OH2.1] 7.4.5.1. Traps for Sanitary Drainage Systems
(2) [F44, F81, F112-OE]. (1) [F81-OH1.1]
[F111-OE] Applies to drainage systems served by a [F42-OH2.5]
sewage system. (6) [F81-OH1.1]
[F81-OH2.1] [F42-OH2.5]
[F44-OH5]
7.4.5.2. Traps for Storm Drainage Systems
[F01-OP1.1]
(1) [F81-OH1.1]
[F01-OS1.1]
(2) [F81-OH1.1]
(3) [F81-OH2.1]
Page 70 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
7.4.5.3. Connection of Subsoil Drainage Pipe to a Sanitary (6) [F81-OH2.1]
Drainage System (7) [F81-OH2.1]
(1) [F40-OH1.1] (8) [F81-OH2.1]
[F40-OH2.1] (9) [F81-OH2.1]
(3) [F81-OH1.1] (10) [F81-OH2.1]
[F81-OH2.1] 7.4.7.2. Size and Spacing of Cleanouts
7.4.5.4. Location and Cleanout for Building Traps (1) [F81-OH2.1]
(1) [F81-OH2.1] (2) [F81-OH2.1]
7.4.5.5. Trap Seals (3) [F81-OH2.1]
(1) [F81-OH1.1] (4) [F81-OH2.1]
[F42-OH2.5] (5) [F81-OH2.1]
(2) [F81-OH1.1] (6) [F81-OH2.1]
[F42-OH2.5] (7) [F81-OH2.1]
7.4.6.1. Separate Systems 7.4.7.3. Manholes
(1) [F40-OR1] (1) [F20-OS3.1]
(3) [F81-OH1.1] (2) (a), (c) [F81-OH1.1]
[F41, F81-OH2.1] (a), (c) [F81-OS1.1]
7.4.6.2. Location of Soil or Waste Pipes (b), [F20, F30, F80-OS3.1]
(1) [F81-OH2.1, OH2.2, OH2.4] (3) [F30-OS3.1] [F36-OS3.6]
(a), (b) [F46-OH2.2] (4) [F81-OH2.1]
7.4.6.3. Sumps or Tanks 7.4.7.4. Location of Cleanouts
(1) [F81-OH2.1] (1) [F81-OH2.1]
(2) [F81-OH1.1] (2) [F81-OH1.1]
[F81-OH2.1] [F30-OS3.1]
(3) [F40, F81-OH2.1] (4) [F81-OH2.1]
[F40, F81-OH1.1] (4.1) [F81-OH2.1]
(4) [F72-OH2.1] (5) [F43-OH2.1]
[F81-OH2.1] [F43-OH5]
(5) [F81-OH2.1] 7.4.8.1. Minimum Slope
(6) [F81-OH2.1] (1) [F81-OH2.1]
(7) [F81-OH2.1] (3) [F81-OH2.1]
(8) [F81-OH2.1] 7.4.8.2. Length of Fixture Outlet Pipes
(9) [F81-OH2.1] (1) [F81-OH1.1]
7.4.6.4. Protection from Backflow 7.4.9.1. No Reduction in Size
(1) [F81-OH1.1] (1) [F81-OH2.1]
[F81-OH2.1] (2) [F81-OH2.1]
(2) [F81-OH1.1] 7.4.9.2. Serving Water Closets
[F81-OH2.1] (1) [F81-OH2.1]
(3) [F81-OH2.1] (2) [F81-OH2.1]
(5) [F40-OH1.1] (3) [F81-OH2.1]
[F40-OH2.1] (4) [F81-OH2.1]
7.4.6.5. Mobile Home Sewer Service (5) [F81-OH1.1, OH2.1, OP5]
(1) [F81-OH2.1] 7.4.9.3. Size of Fixture Outlet Pipes
7.4.7.1. Cleanouts for Drainage Systems (1) [F81-OH2.1]
(1) [F81-OH2.1] (2) [F81-OH2.1]
(2) [F81-OH2.1] (3) [F81-OH1.1]
(3) [F81-OH2.1] [F81-OP5]
(4) [F81-OH2.1] 7.4.9.4. Minimum Size of Building Drains and Sewers
(5) [F81-OH2.1] (1) [F81-OH2.1]
SA-1 • Page 71
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
(2) [F81-OH2.1] 7.5.4.1. Stack Vents
7.4.9.5. Offset in Leaders (1) [F40, F81-OH1.1]
(1) [F81-OH2.1, OH2.3] 7.5.4.2. Vent Stacks
(2) [F81-OH2.1] (1) [F40, F81-OH1.1]
7.4.10.3. Hydraulic Loads from Fixtures with Continuous or (3) [F40, F81-OH1.1]
Semi-continuous Flow (4) [F40, F81-OH1.1]
(1) [F81-OH2.1] 7.5.4.3. Yoke Vents
(2) [F81-OH2.1] (1) [F40, F81-OH1.1]
7.4.10.4. Hydraulic Loads from Roofs or Paved Surfaces (2) [F40, F81-OH1.1]
(2) [F20, F81-OP5] (3) [F40, F81-OH1.1]
(a), (d), (e) [F41, F81-OH2.4, OH2.5] 7.5.4.4. Offset Relief Vents
(b), (c) [F20, F81-OS2.1] (1) [F40, F81-OH1.1]
(4) [F20, F81-OP5] 7.5.4.5. Fixtures Draining into Vent Pipes
7.4.10.5. Conversion of Fixture Units to Litres and Gal/min (1) [F40, F81-OH1.1]
(1) [F81-OH2.1] 7.5.5.1. Venting of Sanitary Sewage Sumps
7.4.10.6. Hydraulic Loads to Soil or Waste Pipes (1) [F40, F81-OH1.1]
(1) [F81-OH2.1] 7.5.5.2. Venting of Interceptors
(2) [F81-OH2.1] (1) [F40, F81-OH1.1]
(3) [F81-OH2.1] [F81-OH2.1]
7.4.10.7. Hydraulic Loads on Branches [F01, F40, F81-OP1.1]
(1) [F81-OH2.1] [F01, F40, F81-OS1.1]
7.4.10.8. Hydraulic Loads on Sanitary Horizontal Drain (2) [F40, F81-OH1.1]
(1) [F81-OH2.1] [F81-OH2.1]
(2) [F81-OH2.1] [F01, F40, F81-OP1.1]
7.4.10.9. Hydraulic Loads on Horizontal Storm Drains [F01, F40, F81-OS1.1]
(1) [F81-OH2.1] (3) [F40, F81-OH1.1]
7.4.10.10. Rain Leaders [F01, F40, F81-OP1.1]
(2) [F62, F81-OH1.3] [F01, F40, F81-OS1.1]
(3) [F62, F81-OH1.3] (4) [F40, F81-OH1.1]
2.4.10.11. Hydraulic Loads on Leaders [F01, F40, F81-OP1.1]
(1) [F81-OP5] [F01, F40, F81-OS1.1]
2.4.10.12. Hydraulic Loads from Fixtures with a Semi- (5) [F40, F81-OH1.1]
Continuous Flow [F01, F40, F81-OP1.1]
(1) [F81-OP5] [F01, F40, F81-OS1.1]
7.5.1.1. Venting for Traps (6) [F40, F81-OH1.1]
(1) [F81-OH1.1] [F81-OH2.1]
(2) [F81-OH1.1] (7) [F40, F81-OH1.1]
7.5.2.1. Wet Venting [F81-OH2.1]
(1) [F40, F81-OH1.1] [F01, F40, F81-OP1.1]
7.5.3.1. Circuit Venting [F01, F40, F81-OS1.1]
(1) [F40, F81-OH1.1] 7.5.5.3. Venting of Drain Piping and Dilution Tanks for
(2) [F40, F81-OH1.1] Corrosive Waste
(3) [F40, F81-OH1.1] (1) [F81-OS3.4]
(4) [F40, F81-OH1.1] 7.5.5.4. Fresh Air Inlets
(5) [F40, F81-OH1.1] (1) [F81-OH1.1]
(6) [F40, F81-OH1.1] 7.5.5.5. Provision for Future Installations
(7) [F40, F81-OH1.1] (1) [F81-OH1.1] Applies to venting systems.
(8) [F40, F81-OH1.1] [F81-OH2.1] Applies to drainage systems.
(9) [F40, F81-OH1.1] (2) [F40, F81-OH1.1]
(10) [F40, F81-OH1.1]
Page 72 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
7.5.6.1. Drainage of Vent Pipes 7.5.8.2. Individual Vents and Dual Vents
(1) [F81-OH1.1] (1) [F81-OH1.1]
(2) [F81-OH1.1] 7.5.8.3. Branch Vents, Headers, Continuous Vents and Circuit
7.5.6.2. Vent Pipe Connections Vents
(1) [F81-OH1.1] (1) [F81-OH1.1]
(2) [F81-OH1.1] 7.5.8.4. Vent Stacks or Stack Vents
(3) [F40, F81-OH1.1] (1) [F81-OH1.1]
7.5.6.3. Location of Vent Pipes (3) [F81-OH1.1]
(1) [F81-OH1.1] (4) [F81-OH1.1]
(2) [F81-OH2.1] (5) [F81-OH1.1]
(3) [F81-OH1.1] 7.5.9.2. Air Admittance Valves
(4) [F40, F81-OH1.1] (1) [F40, F81-OH1.1]
7.5.6.4. Connection of Vents Above Fixtures Served (a) [F140-OC]
(1) [F81-OH1.1] (2) [F40, F81-OH1.1]
(2) [F81-OH1.1] (3) [F40, F81-OH1.1]
7.5.6.5. Terminals 7.5.9.3. Installation Conditions
(1) [F81-OH1.1] (1) [F40, F81-OH1.1]
(2) [F81-OH1.1] (2) [F40, F81-OH1.1]
(4) [F81-OH1.1] (3) [F40, F81-OH1.1]
(5) [F81-OH1.1] (4) [F40, F81-OH1.1]
(6) [F81-OH1.1] (5) [F40, F81-OH1.1]
(7) [F20, F81-OH1.1] 7.6.1.1. Design
(8) [F61, F80-OH1.3] (1) [F31-OS3.2]
[F61, F80-OP2.3] (2) [F31-OS3.2]
(9) [F61-OH1.3] (3) [F71-OH2.3]
[F61-OP2.3] 7.6.1.2. Drainage
(10) [F81-OH1.1] (1) [F81-OP5]
7.5.7.1. General 7.6.1.3. Control and Shut-off Valves
(1) [F81-OH1.1] (1) [F81-OP5]
7.5.7.2. Size Restriction (2) [F81-OP5]
(1) [F81-OH1.1] (2.1) [F81-OP5]
(2) [F81-OH1.1] (2.2) [F81-OP5]
(3) [F81-OH1.1] (3) [F81-OP5]
7.5.7.3. Additional Circuit Vents and Relief Vents (4) [F81-OP5]
(2) [F81-OH1.1] (5) [F70, F72-OH2.1, OH2.3]
7.5.7.4. Offset Relief Vents (6) [F70, F72-OH2.1, OH2.3]
(1) [F81-OH1.1] (47) [F81-OP5]
7.5.7.5. Yoke Vents (8) [F81-OP5]
(1) [F81-OH2.1] (9) [F81-OP5]
7.5.7.6. Vent Pipes for Manholes 7.6.1.3A. Public Washrooms
(1) [F81-OH2.1] (1) [F81-OP5]
7.5.7.7. Vents for Sewage Sumps, Neutralizing and Dilution 7.6.1.3B. Tanks
Tanks, and Macerating Toilet Systems (1) [F81-OP5]
(1) [F81-OH2.1] 7.6.1.4. Protection for Exterior Water Supply
(2) [F81-OH2.1] (1) [F81-OP5]
(3) [F81-OH1.1] 7.6.1.5. Check Valves
7.5.8.1. Hydraulic Loads Draining to Wet Vents (1) [F20, F81-OP5]
(1) [F81-OH1.1] 7.6.1.6. Flushing Devices
(2) [F81-OH1.1] (1) [F72-OH2.1]
SA-1 • Page 73
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
(2) [F72-OH2.1] 7.6.2.3. Backflow Caused by Back Pressure
(3) [F130-OE1.2] (1) [F81-OH2.1] [F46, F70, F81-OH2.2]
(4) [F81-OH2.1] (2) [F81-OH2.1] [F46, F70, F81-OH2.2]
(5) [F130-OE1.2] (3) [F81-OH2.1] [F46, F70, F81-OH2.2]
7.6.1.7. Relief Valves 7.6.2.4. Backflow from Fire Protection Systems.
(1) [F20, F81-OP1.1] (2) [F81-OH2.1] [F46, F70, F81-OH2.2]
[F20, F81-OS1.1] (3) [F02, F12, F81-OP1.2]
[F20, F81-OS2.3] [F02, F12, F81-OS1.2]
[F31, F81-OS3.2] Applies to pressure vessels containing (4) [F81-OH2.1] [F46, F70, F81-OH2.2]
hot water. 7.6.2.5A. Backflow from Buildings with a Solar Domestic Hot
(2) [F20, F81-OP1.1] Water System
[F20, F81-OS1.1] (1) [F70, F81, F46-OH2.1, OH 2.2, OH2.3]
[F20, F81-OS2.3] 7.6.2.6. Premise Isolation
[F31, F81-OS3.2] (1) [F81-OH2.1] [F46, F70, F81-OH2.2]
(4) [F20, F81-OP1.1] [F20, F81-OS1.1] [F20, F81-OS2.3] (3) [F46, F70, F81-OH2.2]
(b) [F31, F81-OS3.2] 7.6.2.7. Hose Bibb
(5) [F20, F81-OP1.1] (1) [F70, F81, F46-OH2.1, OH2.2, OH2.3]
[F20, F81-OS1.1] 7.6.2.8. Cleaning of Systems
[F20, F81-OS2.3] (1) [F81-OH2.1] [F46, F70, F81-OH2.2]
[F31, F81-OS3.2] 7.6.2.9. Air Gap
(b) [F81-OH2.2] Applies to the size of air break. (1) [F81-OH2.1] [F46, F70, F81-OH2.2]
(6) [F20, F81-OP1.1] (2) [F81-OH2.1] [F46, F70, F81-OH2.2]
[F20, F81-OS1.1] 7.6.2.10. Vacuum Breakers and Flood Levels
[F20, F81-OS2.3] (2) [F81-OH2.1] [F46, F70, F81-OH2.2]
[F31, F81-OS3.2] (3) [F81-OH2.1] [F46, F70, F81-OH2.2]
(7) [F20, F81-OP1.1] (4) [F81-OH2.1] [F46, F70, F81-OH2.2]
[F20, F81-OS1.1] 7.6.2.11. Tank-Type Water Closets
[F20, F81-OS2.3] (1) [F70, F81, F46-OH2.1, OH2.2, OH2.3]
[F31, F81-OS3.2] 7.6.3.1. Design
7.6.1.8. Solar Domestic Hot Water Systems (1) [F70, F81-OH2.2]
(1) [F61-OH1.3] (2) [F70-OH2.2]
[F70-OH2.2] (4) [F70, F81-OH2.2] [F40-OH2.1, OH2.4]
[F20-OS2.2, OS2.3] 7.6.3.2. Hydraulic Load
[F31-OS3.2] [F81-OS3.4] (1) [F70, F81-OH2.2]
7.6.1.9. Water Hammer (2) [F70, F81-OH2.2]
(1) [F20-OH4] (3) [F70, F81-OH2.2]
[F20, F81-OP5] (4) [F70, F81-OH2.2]
[F20, F81-OS3.2] 7.6.3.3. Static Pressure
7.6.1.10. Mobile Home Water Service (1) [F20, F81-OP1.1]
(1) [F46, F70-OH2.2] [F20, F81-OP5]
7.6.1.11. Thermal Expansion [F20, F81-OS1.1]
(1) [F20, F46, F81-OP5] [F20, F81-OS2.3]
7.6.2.1. Connection of Systems [F31, F81-OS3.2] Applies to pipes containing hot water
(1) [F81-OH2.1] [F46, F70, F81-OH2.2] 7.6.3.4. Size
(3) [F70, F81, F82-OH2.2, OH2.3] (1) [F70, F81-OH2.2]
(3.1) [F46, F70, F81-OH2.2] (2) [F70, F81-OH2.2]
7.6.2.2. Back-Siphonage (4) [F70, F81-OH2.2]
(1) [F81-OH2.1] [F46, F70, F81-OH2.2] (5) [F71, F72-OH2.1, OH2.3]
(2) [F81-OH2.1] [F46, F70, F81-OH2.2] (6) [F71, F72-OH2.1, OH2.3]
Page 74 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable
Objective and Functional Statements
Solutions
7.6.4.1. Water Supply Fittings
(31) [F130-OR1]
(2) [F30-OS3.1]
[F31-OS3.2]
(3) [F130-OR1]
7.7.1.1. General
(1) [F81-OH2.2]
(2) [F82-OH2.2]
(3) [F40-OH2.2]
(4) [F46-OH2.2]
(5) [F80, F81-OS3.4]
[F81-OP5]
7.7.1.2. Identification and Marking
(0.1) [F46, F81-OH2.2]
(1) [F46, F81-OH2.2]
7.7.1.3. Location of Pipes
(1) [F81-OH2.1, OH2.2, OH2.4]
(c), (d) [F46-OH2.2]
7.7.1.4. Location of Outlets
(1) [F46-OH2.2] [F40-OH2.4]
7.7.2.2. Permitted Applications
(1) [F46-OH2.2]
[F81-OH2.2]
7.7.2.3. Roof Design
(1) [F41-OH2.2]
(2) [F41-OH2.2]
7.7.2.4. Non-Potable Rainwater Harvesting System Design
(1) [F46, F80, F81-OH2.2]
(2) [F41-OH2.2]
(3) [F40-OH2.2]
(4) [F41-OH2.2]
(5) [F80, F81-OS3.4]
[F81-OP5]
(6) [F81-OH2.2]
(7) [F81-OH2.2]
[F81-OP5]
(8) [F81-OH2.2]
[F81-OH2.2]
(9) [F46-OH2.2]
(10) [F46-OH2.2]
7.7.3.1. Conformance to Standards
(1) [F81, F82-OH2.1, OH2.2, OH2.4] [F130-OR1]
SA-1 • Page 75
2024 MMAH Supplementary Standard SA-1
Table 8
Objectives and Functional Statements Attributed to the Acceptable Solutions in Part 8 of Division B
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
8.1.3.1. Discharge (2) [F111, F112-OE]
(1) [F81, F110, F111-OE] [F111, F112-OH2.1]
[F81, F110, F111-OH5] [F111, F112-OH5]
(7) [F81, F110, F111-OE] (3) [F111, F112-OE]
[F81, F110, F111-OH5] [F111, F112-OH2.1]
(8) [F81, F111-OE] [F111, F112-OH5]
[F81, F111-OH5] (4) [F111, F112-OE]
8.2.1.2. Site Evaluation [F111, F112-OH2.1]
(1) [F110, F111, F112-OE] [F111, F112-OH5]
[F110, F111, F112-OH5] (e) [F110-OE]
8.2.1.4. Clearances (e) [F110-OH5]
(2) [F110, F112-OE] (5) [F111, F112-OE]
[F110, F112-OH5] [F111, F112-OH2.1]
(3) [F110, F112-OE] [F111, F112-OH5]
[F110, F112-OH2.1] (6) [F111, F112-OE]
[F110, F112-OH5] [F111, F112-OH2.1]
(4) [F110, F111, F112-OE] [F111, F112-OH5]
[F110, F111, F112-OH5] (7) [F111, F112-OE]
8.2.1.5. Clearance Distances for Class 1, 2 and 3 Sewage [F111, F112-OH2.1]
Systems [F111, F112-OH5]
(1) [F110, F112-OE] (8) [F111, F112-OE]
[F110, F112-OH5] [F111, F112-OH2.1]
8.2.1.6. Clearances for a Class 4 or 5 Sewage System [F111, F112-OH5]
(1) [F110, F112-OE] (9) [F82, F111-OE]
[F110, F112-OH2.1] [F82, F111-OH2.1]
[F110, F112-OH5] [F82, F111-OH5]
(2) [F110, F112-OE] (10) [F82, F111-OE]
[F110, F112-OH2.1] [F82, F111-OH2.1]
[F110, F112-OH5] [F82, F111-OH5]
(3) [F110-OE] (11) [F82, F111-OE]
[F110-OH2.1] [F82, F111-OH2.1]
[F110-OH5] [F82, F111-OH5]
8.2.2.2. Tanks 8.2.2.4. Holding Tanks
(1) [F110, F111, F112-OE] (1) [F82, F111-OE]
[F110, F111, F112-OH5] [F82, F111-OH2.1]
[F20-OP2.3] [F82, F111-OH5]
(2) [F110, F111, F112-OE] (2) [F111-OE]
[F110, F111, F112-OH5] [F111-OH2.1]
[F20-OP2.3] [F111-OH5]
(5) [F82, F111-OE] 8.3.1.2. Application
[F82, F111-OH2.1] (1) [F111, F112-OE]
[F82, F111-OH5] [F111, F112-OH2.1]
(6) [F20-OP2.3] [F111, F112-OH5]
(7) [F81-OP2.6] (3) [F110-OE]
8.2.2.3. Septic Tanks [F110-OH5]
(1) [F111-OE] 8.3.2.1. Construction Requirements
[F111-OH2.1] (1) (a), (b) [F42-OH2.5]
[F111-OH5] (c), (d), (h) [F40-OH2.4]
Page 76 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
(e) [F101-OH6] 8.5.2.1. Construction Requirements
(f), (g) [F50-OH1.1] (1) [F110, F112-OE]
(f), (g) [F42-OH2.5] [F110, F112-OH5]
8.3.3.1. Construction Requirements (2) [F113-OH2.6]
(1) (a) [F110, F112-OE] [F20-OS2.2]
(a) [F110, F112-OH5] (3) [F112-OE]
(b) [F20-OS2.2] [F112-OH5]
(b), (d) [F113-OH2.6] (4) [F82-OE]
(c) [F112-OE] [F42-OH2.5] [F113-OH2.6]
(c) [F112-OH5] [F82-OH5]
(d) [F110-OE] [F30-OS3.1]
8.3.4.1. Construction Requirements (5) [F30-OS3.1]
(1) (a) [F40-OH2.4] [F113-OH2.6] (6) [F113-OH2.6]
(b) [F113-OH2.6] (7) [F111-OE]
(c) [F111-OE] [F111-OH5]
(c) [F111-OH5] (8) [F112-OE]
8.3.5.1. Construction Requirements [F112-OH5]
(1) (a) [F113-OH2.6] 8.6.1.2. General Requirements
(b) [F40-OH2.4] (1) [F112-OE]
(c) [F20-OS2.1] [F112-OH5]
8.4.1.2. Application 8.6.1.3. Pumps and Siphons
(1) [F110-OE] (1) [F110, F111, F112-OE]
[F110-OH5] [F110, F111, F112-OH2.1]
8.4.2.1. Construction Requirements [F110, F111, F112-OH5]
(1) [F110, F112-OE] (2) [F110, F111-OE]
[F110, F112-OH5] [F110, F111-OH2.1]
(2) [F113-OH2.6] [F110, F111-OH5]
[F20-OS2.2] (3) [F110, F111, F112-OE]
(3) [F112-OE] [F110, F111, F112-OH5]
[F112-OH5] (4) [F111, F113-OE]
(4) [F82-OE] [F111, F113-OH5]
[F42-OH2.5] [F113-OH2.6] (5) [F112-OE]
[F82-OH5] [F112-OH5]
[F30-OS3.1] (6) [F110, F111-OE]
(5) [F113-OH2.6] [F110, F111-OH2.1]
(6) [F111-OE] [F110, F111-OH5]
[F111-OH5] 8.6.2.1. Septic Tank Systems
(7) [F112-OE] (1) [F110, F111-OE]
[F112-OH5] [F110, F111-OH5]
8.4.2.2. Maximum Sewage Flow (2) [F110, F111-OE]
(1) [F110, F112-OE] [F110, F111-OH5]
[F110, F112-OH5] (3) [F82-OE]
8.4.2.3. Sizing [F82-OH2.1]
(1) [F110, F112-OE] 8.6.2.2. Other Treatment Units
[F110, F112-OH5] (1) [F110-OE]
8.5.1.2. Application [F110-OH5]
(1) [F110, F112-OE] (2) [F110, F111-OE]
[F110, F112-OH5] [F110, F111-OH5]
(2) [F112-OE] (3) [F111-OE]
[F112-OH5] [F111-OH2.1]
[F111-OH5]
SA-1 • Page 77
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
(4) [F111-OE] [F110, F111-OH5]
[F111-OH2.1] (2) [F110, F111-OE]
[F111-OH5] [F110, F111-OH2.1]
(6) [F82, F111-OE] [F110, F111-OH5]
[F82, F111-OH2.1] (3) [F110-OE]
[F82, F111-OH5] [F110-OH2.1]
8.7.1.1. Application Scope [F110-OH5]
(1) [F110, F111-OE] (4) [F110-OE]
[F110, F111-OH2.1] [F110-OH5]
[F110, F111-OH5] 8.7.3.3. Absorption Trenches e1
8.7.1.2. Limitation on Installation (1) [F110, F111-OE]
(1) [F110, F111, F112-OE] [F110, F111-OH2.1]
[F110, F111, F112-OH2.1] [F110, F111-OH5]
[F110, F111, F112-OH5] (2) [F110, F111-OE]
8.7.2.1. General Requirements [F110, F111-OH2.1]
(1) [F110, F111-OE] [F110, F111-OH5]
[F110, F111-OH2.1] 8.7.3.4. Distribution Pipe e1
[F110, F111-OH5] (1) [F111-OE]
(2) [F104, F110, F111-OE] [F111-OH5]
[F104, F110, F111-OH2.1] (2) [F111-OE]
[F104, F110, F111-OH5] [F111-OH5]
[F104, F110, F111-OR2] (3) [F110, F111-OE]
(3) [F110, F111-OE] [F110, F111-OH2.1]
[F110, F111-OH2.1] [F110, F111-OH5]
[F110, F111-OH5] (4) [F110, F111-OE]
(4) [F110, F111-OE] [F110, F111-OH2.1]
[F110, F111-OH2.1] [F110, F111-OH5]
[F110, F111-OH5] 8.7.3.5. Leaching Chamber e1
(5) [F110, F111-OE] (1) [F111-OE]
[F110, F111-OH2.1] [F111-OH5]
[F110, F111-OH5] (2) [F111-OE]
8.7.2.2. Distribution Pipes within Leaching Beds [F111-OH5]
(2) [F111-OE] (3) [F110, F111-OE]
8.7.2.3. Leaching Chambers within Leaching Beds [F110, F111-OH2.1]
(3) [F111, F112-OE] [F110, F111-OH5]
[F111, F112-OH2.1] 8.7.4.1. Loading Requirements
[F111, F112-OH5] (1) [F110, F111-OE]
(4) [F111-OE] [F110, F111-OH2.1]
8.7.3.1. Length of Distribution Pipe [F110, F111-OH5]
(1) [F110, F111-OE] 8.7.4.2. Construction Requirements
[F110, F111-OH2.1] (1) [F110, F111-OE]
[F110, F111-OH5] [F110, F111-OH2.1]
(2) [F110-OE] [F110, F111-OH5]
[F110-OH5] (2) [F110, F111-OE]
(3) [F110-OE] [F110, F111-OH2.1]
[F110-OH5] [F110, F111-OH5]
(4) [F110-OE] (3) [F110, F111-OE]
[F110-OH5] [F110, F111-OH2.1]
e1 8.7.3.2. Length of Leaching Chamber [F110, F111-OH5]
(1) [F110, F111-OE] (5) [F110, F111-OE]
[F110, F111-OH2.1] [F110, F111-OH2.1]
Page 78 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
[F110, F111-OH5] [F110, F111-OH5]
(6) [F110, F111-OE] (6) [F110, F111, F112-OE]
[F110, F111-OH2.1] [F110, F111, F112-OH2.1]
[F110, F111-OH5] [F110, F111, F112-OH5]
(7) [F110, F111-OE] 8.7.6.1. Construction Requirements
[F110, F111-OH2.1] (1) [F112-OE]
[F110, F111-OH5] [F112-OH5]
(8) [F110, F111-OE] (2) [F110, F111, F112-OE]
[F110, F111-OH2.1] [F110, F111, F112-OH2.1]
[F110, F111-OH5] [F110, F111, F112-OH5]
(9) [F110, F111-OE] (3) [F110, F111-OE]
[F110, F111-OH2.1] [F110, F111-OH2.1]
[F110, F111-OH5] [F110, F111-OH5]
(10) [F110, F111-OE] (4) [F20-OS2.2]
[F110, F111-OH2.1] (5) [F110, F111-OE]
[F110, F111-OH5] [F110, F111-OH2.1]
(11) [F110, F111-OE] [F110, F111-OH5]
[F110, F111-OH2.1] 8.7.7.1. Construction Requirements
[F110, F111-OH5] (1) [F112-OE]
8.7.5.1. Application [F112-OH5]
(1) [F110, F111-OE] (2) [F110, F111-OE]
[F110, F111-OH2.1] [F110, F111-OH2.1]
[F110, F111-OH5] [F110, F111-OH5]
8.7.5.2. Loading Requirements (3) [F110, F112-OE]
(1) [F110, F111-OE] [F110, F112-OH2.1]
[F110, F111-OH2.1] [F110, F112-OH5]
[F110, F111-OH5] (4) [F110, F112-OE]
(2) [F110, F111-OE] [F110, F112-OH2.1]
[F110, F111-OH2.1] [F110, F112-OH5]
[F110, F111-OH5] (5) [F110, F111-OE]
(3) [F110, F111, F112-OE] [F110, F111-OH2.1]
[F110, F111, F112-OH2.1] [F110, F111-OH5]
[F110, F111, F112-OH5] (6) [F110, F111-OE]
(4) [F110, F111, F112-OE] [F110, F111-OH2.1]
[F110, F111, F112-OH2.1] [F110, F111-OH5]
[F110, F111, F112-OH5] (7) [F110, F111-OE]
(5) [F110, F111, F112-OE] [F110, F111-OH2.1]
[F110, F111, F112-OH2.1] [F110, F111-OH5]
[F110, F111, F112-OH5] (8) [F110, F111-OE]
8.7.5.3. Construction Requirements [F110, F111-OH2.1]
(2) [F110, F112-OE] [F110, F111-OH5]
[F110, F112-OH2.1] (9) [F111-OE]
[F110, F112-OH5] [F111-OH5]
(3) [F110, F112-OE] (10) [F111-OE]
[F110, F112-OH2.1] [F111-OH5]
[F110, F112-OH5] (11) [F110, F112-OE]
(4) [F110, F111, F112-OE] [F110, F112-OH2.1]
[F110, F111, F112-OH2.1] [F110, F112-OH5]
[F110, F111, F112-OH5] 8.7.7.2. Construction Requirements
(5) [F110, F111-OE] (2) [ F111-OE]
[F110, F111-OH2.1]
SA-1 • Page 79
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objective and Functional Statements Objective and Functional Statements
Solutions Solutions
8.7.8.1. General Requirements (2) [F82, F110-OE]
(2) [F110, F111-OE] [F82, F110-OH5]
[F110, F111-OH2.1] (3) [F110-OE]
[F110, F111-OH5] [F110-OH5]
8.7.8.2. Construction Requirements (4) [F110-OE]
(1) [F112-OE] [F110-OH5]
[F112-OH5] 8.8.2.2. Sizing of Holding Tanks
(2) [F110, F112-OE] (1) [F110, F111-OE]
[F110, F112-OH2.1] [F110, F111-OH2.1]
[F110, F112-OH5] [F110, F111-OH5]
(3) [F110, F112-OE] 8.9.1.2. General Requirements for Operation and Maintenance
[F110, F112-OH5] (1) [F110-OE]
(4) [F110, F111, F112-OE] [F110-OH5]
[F110, F111, F112-OH2.1] 8.9.2.2. General
[F110, F111, F112-OH5] (1) [F110, F111-OE]
(5) [F110, F111, F112-OE] [F110, F111-OH2.1]
[F110, F111, F112-OH2.1] [F110, F111-OH5]
[F110, F111, F112-OH5] 8.9.2.3. Class 4 Sewage Systems
(7) [F110, F112-OE] (1) [F110, F111-OE]
[F110, F112-OH2.1] [F110, F111-OH2.1]
[F110, F112-OH5] [F110, F111-OH5]
(8) [F110, F111-OE] (2) [F82, F110-OE]
[F110, F111-OH2.1] [F82, F110-OH5]
[F110, F111-OH5] 8.9.2.4. Sampling of Treatment Units
(9) [F110, F111-OE] (1) [F82, F110-OE]
[F110, F111-OH2.1] [F82, F110-OH5]
[F110, F111-OH5] (2) [F82, F110-OE]
(10) [F110, F112-OE] [F82, F110-OH5]
[F110, F112-OH2.1] (3) [F82, F110-OE]
[F110, F112-OH5] [F82, F110-OH5]
8.7.8.3. Design Requirements (4) [F82, F110-OE]
(1) [F110, F111-OE] [F82, F110-OH5]
[F110, F111-OH2.1] 8.9.2.5. Class 5 Sewage Systems
[F110, F111-OH5] (1) [F82, F110-OE]
(2) [F110, F111-OE] [F82, F110-OH5]
[F110, F111-OH2.1] (2) [F110-OE]
[F110, F111-OH5] [F110-OH5]
(3) [F110, F111-OE] 8.9.3.2. General
[F110, F111-OH2.1] (1) [F110, F111-OE]
[F110, F111-OH5] [F110, F111-OH2.1]
(4) [F110, F111-OE] [F110, F111-OH5]
[F110, F111-OH2.1] (2) [F110, F111-OE]
[F110, F111-OH5] [F110, F111-OH2.1]
8.8.1.2. Acceptable Installation [F110, F111-OH5]
(1) [F110-OE] 8.9.3.3. Interceptors
[F110-OH5] (1) [F110, F111-OE]
(2) [F82, F110-OE] [F110, F111-OH2.1]
[F82, F110-OH5] [F110, F111-OH5]
8.8.2.1. Construction Requirements 8.9.3.4. Class 4 Sewage Systems
(1) [F82, F110-OE] (1) [F110, F111-OE]
[F82, F110-OH5] [F110, F111-OH2.1]
Page 80 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable
Objective and Functional Statements
Solutions
[F110, F111-OH5]
8.9.3.5. Pressurized Distribution Systems
(1) [F110, F111-OE]
[F110, F111-OH2.1]
[F110, F111-OH5]
SA-1 • Page 81
2024 MMAH Supplementary Standard SA-1
Table 9
Objectives and Functional Statements Attributed to the Acceptable Solutions in Part 9 of Division B
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.1.1.7. Radon [F20-OP2.3] Applies to elements that support or are part of
(1) [F40, F50-OH1.1] an environmental separator.
9.1.1.8. Building in Flood Plains [F20, F80-OH1.1] Applies where concrete supports or is
(1) (a) [F20-OP2.1] used in the walls of chimneys or fireplaces.
[F20, F55, F61, F80-OH1.1, OH1.2] [F20, F61, F80-
(a) [F20-OS2.1, OS2.3] OH1.3] Applies where concrete supports or is used in an
(a) [F61-OH1.3] environmental separator.
(b) [F10, F12-OS3.1] [F10, F30-OS3.7] [F20, F80-OH4] Applies where concrete elements support
9.3.1.1. General wood-frame floors.
(1) [F20-OP2.1, OP2.4] [F20, F80-OS1.1] Applies where concrete supports or is
[F21-OP2.3, OP2.4] used in chimneys or fireplaces.
[F80-OP2.3] [F20-OS2.1] [F80-OS2.3]
[F20-OP2.3] Applies to elements that support or are part of [F20-OS2.3] Applies to elements that support or are part of
an environmental separator. an environmental separator.
[F20, F21, F80-OH1.1] Applies where concrete supports or [F20, F80-OS3.1] Applies to concrete floors or steps,
is used in the walls of chimneys or fireplaces. concrete that supports wood-frame floors or steps, and
[F20, F21, F55, F61, F80-OH1.1, OH1.2] [F20, F21, F80, concrete steps that support guards or handrails.
F61-OH1.3] Applies where concrete supports or is used in [F20, F80-OS3.4, OS3.7] Applies where concrete supports
an environmental separator. or is used in chimneys or fireplaces.
[F20, F21, F80-OH4] Applies where concrete elements 9.3.1.3. Concrete in Contact with Sulfate Soil
support wood-frame floors. (1) [F20-OP2.1, OP2.4]
[F20, F21, F80-OS1.1] Applies where concrete supports or [F80-OP2.3, OP2.4]
is used in chimneys or fireplaces. [F20-OP2.3] Applies to elements that support or are part of
[F20-OS2.1] [F21, F80-OS2.3] [F20-OS2.3] Applies to an environmental separator.
elements that support or are part of an environmental [F80-OH1] Applies where concrete supports or is used in
separator. the walls of chimneys or fireplaces.
[F20, F21, F80-OS3.1] Applies to concrete floors or steps, [F80-OH1.1, OH1.2, OH1.3] Applies where concrete
concrete that supports wood-frame floors or steps, and supports or is used in an environmental separator.
concrete steps that support guards or handrails. [F80-OH4] Applies where concrete elements support
[F20, F21, F80-OS3.4, OS3.7] Applies where concrete wood-frame floors.
supports or is used in chimneys or fireplaces. [F80-OS1.1] Applies where concrete is used in footings for
(4) [F20-OP2.1, OP2.4] chimneys or fireplaces.
[F21, F80-OP2.3, OP2.4] [F20-OS2.1]
[F20-OP2.3] Applies to elements that support or are part of [F80-OS2.3]
an environmental separator. [F20-OS2.3] Applies to elements that support or are part of
[F20, F21, F80-OH1.1] Applies where concrete supports or an environmental separator.
is used in the walls of chimneys or fireplaces. [F80-OS3.1] Applies to concrete floors or steps, concrete
[F20, F21, F55, F80, F61-OH1.1, OH1.2] [F20, F21, F80, that supports wood-frame floors or steps, and concrete
F61-OH1.3] Applies to elements that support or are part of steps that support guards or handrails.
an environmental separator. [F80-OS3.4, OS3.7] Applies where concrete supports or is
[F20, F21, F80-OH4] Applies to elements that support used in chimneys or fireplaces.
floors. 9.3.1.4. Aggregates
[F20, F80-OS1.1] Applies where concrete supports or is (1) [F20-OP2.1, OP2.4]
used in chimneys or fireplaces. [F80-OP2.3, OP2.4]
[F20-OS2.1] [F80-OS2.3] [F20-OP2.3] Applies to elements that support or are part of
[F20-OS2.3] Applies to elements that support or are part of an environmental separator.
an environmental separator. [F20, F80-OS1.1] Applies to concrete used in chimneys or
[F20, F80-OS3.1] Applies to concrete that supports wood- fireplaces.
frame floors or steps. [F20-OS2.1]
[F20, F80-OS3.4, OS3.7] Applies where concrete supports [F80-OS2.3]
or is used in chimneys or fireplaces. [F20-OS2.3] Applies to elements that support or are part of
9.3.1.2. Cement an environmental separator.
(1) [F20-OP2.1, OP2.4]
[F80-OP2.3, OP2.4]
Page 82 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F80-OS3.1] Applies to floors and elements that (a) [F20, F21, F80-OH4] Applies to elements that support
support floors. [F20, F80-OS3.4] Applies to concrete used floors.
in chimneys or fireplaces. (b) [F20-OP2.1, OP2.4]
[F20, F55, F61, F80-OH1.1, OH1.2] Applies to elements (b) [F21-OP2.3, OP2.4]
that support or are part of an environmental separator and (b) [F80-OP2.3]
to masonry used in chimneys and fireplaces. (b) [F20-OP2.3] Applies to elements that support or are
[F20, F61, F80-OH1.3] Applies to elements that support or part of an environmental separator.
are part of an environmental separator and to masonry (b) [F20-OS2.1]
used in chimneys and fireplaces. (b) [F21, F80-OS2.3]
[F20, F80-OH4] Applies to floors and elements that (b) [F20-OS2.3] Applies to elements that support or are
support floors. part of an environmental separator.
9.3.1.5. Water (b) [F20, F21, F80-OS3.1]
(1) [F20-OP2.1, OP2.4] (b) [F20, F21, F55, F61, F80-OH1.1, OH1.2] [F20, F21,
[F80-OP2.3, OP2.4] F61, F80-OH1.3],
[F20-OP2.3] Applies to elements that support or are part of (c) [F20-OP2.1] [F20, F21, F80-OP2.3, OP2.4]
an environmental separator. (c) [F20-OS2.1] [F20, F21, F80-OS2.3]
[F20, F80-OS1.1] Applies where concrete supports or is (c) [F20, F21, F80-OS3.1]
used in chimneys or fireplaces.
(2) [F80-OS3.1]
[F20-OS2.1]
9.3.1.7. Concrete Mixes
[F80-OS2.3]
[F20-OS2.3] Applies to elements that support or are part of (1) (a) [F20-OP2.1, OP2.4]
an environmental separator. (a) [F21-OP2.3, OP2.4]
(a) [F20, F55, F61-OP2.3] Applies to elements that support
[F20, F80-OS3.1] Applies to concrete floors or steps,
or are part of an environmental separator.
concrete that supports wood-frame floors or steps, and
concrete steps that support guards or handrails. (a) [F20, F21, F61-OS1.1] Applies where concrete
[F20, F80-OS3.4, OS3.7] Applies where concrete supports supports or is used in chimneys or fireplaces.
or is used in chimneys or fireplaces. (a) [F20-OS2.1]
[F20, F55, F61, F80-OH1.1, OH1.2] Applies to elements (a) [F21-OS2.3]
that support or are part of an environmental separator and (a) [F20, F61, F55-OS2.3] Applies to elements that support
to masonry used in chimneys and fireplaces. or are part of an environmental separator.
[F20, F61, F80-OH1.3] Applies to elements that support or (a) [F20, F21, F61-OS3.1] Applies to concrete floors or
are part of an environment+tal separator and to masonry steps, concrete that supports wood-frame floors or steps,
used in chimneys and fireplaces. and concrete steps that support guards or handrails.
[F20, F80-OH4] Applies where concrete elements support (a) [F20, F21, F61-OS3.4, OS3.7] Applies where concrete
wood-frame floors. supports or is used in chimneys or fireplaces.
(a) [F20, F21, F80-OH1.1] Applies where concrete
9.3.1.6. Compressive Strength
supports or is used in the walls of chimneys or fireplaces.
(1) (a) [F20-OP2.1, OP2.4] (a) [F20, F21, F80, F61, F55-OH1.1, OH1.2] [F20, F21,
(a) [F21-OP2.3, OP2.4] F80, F61-OH1.3] Applies where concrete supports or is
(a) [F80-OP2.3] used in an environmental separator.
(a) [F20-OP2.3] Applies to elements that support are part
(a) [F20, F21, F61-OH4] Applies to elements that support
of an environmental separator.
floors.
(a) [F20, F21, F80-OS1.1] Applies where concrete
supports or is used in chimneys or fireplaces. (b) [F20-OP2.1, OP2.4]
(b) [F21-OP2.3, OP2.4]
(a) [F20-OS2.1]
(b) [F80-OP2.3]
(a) [F21, F80-OP2.3]
(b) [F20-OP2.3] Applies where concrete is used in an
(a) [F20-OS2.3] Applies to elements that support or are
environmental separator.
part of an environmental separator.
(b) [F20, F21, F55, F61, F80-OH1.1, OH1.2] [F20, F21,
(a) [F20, F80-OS3.1] Applies to elements that support
F61, F80-OH1.3]
floors or steps.
(a) [F20, F80-OS3.4, OS3.7] Applies where concrete (b) [F20-OS2.1]
supports or is used in chimneys or fireplaces. (b) [F21, F80-OS2.3]
(b) [F20-OS2.3] Applies where concrete is used in an
(a) [F20, F80-OH1.1] Applies where concrete supports or
environmental separator.
is used in the walls of chimneys or fireplaces.
(a) [F20, F55, F61, F80-OH1.1, OH1.2] [F20, F61, F80- (b) [F20, F21, F80-OS3.1]
OH1.3] Applies where concrete supports or is used in an (c) [F20, F21, F80-OP2.3, OP2.4]
environmental separator. (c) [F20, F21-OS2.1] [F20, F21, F80-OS2.3]
(c) [F20, F21, F80-OS3.1]
SA-1 • Page 83
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F20-OP2.1, OP2.4] [F21-OP2.3, OP2.4] [F20, F80-OS3.4, OS3.7] Applies where concrete supports
[F20, F61, F55-OP2.3] Applies where concrete supports or or is used in chimneys or fireplaces.
is used in an environmental separator. [F20, F80-OH1.1] Applies where concrete supports or is
[F20, F21-OS1.1] Applies where concrete supports or is used in the walls of chimneys or fireplaces.
used in chimneys or fireplaces. [F20, F55, F61, F80-OH1.1, OH1.2] [F20, F61, F80-
[F20-OS2.1] [F21-OS2.3] OH1.3] Applies where concrete supports or is used in an
[F20, F55, F61-OS2.3] Applies to elements that support or environmental separator.
are part of an environmental separator. [F20, F21, F80-OH4] Applies where concrete elements
[F20, F80-OS3.1] Applies to concrete floors or steps, support wood-frame floors.
concrete that supports wood-frame floors or steps, and (2) [F20-OH1.1] Applies where concrete supports or is used in
concrete steps that support guards or handrails. the walls of chimneys or fireplaces.
[F20, F80-OS3.1, OS3.7] Applies where concrete supports [F20, F55, F61-OH1.1, OH1.2] [F20, F61-OH1.3] Applies
or is used in chimneys or fireplaces. where concrete supports or is used in an environmental
[F20, F21, F55, F61-OH1.1] Applies where concrete separator.
supports or is used in the walls of chimneys or fireplaces. [F20, F55, F61-OH4] Applies to elements that support
[F20, F21-OH1.2, OH1.3] Applies where concrete supports floors.
or is used in an environmental separator. [F20-OP2.1, OP2.4]
[F20, F21, F55, F61-OH4] Applies where concrete [F20, F55, F61-OP2.3] [F55, F61-OP2.4] Applies to
elements support wood-frame floors. elements that support or are part of an environmental
9.3.1.8. Admixtures separator.
(1) [F20-OP2.1, OP2.4] [F20-OS1.1] Applies to concrete that supports or is used in
[F21-OP2.3, OP2.4] chimneys or fireplaces.
[F80-OP2.3, OP2.4] [F20-OS2.1]
[F20-OP2.3] Applies to elements that support or are part of [F20, F55, F61-OS2.3] Applies to elements that support or
an environmental separator. are part of an environmental separator.
[F20, F21, F80-OS1.1] Applies where concrete supports or [F20, F55, F61-OS3.1] Applies to floors and elements that
is used in chimneys or fireplaces. support floors.
[F20-OS2.1] [F21-OS2.3] [F20, F55, F61-OS3.4] Applies to concrete that supports or
[F20, F55, F61-OS2.3] Applies to elements that support or is used in chimneys or fireplaces.
are part of an environmental separator. 9.3.2.2. Lumber Grades
[F20, F80-OS3.1] Applies to concrete floors or steps, (1) [F20-OP2.1, OP2.4]
concrete that supports wood-frame floors or steps, and [F22-OP2.4]
concrete steps that support guards or handrails. [F20, F22-OP2.3] Applies to elements that support or are
[F20, F80-OS3.4, OS3.7] Applies where concrete supports part of an environmental separator.
or is used in chimneys or fireplaces. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F80-OH1.1] Applies where concrete supports or is support or are part of an environmental separator.
used in the walls of chimneys or fireplaces. [F20, F22-OH4] Applies to floors and elements that
[F20, F55, F61, F80-OH1.1, OH1.2] [F20, F61, F80- support floors.
OH1.3] Applies where concrete supports or is used in an [F20, F22-OS1.2] Applies to assemblies required to
environmental separator. provide fire resistance.
[F20, F21, F80-OH4] Applies where concrete elements [F20-OS2.1]
support wood-frame floors. [F20, F22-OS2.3] Applies to elements that support or are
9.3.1.9. Cold Weather Requirements part of an environmental separator.
(1) [F20-OP2.1, OP2.4] [F22-OS3.1] Applies to floors and elements that support
[F21, F80-OP2.3, OP2.4] floors.
[F20-OP2.3] Applies to elements that support or are part of [F22-OS3.7] Applies to walls, or elements that support
an environmental separator. walls, that contain doors or windows required for
[F20, F21, F80-OS1.1] Applies where concrete supports or emergency egress.
is used in chimneys or fireplaces. 9.3.2.5. Moisture Content
[F20-OS2.1] (1) [F21, F80-OP2.3, OP2.4]
[F21-OS2.3] [F21, F80-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20-OS2.3] Applies to elements that support or are part of support or are part of an environmental separator.
en environmental separator.
[F21, F80-OH4] Applies to floors and elements that
[F20, F80-OS3.1] Applies to concrete floors or steps, support floors.
concrete that supports wood-frame floors or steps, and
concrete steps that support guards or handrails. [F21, F80-OS1.2] Applies to assemblies required to
provide fire resistance.
Page 84 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F21, F80-OS2.3] [F80-OH4] Applies where structural wood elements
[F21, F80-OS3.1] Applies to floors and elements that support or are used in floors.
support floors. (4) [F80-OS2.3,OS2.5]
9.3.2.8. Undersized Lumber [F80-OP2.3,OP2.4,OP2.5]
(1) [F20-OP2.1, OP2.4] [F80,F61,F55-OH1.1,OH1.2] [F80,F61-OH1.3] Applies
[F22-OP2.4] where cribbing or retaining walls support an environmental
[F20, F22-OP2.3] Applies to elements that support or are separator.
part of an environmental separator. [F80-OH4] Applies to floors and elements that support
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that floors.
support or are part of an environmental separator. [F80-OS3.1] Applies where cribbing or retaining walls
[F20, F22-OH4] Applies to floors and elements that support floors.
support floors. [F80-OS1.2] Applies where cribbing or retaining walls
[F20, F22-OS1.2] Applies to assemblies required to support assemblies that are required to provide fire
provide fire resistance. resistance.
[F20-OS2.1] (5) [F80,F81-OS2.3,OS2.4
[F20, F22-OS2.3] Applies to elements that support or are [F80,F81-OP2.3,OP2.4]
part of an environmental separator. [F80,F81-OH4] Applies where structural wood elements
[F20, F22-OS3.1] Applies to floors and elements that support wood-frame floors.
support floors. [F80,F81-OS3.1] Applies where structural wood elements
9.3.2.9. Termite and Decay Protection support or are used in floors.
(1) [F80, F82-OP2.3, OP2.4] [F55, F61, F80-OH1.1, OH1.2] [F61, F80-OH1.3] Applies
[F80, F82-OS1.2] Applies where wood elements support or where cribbing or retaining walls support an environmental
are used in assemblies that are required to provide fire separator.
resistance. [F80,F81-OS1.2] Applies where structural wood elements
[F80, F82-OS2.3] support or are used in assemblies that are required to
[F80, F82-OS3.1] Applies where structural wood elements provide fire resistance.
support or are used in floors. (6) [F20,F60-OS2.3
[F55, F61, F80, F82-OH1.1, OH1.2] Applies where [F80, F81-OS1.2] Applies where structural wood elements
structural wood elements support or are used in an support or are used in assemblies that are required to
environmental separator. provide fire resistance.
[F80, F82-OH4] Applies where structural wood elements [F20,F61-OP2.3,OP2.4]
support or are used in floors. [F20,F55,F61-OH1.1,OH1.2] [F20,F61-OH1.3] Applies
(2) [F80, F82-OP2.3, OP2.4] where structural wood elements support or are used in an
[F80, F82-OS2.1] Applies where structural wood elements environmental separator.
support or are used in assemblies that are required to [F61,F80-OH4] Applies to floors and elements that
provide fire resistance. support floors.
[F80, F82-OS2.3] [F20,F61-OS3.1] Applies where structural wood elements
[F80, F82-OS3.1] Applies where structural wood elements support or are used in floors.
support or are used in floors. 9.3.3.2. Galvanized Sheet Steel
[F55, F61, F82, F80-OH1.1, OH1.2] [F61, F80, F82- (1) [F80-OP2.3, OP2.4]
OH1.3] Applies where structural wood elements support or [F80-OH1.1, OH1.2, OH1.3] Applies where sheet metal is
are used in an environmental separator. used in an environmental separator.
[F80, F82-OH4] Applies where structural wood elements [F80-OH4.1] Applies where sheet metal is used in
support or are used in floors. assemblies that support floors.
(3) [F80-OP2.3, OP2.4] [F80-OS2.3]
[F80-OS1.2] Applies where structural wood elements [F80-OS3.1] Applies where sheet metal is used in
support or are used in assemblies that are required to assemblies that support floors.
provide fire resistance. (2) [F80-OH1.1, OH1.2, OH1.3]
[F80-OS2.3] [F80-OP2.3]
[F80-OS3.1] Applies where structural wood elements [F80-OS2.3]
support or are used in floors.
9.4.2.2. Specified Design Snow Loads
[F82,F80,F61,F55-OH1.1,OH1.2] [F82,F80,F61-OH1.3]
(1) [F20-OP2.1, OP2.3] [F22-OP2.3]
Applies where structural wood elements support or are
used in an environmental separator. [F20-OS2.1, OS2.3] [F22-OS2.3]
[F22-OH1.1, OH1.2, OH1.3]
SA-1 • Page 85
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F20-OP2.1] [F20-OH4] Applies to floors and elements that support
[F20-OS2.1] floors.
(4) [F20-OS2.1,OS2.3] [F22-OS2.3] [F20-OP2.2, OP2.4]
[F20-OP2.1,OP2.3] [F22-OP2.3] [F20-OP2.3] Applies to elements that support or are part of
an environmental separator.
[F22-OH1.1,OH1.2,OH1.3]
[F20-OS2.2] [F20-OS2.3] Applies to elements that support
9.4.2.3. Platforms Subject to Snow and Occupancy Loads or are part of an environmental separator.
(1) [F20-OP2.1] [F20-OS3.1] Applies to floors and elements that support
[F20-OS2.1] floors.
9.4.2.4. Attics and Roof Spaces 9.4.4.3. High Water Table
(1) [F20-OP2.1] (1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20-OS2.1] support or are part of an environmental separator.
9.4.3.1. Deflections [F20-OH4] Applies to floors and elements that support
(1) [F22-OH1.1, OH1.2, OH1.3] Applies to elements that floors.
support or are part of an environmental separator. [F20-OP2.2, OP2.4]
[F22-OH4] [F20-OP2.3] Applies to elements that support or are part of
[F22-OP2.1, OP2.4] an environmental separator.
[F22-OP2.3] Applies to elements that support or are part of [F20-OS2.2]
an environmental separator. [F20-OS2.3] Applies to elements that support or are part of
[F22-OS2.3] Applies to elements that support or are part of an environmental separator.
an environmental separator. [F20-OS3.1] Applies to floors and elements that support
[F22-OS3.1] Applies to floors and elements that support floors.
floors. 9.4.4.4. Soil Movement
[F22-OS3.7] Applies to walls, and elements that support (1) [F21-OH1.1, OH1.2, OH1.3] Applies to walls that support
walls, that contain doors or windows required for or are part of an environmental separator.
emergency egress. [F21-OH4] Applies to foundations that support floors and
9.4.4.1. Allowable Bearing Pressures other elements that support floors.
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to footings that [F21-OP2.1, OP2.4]
support an environmental separator. [F21-OP2.3] Applies to elements that support or are part of
[F20-OH4] Applies to footings that support floors and other an environmental separator.
elements that support floors. [F21-OS2.1]
[F20-OP2.2, OP2.4] [F21-OS2.3] Applies to elements that support or are part of
[F20-OP2.3] Applies to elements that support or are part of an environmental separator.
an environmental separator. [F21-OS3.1] Applies to footings that support floors and
[F20-OS2.2] other elements that support floors.
[F20-OS2.3] Applies to elements that support or are part of [F21-OS3.7] Applies to footings that support walls that
an environmental separator. contain doors or windows required for emergency egress.
[F20-OS3.1] Applies to footings that support floors and 9.4.4.6. Walls Supporting Drained Earth
other elements that support floors. (1) [F20-OH1.1, OH1.2, OH1.3]
[F20-OS3.7] Applies to footings that support walls that [F20-OH4] Applies to floors and elements that support
contain doors or windows required for emergency egress. floors.
9.4.4.2. Foundation Capacity in Weaker Soil and Rock [F20-OP2.1, OP2.3, OP2.4]
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.1, OS2.3]
support or are part of an environmental separator. [F20-OS3.1] Applies to floors and elements that support
[F20-OH4] Applies to floors and elements that support floors.
floors. [F20-OS3.7] Applies to walls, and elements that support
[F20-OP2.2, OP2.4] [F20-OP2.3] Applies to elements that walls, that contain doors or windows required for
support or are part of an environmental separator. emergency egress.
[F20-OS2.2] (2) [F20-OH1.1, OH1.2, OH1.3]
[F20-OS2.3] Applies to elements that support or are part of [F20-OH4] Applies to floors and elements that support
an environmental separator. floors.
[F20-OS3.1] Applies to floors and elements that support [F20-OP2.1, OP2.3, OP2.4]
floors. [F20-OS2.1, OS2.3]
(2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS3.1] Applies to floors and elements that support
support or are part of an environmental separator. floors.
Page 86 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OS3.7] Applies to walls, and elements that support 9.5.5.3. Doors to Bathrooms
walls, that contain doors or windows required for (1) [F74-OA2]
emergency egress. 9.6.1.2. Material Standards for Glass
9.5.1.2. Combination Rooms (1) [F20-OS2.1] [F63-OS2.3]
(2) [F10-OS3.7] (e),(i) [F63-OH1.1] [F51,F63-OH1.2]
9.5.2.3. Stud Wall Reinforcement (h) [F03-OS1.2]
(1) [F74-OA2] (2) [F30-OS3.1] [F10-OS3.7]
9.5.3.1. Ceiling Heights of Rooms or Spaces (3) [F30-OS3.1] [F10-OS3.7]
(1) [F30-OS3.1] [F10-OS3.7] 9.6.1.3. Structural Sufficiency of Glass
(2) [F30-OS3.1] [F10-OS3.7] (1) [F20-OS2.1]
(3) [F30-OS3.1] [F10-OS3.7] (2) [F20-OS2.1]
(4) [F30-OS3.1] [F10-OS3.7] (3) [F30-OS3.1] [F10-OS3.7]
9.5.3.2. Mezzanines 9.6.1.4. Types of Glass and Protection of Glass
(1) [F30-OS3.1] [F10-OS3.7] (1) [F30-OS3.1] [F10-OS3.7]
9.5.3.3. Storage Garages (2) [F30-OS3.1] [F10-OS3.7]
(1) [F30-OS3.1] [F10-OS3.7] (3) [F30-OS3.1] [F10-OS3.7]
9.5.3A.1. Areas of Living Rooms and Spaces (4) [F30-OS3.1] [F10-OS3.7] Applies to portion of Code text:
(1) [F10-OS3.7] “... except that such partitions shall be suitably marked to
indicate their existence and position.”
(2) [F10-OS3.7]
(5) [F30-OS3.1] [F10-OS3.7]
9.5.3B.1. Area of Dining Rooms or Spaces
(6) [F20,F30-OS3.1]
(1) [F10-OS3.7]
9.7.2.1. Entrance Doors
(2) [F10-OS3.7]
(1) [F40, F42, F61-OH1.1] [F51, F54-OH1.2]
9.5.3C.1. Kitchen Areas
[F42-OH2.5] Applies to portion of Code text: “at each
(1) [F10-OS3.7] entrance to a dwelling unit”
9.5.3D.1. Areas of Bedrooms [F131-OR2] Applies to portion of Code text: “at each
(1) [F10-OS3.7] entrance to a dwelling unit”
9.5.3D.2. Areas of Master Bedrooms [F42, F61-OS2.3] Applies to portion of Code text: “at each
(1) [F10-OS3.7] entrance to a dwelling unit”
9.5.3D.3. Areas of Combination Bedrooms (2) [F35-OS4.2]
(1) [F10-OS3.7] 9.7.2.3. Minimum Window Areas
9.5.3D.4. Areas of Other Sleeping Rooms (1) [F102-OH7]
(1) [F10-OS3.7] [F10-OS3.7]
9.5.3D.5. Recreational Camps 9.7.3.1. General Performance Criteria
(1) [F10-OS3.7] (1) [F42, F55, F61, F62, F63-OH1.1]
[F81-OH1.1] Applies to windows that provide required non-
9.5.3D.6. Camps for Housing Workers heating season ventilation.
(1) [F10-OS3.7] [F54, F55, F61, F62, F63-OH1.2] [F63, F61, F62-OH1.3]
9.5.3E.1. Combined Living, Dining, Bedroom and Kitchen
[F20, F55, F61-OS2.1,OS2.3]
Spaces
[F42-OH2.5]
(1) [F10-OS3.7]
[F81-OS3.7]
9.5.3F.1. Space to Accommodate Fixtures
[F34-OS4.1]
(1) [F70, F71-OH2.3]
(2) F81-OH1.1] Applies to skylights that provide required non-
[F101-OH6] heating season ventilation.
9.5.3F.2. Doors to Rooms Containing Water Closets [F20, F22-OH1.3]
(1) [F101-OH6] Applies to portion of Code text: “to each room [F20-OS2.1, OS2.3]
containing a water closet” (3) [F42, F55-OH1.1]
9.5.4.1. Hallway Width [F42-OH2.5]
(1) [F10-OS3.7] [F81-OS3.7]
9.5.5.1. Doorway Opening Sizes [F34-OS4.1 ]
(1) [F30-OS3.1] [F10-OS3.7] (4) [F20, F22-OS2.3]
9.5.5.2. Doors to Public Water Closet Rooms [F30-OS3.1]
(1) [F30-OS3.1] [F10-OS3.7] [F20, F61-OH1.1, OH1.2]
SA-1 • Page 87
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F34-OS4.1] 9.7.6.2. Sealants, Trim and Flashing
9.7.3.2. Heat Transfer Performance (1) [F61, F63-OH1.1, OH1.3] [F61, F51, F54, F63-OH1.2]
(1) [F51, F63-OH1.1, OH1.2] [F61,F63-0S2.3]
[F63-OS2.3] (4) [F80-OS2.1, OS2.3]
9.7.3.3. Thermal Characteristics of Windows, Doors and [F80-OP2.1, OP2.3]
Skylights [F80-OH1.1, OH1.2,OH1.3]
(1) [F63-OH1.1, OH1.2, OH1.3] 9.8.1.1. General
[F63-OS2.3] 9.8.2.1. Stair Width
(2) F63-OS2.3] (1) [F30-OS3.1] [F10-OS3.7]
F63-OH1.1, OH1.2] (2) [F30-OS3.1] [F10-OS3.7]
(3) [F63-OH1.1, OH1.2, OH1.3] (3) [F30-OS3.1] [F10-OS3.7]
[F63-OS2.3] (4) [F30-OS3.1] [F10-OS3.7]
(4) [F63-OH1.1, OH1.2, OH1.3] 9.8.2.2. Height Over Stairs
[F63-OS2.3] (2) [F30-OS3.1] [F10-OS3.7]
[F63-OS3.1] (3) [F30-OS3.1] [F10-OS3.7]
9.7.4.2. General (4) [F30-OS3.1] [F10-OS3.7]
(1) [F20, F55, F61, F62, F63-0H1.1] 9.8.3.1. Straight and Curved Runs in Stairs
[F81-OH1.1] Applies to windows that provide required non-
(1) [F30-OS3.1] [F10-OS3.7]
heating season ventilation. [F54, F55, F61, F62, F63-
OH1.2] [F63, F20, F61, F62-OH1.3] (2) [F10-OS3.7]
[F20, F21, F61-OS2.3] (3) [F30-OS3.1] [F10-OS3.7]
[F10-OS1.5] Applies where windows, doors or skylights (4) [F30-OS3.1] [F10-OS3.7]
serve bedrooms, except bedrooms that have direct access 9.8.3.2 Minimum Number of Risers
to the exterior through an exit door or bedrooms that are in (1) [F30-OS3.1] [F10-OS3.7]
sprinklered suites. 9.8.3.3. Maximum Height of Flights
9.7.4.3. Performance Requirements (1) [F30-OS3.1]
(1) [[F20, F55, F61-OH1.1] 9.8.4.1. Dimensions for Risers
[F55-OH1.2] [F20, F61, F62-OH1.3] (1) [F30-OS3.1] [F10-OS3.7]
(4) [F40, F61, F42-OH1.1] [F51, F54-OH1.2] 9.8.4.2. Dimensions for Runs and Rectangular Treads
[F61, F42-OS2.3] (1) [F30-OS3.1] [F10-OS3.7]
[F80-OS3.7] (2) [F30-OS3.1] [F10-OS3.7]
[F80-OS4.1] 9.8.4.3. Dimensions for Tapered Treads
[F42-OH2.5] (1) [F30-OS3.1] [F10-OS3.7]
9.7.5.2. Resistance to Forced Entry for Doors (3) [F30-OS3.1] [F10-OS3.7]
(2) [F34-OS4.1] 9.8.4.4. Uniformity and Tolerances for Risers, Runs and
(3) [F20-OS4.1] Treads
(4) [F34-OS4.1] (1) [F30-OS3.1] [F10-OS3.7]
(5) [F34-OS4.1] (2) [F30-OS3.1] [F10-OS3.7]
(6) [F20-OS4.1] (3) [F30-OS3.1] [F10-OS3.7]
(7) [F20-OS4.1] (4) [F30-OS3.1] [F10-OS3.7]
(8) [F34-OS4.1] (5) [F30-OS3.1] [F10-OS3.7]
(9) [F20-OS4.1] 9.8.4.5. Uniformity of Runs in Flights with Mixed Treads within
9.7.5.3. Resistance to Forced Entry for Windows a House or Dwelling Unit
(1) [F34-OS4.1] (1) [F30-OS3.1] [F10-OS3.7]
9.7.6.1. Installation of Windows, Doors and Skylights (2) [F30-OS3.1] [F10-OS3.7]
(1) [F20, F54, F55, F61, F63-OH1.1, OH1.2, OH1.3] 9.8.4.6. Winders
[F20, F61, F63-OS2.3] (1) [F30-OS3.1] [F10-OS3.7]
(2) [F54, F55, F61, F63-OH1.1, OH1.2, OH1.3] (2) [F30-OS3.1] [F10-OS3.7]
[F61, F63-OS2.3] 9.8.4.7. Spiral Stairs
(3) [F55, F61, F63-OS2.3] (1) [F30-OS3.1]
[F55, F61, F63-OH1.1, OH1.2] (3) [F30-OS3.1]
Page 88 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.8.4.8. Tread Nosings 9.8.8.1. Required Guards
(1) [F30-OS3.1] [F10-OS3.7] (1) [F30-OS3.1] [F10-OS3.7]
(2) [F30-OS3.1] [F10-OS3.7] (3) [F30-OS3.1] [F10-OS3.7]
9.8.4.9. Open Risers (4) [F30-OS3.1]
(1) [F30-OS3.1] (6) [F30-OS3.1] [F10-OS3.7]
9.8.4.10. Interior Stairs Extending Through the Roof (7) [F30-OS3.1] [F10-OS3.7]
(1) [F30-OS3.1] [F10-OS3.7] (8) [F30-OS3.1]
9.8.5.2. Ramp Width 9.8.8.2. Loads on Guards
(1), (2) [F30-OS3.1] [F10-OS3.7] (1) [F20-OS2.1]
9.8.5.3. Height Over Ramps (2) [F20-OS2.4]
(1) [F30-OS3.1] [F10-OS3.7] 9.8.8.3. Height of Guards
(2) [F30-OS3.1] [F10-OS3.7] (1) [F30-OS3.1] [F10-OS3.7]
9.8.5.4. Ramp Slope (2) [F30-OS3.1] [F10-OS3.7]
(1) [F30-OS3.1] [F10-OS3.7] (3) [F30-OS3.1] [F10-OS3.7]
9.8.5.5. Maximum Rise (3.1) [F30-OS3.1] [F10-OS3.7]
(1) [F30-OS3.1] 9.8.8.4. Guards for Floors and Ramps in Garages
9.8.6.2. Required Landings (1) [F10-OS3.1]
(1) [F30-OS3.1] [F10-OS3.7] (2) [F20-OS2.1]
9.8.6.3. Dimensions of Landings 9.8.8.5. Openings in Guards
(1) [F30-OS3.1] [F10-OS3.7] (1) [F30-OS3.1]
(2) [F30-OS3.1] [F10-OS3.7] (2) [F30-OS3.1]
(4) [F30-OS3.1] [F10-OS3.7] (3) [F30-OS3.1]
(5) [F30-OS3.1] [F10-OS3.7] 9.8.8.6. Guards Designed not to Facilitate Climbing
(6) [F30-OS3.1] [F10-OS3.7] (1) [F30-OS3.1]
(7) [F30-OS3.1] [F10-OS3.7] 9.8.8.7. Glass in Guards
9.8.6.4. Height Over Landings (1) [F20-OS2.1]
(1) [F30-OS3.1] [F10-OS3.7] [F20-OS3.1, OS3.7]
(2) [F30-OS3.1] [F10-OS3.7] 9.8.9.1. Loads on Stairs and Ramps
9.8.7.1. Required Handrails (1) [F20-OS2.1]
(1) [F30-OS3.1] [F10-OS3.7] [F22-OH4]
(2) [F30-OS3.1] [F10-OS3.7] 9.8.9.2. Exterior Concrete Stairs
(5) [F30-OS3.1] [F10-OS3.7] (1) [F22-OS3.1, OS3.7]
9.8.7.2. Continuity of Handrails 9.8.9.3. Exterior Wood Steps
(1) [F30-OS3.1] [F10-OS3.7] (1) [F80-OS2.3]
(2) [F30-OS3.1] [F10-OS3.7] [F80-OS3.1, OS3.7]
9.8.7.3. Termination of Handrails 9.8.9.4. Wooden Stair Stringers
(1) [F30-OS3.1] [F10-OS3.7]
(1) [F20-OS2.1]
(2) [F30-OS3.1] [F10-OS3.7]
[F22-OH4]
9.8.7.4. Height of Handrails (2) [F20-OS2.1]
(2) [F30-OS3.1] [F10-OS3.7] [F22-OH4]
9.8.7.5. Ergonomic Design 9.8.9.5. Treads
(1) [F30-OS3.1] [F10-OS3.7] (1) [F20-OS2.1]
(2) [F30-OS3.1] [F10-OS3.7] [F22-OH4]
9.8.7.6. Projections into Stairs and Ramps (2) [F20-OS2.1]
(1) [F30-OS3.1] [F10-OS3.7] [F22-OH4]
9.8.7.7. Design and Attachment of Handrails 9.8.9.6. Finish for Treads, Landings and Ramps
(1) [F20-OS2.1] (0.1) [F30, F80-OS3.1] [F10-OS3.7]
[F20-OS3.1, OS3.7] (1) [F30-OS3.1] [F10-OS3.7]
(2) [F20-OS2.1] (2) [F30-OS3.1] [F10-OS3.7]
[F20-OS3.1, OS3.7] (3) [F73-OA1]
(4) [F30-OS3.1] [F10-OS3.7]
SA-1 • Page 89
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.8.10.1. Design 9.9.4.6. Openings Near Exit Doors
(1) [F20-OS2.1] (2) [F05-OS1.5]
[F22-OS3.1, OS3.7] 9.9.4.7. Stairways in Group D or E Buildings
9.8.10.2. Anchorage (1) [F05-OS1.5]
(1) [F20-OH1.1, OH1.2, OH1.3] 9.9.5.2. Occupancies in Corridors
[F20-OS2.1] (1) [F10-OS3.7]
[F22-OS3.1, OS3.7]
9.8.10.3. Prevention of Damage Due to Frost 9.9.5.3. Obstructions in Public Corridors
(1) [F21-OH1.1, OH1.2, OH1.3] (1) [F30-OS3.1]
[F21-OS2.1] 9.9.5.4. Obstructions in Exits
[F21-OS3.1] (1) [F10-OS3.7]
9.9.2.1. Types of Exits 9.9.5.5. Obstructions in Means of Egress
(2.1) [F04-OP1.2, OP1.3] [F06, F12, F81-OP1.2] (1) [F10-OS3.7]
[F80-OP2.3] (2) [F10-OS3.7]
[F04-OS1.2, OS1.3] [F05, F10, F12-OS1.5] [F06-OS1.2] 9.9.5.6. Mirrors or Draperies
[F20, F80-OS2.1] [F80, F81-OS2.3] (1) [F30-OS3.1] [F10-OS3.7]
[F20, F30-OS3.1] [F10, F12-OS3.7] 9.9.5.7. Fuel-Fired Appliances
9.9.2.2. Purpose of Exits (1) [F10-OS1.5]
(1) [F10-OS3.7] Applies to portion of Code text “An exit shall [F10-OS3.7]
be designed for no purpose other than exiting ...” 9.9.5.8. Service Rooms
9.9.2.3. Elevators, Slide Escapes and Windows as Means of (1) [F30-OS3.1] [F10-OS3.7]
Egress 9.9.5.9. Ancillary Rooms
(1) [F10-OS3.7] (1) [F05, F06-OS1.5]
9.9.2.4. Principle Entrances [F10-OS3.7]
(1) [F10-OS3.7] 9.9.6.1. Obstructions by Doors
9.9.2.5. Front Edge of Stair Treads (2) [F30-OS3.1] [F10-OS3.7]
(1) [F30-OS1.5] (3) [F30-OS3.1] [F10-OS3.7]
[F30-OS3.1] 9.9.6.2. Clear Opening Height at Doorways
9.9.2.6. Exterior Exit Stairs that Serve a Hotel (1) [F30-OS3.1] [F10-OS3.7]
(1) [F30-OS1.5] (2) [F30-OS3.1] [F10-OS3.7]
[F30-OS3.1] 9.9.6.3. Clear Opening Width at Doorways
9.9.3.2. Exit Width (2) [F30-OS3.1] [F10-OS3.7]
(1) [F10-OS3.7] (3) [F30-OS3.1] [F10-OS3.7]
9.9.3.3. Width of Corridors 9.9.6.4. Door Action
(1) [F30-OS3.1] [F10-OS3.7] (1) [F10-OS3.7]
9.9.3.4. Clear Height (2) [F10-OS3.7]
(1) [F30-OS3.1] [F10-OS3.7] 9.9.6.5. Direction of Door Swing
(2) [F30-OS3.1] [F10-OS3.7] (1) [F10-OS3.7]
9.9.4.2. Fire Separation for Exits (2) [F10-OS3.7]
(1) [F03-OP1.2] (3) [F10-OS3.7]
[F03-OS1.2] [F05-OS1.5] (4) [F10-OS3.7]
(2) [F03-OP1.2] 9.9.6.6. Nearness of Doors to Stairs
[F03-OS1.2] [F05-OS1.5] (1) [F30-OS3.1] [F10-OS3.7]
(3) [F05-OS1.5] (2) [F10-OS3.7]
(4) [F03-OS1.2] [F05-OS1.5] 9.9.6.7. Door Latching, Locking and Opening Mechanisms
9.9.4.3. Wired Glass or Glass Block (1) (a) [F10-OS3.7]
(2) [F05-OS1.5] (b) [F10, F81-OS3.7]
9.9.4.4. Openings Near Unenclosed Exit Stairs and Ramps (2) [F10-OS3.7]
(1) [F05-OS1.5] (3) [F10-OS3.7]
9.9.4.5. Openings in Exterior Walls of Exits [F73-OA1]
(1) [F05-OS1.5] (4) [F10-OS3.7]
Page 90 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.9.6.8. Effort Required to Open 9.9.11.2. Visibility of Exits
(1) [F10-OS3.7] (1) [F10-OS3.7]
9.9.7.1. Egress from Roof Area, Podiums, Terraces, Platforms (2) [F10-OS3.7]
and Contained Open Spaces 9.9.11.3. Exit Signs
(1) [F10-OS3.7] (1) [F10-OS3.7]
(2) [F10-OS3.7] (2) [F10-OS3.7]
9.9.7.2. Means of Egress from Suites (3) [F10, F81-OS3.7]
(1) [F10-OS1.5] (4) [F10, F81-OS3.7]
(2) [F10-OS3.7] (5) [F10-OS3.7]
9.9.7.3. Dead End Corridors (6) [F10-OS3.7]
(1) [F10-OS3.7] (7) [F10-OS3.7]
(2) [F10-OS3.7] 9.9.11.4. Signs for Stairs and Ramps at Exit Level
(3) [F31-OS1.2] [F05-OS1.5] (1) [F10-OS3.7]
[F30-OS3.1] [F10-OS3.7] 9.9.11.5. Floor Numbering
9.9.7.4. Number and Spacing of Egress Doors (1) [F10-OS3.7]
(1) [F10-OS3.7] [F73-OA1]
(2) [F10-OS1.5] 9.9.12.2. Required Lighting in Egress Facilities
9.9.7.5. Independent Access to Exit (1) [F30-OS3.1] [F10-OS3.7]
(1) [F10-OS3.7] (2) [F30-OS3.1] [F10-OS3.7]
9.9.8.2. Number of Required Exits 9.9.12.3. Emergency Lighting
(1) [F10-OS3.7] (1) [F30-OS3.1] [F10-OS3.7]
9.9.8.3. Contribution of Each Exit (2) [F30-OS3.1] [F10-OS3.7]
(1) [F10-OS3.7] (3) [F30-OS3.1] [F10-OS3.7]
9.9.8.4. Location of Exits (4) [F30-OS3.1] [F10-OS3.7]
(1) [F10-OS1.5] (5) [F30-OS3.1] [F10-OS3.7]
9.9.8.5. Exiting through a Lobby (6) [F30-OS3.1] [F10-OS3.7]
(1) [F10-OS1.5] (7) [F30-OS3.1] [F10-OS3.7]
(2) [F10-OS1.5] 9.10.1.2 Testing of Integrated Fire Protection and Life Safety
(3) [F10-OS1.5] Systems
(3.1) [F10-OS1.5] (1) [F02,F81,F82-OS1.2,OS1.5]
(4) [F10-OS1.5] [F02,F81,F82-OP1.2]
(5) [F10-OS1.5] 9.10.1.3. Items Under Part 3 Jurisdiction
(6) [F10-OS1.5] (5) [F01-OS1.1] Applies to portion of Code text: “ ... facilities
9.9.8.6. Mezzanine Means of Egress for the dispensing of fuel shall not be installed in any
(1) [F05-OS1.5] building.”
(4) [F05-OS1.5] 9.10.3.4. Suspended Membrane Ceiling
9.9.9.1. Travel Limit to Exits or Egress Doors (1) [F03-OP1.3]
(1) [F10-OS3.7] [F04-OS1.3]
(2) [F10-OS3.7] 9.10.4.3. Basement Storage Garages
(3) [F10-OS3.7] (1) [F03-OS1.2]
9.9.9.2. Two Separate Exits [F03-OP1.2]
(1) [F10-OS3.7] 9.10.5.1. Permitted Openings in Wall and Ceiling Membranes
9.9.9.3. Shared Egress Facilities (1) [F03-OP1.2] [F04-OP1.3]
(1) [F10-OS3.7] [F03-OS1.2] [F04-OS1.3]
(2) [F10-OS3.7] (2) [F04-OP1.3]
9.9.10.1. Egress Windows or Doors for Bedrooms [F04-OS1.3]
(1) [F10-OS3.7] (2.1) [F03-OP1.2]
(2) [F10-OS3.7] [F03-OS1.2]
(3) [F10-OS3.7] (3) [F04-OP1.3]
(4) [F10-OS3.7] [F04-OS1.2, OS1.3]
(5) [F10-OS3.7]
SA-1 • Page 91
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.10.7.1. Protection of Structural Steel Members [F03-OS1.2]
(1) [F03-OP1.2] [F04-OP1.3] (2) [F03-OP1.2]
[F03-OS1.2] [F04-OS1.3] [F03-OS1.2]
9.10.8.1. Fire-Resistance Ratings for Floors and Roofs 9.10.9.7. Piping Penetrations
(1) [F03-OP1.2] [F04-OP1.2, OP1.3] Applies to portion of (1) [F03-OS1.2] [F04-OS1.2]
Code text: “Except as other wise provided in this [F03-OS1.2] [F04-OS1.3] [F03-OP1.2] [F04-OP1.2]
Subsection, the fire-resistance ratings of floors and roofs (2) [F03-OS1.2]
shall conform to Table 9.10.8.1.”
[F03-OS1.2]
[F03-OS1.2] [F04-OS1.2, OS1.3] Applies to portion of
(5) [F03-OS1.2] [F04-OS1.2]
Code text: “Except as otherwise provided in this
Subsection, the fire-resistance ratings of floors and roofs [F03-OP1.2] [F04-OP1.2]
shall conform to Table 9.10.8.1.” 9.10.9.8. Penetrations by Outlet Boxes or Service Equipment
9.10.8.2. Fire-Resistance Ratings in Sprinklered Buildings in Concealed Spaces
(1) (a), (b) [F13-OP1.2] [F02, F82-OP1.3] (1) [F03-OP1.2]
(a), (b) [F13-OS1.2, OS1.5] [F02, F82-OS1.3] [F03-OS1.2]
9.10.8.3. Fire-Resistance Ratings for Walls, Columns and (6) [F03-OS1.2] [F04-OS1.2]
Arches [F03-OP1.2] [F04-OP1.2]
(1) [F04-OP1.2, OP1.3] 9.10.9.10. Colapse of Combustible Constructions
[F04-OS1.2, OS1.3] (1) [F03-OP1.2]
(2) [F04-OP1.2, OP1.3] [F03-OS1.2]
[F04-OP1.2,OP1.3] (2) [F03-OP1.2]
9.10.8.4. Support of Noncombustible Construction [F03-OS1.2]
(1) [F04-OS1.3] 9.10.9.12. Concealed Spaces Above Fire Separation
[F04-OP1.3] (1) [F03-OP1.2]
9.10.8.7. Roofs Supporting an Occupancy [F03-OS1.2]
(1) [F03-OP1.2] (2) [F03-OP1.2]
[F03-OS1.2] [F03-OS1.2]
9.10.8.8. Floors of Exterior Passageways 9.10.9.13. Separation of Residential Occupancies
(1) [F06-OP1.2] [F04-OP1.3] (1) [F03-OP1.2]
[F05-OS1.5] [F06-OS1.2, OS1.5] [F03-OS1.2]
9.10.9.2. Continuous Barrier (2) [F03-OP1.2]
(1) [F03-OP1.2] [F03-OS1.2]
[F03-OS1.2] (3) [F03-OP1.2]
(2) [F03-OS1.2] [F03-OS1.2]
(3) [F03-OP1.2] 9.10.9.14. Residential Suites in Industrial Buildings
[F03-OS1.2] (1) [F02-OS1.2]
(4) [F03-OP1.2] (2) [F02, F03-OS1.2]
[F03-OS1.2] 9.10.9.15. Separation of Suites
(5) [F03-OP1.2] (1) [F03-OP1.2]
[F03-OS1.2] [F03-OS1.2]
(2) [F02-OP1.2]
9.10.9.3. Openings to be Protected With Closures
(1) [F03-OP1.2] [F02-OS1.2]
[F03-OS1.2] 9.10.9.16. Separation of Residential Suites
(1) [F03-OP1.2]
(2) [F03-OP1.2]
[F03-OS1.2]
[F03-OS1.2]
(3) [F03-OS1.2]
9.10.9.4. Floor Assemblies
(4) [F03-OP1.2]
(1) [F03-OP1.2]
[F03-OS1.2]
[F03-OS1.2]
9.10.9.17. Separation of Public Corridors
9.10.9.6. General Requirements for Penetration of Fire
Separations (1) [F03, F06-OP1.2]
(1) [F03-OP1.2] [F03, F05-OS1.5] [F06-OS1.2, OS1.5]
(2) [F03-OS1.2] [F06, F05-OS1.5]
Page 92 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F03, F06-OP1.2] 9.10.11.2. Firewalls Not Required
(3) [F03-OS1.2] [F05, F06-OS1.5] (2) [F03-OP3.1]
[F03, F06-OP1.2] [F03-OS1.2]
9.10.9.18. Separation of Storage Garages (3) [F03-OP3.1]
(1), (2) [F03-OP1.2] [F03-OS1.2]
[F03-OS1.2] 9.10.12.1. Termination of Floors or Mezzanines
(4) [F01-OS1.1] (1) [F03-OP1.2, OP1.4]
[F44-OS3.4] [F03-OS1.5]
(5) [F01-OS1.1] 9.10.12.2 Location of Skylights
[F44-OS3.4] (1) [F03-OP1.2]
9.10.9.19. Separation of Repair Garages [F03-OS1.2]
(1) [F03-OP1.2] 9.10.12.3. Exterior Walls Meeting at an Angle
[F03-OS1.2] (1) [F03-OP1.2]
(3) [F03-OP1.2] [F03-OS1.2]
[F03-OS1.2] (2) [F03-OP1.2]
(4) [F44-OH1.1] [F03-OS1.2]
[F44-OS1.1] (3) [F03-OP1.2]
[F44-OS3.4] [F03-OS1.2]
(5) [F44-OH1.1] 9.10.12.4. Protection of Soffits
[F44-OS1.1] (2) [F03-OP1.2]
[F44-OS3.4] [F03-OS1.2]
9.10.9.20. Exhaust Ducts Serving More Than One Fire (3) [F03-OP1.2]
Compartment [F03-OS1.2]
(1) [F03-OS1.2] 9.10.13.1. Closures
(2) [F03-OS1.2] (1) [F03-OP1.2]
9.10.9.21. Central Vacuum Systems [F03-OS1.2]
(1) [F03-OS1.2] 9.10.13.2. Solid Core Wood Door as a Closure
9.10.10.3. Separation of Service Rooms (2) [F03-OP1.2]
(1) [F03-OP1.2] [F03, F81-OP1.4] [F03-OS1.2]
[F03-OS1.2] [F03, F81-OS1.4] 9.10.13.5. Wired Glass as a Closure
9.10.10.4. Location of Fuel Fired Appliances (2) [F03-OP1.2]
(1) [F03-OP1.2] [F03, F81-OP1.4] [F03-OS1.2]
[F03-OS1.2] [F03, F81-OS1.4] (3) [F03-OP1.2]
9.10.10.5. Incinerators [F03-OS1.2]
(1) [F03-OP1.2] [F03, F81-OP1.4] 9.10.13.6. Steel Door Frames
[F03-OS1.2] [F03, F81-OS1.4] (1) [F03-OP1.2]
(2) [F01-OS1.1] [F03-OS1.2]
(3) [F01-OP1.1] 9.10.13.8. Maximum Size of Opening
[F20-OP2.1] [F80-OP2.3] (1) [F03-OP1.2]
[F01-OS1.1] [F03-OS1.2]
[F20-OS2.1] [F80-OS2.3] (2) [F03-OP1.2]
[F40, F61-OH1.1, OH1.3] [F03-OS1.2]
(4) [F01, F02-OS1.2]
9.10.13.9. Door Latch
9.10.10.6. Storage Rooms (1) [F03-OP1.2]
(1) [F03-OP1.2] [F03-OS1.2]
[F03-OS1.2]
9.10.13.10. Self-Closing Device
9.10.11.1. Required Firewalls (1) [F03-OP1.2]
(1) [F03-OP1.2] [F03-OS1.2]
[F03-OP3.1]
9.10.13.12. Service Room Doors
[F03-OS1.2]
(1) [F10-OS1.5] Applies to portion of Code text: “... but shall
swing outward from such rooms in all other cases.”
SA-1 • Page 93
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F30-OS3.1] Applies to portion of Code text: “Swing-type [F02, F03-OS1.2]
doors shall open into service rooms containing fuel-fired (7) [F02, F03-OP1.2]
equipment where such doors lead to public corridors or [F02, F03-OS1.2]
rooms used for assembly ...”
9.10.16.2. Required Fire Blocks in Wall Assemblies
9.10.13.13. Fire Dampers
(1) [F03-OP1.2]
(1) [F03-OP1.2]
[F03-OS1.2]
[F03-OS1.2]
9.10.16.3. Fire Block Materials
9.10.13.14. Fire Stop Flaps
(1) [F03-OP1.2]
(1) [F03-OP1.3]
[F03-OS1.2]
[F03-OS1.3]
(2) [F03-OP1.2]
9.10.13.15. Doors Between Garages and Houses or Dwelling
[F03-OS1.2]
Units
(3) [F04-OP1.2]
(1) [F01-OS1.1]
[F04-OS1.2]
[F44-OS3.4]
9.10.16.4. Penetration of Fire Blocks
(2) [F01-OS1.1]
(1) [F03-OP1.2]
[F44-OS3.4]
[F03-OS1.2]
9.10.13.16. Door Stops
9.10.17.1. Flame-Spread Rating of Interior Surfaces
(1) [F81-OP1.4]
(1) [F02-OS1.2]
[F81-OS1.4]
9.10.17.2. Ceilings in Exits or Public Corridors
9.10.14.4. Openings in Exposing Building Face
(1) [F05-OS1.5]
(1) [F03-OP3.1]
9.10.17.3. Walls in Exits
(2) [F03-OP3.1]
(1) [F05-OS1.5]
(6) [F03-OP3.1]
(2) [F05-OS1.5]
(7) [F03-OP3.1]
9.10.17.4. Exterior Exit Passageways
9.10.14.5. Construction of Exposing Building Face and Walls
above Exposing Building Face (1) [F05-OS1.5]
(1) [F02, F03-OP3.1] 9.10.17.5. Walls in Public Corridors
(2) [F02, F03-OP3.1] (1) [F05-OS1.5]
(4) [F03-OP3.1] 9.10.17.9. Combustible Skylights
(6) [F03-OP3.1] (1) [F02, F05-OS1.5]
(12) [F03-OP3.1] 9.10.17.10. Protection of Foamed Plastics
9.10.15.3A. Inadequate Firefighting Facilities (1) [F01, F02, F05-OS1.5]
(1) [F03-OP3.1] (2) [F02-OS1.2] [F05-OS1.5]
9.10.15.4. Glazed Openings in Exposing Building Face [F02-OP1.2]
(1) [F03-OP3.1] (3) [F01, F02-OS1.2]
(7) [F03-OP3.1] 9.10.18.1. Access Provided through a Firewall
(8) [F03-OP3.1] (1) [F11-OS1.5]
9.10.15.5. Construction of Exposing Building Face of Houses 9.10.18.2. Fire Alarm System Required
(1) [F02, F03-OP3.1] (2) [F11-OS1.5]
(1.1) [F02, F03-OP3.1] 9.10.18.4. Rooms and Spaces Requiring Heat Detectors or
(2) [F02, F03-OP3.1] Smoke Detectors
(5) [F03-OP3.1] (1) [F11-OS1.5]
9.10.16.1. Required Fire Blocks in Concealed Spaces (2) [F11-OS1.5]
(1) [F03-OP1.2] (3) [F02-OS1.2] Applies to sprinklered buildings.
[F11-OS1.5] Applies to the supervision of the system and
[F03-OS1.2]
flow alarm.
(3) [F03-OP1.2]
(4) [F11-OS1.5]
[F03-OS1.2]
9.10.18.5. Smoke Detectors in Recirculating Air Handling
(4) [F03-OP1.2] Systems
[F03-OS1.2] (1) [F03-OS1.2]
(5) [F03-OP1.2]
[F03-OS1.2]
(6) [F02, F03-OP1.2]
Page 94 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.10.18.6. Portions of Buildings Considered as Separate [F12-OS1.2, OS1.5] Applies to portion of Code text:
Buildings “Access required in Sentence (1) ... provides an opening
(1) [F03-OS1.2] not less than 1 100 mm high and 550 mm wide, the sill of
(2) [F11-OS1.2] which shall not be more than 900 mm above the floor.”
9.10.18.7. Central Vacuum Systems 9.10.20.3. Fire Department Access to Buildings
(1) [F03-OS1.2] (2) [F12-OP1.2]
9.10.18.9. Fire Alarm System in a Hotel [F12-OS1.2, OS1.5]
(1) [F11-OS1.5] (2) [F12-OP1.2]
[F12-OS1.2, OS1.5]
9.10.18.10. Commissioning of Life Safety and Fire Protection
Systems 9.10.20.4. Portable Fire Extinguishers
(1) [F02, F81, F82-OS1.2, OS1.5] (1) [F02, F12, F81-OP1.2]
[F02, F81, F82-OP1.2] [F81, F02, F12-OS1.2]
9.10.19.1. Required Smoke Alarms 9.10.20.5. Freeze Protection for Fire Protection Systems
(1) [F11, F81-OS1.5] (1) [F02, F81-OP1.2]
(2) [F11, F81-OS1.5] [F02, F81-OS1.2]
[F74-OA2] 9.10.21.2. Separation of Sleeping Rooms
(4) [F11, F81-OS1.5] (1) [F03-OP1.2]
[F74-OA2] [F03-OS1.2]
[F74-OA2] 9.10.21.3. Floor Assemblies Between the First and Second
9.10.19.2. Sound Patterns of Smoke Alarms Storey
(1) [F11-OS1.5] (1) [F03-OP1.2]
9.10.19.3. Location of Smoke Alarms [F03-OS1.2, OS1.5]
(1) [F11-OS1.5] 9.10.21.4. Walkways Connecting Buildings
(1.1) [F11-OS1.5] (1) [F03-OP1.2]
(2) [F11, F81-OS1.5] [F03-OP3.1]
(3) [F11-OS1.5] [F03, F06-OS1.2, OS1.5]
(4) [F11-OS1.5] 9.10.21.5. Spatial Separations
(6) [F11, F81-OS1.5] (1) [F03-OP3.1]
[F74-OA2] 9.10.21.6. Flame-Spread Ratings
9.10.19.4. Power Supply (1) [F05-OS1.2, OS1.5]
(1) [F81-OS1.5] 9.10.21.7. Smoke Detectors
(3) [F81-OS1.5] (1) [F11-OS1.5]
9.10.19.5. Interconnection of Smoke Alarms 9.10.21.8. Portable Fire Extinguishers
(1) [F11-OS1.5] (1) [F02, F12, F81-OP1.2]
(2) [F11-OS1.5] [F02, F12, F81-OS1.2]
9.10.19.6. Silencing of Smoke Alarms 9.10.21.9. Hose Stations
(1) [F11, F81-OS1.5] (1) [F02, F12, F81-OP1.2]
9.10.19.7. Instructions for Maintenance and Care [F02, F12, F81-OS1.2]
(1) [F82-OS1.5] (2) [F12-OP1.2]
9.10.19.8. Residential Fire Warning Systems [F12-OS1.2]
(1) [F81, F11-OS1.5] (3) [F12-OP1.2]
[F12-OS1.2]
9.10.20.1. Windows or Access Panels Required
(1), (2) [F12-OP1.2] 9.10.22.2. Vertical Clearances above Cooktops
[F12-OS1.2, OS1.5] (1) [F01-OS1.1, OS1.2]
(2) [F01-OS1.1, OS1.2]
9.10.20.2. Access to Basements
(1) [F12-OP1.2] 9.10.22.3. Protection Around Cooktops
[F12-OS1.2, OS1.5] (1) [F01-OS1.1, OS1.2]
(2) [F12-OP1.2] Applies to portion of Code text: “Access (3) [F01-OS1.1, OS1.2]
required in Sentence (1) ... provides an opening not less 9.11.1.1. Required Protection
than 1 100 mm high and 550 mm wide, the sill of which (1) [F56-OH3.1]
shall not be more than 900 mm above the floor.” (3) [F56-OH3.1]
SA-1 • Page 95
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.11.1.2. Determination of Sound Transmission Ratings (1) [F20-OS2.2, OS2.3]
(1) [F56-OH3.1] [F20-OS3.1] Applies to floors and elements that support
(2) [F56-OH3.1] floors.
9.11.1.4. Adjoining Construction [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator.
(2) [F56-OH3.1]
[F20-OH4] Applies to floors and elements that support
(3) [F56-OH3.1]
floors.
(4) [F56-OH3.1]
9.12.2.2. Minimum Depth of Foundations
9.12.1.1. Removal of Topsoil and Organic Matter
(1) [F21-OP2.3, OP2.4]
(1) [F20, F40, F41-OH1.1] [F21-OS2.3]
(2) [F81-OP2.3, OP2.4] [F21-OS3.1] Applies to floors, elements that support floors,
[F81-OH1.1, OH1.2, OH1.3] Applies to elements that and concrete steps with more than 2 risers.
support or are part of an environmental separator. [F21-OH1.1, OH1.2, OH1.3] Applies to elements that
[F81-OS1.2] Applies to assemblies required to provide fire support or are part of an environmental separator.
resistance. [F21-OH4] Applies to floors and elements that support
[F81-OS2.3] floors.
[F81-OS3.1] Applies to floors and elements that support 9.12.3.1. Placement of Backfill
floors. (1) [F81-OH1.1, OH1.2, OH1.3] Applies to elements that
(3) [F20-OP2.2] [F20, F21-OP2.3, OP2.4] support or are part of an environmental separator.
[F20-OS2.2, OS2.3] [F21-OS2.3] [F22-OH4] Applies to floors and elements that support
[F20, F21-OS3.1] Applies to floors and elements that floors.
support floors. [F81-OP2.1]
[F20, F21, F40, F41-OH1.1] [F20, F21-OH1.2, OH1.3] [F22-OP2.4]
Applies to elements that support or are part of an [F81-OP2.3] Applies to elements that support or are part of
environmental separator. an environmental separator.
[F20, F21-OH4] Applies to floors and elements that [F81-OS2.1]
support floors. [F81-OS2.3] Applies to elements that support or are part of
9.12.1.2. Standing Water an environmental separator.
(1) [F60-OP2.2, OP2.3, OP2.4] [F22-OS3.1] Applies to floors and elements that support
[F60-OS2.2, OS2.3] floors.
[F22-OS3.7] Applies to walls, and elements that support
[F60-OS3.1] Applies to floors and elements that support walls, that contain doors or windows required for
floors. emergency egress.
[F60-OH1.1, OH1.2, OH1.3] Applies to elements that
9.12.3.2. Grading of Backfill
support or are part of an environmental separator.
(1) [F60, F61-OH1.1, OH1.2, OH1.3]
[F60-OH4] Applies to floors and elements that support
floors. [F60, F61-OP2.3]
9.12.1.3. Protection from Freezing [F60, F61-OS2.3]
(1) [F21-OP2.3, OP2.4] 9.12.3.3. Deleterious Debris and Boulders
[F21-OS2.3] (1) [F81-OH1.1, OH1.2, OH1.3]
[F21-OS3.1] Applies to floors and elements that support [F81-OP2.3]
floors. [F81-OS2.3]
[F21-OH1.1, OH1.2, OH1.3] Applies to elements that [F81-OS3.1] Applies to floors and elements that support
support or are part of an environmental separator. floors.
[F21-OH4] Applies to floors and elements that support (2) [F20-OH1.1, OH1.2, OH1.3]
floors. [F20-OP2.1, OP2.3]
9.12.1.4. Precautions During Excavation [F20-OS2.1, OS2.3]
(1) [F20-OP2.3] [F20-OS3.1] Applies to floors and elements that support
[F20, F21, F22, F62, F80-OP4.1] floors.
[F20, F22, F80-OS2.6] (3) [F20-OH1.1, OH1.2, OH1.3]
(2) [F20-OP2.3] [F20-OP2.1, OP2.3]
[F20, F21, F80-OP4.1] [F20-OS2.1, OS2.3]
[F20, F80-OS2.6] [F20-OS3.1] Applies to floors and elements that support
9.12.2.1. Excavation to Undisturbed Soil floors.
[F20-OP2.2, OP2.3, OP2.4]
Page 96 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.12.3.4. Lateral Support of Foundation Wall 9.13.2.6. Dampproofing of Floors-on-Ground
(1) [F20, F22-OP2.1] (1) [F61-OS2.3]
[F20, F22-OS2.1] [F61-OH1.1, OH1.2, OH1.3]
9.12.4.1. Support of Footings (2) [F61-OS2.3]
(1) [F21-OH1.1, OH1.2, OH1.3] [F61-OH1.1, OH1.2, OH1.3]
[F21-OH2.1] Applies to sewer-line locations beneath 9.13.2.7. Dampproofing of Preserved Wood Foundation Walls
footings. (1) [F61-OS2.3]
[F21-OP2.2] [F61-OH1.1, OH1.2, OH1.3]
[F21-OP2.3] Applies to elements that support or are part of 9.13.3.1. Required Waterproofing
an environmental separator.
(1) [F61-OS2.3]
[F21-OS2.1]
[F61-OH1.1, OH1.2, OH1.3]
[F21-OS2.3] Applies to elements that support or are part of
an environmental separator. (2) [F61-OS2.3]
[F21-OS3.1] Applies to floors and elements that support [F61-OH1.1, OH1.2, OH1.3]
floors. 9.13.3.2. Waterproofing Materials
9.13.2.1. Required Dampproofing (1) [F61-OS2.3]
(1) [F61-OH1.1, OH1.2, OH1.3] [F61-OH1.1, OH1.2, OH1.3]
[F61-OS2.3] (2) [F61-OS2.3]
(2) [F61-OH1.1, OH1.2, OH1.3] [F61-OH1.1, OH1.2, OH1.3]
[F61-OS2.3] 9.13.3.3. Preparation of Surfaces
9.13.2.2. Dampproofing Materials (1) [F61-OS2.3]
(1) [F61-OS2.3] [F61-OH1.1, OH1.2, OH1.3]
[F61-OH1.1, OH1.2, OH1.3] (2) [F61-OS2.3]
(2) [F61-OS2.3] [F61-OH1.1, OH1.2, OH1.3]
[F61-OH1.1, OH1.2, OH1.3] (3) [F61-OS2.3]
9.13.2.3. Preparation of Surface [F61-OH1.1, OH1.2, OH1.3]
(1) [F61-OS2.3] (4) [F61-OS2.3]
[F61-OH1.1, OH1.2, OH1.3] [F61-OH1.1, OH1.2, OH1.3]
(2) [F61-OS2.3] (5) [F61-OS2.3]
[F61-OH1.1, OH1.2, OH1.3] [F61-OH1.1, OH1.2, OH1.3]
(3) [F61-OS2.3] 9.13.3.4. Application of Waterproofing Membranes
[F61-OH1.1, OH1.2, OH1.3] [F61-OH1.1, OH1.2, OH1.3]
(4) [F61-OS2.3] 9.13.3.5. Floor Waterproofing System
[F61-OH1.1, OH1.2, OH1.3] (1) [F61-OS2.3]
(5) [F61-OS2.3] [F61-OH1.1, OH1.2, OH1.3]
[F61-OH1.1, OH1.2, OH1.3] 9.13.4.1. Application and Scope
(6) [F61-OS2.3] (3) [F40-OH1.1]
[F61-OH1.1, OH1.2, OH1.3] 9.13.4.2. Protection from Soil Gas Ingress
9.13.2.4. Application of Dampproofing Material (1) [F40-OH1.1]
(1) [F61-OS2.3] (1.2) [F40-OH1.1]
[F61-OH1.1, OH1.2, OH1.3] (2) [F40-OH1.1]
(2) [F61-OS2.3] (3) [F40-OH1.1]
[F61-OH1.1, OH1.2, OH1.3] 9.13.4.3. Providing for the Rough-In for a Subfloor
(3) [F61-OS2.3] Depressurization System
[F61-OH1.1, OH1.2, OH1.3] (1) [F40-OH1.1]
9.13.2.5. Moisture Protection for Interior Finishes (2) [F40-OH1.1]
(1) [F61-OS2.3] (3) [F40-OH1.1]
[F61-OH1.1, OH1.2] 9.14.2.1. Foundation Wall Drainage
(2) [F61-OS2.3] (1) [F60-OH1.1, OH1.2, OH1.3]
[F61-OH1.1, OH1.2] [F60-OP2.1, OP2.2, OP2.3]
(3) [F61-OS2.3] [F60-OS2.1, OS2.2, OS2.3]
[F61-OH1.1, OH1.2] (1.1) [F60-OH1.1, OH1.2, OH1.3]
SA-1 • Page 97
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) (a) [F60-OH1.1, OH1.2, OH1.3] Applies where foundations (b) [F21-OP2.3] Applies to elements that support or are
serve as or support an environmental separator. part of an environmental separator.
(a) [F60-OS2.1] (b) [F21-OS2.1]
(a) [F60-OS2.3] Applies where foundations serve as or (b) [F21-OS2.3] Applies to elements that support or are
support an environmental separator. part of an environmental separator
(b) [F21-OH1.1, OH1.2, OH1.3] Applies where foundations (b) [F21-OS3.1] Applies to floors and elements that
serve as or support an environmental separator. support floors.
(b) [F21-OH4.1] Applies where foundations support floors 9.14.4.2. Installation
or elements supporting floors. (1) [F60-OH1.1, OH1.2, OH1.3]
(b) [F21-OP2.1] [F60-OP2.1, OP2.2, OP2.3]
(b) [F21-OP2.3] Applies where foundations serve as or [F60-OS2.1, OS2.2, OS2.3]
support an environmental separator.
(b) [F21-OP2.4] Applies where foundations support walls 9.14.4.3. Grading
or floors. (1) [F60-OH1.1, OH1.2, OH1.3]
(b) [F21-OS2.1] [F60-OP2.1, OP2.2, OP2.3]
(b) [F21-OS2.3] Applies where foundations serve as or [F60-OS2.1, OS2.2, OS2.3]
support an environmental separator. 9.14.4.4. Wet Site Conditions
(b) [F21-OS3.1] Applies where foundations support floors (1) [F60-OH1.1, OH1.2, OH1.3]
or elements supporting floors. [F60-OP2.1, OP2.2, OP2.3]
(b) [F21-OS3.7] Applies where foundations support walls
[F60-OS2.1, OS2.2, OS2.3]
that contain windows or doors required for emergency
egress. 9.14.5.1. Drainage Disposal
(3) [F60-OH1.1, OH1.2, OH1.3] (1) [F60-OH1.1, OH1.2, OH1.3]
9.14.3.1. Material Standards [F60-OP2.1, OP2.2, OP2.3]
(1) [F60-OH1.1, OH1.2, OH1.3] [F60-OS2.1, OS2.2, OS2.3]
[F60-OP2.1, OP2.3] 9.14.5.2. Sump Pits
[F60-OS2.1, OS2.3] (1) (a),(b) [F60,F61-OH1.1,OH1.3]
(c) [F40-OH1.1] [F52-OH1.2]
9.14.3.2. Minimum Size
(a),(b) [F60,F61-OS2.1,OS2.3]
(1) [F60-OH1.1, OH1.2, OH1.3]
(c) [F52-OS2.3]
[F60-OP2.1, OP2.2, OP2.3]
(a),(b) [F60,F61-OP2.3,OP2.4]
[F60-OS2.1, OS2.2, OS2.3] (c) [F52-OP2.3]
9.14.3.3. Installation (c) [F30-OS3.1]
(1) [F60-OH1.1, OH1.2, OH1.3] (2) [F30-OS3.1]
[F60-OP2.1, OP2.2, OP2.3] [F40-OH1.1]
[F60-OS2.1, OS2.2, OS2.3] (3) [F60-OH1.1, OH1.2, OH1.3]
(2) [F60-OH1.1, OH1.2, OH1.3] [F60-OP2.1, OP2.2, OP2.3]
[F60-OP2.1, OP2.2, OP2.3] [F60-OS2.1, OS2.2, OS2.3]
[F60-OS2.1, OS2.2, OS2.3] 9.14.5.3. Dry Wells
(3) [F60-OH1.1, OH1.2, OH1.3] (1) [F60-OH1.1, OH1.2, OH1.3]
[F60-OP2.1, OP2.2, OP2.3] [F60-OP2.1, OP2.2, OP2.3]
[F60-OS2.1, OS2.2, OS2.3] [F60-OS2.1, OS2.2, OS2.3]
(4) [F60-OH1.1, OH1.2, OH1.3] (2) [F60-OH1.1, OH1.2, OH1.3]
[F60-OP2.1, OP2.2, OP2.3] [F60-OP2.1, OP2.2, OP2.3]
[F60-OS2.1, OS2.2, OS2.3] [F60-OS2.1, OS2.2, OS2.3]
9.14.4.1. Type of Granular Material 9.14.6.1. Surface Drainage
(1) (a) [F60-OH1.1, OH1.2, OH1.3] (1) [F60-OH1.1, OH1.2, OH1.3]
(a) [F60-OP2.3] [F21-OP2.6] [F60-OP2.1, OP2.2, OP2.3]
(a) [F21-OS2.2] [F60-OS2.3] [F60-OS2.1, OS2.2, OS2.3]
(b) [F21-OH1.1, OH1.2, OH1.3] Applies to elements that
9.14.6.2. Drainage away from Wells or Leaching Beds
support or are part of an environmental separator.
(1) [F46-OH2.2] Applies to directing drainage away from the
(b) [F21-OH4] Applies to floors and elements that support location of a water supply.
floors. [F44-OH2.1] Applies to directing drainage away from a
(b) [F21-OP2.1, OP2.4] septic tank disposal system.
Page 98 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.14.6.3. Window Wells (b) [F20, F80-OP2.3] Applies to elements that support or
(1) [F60-OH1.1, OH1.2, OH1.3] are part of an environmental separator.
[F60-OP2.1, OP2.3] (b) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements
[F60-OS2.1, OS2.3] that support or are part of an environmental separator.
9.14.6.4. Catch Basin (b) [F20, F80-OH4] Applies to floors and elements that
support floors.
(1) [F60-OH1.1, OH1.2, OH1.3]
(b) [F20-OS2.1]
[F61-OP2.3]
(b) [F20, F80-OS2.3] Applies to elements that support or
[F61-OS2.3] are part of an environmental separator.
[F61-OS3.1] (b) [F20, F80-OS3.1] Applies to floors and elements that
9.15.1.3. Foundations for Deformation Resistant Buildings support floors.
(1) [F20-OP2.2] (c) [F20-OP2.1]
[F22-OP2.4] (c) [F61-OP2.4]
[F20, F22-OP2.3] Applies to elements that support or are (c) [F20, F61-OP2.3] Applies to elements that support or
part of an environmental separator. are part of an environmental separator.
[F22-OH1.1, OH1.2, OH1.3] Applies to elements that (c) [F20, F61-OH1.1, OH1.2, OH1.3] Applies to elements
support or are part of an environmental separator. that support or are part of an environmental separator.
[F22-OH4] Applies to floors and elements that support (c) [F20, F61-OH4] Applies to floors and elements that
floors. support floors.
[F20-OS2.2] (c) [F20-OS2.1]
[F20, F22-OS2.3] Applies to elements that support or are (c) [F20, F61-OS2.3] Applies to elements that support or
part of an environmental separator. are part of an environmental separator.
[F22-OS3.1] Applies to floors and elements that support (c) [F20, F61-OS3.1] Applies to floors and elements that
floors. support floors.
[F22-OS3.7] Applies to walls, and elements that support 9.15.2.3. Pier Type Foundations
walls, that contain doors or windows required for
(1) [F20-OP2.1, OP2.2]
emergency egress.
[F22-OP2.4]
9.15.2.2. Unit Masonry Construction [F20, F22-OP2.3] Applies to elements that support or are
(1) [F20-OP2.1] part of an environmental separator.
[F21, F61-OP2.4] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F21, F61-OP2.3] Applies to elements that support or support or are part of an environmental separator.
are part of an environmental separator.
[F20, F22-OH4] Applies to floors and elements that
[F20, F21, F61-OH1.1, OH1.2, OH1.3] Applies to elements support floors.
that support or are part of an environmental separator.
[F20-OS2.1, OS2.2]
[F20, F21, F61-OH4] Applies to floors and elements that [F20, F22-OS2.3] Applies to elements that support or are
support floors. part of an environmental separator.
[F20-OS2.1] [F20, F22-OS3.1] Applies to floors and elements that
[F20, F21, F61-OS2.3] Applies to elements that support or support floors.
are part of an environmental separator.
(2) [F20-OP2.1, OP2.2]
[F20, F21, F61-OS3.1] Applies to floors and elements that [F22-OP2.4]
support floors. [F20, F22-OP2.3] Applies to elements that support or are
(3) (a) [F20-OP2.1] part of an environmental separator.
(a) [F80-OP2.4] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
(a) [F20, F80-OP2.3] Applies to elements that support or support or are part of an environmental separator.
are part of an environmental separator.
[F20, F22-OH4] Applies to floors and elements that
(a) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements support floors.
that support or are part of an environmental separator.
[F20-OS2.1, OS2.2]
(a) [F20, F80-OH4] Applies to floors and elements that [F20, F22-OS2.3] Applies to elements that support or are
support floors. part of an environmental separator.
(a) [F20-OS2.1] [F20, F22-OS3.1] Applies to floors and elements that
(a) [F20, F80-OS2.3] Applies to elements that support or support floors.
are part of an environmental separator.
(3) [F20-OP2.1, OP2.4, OP2.5]
(a) [F20, F80-OS3.1] Applies to floors and elements that [F22-OP2.4, OP2.5]
support floors. [F20, F22-OP2.3] Applies to elements that support or are
(b) [F20-OP2.1] part of an environmental separator.
(b) [F20-OP2.4]
SA-1 • Page 99
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F21-OP2.3] Applies to elements that support or are part of
support or are part of an environmental separator. an environmental separator.
[F20, F22-OH4] Applies to floors and elements that [F21-OS2.4]
support floors [F21-OS2.3] Applies to elements that support or are part of
[F20, F22-OS2.3] Applies to elements that support or are an environmental separator.
part of an environmental separator. [F21-OS3.1] Applies to floors and elements that support
[F20, F22-OS3.1] Applies to floors and elements that floors.
support floors. (2) [F21-OH1.1, OH1.2, OH1.3] Applies to elements that
(4) [F20-OP2.1, OP2.4] support or are part of an environmental separator.
[F22-OP2.4, OP2.5] [F21-OH4] Applies to floors and elements that support
[F20, F22-OP2.3] Applies to elements that support or are floors.
part of an environmental separator. [F21-OP2.1, OP2.4]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F21-OP2.3] Applies to elements that support or are part of
support or are part of an environmental separator. an environmental separator.
[F20, F22-OH4] Applies to floors and elements that [F21-OS2.1]
support floors. [F21-OS2.3] Applies to elements that support or are part of
[F20-OS2.1, OS2.4] an environmental separator.
[F22-OS2.4, OS2.5] [F21-OS3.1] Applies to floors and elements that support
[F20, F22-OS2.3] Applies to elements that support or are floors.
part of an environmental separator. 9.15.3.4. Basic Footing Widths and Areas
[F20, F22-OS3.1] Applies to floors and elements that (1) [F20-OP2.1]
support floors. [F21-OP2.4]
9.15.2.4. Wood Frame Foundations [F20, F21-OP2.3] Applies to elements that support or are
(1) (a) [F20-OP2.1, OP2.2] part of an environmental separator.
(a) [F20, F80-OP2.3] Applies to elements support or are [F20, F21-OH1.1, OH1.2, OH1.3] Applies to elements that
part of an environmental separator. support or are part of an environmental separator.
(a) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements [F20, F21-OH4] Applies to floors and elements that
that support or are part of an environmental separator. support floors.
(a) [F20, F80-OH4] Applies to floors and elements that [F20-OS2.2]
support floors. [F20, F21-OS2.3] Applies to elements that support or are
(a) [F20-OS2.1, OS2.2] part of an environmental separator.
(a) [F20, F80-OS2.3] Applies to elements that support or [F20, F21-OS3.1] Applies to floors and elements that
are part of an environmental separator. support floors.
(a) [F20, F80-OS3.1] Applies to floors and elements that (2) [F20-OP2.2]
support floors. [F21-OP2.4]
9.15.3.1. Footings Required [F20, F21-OP2.3] Applies to elements that support or are
(1) [F20-OP2.2] part of an environmental separator.
[F20, F21-OP2.4] [F20, F21-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F21-OP2.3] Applies to elements that support or are support or are part of an environmental separator.
part of an environmental separator. [F20, F21-OH4] Applies to floors and elements that
[F20, F21-OH1.1, OH1.2, OH1.3] Applies to elements that support floors.
support or are part of an environmental separator. [F20-OS2.2]
[F20, F21-OH4] Applies to floors and elements that [F20, F21-OS2.3] Applies to elements that support or are
support floors. part of an environmental separator.
[F20-OS2.2] [F20, F21-OS3.1] Applies to floors and elements that
[F20, F21-OS2.3] Applies to elements that support or are support floors.
part of an environmental separator. (3) [F20-OP2.2]
[F20, F21-OS3.1] Applies to floors and elements that [F21-OP2.4]
support floors. [F20, F21-OP2.3] Applies to elements that support or are
9.15.3.2. Support of Footings part of an environmental separator.
(1) [F21-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F21-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator. support or are part of an environmental separator.
[F21-OH4] Applies to floors and elements that support [F20, F21-OH4] Applies to floors and elements that
floors. support floors.
[F21-OP2.4] [F20-OS2.2]
Page 100 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F21-OS2.3] Applies to elements that support or are 9.15.3.9. Step Footings
part of an environmental separator. (1) [F20, F22-OP2.3, OP2.4]
[F20, F21-OS3.1] Applies to floors and elements that [F20, F22-OH1.1, OH1.2, OH1.3] Applies where the
support floors. foundation supports or is part of an environmental
9.15.3.5. Adjustments to Footing Widths for Exterior Walls separator.
(1) [F20-OP2.2, OP2.3] [F21-OP2.3, OP2.4] [F20, F22-OH4] Applies to foundations that support floors.
[F20-OS2.2, OS2.3] [F21-OS2.3] [F20, F22-OS2.3, OS2.4]
[F20, F21-OH1.1, OH1.2, OH1.3] [F20, F22-OS3.1] Applies to foundations that support
[F20, F21-OH4] Applies to floors and elements that floors.
support floors. 9.15.4.1. Flat Wall Insulating Concrete Form Units
[F20, F21-OS3.1] Applies to floors and elements that (1) [F22, F55, F63-OH1.1, OH1.2, OH1.3]
support floors. 9.15.4.2. Foundation Wall Thickness and Required Lateral
9.15.3.6. Adjustments to Footing Widths for Interior Walls Support
(1) [F20-OP2.2] (1) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
[F21-OP2.4] [F20, F22-OH1.1, OH1.2, OH1.3]
[F20, F21-OP2.3] Applies to elements that support or are [F20, F22-OH4] Applies to floors and elements that
part of an environmental separator. support floors.
[F20, F21-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.1, OS2.3] [F22-OS2.3]
support or are part of an environmental separator.
[F20, F22-OS3.1] Applies to floors and elements that
[F20, F21-OH4] Applies to floors and elements that support floors.
support floors.
(2) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
[F20-OS2.2]
[F20, F22-OH1.1, OH1.2, OH1.3]
[F20, F21-OS2.3] Applies to elements that support or are
part of an environmental separator. [F20, F22-OH4] Applies to floors and elements that
support floors.
[F20, F21-OS3.1] Applies to floors and elements that
support floors. [F20-OS2.1, OS2.3] [F22-OS2.3]
(2) [F20-OP2.2] [F20, F22-OS3.1] Applies to floors and elements that
support floors.
[F10-OS2.2]
(2.1) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
9.15.3.7. Adjustments to Footing Area for Columns
[F20, F22-OH1.1, OH1.2, OH1.3]
(1) [F20-OP2.2]
[F20, F22-OH4] Applies to floors and elements that
[F21-OP2.4]
support floors.
[F20, F21-OP2.3] Applies to elements that support or are
part of an environmental separator. [F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4]
[F20, F21-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OS3.1] Applies to floors and elements that
support or are part of an environmental separator. support floors.
[F20, F21-OH4] Applies to floors and elements that (3) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
support floors. [F20, F22-OH1.1, OH1.2, OH1.3]
[F20-OS2.2] [F20, F22-OH4] Applies to floors and elements that
[F20, F21-OS2.3] Applies to elements that support or are support floors.
part of an environmental separator. [F20-OS2.1, OS2.3] [F22-OS2.3]
[F20, F21-OS3.1] Applies to floors and elements that [F20, F22-OS3.1] Applies to floors and elements that
support floors. support floors.
9.15.3.8. Footing Thickness (4) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OH1.1, OH1.2, OH1.3]
support or are part of an environmental separator. [F20, F22-OH4] Applies to floors and elements that
[F20-OH4] Applies to floors and elements that support support floors.
floors. [F20-OS2.1, OS2.3] [F22-OS3.2, OS2.4]
[F20-OP2.1, OP2.4] [F20, F22-OS3.1] Applies to floors and elements that
[F20-OP2.3] Applies to elements that support or are part of support floors.
an environmental separator. (5) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
[F20-OS2.1] [F20, F22-OH1.1, OH1.2, OH1.3]
[F20-OS2.3] Applies to elements that support or are part of
[F20, F22-OH4] Applies to floors and elements that
an environmental separator.
support floors.
[F20-OS3.1] Applies to floors and elements that support
[F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4]
floors.
SA-1 • Page 101
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OS3.1] Applies to floors and elements that [F20-OH4] Applies to floors and elements that support
support floors. floors.
(6) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4] [F20-OP2.1, OP2.4]
[F20, F22-OH1.1, OH1.2, OH1.3] [F20-OP2.3] Applies to elements that support or are part of
[F20, F22-OH4] Applies to floors and elements that an environmental separator.
support floors. [F20-OS2.1]
[F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4] [F20-OS2.3] Applies to elements that support or are part of
an environmental separator.
[F20, F22-OS3.1] Applies to floors and elements that
support floors. [F20-OS3.1] Applies to floors and elements that support
floors.
(7) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
(2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OH1.1, OH1.2, OH1.3]
support or are part of environmental separator.
[F20, F22-OH4] Applies to floors and elements that
[F20-OH4] Applies to floors and elements that support
support floors.
floors.
[F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4]
[F20-OP2.1, OP2.4]
[F20, F22-OS3.1] Applies to floor and elements that [F20-OP2.3] Applies to elements that support or are part of
support floors. an environmental separator.
9.15.4.5. Reinforcement for Flat Insulating Concrete Form [F20-OS2.1]
Foundation Walls [F20-OS2.3] Applies to elements that support or are part of
(1) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4] an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] [F20-OS3.1] Applies to floors and elements that support
[F20, F22-OH4] Applies to floors and elements that floors.
support floors. (3) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4] support or are part of an environmental separator.
[F20, F22-OS3.1] Applies to floors and elements that [F20-OH4] Applies to floors and elements that support
support floors. floors.
(2) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4] [F20-OP2.1, OP2.4]
[F20, F22-OH1.1, OH1.2, OH1.3] [F20-OP2.3] Applies to elements that support or are part of
[F20, F22-OH4] Applies to floors and elements that an environmental separator.
support floors. [F20-OS2.1]
[F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4] [F20-OS2.3] Applies to elements that support or are part of
an environmental separator.
[F20, F22-OS3.1] Applies to floors and elements that
support floors. [F20-OS3.1] Applies to floors and elements that support
floors.
(3) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
9.15.4.9. Crack Control Joints
[F20, F22-OH1.1, OH1.2, OH1.3]
(1) [F21-OP2.3]
[F20, F22-OH4] Applies to floors and elements that
support floors. [F21-OS2.3]
[F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4] [F21-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator.
[F20, F22-OS3.1] Applies to floors and elements that
support floors. (2) [F20-OP2.1]
[F20, F61-OP2.3] Applies to elements that support or are
(4) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
part of an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3]
[F20-OS2.1]
[F20, F22-OH4] Applies to floors and elements that [F20, F61-OS2.3] Applies to elements that support or are
support floors. part of an environmental separator.
[F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4] [F61-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OS3.1] Applies to floors and elements that support or are part of an environmental separator.
support floors. 9.15.5.1. Support of Floor Joists
9.15.4.6. Extension above Ground Level (1) [F20-OP2.1, OP2.4]
(1) [F61-OH1.1, OH1.2, OH1.3] [F20-OP2.3] [F40, F61-OP2.3, OP2.4] Applies to elements
[F61-OP2.3] that support or are part of an environmental separator.
[F61-OS2.3] [F20, F40, F61-OH1.1, OH1.2, OH1.3] Applies to elements
9.15.4.7. Reduction in Thickness that support or are part of an environmental separator.
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F40, F61-OH4] Applies to floors and elements that
support or are part of an environmental separator. support floors.
Page 102 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OS2.1] [F20-OH4] Applies to floors and elements that support
[F40, F61-OS2.3] Applies to elements that support or are floors.
part of an environmental separator. [F20-OP2.1, OP2.4]
[F20, F40, F61-OS3.1] Applies to floors and elements that [F20-OP2.3] Applies to elements that support or are part of
support floors. an environmental separator.
9.15.5.2. Support of Beams [F20-OS2.1]
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.3] Applies to elements that support or are part of
support or are part of an environmental separator. an environmental separator.
[F20-OH4] Applies to floors and elements that support [F20-OS3.1] Applies to floors and elements that support
floors. floors.
[F20-OP2.1, OP2.4] 9.15.6.2. Foundation Walls Above Ground
[F20-OP2.3] Applies to elements that support or are part of (1) [F61-OH1.1, OH1.2, OH1.3]
an environmental separator. [F61-OP2.3]
[F20-OS2.1] [F61-OS2.3]
[F20-OS2.3] Applies to elements that support or are part of 9.15.6.3. Form Ties
an environmental separator.
(1) [F61-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20-OS3.1] Applies to floors and elements that support support or are part of an environmental separator.
floors.
[F61-OP2.3] Applies to elements that support or are part of
(2) [F80-OH1.1, OH1.2, OH1.3] Applies to elements that an environmental separator.
support or are part of an environmental separator.
[F61-OS2.3] Applies to elements that support or are part of
[F80-OH4] Applies to floors and elements that support an environmental separator.
floors.
[F30-OS3.1]
[F80-OP2.3, OP2.4] Applies to elements that support or
are part of an environmental separator. 9.16.1.3. Required Floors-on-Ground
[F80-OS2.3] Applies to elements that support or are part of (1) (a), (b) [F30-OS3.1]
an environmental separator. (a), (b) [F40-OH2.4]
[F80-OS3.1] Applies to floors and elements that support 9.16.2.1. Required Installation of Granular Fill
floors. (1) [F40, F61-OH1.1] [F61, F60-OH1.2, OH1.3]
9.15.5.3. Pilasters [F60-OS2.3]
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that 9.16.2.2. Support of Floors
support or are part of an environmental separator. (1) [F21-OH1.1, OH1.2, OH1.3]
[F20-OH4] Applies to floors and elements that support [F21-OP2.1, OP2.3, OP2.4]
floors. [F21-OS2.1, OS2.3]
[F20-OP2.1, OP2.4] [F21-OS3.1]
[F20-OP2.3] Applies to elements that support or are part of
(2) [F21-OH1.1, OH1.2, OH1.3]
an environmental separator.
[F21-OP2.1, OP2.3, OP2.4]
[F20-OS2.1]
[F20-OS2.3] Applies to elements that support or are part of [F21-OS2.1, OS2.3]
an environmental separator. [F21-OS3.1]
[F20-OS3.1] Applies to floors and elements that support (3) [F22-OS3.1]
floors. 9.16.3.1. Control of Water Ingress
(2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that (1) [F60-OH1.1, OH1.2, OH1.3]
support or are part of an environmental separator. [F60-OS2.3]
[F20-OH4] Applies to floors and elements that support [F60-OS3.1]
floors. 9.16.3.2. Hydrostatic Pressure
[F20-OP2.1, OP2.4] (1) [F20-OH1.1, OH1.2, OH1.3]
[F20-OP2.3] Applies to elements that support or are part of
[F20-OP2.1] [F61-OP2.6]
an environmental separator.
[F20-OS2.1] [F61-OS2.3]
[F20-OS2.1]
[F20-OS2.3] Applies to elements that support or are part of [F20-OS3.1]
an environmental separator. 9.16.3.3. Floor Drains
[F20-OS3.1] Applies to floors and elements that support (1) [F62-OH1.1, OH1.2, OH1.3]
floors. [F62-OS2.3]
(3) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F62-OS3.1]
support or are part of an environmental separator.
SA-1 • Page 103
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.16.4.1. Surface Finish [F22-OS3.7] Applies to walls, and elements that support
(1) [F30, F80-OS3.1] walls, that contain doors or windows required for
[F40-OH2.4] emergency egress.
[F62-OH1.1, OH1.2, OH1.3] (2) [F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator.
(2) [F20, F80-OS3.1]
[F22-OH4] Applies to floors and elements that support
[F41-OH1.1]
floors.
9.16.4.2. Topping Course
[F22-OP2.4, OP2.5]
(1) [F20, F80-OS3.1] [F22-OP2.3] Applies to elements that support or are part of
(2) [F20, F80-OS3.1] an environmental separator.
9.16.4.3. Thickness [F22-OS2.4, OS2.5]
(1) [F20-OH1.1, OH1.2, OH1.3] [F22-OS2.3] Applies to elements that support or are part of
[F20-OH4] an environmental separator.
[F20-OP2.1, OP2.3] [F22-OS3.1] Applies to floors and elements that support
[F20-OS2.1, OS2.3] floors.
[F22-OS3.7] Applies to walls, and elements that support
[F20-OS3.1] walls, that contain doors or windows required for
9.16.4.4. Bond Break emergency egress.
(1) [F21-OS3.1] 9.17.3.1. Size and Thickness
9.16.5.1. Wood Frame Floors (1) [F20-OP2.1]
(1) [F20-OH1.1, OH1.2, OH1.3] Applies where wood-frame [F20, F22-OP2.4]
floors-on-ground serve as an environmental separator. [F20, F22-OP2.3] Applies to elements that support or are
[F20-OH4] part of an environmental separator.
[F20-OP2.1] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20-OP2.3] Applies where wood-frame floors-on-ground support or are part of an environmental separator.
serve as an environmental separator. [F20, F22-OH4] Applies to floors and elements that
[F20-OS2.1] support floors.
[F20-OS2.3] Applies where wood-frame floors-on-ground [F20-OS2.1]
serve as an environmental separator. [F20, F22-OS2.3] Applies to elements that support or are
[F20-OS3.1] part of an environmental separator.
9.17.2.1. Location [F20, F22-OS3.1] Applies to floors and elements that
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that support floors.
support or are part of an environmental separator. (2) [F20-OP2.1]
[F20-OH4] Applies to floors and elements that support [F20, F22-OP2.4]
floors. [F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator.
[F20-OP2.2, OP2.4]
[F20-OP2.3] Applies to elements that support or are part of [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
an environmental separator. support or are part of an environmental separator.
[F20-OS2.2] [F20, F22-OH4] Applies to floors and elements that
[F20-OS2.3] Applies to elements that support or are part of support floors.
an environmental separator. [F20-OS2.1]
[F20-OS3.1] Applies to floors and elements that support [F20, F22-OS2.3] Applies to elements that support or are
floors. part of an environmental separator.
9.17.2.2. Lateral Support [F20, F22-OS3.1] Applies to floors and elements that
support floors.
(1) [F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator. 9.17.3.2. End Bearing Plates
[F22-OH4] Applies to floors and elements that support (1) [F20-OP2.1]
floors. [F20, F22-OP2.4]
[F20, F22-OP2.3] Applies to elements that support or are
[F22-OP2.4, OP2.5]
part of an environmental separator.
[F22-OP2.3] Applies to elements that support or are part of
an environmental separator. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator.
[F22-OS2.4, OS2.5]
[F22-OS2.3] Applies to elements that support or are part of [F20, F22-OH4] Applies to floors and elements that
an environmental separator. support floors.
[F22-OS3.1] Applies to floors and elements that support [F20-OS2.1]
floors.
Page 104 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OS3.1] Applies to floors and elements that
part of an environmental separator. support floors.
[F20, F22-OS3.1] Applies to floors and elements that 9.17.4.2. Materials
support floors. (1) [F20-OP2.1]
9.17.3.3. Paint [F20, F22-OP2.4]
(1) [F80-OH1.1, OH1.2, OH1.3] [F20, F22-OP2.3] Applies to elements that support or are
[F80-OP2.3, OP2.4] part of an environmental separator.
[F80-OH4] Applies to floors and elements that support [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
floors. support or are part of an environmental separator.
[F80-OS2.3] [F20, F22-OH4] Applies to floors and elements that
support floors.
[F80-OS3.1] Applies to floors and elements that support
floors. [F20-OS2.1]
[F20, F22-OS2.3] Applies to elements that support or are
9.17.3.4. Design of Adjustable Steel Columns part of an environmental separator.
(1) [F20-OP2.1] [F20, F22-OS3.1] Applies to floors and elements that
[F22-OP2.4] support floors.
[F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator. (2) [F20-OP2.1]
[F20, F22-OP2.4]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OP2.3] Applies to elements that support or are
support or are part of an environmental separator. part of an environmental separator.
[F20, F22-OH4] Applies to floors and elements that
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support floors.
support or are part of an environmental separator.
[F20-OS2.1]
[F20, F22-OH4] Applies to floors and elements that
[F22-OS2.4]
support floors.
[F20, F22-OS2.3] Applies to elements that support or are
part of an environmental separator. [F20-OS2.1]
[F20, F22-OS2.3] Applies to elements that support or are
[F20, F22-OS3.1] Applies to floors and elements that
part of an environmental separator.
support floors.
[F20, F22-OS3.7] Applies to walls, and elements that [F20, F22-OS3.1] Applies to floors and elements that
support walls, that contain doors or windows required for support floors.
emergency egress. 9.17.4.3. Columns in Contact with Concrete
9.17.4.1. Column Sizes (1) [F80-OH1.1, OH1.2, OH1.3] Applies to elements that
(1) [F20-OP2.1] support or are part of an environmental separator.
[F20, F22-OP2.4] [F80-OH4] Applies to floors and elements that support
[F20, F22-OP2.3] Applies to elements that support or are floors.
part of an environmental separator. [F80-OP2.4]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F80-OP2.3] Applies to elements that support or are part of
support or are part of an environmental separator. an environmental separator.
[F20, F22-OH4] Applies to floors and elements that [F80-OS2.3] Applies to elements that support or are part of
support floors. an environmental separator.
[F20-OS2.1] [F80-OS3.1] Applies to floors and elements that support
[F20, F22-OS2.3] Applies to elements that support or are floors.
part of an environmental separator. 9.17.4.4. Wood Column Termite Protection
[F20, F22-OS3.1] Applies to floors and elements that (1) [F80, F82-OP2.3, OP2.4]
support floors. [F80, F82-OS2.3]
(2) [F20-OP2.1] 9.17.5.1. Materials
[F20, F22-OP2.4] (1) [F20-OP2.1]
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OP2.4]
part of an environmental separator. [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that part of an environmental separator.
support or are part of an environmental separator. [F20, F11-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OH4] Applies to floors and elements that support or are part of an environmental separator.
support floors. [F20, F22-OH4] Applies to floors and elements that
[F20-OS2.1] support floors.
[F20, F22-OS2.3] Applies to elements that support or are [F20-OS2.1]
part of an environmental separator.
SA-1 • Page 105
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OS2.3] Applies to elements that support or are [F82-OH2.1]
part of an environmental separator. 9.18.5.1. Drainage
[F20, F22-OS3.1] Applies to floors and elements that (1) [F60-OH1.1, OH1.2]
support floors. [F60-OS2.3]
9.17.5.2. Sizes 9.18.6.1. Ground Cover in Unheated Crawl Spaces
(1) [F20-OP2.1] (1) [F61-OH1.1, OH1.2]
[F20, F22-OP2.4]
[F61-OS2.3]
[F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator. (2) [F61-OH1.1, OH1.2]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F61-OS2.3]
support or are part of an environmental separator. 9.18.6.2. Ground Cover in Heated Crawl Spaces
[F20, F22-OH4] Applies to floors and elements that (1) [F40, F61-OH1.1] [F61-OH1.2]
support floors. [F61-OS2.3]
[F20-OS2.1] (2) [F40, F61-OH1.1] [F61-OH1.2]
[F20, F22-OS2.3] Applies to elements that support or are [F61-OS2.3]
part of an environmental separator. (3) [F40-OH1.1]
[F20, F22-OS3.1] Applies to floors and elements that (4) [F40,F61-OH1.1,OH1.2]
support floors.
[F61-OS2.3]
9.17.6.2. Sizes
9.18.7.1. Crawl Spaces as Warm Air Plenums
(1) [F20-OP2.1]
[F20, F22-OP2.4] (1) [F51-OH1.1, OH1.2]
[F20, F22-OP2.3] Applies to elements that support or are [F51-OS2.3]
part of an environmental separator. (2) [F02-OS1.2]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that (3) [F01-OS1.1]
support or are part of an environmental separator. (4) [F01-OS1.1]
[F20, F22-OH4] Applies to floors and elements that 9.19.1.1. Required Venting
support floors. (1) [F51, F62-OS2.3]
[F20-OS2.1] [F51, F62-OH1.1, OH1.2]
[F20, F22-OS2.3] Applies to elements that support or are [F51-OH1.3] Applies to sloped roof assemblies that may
part of an environmental separator. be subject to ice damming.
[F20, F22-OS3.1] Applies to floors and elements that 9.19.1.2. Vent Requirements
support floors.
(1) [F51, F62-OS2.3]
9.18.2.1. Access Openings
[F51, F62-OH1.1, OH1.2]
(1) [F82-OH1.1, OH1.2] [F51-OH1.3] Applies to sloped roof assemblies that may
(2) [F42-OH2.4, OH2.5] Applies where crawl spaces are be subject to ice damming.
heated or unheated and access is from the exterior. (2) [F51, F62-OS2.3]
[F51, F63-OS2.3] Applies where crawl spaces are [F51, F62-OH1.1, OH1.2]
unheated and access is from the interior. [F51-OH1.3] Applies to sloped roof assemblies that may
[F42, F61-OS2.3] Applies where crawl spaces are heated be subject to ice damming.
or unheated and access is from the exterior.
(3) [F51, F62-OS2.3]
[F63-OS2.3] Applies where crawl spaces are unheated
[F51, F62-OH1.1, OH1.2]
and access is from the interior.
[F51-OH1.3] Applies to sloped roof assemblies that may
[F42, F61-OS2.3] Applies where crawl spaces are heated
be subject to ice damming.
or unheated and access is from the exterior.
(4) [F51, F62-OS2.3]
9.18.3.1. Ventilation of Unheated Crawl Spaces
[F51, F61-OH1.1, OH1.2]
(1) [F62-OH1.1]
[F51-OH1.3] Applies to sloped roof assemblies that may
[F62-OS2.3] be subject to ice damming.
(2) [F62-OH1.1] (5) [F42, F51, F61, F62-OS2.3]
[F62-OS2.3] [F42-OH1.1] Applies to resistance to the entry of insects.
(3) (a) [F62-OH1.1, OH1.2] [F51, F61, F62-OH1.1, OH1.2, OH1.3]
(a), (b) [F42, F61, F62-OS2.3] [F42-OH2.5] Applies to resistance to the entry of insects.
(b) [F42, F61-OH1.1, OH1.2] 9.19.1.3. Clearances
(b) [F42-OH2.3, OH2.5] (1) [F51, F62-OH1.1, OH1.2, OH1.3]
9.18.4.1. Access Way to Services [F51, F62-OS2.3]
(1) [F82-OH1.1, OH1.2]
Page 106 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F51, F62-OH1.1, OH1.2, OH1.3] [F20, F80-OP2.3] Applies to elements that support or are
[F51, F62-OS2.3] part of an environmental separator or are exposed to
(3) [F51, F62-OH1.1, OH1.2, OH1.3] moisture.
[F51, F62-OS2.3] [F01-OS1.1, OS1.2] Applies to masonry used in chimneys
and fireplaces.
9.19.2.1. Access
[F20, F80-OS1.2] Applies to assemblies required to
(1) [F82-OH1.1, OH1.2, OH1.3] provide fire resistance.
[F82-OS2.3] [F20, F80-OS2.1]
(2) [F82-OH1.1, OH1.2] [F20, F80-OS2.3] Applies to elements that support or are
[F82-OS2.3] part of an environmental separator or are exposed to
(3) [F42-OH1.1] Applies where access is from an unheated moisture.
enclosed space. [F20, F80-OS3.1] Applies to floors and elements that
[F51-OH1.2] Applies where access is from an interior support floors.
heated space. [F20, F80-OS3.4] Applies to masonry used in chimneys
[F42-OH1.1] [F61-OH1.1, OH1.2, OH1.3] Applies where and fireplaces.
access is from the exterior. 9.20.2.3. Glass Blocks
[F42-OH2.5] Applies where access is from the exterior or (1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
an unheated enclosed space. support or are part of an environmental separator and to
[F42, F61-OS2.3] Applies where access is from the masonry used in chimneys and fireplaces.
exterior or an unheated enclosed space. [F20-OH4] Applies to floors and elements that support
9.20.2.1. Masonry Unit Standards floors.
(1) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that [F01, F20-OP1.1] [F20-OP1.2] Applies to assemblies
support or are part of an environmental separator and to required to provide fire resistance.
masonry used in chimneys and fireplaces. [F20-OP2.1, OP2.4]
[F20, F80-OH4] Applies to floors and elements that [F20-OP2.3] Applies to elements that support or are part of
support floors. an environmental separator or are exposed to moisture.
[F01-OP1.2] Applies to masonry used in chimneys and [F01, F20-OS1.1] [F20-OS1.2] Applies to assemblies
fireplaces. required to provided fire resistance.
[F20, F80-OP1.2] Applies to assemblies required to [F20-OS2.1]
provide fire resistance. [F20-OS2.3] Applies to elements that support or are part of
[F20, F80-OP2.1, OP2.4] an environmental separator or are exposed to moisture.
[F20, F80-OP2.3] Applies to elements that support or are [F20-OS3.1] Applies to floors and elements that support
part of an environmental separator or are exposed to floors.
moisture. [F01, F20-OS3.4] Applies to masonry used in chimneys
[F01-OS1.1, OS1.2] Applies to masonry used in chimneys and fireplaces.
and fireplaces. [F20, F80-OS1.2] Applies to assemblies 9.20.2.4. Cellular Concrete
required to provide fire resistance. (1) [F80-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F80-OS2.1] support or are part of an environmental separator and to
[F20, F80-OS2.3] Applies to elements that support or are masonry used in chimneys and fireplaces.
part of an environmental separator or are exposed to [F80-OH4] Applies to floors and elements that support
moisture. floors.
[F20, F80-OS3.1] Applies to floors and elements that [F80-OP1.2] Applies to masonry used in chimneys and
support floors. fireplaces.
[F20, F80-OS3.4] Applies to masonry used in chimneys
[F80-OS1.2] Applies to masonry used in chimneys and
and fireplaces.
fireplaces.
9.20.2.2. Used Brick
[F80-OP1.2, OP2.4]
(1) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that [F80-OP2.3] Applies to elements that support or are part of
support or are part of an environmental separator and to an environmental separator or are exposed to moisture.
masonry used in chimneys and fireplaces.
[F80-OS2.1]
[F20, F80-OH4] Applies to floors and elements that [F80-OS2.3] Applies to elements that support or are part of
support floors. an environmental separator or are exposed to moisture.
[F01-OP1.2] Applies to masonry used in chimneys and [F80-OS3.1] Applies to floors and elements that support
fireplaces. floors.
[F20, F80-OP1.2] Applies to assemblies required to [F80-OS3.4] Applies to masonry used in chimneys and
provide fire resistance. fireplaces.
[F20, F80-OP2.1, OP2.4]
SA-1 • Page 107
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.20.2.5. Stone [F20, F80-OS3.1] Applies to floors and elements that
(1) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that support floors.
support or are part of an environmental separator and to [F20, F80-OS3.4] Applies to masonry used in chimneys
masonry used in chimneys and fireplaces. and fireplaces.
[F20, F80-OH4] Applies to floors and elements that 9.20.3.1. Mortar Materials
support floors. (1) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that
[F01, F20, F80-OP1.2] Applies to masonry used in support or are part of an environmental separator and to
chimneys and fireplaces. masonry used in chimneys and fireplaces.
[F20, F80-OP1.2] Applies to assemblies required to [F20, F80-OH4] Applies to floors and elements that
provide fire resistance. support floors.
[F20, F80-OP2.1, OP2.4] [F20, F80-OS3.1] Applies to floors and elements that
[F20, F80-OP2.3] Applies to elements that support or are support floors.
part of an environmental separator or are exposed to [F20, F80-OP2.1, OP2.4]
moisture. [F20, F80-OP2.3] Applies to elements support or are part
[F01-OS1.1, OS1.2] Applies to masonry used in chimneys of an environmental separator.
and fireplaces. [F20, F80-OS1.2] Applies to assemblies required to
[F20, F80-OS1.2] Applies to assemblies required to provide fire resistance.
provide fire resistance. [F20, F80-OS2.1]
[F20, F80-OS2.1] [F20, F80-OS2.3] Applies to elements that support or are
[F20, 80-OS2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator or are exposed to (2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
moisture. support or are part of an environmental separator.
9.20.2.6. Concrete Units Exposed to the Weather [F20-OH4] Applies to floors and elements that support
(1) [F61, F80-OH1.1, OH1.2, OH1.3] floors.
[F80-OH4] Applies to floors and elements that support [F20-OP2.1, OP2.4]
floors. [F20-OP2.3] Applies to elements that support or are part of
[F80-OP2.1, OP2.3] [F61-OP2.3] an environmental separator or are exposed to moisture.
[F80-OP1.2] Applies to concrete blocks in chimneys and [F20-OS1.2] Applies to assemblies required to provide fire
fireplaces. resistance.
[F80-OS2.1, OS2.3] [F61-OS2.3] [F20-OS2.1]
[F80-OS3.1] Applies to elements that support floors. [F20-OS2.3] Applies to elements that support or are part of
[F80-OS3.4] Applies to masonry used in chimneys and an environmental separator or are exposed to moisture.
fireplaces. [F20-OS3.1] Applies to floors and elements that support
9.20.2.7. Compressive Strength floors.
(1) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that (3) [F21-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental and to masonry support or are part of an environmental separator and to
used in chimneys and fireplaces. masonry used in chimneys and fireplaces.
[F20, F80-OH4] Applies to floors and elements that [F21-OH4] Applies to floors and elements that support
support floors. floors.
[F01, F20, F80-OP1.2] Applies to masonry used in [F21-OP2.1, OP2.4]
chimneys and fireplaces. [F21-OP2.3] Applies to elements that support or are part of
[F20, F80-OP1.2] Applies to assemblies required to an environmental separator or are exposed to moisture.
provide fire resistance. [F21-OS1.2] Applies to assemblies required to provide fire
[F20, F80-OP2.1, OP2.4] resistance.
[F20, F80-OP2.3] Applies to elements that support or are [F21-OS2.1]
part of an environmental separator or are exposed to [F21-OS2.3] Applies to elements that support or are part of
moisture. an environmental separator or are exposed to moisture.
[F01-OS1.1, OS1.2] Applies to masonry used in chimneys [F21-OS3.1] Applies to floors and elements that support
and fireplaces. floors.
[F20, F80-OS1.2] Applies to assemblies required to (4) [F21-OH1.1, OH1.2, OH1.3] Applies to elements that
provide fire resistance. support or are part of an environmental separator and to
[F20, F80-OS2.1] masonry used in chimneys and fireplaces.
[F20, F80-OS2.3] Applies to elements that support or are [F21-OH4] Applies to floors and elements that support
part of an environmental separator or are exposed to floors.
moisture. [F21-OP2.1, OP2.4]
Page 108 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F21-OP2.3] Applies to elements that support or are part of [F20, F21-OS1.2] Applies to assemblies required to
an environmental separator or are exposed to moisture. provide fire resistance.
[F21-OS1.2] Applies to assemblies required to provide fire [F20, F21-OS2.1]
resistance. [F20, F21-OS2.3] Applies to elements that support or are
[F21-OS2.1] part of an environmental separator.
[F21-OS2.3] Applies to elements that support or are part of [F20, F21-OS3.1] Applies to floors and elements that
an environmental separator or are exposed to moisture. support floors.
[F21-OS3.1] Applies to floors and elements that support (5) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
floors. support or are part of an environmental separator and to
9.20.3.2. Mortar and Grout Mixes masonry used in chimneys and fireplaces.
(1) [F20, F21, F61-OH1.1, OH1.2, OH1.3] Applies to elements [F20-OH4] Applies to floors and elements that support
that support or are part of an environmental separator and floors.
to masonry used in chimneys and fireplaces. [F20-OP2.1, OP2.4]
[F20, F21, F61-OH4] Applies to floors and elements that [F20-OP2.3] Applies to elements that support or are part of
support floors. an environmental separator.
[F20, F21, F61-OP2.1, OP2.4] [F20-OS1.2] Applies to assemblies required to provide fire
[F20, F21, F61-OP2.3] Applies to elements that support or resistance.
are part of an environmental separator. [F20-OS2.1]
[F20, F21-OS1.2] Applies to assemblies required to [F20-OS2.3] Applies to elements that support or are part of
provide fire resistance. an environmental separator.
[F20, F21, F61-OS2.1] [F20-OS3.1] Applies to floors and elements that support
[F20, F21, F61-OS2.3] Applies to elements that support or floors.
are part of an environmental separator. (6) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F21, F61-OS3.1] Applies to floors and elements that support or are part of an environmental separator or are
support floors. part of an environmental separator and to masonry used in
(2) (a) [F21, F55, F61-OH1.1, OH1.2, OH1.3] chimneys and fireplaces.
(a) [F21, F55, F61-OP2.1, OP2.3] [F20-OH4] Applies to floors and elements that support
(a) [F21, F55, F61-OS2.1, OS2.3] floors.
(b) [F2-OP2.1] [F20-OP2.1, OP2.4]
[F20-OP2.3] Applies to elements that support or are part of
(b) [F21, F44-OS1.2] Applies to assemblies required to
provide fire resistance. an environmental separator.
(b) [F21-OS2.1] [F20-OS1.2] Applies to assemblies required to provide fire
resistance.
(3) [F20, F21, F61-OH1.1, OH1.2, OH1.3] Applies to elements
that support or are part of an environmental separator and [F20-OS2.1]
to masonry used in chimneys and fireplaces. [F20-OS2.3] Applies to elements that support or are part of
an environmental separator.
[F20, F21, F61-OH4] Applies to floors and elements that
support floors. [F20-OS3.1] Applies to floors and elements that support
floors.
[F20, F21, F61-OP2.1, OP2.4]
[F20, F21, F61-OP2.3] Applies to elements that support or (7) [F20, F21, F61-OH1.1, OH1.2, OH1.3] Applies to elements
are part of an environmental separator. that support or are part of an environmental separator and
[F20, F21-OS1.2] Applies to assemblies required to to masonry used in chimneys and fireplaces.
provide fire resistance. [F20, F21, F61-OH4] Applies to floors and elements that
[F20, F21, F61-OS2.1] support floors.
[F20, F21, F61-OS2.3] Applies to elements that support or [F20, F21, F61-OP2.1, OP2.4]
are part of an environmental separator. [F20, F21, F61-OP2.3] Applies to elements that support or
[F20, F21, F61-OS3.1] Applies to floors and elements that are part of an environmental separator.
support floors. [F20, F21, F61-OS1.2] Applies to assemblies required to
(4) [F20, F21-OH1.1, OH1.2, OH1.3] Applies to elements that provide fire resistance.
support or are part of an environmental separator and to [F20, F21, F61-OS2.1]
masonry used in chimneys and fireplaces. [F20, F21, F61-OS2.3] Applies to elements that support or
[F20, F21-OH4] Applies to floors and elements that are part of an environmental separator.
support floors. [F20, F21, F61-OS3.1] Applies to floors and elements that
[F20, F21-OP2.1, OP2.4] support floors.
[F20, F21-OP2.3] Applies to elements that support or are
part of an environmental separator.
SA-1 • Page 109
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.20.4.1. Thickness [F20-OP2.3] Applies to elements that support or are part of
(1) [F20, F61-OH1.1, OH1.2, OH1.3] Applies to elements that an environmental separator or are exposed to moisture.
support or are part of an environmental separator. [F20-OS1.2] Applies to assemblies required to provide fire
[F20, F61-OH4] Applies to floors and elements that resistance.
support floors. [F20-OS2.1]
[F20, F61-OP2.1, OP2.4] [F20-OS2.3] Applies to elements that support or are part of
[F20, F61-OP2.3] Applies to elements that support or are an environmental separator or are exposed to moisture.
part of an environmental separator or are exposed to [F20-OS3.1] Applies to floors and elements that support
moisture. floors.
[F20, F61-OS1.2] Applies to assemblies required to (3) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
provide fire resistance. support or are part of an environmental separator and to
masonry used in chimneys and fireplaces.
[F20, F61-OS2.1]
[F20-OH4] Applies to floors and elements that support
[F20, F61-OS2.3] Applies to elements that support or are
floors.
part of an environmental separator or are exposed to
moisture. [F20-OP2.1, OP2.4]
[F20-OP2.3] Applies to elements that support or are part of
[F20, F61-OS3.1] Applies to floors and elements that an environmental separator or are exposed to moisture.
support floors.
[F20-OS1.2] Applies to assemblies required to provide fire
(2) [F20, F61-OH1.1, OH1.2, OH1.3] Applies to elements that resistance.
support or are part of an environmental separator. [F20-OS2.1]
[F20, F61-OH4] Applies to floors and elements that [F20-OS2.3] Applies to elements that support or are part of
support floors. an environmental separator or are exposed to moisture.
[F20, F61-OP2.1, OP2.4] [F20-OS3.1] Applies to floors and elements that support
[F20, F61-OP2.3] Applies to elements that support or are floors.
part of an environmental separator or are exposed to 9.20.5.1. Masonry Support
moisture. (1) [F20, F21-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F61-OS1.2] Applies to assemblies required to support or are part of an environmental separator.
provide fire resistance. [F20, F21-OH4] Applies to floors and elements that
[F20, F61-OS2.1] support floors.
[F20, F61-OS2.3] Applies to elements that support or are [F20, F21-OP2.1, OP2.4]
part of an environmental separator or are exposed to [F20, F21-OP2.3] Applies to elements that support or are
moisture. part of an environmental separator or are exposed to
[F20, F61-OS3.1] Applies to floors and elements that moisture.
support floors. [F20, F21-OS1.2] Applies to assemblies required to
9.20.4.2. Masonry Units provide fire resistance.
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F21-OS2.1]
support or are part of an environmental separator and to [F20, F21-OS2.3] Applies to elements that support or are
masonry used in chimneys and fireplaces. part of an environmental separator or are exposed to
moisture.
[F20-OH4] Applies to floors and elements that support
[F20, F21-OS3.1] Applies to floors and elements that
floors.
support floors.
[F20-OP2.1, OP2.4]
(2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20-OP2.3] Applies to elements that support or are part of
support or are part of an environmental separator.
an environmental separator or are exposed to moisture.
[F20-OH4] Applies to floors and elements that support
[F20-OS1.2] Applies to assemblies required to provide fire floors.
resistance.
[F20-OP2.1, OP2.4]
[F20-OS2.1] [F20-OP2.3] Applies to elements that support or are part of
[F20-OS2.3] Applies to elements that support or are part of an environmental separator or are exposed to moisture.
an environmental separator or are exposed to moisture. [F20-OS1.2] Applies to assemblies required to provide fire
[F20-OS3.1] Applies to floors and elements that support resistance.
floors. [F20-OS2.1]
(2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.2] Applies to elements that support or are part of
support or are part of an environmental separator and to an environmental separator or are exposed to moisture.
masonry used in chimneys and fireplaces. [F20-OS3.1] Applies to floors and elements that support
[F20-OH4] Applies to floors and elements that support floors.
floors.
[F20-OP2.1, OP2.4]
Page 110 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.20.5.2. Lintels or Arches [F20, F22-OP2.1, OP2.3, OP2.4]
(1) [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OS1.2] Applies to assemblies required to
support or are part of an environmental separator. provide fire resistance.
[F20, F22-OH4] Applies to floors and elements that [F20, F22-OS2.1, OS2.3]
support floors. (6) [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22–OP2.1, OP2.4] support or are part of an environmental separator.
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OP2.1, OP2.4]
part of an environmental separator or are exposed to [F20, F22-OP2.3] Applies to elements that support or are
moisture. part of an environmental separator or are exposed to
[F20, F22-OS1.2] Applies to assemblies required to moisture.
provide fire resistance. [F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OS2.1] provide fire resistance.
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OS2.1]
part of an environmental separator or are exposed to [F20, F22-OS2.3] Applies to elements that support or are
moisture. part of an environmental separator.
[F20, F22-OS3.1] Applies to floors and elements that
9.20.6.1. Thickness of Exterior Walls
support floors.
(1) [F20-OP2.1, OP2.4, OP2.5]
(2) [F20, F22-OH1.1, OH1.2, OH1.3]
[F22-OP2.4, OP2.5]
[F20, F22-OP2.1, OP2.3, OP2.4] [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OS1.2] Applies to assemblies required to part of an environmental separator.
provide fire resistance. [F20, F22-OH1.1.OH1.2, OH1.3] Applies to elements that
[F20, F22-OS2.1, OS2.3] support or are part of an environmental separator.
(3) [F20, F22-OH1.1, OH1.2, OH1.3] [F20, F22-OH4] Applies to floors and elements that
[F20, F22-OP2.1, OP2.3, OP2.4] support floors.
[F20, F22-OS1.2] Applies to assemblies required to [F20-OS2.1, OS2.5]
provide fire resistance. [F22-OS2.5]
[F20, F22-OS2.1, OS2.3] [F20, F22-OS2.3] Applies to elements that support or are
(3.1) [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that part of an environmental separator.
support or are part of an environmental separator. [F20, F22-OS3.1] Applies to floors and elements that
[F20, F22-OP2.1, OP2.4] support floors.
[F20, F22-OP2.3] Applies to elements that support or are (2) [F20-OP2.1, OP2.4, OP2.5]
part of an environmental separator or are exposed to [F22-OP2.4, OP2.5]
moisture. [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OS1.2] Applies to assemblies required to part of an environmental separator.
provide fire resistance. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OS2.1] support or are part of environmental separator.
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OH4] Applies to floors and elements that
part of an environmental separator. support floors.
(4) [F80-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.1, OS2.5]
support or are part of an environmental separator. [F22-OS2.5]
[F80-OH4] Applies to floors and elements that support [F20, F22-OS2.3] Applies to elements that support or are
floors. part of an environmental separator.
[F80-OP2.1, OP2.4] [F20, F22-OS3.1] Applies to floors and elements that
[F80-OP2.3] Applies to elements that support or are part of support floors.
an environmental separator or are exposed to moisture. (3) [F20-OP2.1, OP2.4, OP2.5]
[F20-OS1.2] Applies to assemblies required to provide fire [F22-OP2.4, OP2.5]
resistance. [F20, F22-OP2.3] Applies to elements that support are or
part of an environmental separator.
[F80-OS2.1]
[F80-OS2.3] Applies to elements that support or are part of [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
an environmental separator or are exposed to moisture. support or are part of an environmental separator.
[F20, F22-OH4] Applies to floors and elements that
[F80-OS3.1] Applies to floors and elements that support
support floors.
floors.
[F20, F22-OS1.2] Applies to assemblies required to
[F80-OS3.7] Applies to walls, and elements that support
provide fire resistance.
walls, that contain doors or windows required for
emergency egress. [F20-OS2.1, OS2.5]
[F22-OS2.5]
(5) [F20, F22-OH1.1, OH1.2, OH1.3]
SA-1 • Page 111
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OS2.3] Applies to elements that support or are 9.20.6.4. Masonry Veneer
part of an environmental separator. (1) [F20-OP2.1, OP2.5]
[F20, F22-OS3.1] Applies to floors and elements that [F22-OP2.5]
support floors. [F20, F22-OP2.3] Applies to elements that are part of an
9.20.6.2. Cavity Walls environmental separator.
(1) [F20-OP2.1, OP2.4, OP2.5] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OP2.4, OP2.5] are part of an environmental separator.
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OS1.2] Applies to assemblies required to
part of an environmental separator or are exposed to provide fire resistance.
moisture. [F20-OS2.1, OS2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F22-OS2.5]
support or are part of an environmental separator. [F20, F22-OS2.3] Applies to elements that are part of an
[F20, F22-OH4] Applies to floors and elements that environmental separator.
support floors. (2) [F61-OH1.1, OH1.2, OH1.3]
[F20, F22-OS1.2] Applies to assembles required to provide [F61-OP2.3]
fire resistance. [F61-OS1.2] Applies to assemblies required to provide fire
[F20-OS2.1, OS2.5] resistance.
[F22-OS2.5] [F61-OS2.3]
[F20, F22-OS2.3] Applies to elements that support or are (3) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5]
part of an environmental separator or are exposed to
[F20, F22-OH1.1, OH1.2, OH1.3]
moisture.
[F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OS3.1] Applies to floors and elements that
provide fire resistance.
support floors.
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
(2) [F20-OP2.1, OP2.4, OP2.5]
[F22-OP2.4, OP2.5] 9.20.6.5. Parapet Walls
[F20, F22, F61-OP2.3] Applies to elements that support or (1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.5]
are part of an environmental separator. [F20-OS2.1, OP2.3, OP2.5] [F22-OS2.5]
[F61-OS1.2] Applies to assemblies required to provide fire [F20, F22-OH1.1, OH1.2, OH1.3]
resistance. (2) [F61-OH1.1, OH1.2, OH1.3]
[F20-OS2.1, OS2.5] [F61-OP2.3]
[F22-OS2.5] [F61-OS1.2]
[F20, F22, F61-OS2.3] Applies to elements that support or
[F61-OS2.3]
are part of an environmental separator.
(3) [F61-OH1.1, OH1.2, OH1.3]
[F20, F22-OS3.1] Applies to floors and elements that
support floors [F61-OP2.3]
[F20, F22, F61-OH1.1, OH1.2, OH1.3] Applies to elements [F61-OS1.2]
that support or are part of an environmental separator. [F61-OS2.3]
[F20, F22-OH4] Applies to floors and elements that 9.20.7.1. Maximum Dimensions
support floors. (1) [F20-OP2.1, OP2.4, OP2.5]
(3) [F20-OP2.1, OP2.4, OP2.5] [F22-OP2.4, OP2.5]
[F22-OP2.4, OP2.5] [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OP2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20-OS2.1, OS2.5] support or are part of an environmental separator.
[F22-OS2.5] [F20, F22-OH4] Applies to floors and elements that
[F20, F22-OS2.3] Applies to elements that support or are support floors.
part of an environmental separator or are exposed to [F20, F22-OS1.2] Applies to assemblies required to
moisture provide fire resistance.
[F20, F22-OS3.1] Applies to floors and elements that [F20-OS2.1, OS2.5]
support floors. [F22-OS2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OS2.3] Applies to elements that support or are
support or are part of an environmental separator. part of an environmental separator.
[F20, F22-OH4] Applies to floors and elements that [F20, F22-OS3.1] Applies to floors and elements that
support floors. support floors.
9.20.6.3. Thickness of Interior Walls 9.20.7.2. Minimum Wall Thickness
(2) (b) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.5] (1) [F20-OP2.1, OP2.4, OP2.5]
(b) [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.5] [F22-OP2.4, OP2.5]
Page 112 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OS1.2] Applies to assemblies required to
part of an environmental separator. provide fire resistance.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.1, OS2.5]
support or are part of an environmental separator. [F22-OS2.5]
[F20, F22-OH4] Applies to floors and elements that [F20, F22-OS2.3] Applies to elements that support or are
support floors. part of an environmental separator.
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OS3.1] Applies to floors and elements that
provide fire resistance. support floors.
[F20-OS2.1, OS2.5] 9.20.7.5. Chases or Recesses Cut into Walls
[F22-OS2.5] (1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OS2.3] Applies to elements that support or are support or are part of an environmental separator.
part of an environmental separator.
[F20-OH4] Applies to floors and elements that support
[F20, F22-OS3.1] Applies to floors and elements that floors.
support floors.
[F20-OP2.1, OP2.4]
(2) [F20-OP2.1, OP2.4, OP2.5] [F20-OP2.3] Applies to elements that support or are part of
[F22-OP2.4, OP2.5] an environmental separator.
[F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator. [F20-OS1.2] Applies to assemblies required to provide fire
resistance.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator. [F20-OS2.1]
[F20-OS2.3] Applies to elements that support or are part of
[F20, F22-OH4] Applies to floors and elements that
an environmental separator.
support floors.
[F20-OS3.1] Applies to floors and elements that support
[F20, F22-OS1.2] Applies to assemblies required to
floors.
provide fire resistance.
[F20-OS2.1, OS2.5] 9.20.8.1. Capping of Hollow Masonry Walls
[F22-OS2.5] (1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OS2.3] Applies to elements that support or are a support or are part of an environmental separator.
part of an environmental separator. [F20-OH4] Applies to floors and elements that support
[F20, F22-OS3.1] Applies to floors and elements that floors.
support floors. [F20-OP2.1, OP2.4]
9.20.7.3. Separation of Chases and Recesses [F20-OP2.3] Applies to elements that support or are part of
(1) [F20-OP2.1, OP2.4, OP2.5] an environmental separator.
[F22-OP2.4, OP2.5] [F20-OS1.2] Applies to assemblies required to provide fire
[F20, F22-OP2.3] Applies to elements that support or are resistance.
part of an environmental separator. [F20-OS2.1]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.3] Applies to elements that support or are part of
support or are part of an environmental separator. an environmental separator.
[F20, F22-OH4] Applies to floors and elements that [F20-OS3.1] Applies to floors and elements that support
support floors. floors.
[F20, F22-OS1.2] Applies to assemblies required to (2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
provide fire resistance. support or are part of an environmental separator.
[F20-OS2.1, OS2.5] [F20-OH4] Applies to floors and elements that support
[F22-OS2.5] floors.
[F20, F22-OS2.3] Applies to elements that support or are [F20-OP2.1, OP2.4]
part of an environmental separator. [F20-OP2.3] Applies to elements that support or are part of
[F20, F22-OS3.1] Applies to floors and elements that an environmental separator.
support floors. [F20-OS2.1]
9.20.7.4. Non-Conforming Chases or Recesses [F20-OS2.3] Applies to elements that support or are part of
(1) [F20-OP2.1, OP2.4, OP2.5] an environmental separator.
[F22-OP2.4, OP2.5] [F20-OS3.1] Applies to floors and elements that support
[F20, F22-OP2.3] Applies to elements that support or are floors.
part of an environmental separator. 9.20.8.2. Cavity Walls Supporting Framing Members
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that (1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator. support or are part of an environmental separator.
[F20, F22-OH4] Applies to floors and elements that [F20-OH4] Applies to floors and elements that support
support floors. floors.
SA-1 • Page 113
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OP2.1, OP2.4] [F20-OS2.1, OS2.5]
[F20-OP2.3] Applies to elements that support or are part of [F22-OS2.5]
an environmental separator. [F20, F22-OS2.3] Applies to elements that support or are
[F20-OS1.2] Applies to assemblies required to provide fire part of an environmental separator.
resistance. [F20, F22-OS3.1] Applies to floors and elements that
[F20-OS2.1] support floors.
[F20-OS2.3] Applies to elements that support or are part of (2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
an environmental separator. support or are part of an environmental separator.
[F20-OS3.1] Applies to floors and elements that support [F20-OH4] Applies to floors and elements that support
floors. floors.
(2) [F80-OP2.3] [F20-OP2.1, OP2.2]
[F80-OS2.3] [F20-OP2.3] Applies to elements that support or are part of
(3) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that an environmental separator.
support or are part of an environmental separator. [F20-OS1.2] Applies to assemblies required to provide fire
[F20-OH4] Applies to floors and elements that support resistance.
floors. [F20-OS2.1]
[F20-OP2.1, OP2.4] [F20-OS2.3] Applies to elements that support or are part of
[F20-OP2.3] Applies to elements that support or are part of an environmental separator.
an environmental separator. [F20-OS3.1] Applies to floors and elements that support
[F20-OS1.2] Applies to assemblies required to provide fire floors.
resistance. (3) [F20-OP2.1, OP2.4, OP2.5]
[F20-OS2.1] [F22-OP2.4, OP2.5]
[F20-OS2.3] Applies to elements that support or are part of [F20, F22-OP2.3] Applies to elements that support or are
an environmental separator. part of an environmental separator.
[F20-OS3.1] Applies to floors and elements that support [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
floors. support or are part of an environmental separator.
9.20.8.3. Bearing of Beams and Joists [F20, F22-OH4] Applies to floors and elements that
support floors.
(1) [F20-OP2.1]
[F20-OP2.3] Applies to elements that support or are part of [F20, F22-OS1.2] Applies to assemblies required to
an environmental separator. provide fire resistance.
[F20-OS2.1] [F20-OS2.1, OS2.5]
[F20-OS2.3] Applies to elements that support or are part of [F22-OS2.5]
an environmental separator. [F20, F22-OS2.3] Applies to elements that support or are
part of an environmental separator.
(2) [F20-OP2.1]
[F20-OP2.3] Applies to elements that support or are part of [F20, F22-OS3.1] Applies to floors and elements that
an environmental separator. support floors.
[F20-OS2.1] (4) [F20-OP2.1, OP2.4, OP2.5]
[F20-OS2.3] Applies to elements that support or are part of [F22-OP2.4, OP2.5]
an environmental separator. [F20, F22-OP2.3] Applies to elements that support or are
(3) [F20-OP2.1] part of an environmental separator.
[F20-OP2.3] Applies to elements that support or are part of [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
an environmental separator. support or are part of an environmental separator.
[F20-OS2.1]
[F20, F22-OH4] Applies to floors and elements that
[F20-OS2.3] Applies to elements that support or are part of
an environmental separator. support floors.
9.20.8.4. Support of Beams and Columns [F20, F22-OS1.2] Applies to assemblies required to
(1) [F20-OP2.1, OP2.4, OP2.5] provide fire resistance.
[F22-OP2.4, OP2.5] [F20-OS2.1, OS2.5]
[F20, F22-OP2.3] Applies to elements that support or are [F22-OS2.5]
part of an environmental separator. [F20, F22-OS2.3] Applies to elements that support or are
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that part of an environmental separator.
support or are part of an environmental separator.
[F20, F22-OS3.1] Applies to floors and elements that
[F20, F22-OH4] Applies to floors and elements that
support floors. support floors.
[F20, F22-OS1.2] Applies to assemblies required to (5) [F20-OP2.1, OP2.4, OP2.5]
provide fire resistance. [F22-OP2.4, OP2.5]
Page 114 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OP2.3] Applies to elements that support or are [F20-OP2.3] Applies to elements that support or are part of
part of an environmental separator. an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS1.2] Applies to assemblies required to provide fire
support or are part of an environmental separator. resistance.
[F20, F22-OH4] Applies to floors and elements that [F20-OS2.1]
support floors. [F20-OS2.3] Applies to elements that support or are part of
[F20, F22-OS1.2] Applies to assemblies required to an environmental separator.
provide fire resistance. [F20-OS3.1] Applies to floors and elements that support
[F20-OS2.1, OS2.4, OS2.5] floors.
[F22-OS2.4, OS2.5] 9.20.9.2. Bonding or Tying of Other than Masonry Veneer
[F20, F22-OS2.3] Applies to elements that support or are (1) [F20-OP2.1, OP2.5]
part of an environmental separator. [F22-OP2.4, OP2.5]
[F20, F22-OS3.1] Applies to floors and elements that [F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator.
support floors.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
9.20.8.5. Projection of Masonry Veneer Beyond Supporting support or are part of an environmental separator.
Members [F20, F22-OH4] Applies to floors and elements that
(1) [F20-OP2.1, OP2.4, OP2.5] support floors.
[F22-OP2.4, OP2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OP2.3] Applies to elements that support or are provide fire resistance.
part of an environmental separator. [F20-OS2.1, OS2.5]
[F22-OS2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OS2.3] Applies to elements that support or are
support or are part of an environmental separator. part of an environmental separator.
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OS3.1] Applies to floors and elements that
provide fire resistance. support floors.
[F20-OS2.1, OS2.5] [F20, F22-OS3.7] Applies to walls, and elements that
[F22-OS2.5] support walls, that contains doors or windows required for
emergency egress.
[F20, F22-OS2.3] Applies to elements that support or are
9.20.9.3. Bonding
part of an environmental separator.
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
9.20.9.1. Joints to be Offset or Reinforced support or are part of an environmental separator.
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OH4] Applies to floors and elements that support
support or are part of an environmental separator. floors.
[F20-OH4] Applies to floors and elements that support [F20-OP2.1, OP2.4]
floors. [F20-OP2.3] Applies to elements that support or are part of
an environmental separator.
[F20-OP2.1, OP2.4]
[F20-OS1.2] Applies to assemblies required to provide fire
[F20-OP2.3] Applies to elements that support or are part of resistance.
an environmental separator. [F20-OS2.1]
[F20-OS1.2] Applies to assemblies required to provide fire [F20-OS2.3] Applies to elements that support or are part of
resistance. an environmental separator.
[F20-OS2.1] [F20-OS3.1] Applies to floors and elements that support
[F20-OS2.3] Applies to elements that support or are part of floors.
an environmental separator. (2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator.
[F20-OS3.1] Applies to floors and elements that support
[F20-OH4] Applies to floors and elements that support
floors. floors.
(2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OP2.1, OP2.4]
support or are part of an environmental separator. [F20-OP2.3] Applies to elements that support or are part of
[F20-OH4] Applies to floors and elements that support an environmental separator.
floors. [F20-OS1.2] Applies to assemblies required to provide fire
resistance.
[F20-OP2.1, OP2.4]
[F20-OS2.1]
SA-1 • Page 115
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OS2.3] Applies to elements that support or are part of [F20, F80-OH4] Applies to floors and elements that
an environmental separator. support floors.
[F20-OS3.1] Applies to floors and elements that support [F20, F80-OP2.1, OP2.4]
floors. [F20, F80-OP2.3] Applies to elements that support or are
(3) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that part of an environmental separator.
support or are part of an environmental separator. [F20, F80-OS1.2] Applies to assemblies required to
[F20-OH4] Applies to floors and elements that support provide fire resistance.
floors. [F20, F80-OS2.1]
[F20-OP2.1, OP2.4] [F20, F80-OS2.3] Applies to elements that support or are
[F20-OP2.3] Applies to elements that support or are part of part of an environmental separator.
an environmental separator. [F20, F80-OS3.7] Applies to floors and elements that
[F20-OS1.2] Applies to assemblies required to provide fire support floors.
resistance. [F20, F80-OS3.7] Applies to walls, and elements that
[F20-OS2.1] support walls, that contain doors and windows required for
[F20-OS2.3] Applies to elements that support or are part of emergency egress.
an environmental separator. (5) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20-OS3.1] Applies to floors and elements that support support or are part of an environmental separator.
floors. [F20-OH4] Applies to floors and elements that support
9.20.9.4. Tying floors.
(2) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OP2.1, OP2.4]
support or are part of an environmental separator. [F20-OP2.3] Applies to elements that support or are part of
an environmental separator.
[F20, F80-OH4] Applies to floors and elements that
support floors. [F20-OS1.2] Applies to assemblies required to provide fire
resistance.
[F20, F80-OP2.1, OP2.4]
[F20, F80-OP2.3] Applies to elements that support or are [F20-OS2.1]
part of an environmental separator. [F20-OS2.3] Applies to elements that support or are part of
an environmental separator.
[F20, F80-OS1.2] Applies to assemblies required to
provide fire resistance. [F20-OS3.1] Applies to floors and elements that support
floors.
[F20, F80-OS2.1]
[F20, F80-OS2.3] Applies to elements that support or are (6) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
part of an environmental separator. support or are part of an environmental separator.
[F20, F80-OS3.1] Applies to floors and elements that [F20-OH4] Applies to floors and elements that support
support floors. floors.
[F20, F80-OS3.7] Applies to walls, and elements that [F20-OP2.1, OP2.4]
support walls, that contain doors or windows required for [F20-OP2.3] Applies to elements that support or are part of
emergency egress. an environmental separator.
(3) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS1.2] Applies to assemblies required to provide fire
support or are part of an environmental separator. resistance.
[F20, F80-OH4] Applies to floors and elements that [F20-OS2.1]
support floors. [F20-OS2.3] Applies to elements that support or are part of
[F20, F80-OP2.1, OP2.4] an environmental separator.
[F20, F80-OP2.3] Applies to elements that support or are [F20-OS3.1] Applies to floors and elements that support
part of an environmental separator. floors.
[F20, F80-OS1.2] Applies to assemblies required to (7) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
provide fire resistance. support or are part of an environmental separator.
[F20, F80-OS2.1] [F20-OH4] Applies to floors and elements that support
[F20, F80-OS2.3] Applies to elements that support or are floors.
part of an environmental separator. [F20-OP2.1, OP2.4]
[F20, F80-OS3.1] Applies to floors and elements that [F20-OP2.3] Applies to elements that support or are part of
support floors. an environmental separator.
[F20, F80-OS3.7] Applies to walls, and elements that [F20-OS1.2] Applies to assemblies required to provide fire
support walls, that contain doors or windows for resistance.
emergency egress. [F20-OS2.1]
(4) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.3] Applies to elements that support or are part of
support or are part of an environmental separator. an environmental separator.
Page 116 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OS3.1] Applies to floors and elements that support [F20, F22, F80-OS1.2] Applies to assemblies required to
floors. provide fire resistance.
(8) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F80-OP2.1]
support or are part of an environmental separator. [F20, F22, F80-OP2.5]
[F20-OH4] Applies to floors and elements that support [F20, F22, F80-OP2.3] Applies to elements that support or
floors. are part of an environmental separator.
[F20-OP2.1, OP2.4] [F20, F80-OS2.1]
[F20-OP2.3] Applies to elements that support or are part of [F20, F22, F80-OS2.5]
an environmental separator. [F20, F22, F80-OS2.3] Applies to elements that support or
[F20-OS1.2] Applies to assemblies required to provide fire are part of an environmental separator.
resistance. 9.20.9.6. Reinforcing for Glass Block
[F20-OS2.1] (1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that are
[F20-OS2.3] Applies to elements that support or are part of part of an environmental separator.
an environmental separator. [F20-OP2.1]
[F20-OS3.1] Applies to floors and elements that support [F20-OP2.3] Applies to elements that are part of an
floors. environmental separator.
(9) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS1.2] Applies to assemblies required to provide fire
support or are part of an environmental separator. resistance.
[F20-OH4] Applies to floors and elements that support [F20-OS2.1]
floors. [F20-OS2.3] Applies to elements that are part of an
[F20-OP2.1, OP2.4] environmental separator.
[F20-OP2.3] Applies to elements that support or are part of (2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that are
an environmental separator. part of an environmental separator.
[F20-OS1.2] Applies to assemblies required to provide fire [F20-OP2.1]
resistance. [F20-OP2.3] Applies to elements that are part of an
[F20-OS2.1] environmental separator.
[F20-OS2.3] Applies to elements that support or are part of [F20-OS1.2] Applies to assemblies required to provide fire
an environmental separator. resistance.
[F20-OS3.1] Applies to floors and elements that support [F20-OS2.1]
floors. [F20-OS2.3] Applies to elements that are part of an
9.20.9.5. Ties for Masonry Veneer environmental separator.
(1) [F20, F22, F80-OH1.1, OH1.2, OH1.3] Applies to elements 9.20.10.1. Lateral Support Required
that support or are part of an environmental separator. (1) [F20-OP2.1]
[F20, F22, F80-OS1.2] Applies to assemblies required to [F20, F22-OP2.4, OP2.5]
provide fire resistance. [F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator.
[F20, F80-OP2.1]
[F20, F22, F80-OP2.5] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22, F80-OP2.3] Applies to elements that support or support or are part of an environmental separator.
are part of an environmental separator. [F20, F22-OH4] Applies to floors and elements that
[F20, F80-OS2.1] support floors.
[F20, F22, F80-OS2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F20, F22, F80-OS2.3] Applies to elements that support or provide fire resistance.
are part of an environmental separator. [F20-OS2.1]
(2) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OS2.5]
support or are part of an environmental separator. [F20, F22-OS2.3] Applies to elements that support or are
[F20, F80-OP2.1] part of an environmental separator.
[F20, F80-OP2.3] Applies to elements that support or are [F20, F22-OS3.1] Applies to floors and elements that
part of an environmental separator. support floors.
[F20, F80-OS1.2] Applies to assemblies required to (2) [F20-OP2.1, OP2.4] [F20, F22-OP2.5]
provide fire resistance. [F20, F22-OS1.2] Applies to assemblies required to
[F20, F80-OS2.1] provide fire resistance.
[F20, F80-OS2.3] Applies to elements that support or are [F20-OS2.1]
part of an environmental separator. [F20, F22-OS2.5]
(4) [F20, F22, F80-OH1.1, OH1.2, OH1.3] Applies to elements (a) [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements
that support or are part of an environmental separator. that support or are part of an environmental separator.
SA-1 • Page 117
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(a) [F20, F22-OH4] Applies to floors and elements that [F20, F80-OS2.1]
support floors. [F20, F80-OS2.3] Applies to elements that support are part
(a) [F20, F22-OP2.3] Applies to elements that support or of an environmental separator.
are part of an environmental separator. [F20, F80-OS3.1] Applies to floors and elements that
(a) [F20, F22-OS2.3] Applies to elements that support or support walls.
are part of an environmental separator. [F20, F80-OS3.7] Applies to walls, and elements that
(a) [F20, F22-OS3.1] Applies to floors and elements that support walls, that contain doors or windows required for
support floors. emergency egress.
(4) [F20-OP2.1] (3) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OP2.4, OP2.5] support or are part of an environmental separator.
[F20, F22-OP2.3] Applies to elements that support or are [F20-OH4] Applies to floors and elements that support
part of an environmental separator or are exposed to floors.
moisture. [F20-OP2.1, OP2.4]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OP2.3] Applies to elements that support or are part of
support or are part of an environmental separator. an environmental separator or are exposed to moisture.
[F20, F22-OH4] Applies to floors and elements that [F20-OS1.2] Applies to assemblies required to provide fire
support fire resistance. resistance.
[F20, F22-OS1.2] Applies to assemblies required to [F20-OS2.1]
provide fire resistance. [F20-OS2.3] Applies to elements that support or are part of
[F20-OS2.1] an environmental separator.
[F20, F22-OS2.5] [F20-OS3.1] Applies to floors and elements that support
[F20, F22-OS2.3] Applies to elements that support or are floors.
part of an environmental separator or are exposed to (4) [F20-OP2.1]
moisture. [F20, F22-OP2.4, OP2.5]
[F20, F22-OS3.1] Applies to floors and elements that [F20, F22-OP2.3] Applies to elements that support or are
support floors. part of an environmental separator or are exposed to
9.20.11.1. Anchorage to Floor or Roof Assemblies where moisture.
Masonry Walls Require Lateral Support [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
(1) [F20-OP2.1] support or are part of an environmental separator.
[F20, F22-OP2.4, OP2.5] [F20, F22-OH4] Applies to floors and elements that
[F20, F22-OP2.3] Applies to elements that support or are support floors.
part of an environmental separator. [F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that provide fire resistance.
support or are part of an environmental separator. [F20-OS2.1]
[F20-OS2.1] [F20,F22-OS2.5] [F20,F22-OS2.3] Applies to [F20, F22-OS2.5]
elements that support or are part of an environmental [F20, F22-OS2.3] Applies to elements that support or are
separator part of an environmental separator.
[F20, F22-OH4] Applies to floors and elements that [F20, F22-OS3.1] Applies to floors and elements that
support floors. support floors.
[F20, F22-OS1.2] Applies to assemblies required to 9.20.11.2. Bonding and Tying of Intersecting Masonry Walls
provide fire resistance. where Walls Require Lateral Support
[F20-OS2.1] (1) [F20-OP2.1]
[F20, F22-OS2.5] [F20, F22-OP2.4, OP2.5]
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator. part of an environmental separator or are exposed to
[F20, F22-OS3.1] Applies to floors and elements that moisture.
support floors. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
(2) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that support or are part of an environmental separator.
support or are part of an environmental separator. [F20, F22-OH4] Applies to floors and elements that
[F20, F80-OH4] Applies to floors and elements that support floors.
support floors. [F20, F22-OS1.2] Applies to assemblies required to
[F20, F80-OP2.3] Applies to elements that support or are provide fire resistance.
part of an environmental separator or are exposed to [F20-OS2.1]
moisture. [F20, F22-OS2.5]
[F20, F80-OS1.2] Applies to assemblies required to [F20, F22-OS2.3] Applies to elements that support or are
provide fire resistance. part of an environmental separator.
Page 118 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OS3.1] Applies to floors and elements that [F20-OP2.1, OP2.4]
support floors. [F20-OP2.3] Applies to elements that support or are part of
(2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that an environmental separator.
support or are part of an environmental separator. [F20-OS1.2] Applies to assemblies required to provide fire
[F20-OH4] Applies to floors and elements that support resistance.
floors [F20-OS2.1]
[F20-OP2.1, OP2.4] [F20-OS2.3] Applies to elements that support or are part of
[F20-OP2.3] Applies to elements that support or are part of an environmental separator.
an environmental separator. [F20-OS3.1] Applies to floors and elements that support
[F20-OS2.1] floors.
[F20-OS2.3] Applies to elements that support or are part of 9.20.11.4. AnchoringWood Frame Roof Systems to Masonry
an environmental separator. Walls
[F20-OS3.1] Applies to floors and elements that support (1) [F20-OH1.1, OH1.2, OH1.3]
floors. [F20-OP2.1, OP2.3]
(3) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.1, OS2.3]
support floors or are part of an environmental separator. (2) [F20-OH1.1, OH1.2, OH1.3]
[F20, F80-OH4] Applies to floors and elements that [F20-OP2.1, OP2.3]
support floors.
[F20-OS2.1, OS2.3]
[F20, F80-OP2.1, OP2.4]
[F20, F80-OP2.3] Applies to elements that support or are 9.20.11.5. Anchoring Masonry Cornices, Sills and Trim to
part of an environmental separator. Masonry Walls
[F20, F80-OS1.2] Applies to assemblies required to (1) [F20, F80-OS2.1, OS2.3, OS2.5] [F22-OS2.5]
provide fire resistance. 9.20.11.6. Anchoring to Masonry Piers
[F20, F80-OS2.1] (1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F80-OS2.3] Applies to elements that support or are support or are part of an environmental separator.
part of an environmental separator. [F20-OH4] Applies to floors and elements that support
[F20, F80-OS3.1] Applies to floors and elements that floors.
support floors. [F20-OP2.1]
[F20, F80-OS3.7] Applies to walls, and elements that [F20-OP2.3] Applies to elements that support or are part of
support walls, that contain doors or windows required for an environmental separator.
emergency egress. [F20-OS1.2] Applies to assemblies required to provide fire
9.20.11.3. Anchoring Intersecting Wood Frame Walls to Masonry resistance.
Walls [F20-OS2.1]
(1) [F20, F22, F80-OH1.1, OH1.2, OH1.3] Applies to elements [F20-OS2.3] Applies to elements that support or are part of
that support or are part of an environmental separator. an environmental separator.
[F20, F22, F80-OH4] Applies to floors and elements that [F20-OS3.1] Applies to floors and elements that support
support floors. floors.
[F20, F22, F80-OS1.2] Applies to assemblies to provide 9.20.12.1. Corbelling
fire resistance. (1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F80-OS2.1] support or are part of an environmental separator.
[F20, F22, F80-OS2.5] [F20-OH4] Applies to floors and elements that support
[F20, F22, F80-OS2.3] Applies to elements that support or floors.
are part of an environmental separator. [F20-OP2.1]
[F20, F22, F80-OS3.1] Applies to floors and elements that [F20-OP2.3] Applies to elements that support or are part of
support floors. an environmental separator.
[F20, F22, F80-OS3.7] Applies to walls, and elements that [F20-OS1.2] Applies to assemblies required to provide fire
support walls, that contain doors or windows required for resistance.
emergency egress.
[F20-OS2.1]
[F20, F80-OP2.1] [F20-OS2.3] Applies to elements that support or are part of
[F20, F22, F80-OP2.4, OP2.5] an environmental separator.
[F20, F22, F80-OP2.3] Applies to elements that support or
[F20-OS3.1] Applies to floors and elements that support
are part of an environmental separator.
floors.
(2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
(2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator.
support or are part of an environmental separator.
[F20-OH4] Applies to floors and elements that support
[F20-OH4] Applies to floors and elements that support
floors.
floors.
SA-1 • Page 119
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OP2.1, OP2.4] [F80-OS2.1, OS2.3]
[F20-OP2.3] Applies to elements that support or are part of (2) [F80-OH1.1, OH1.2, OH1.3]
an environmental separator. [F20-OP2.1, OP2.3]
[F20-OS1.2] Applies to assemblies required to provide fire [F80-OS1.2] Applies to assemblies required to provide fire
resistance. resistance.
[F20-OS2.1] [F80-OS2.1, OS2.3]
[F20-OS2.3] Applies to elements that support or are part of
9.20.13.2. Fastening of Flashing
an environmental separator.
(1) [F80-OH1.1, OH1.2, OH1.3]
9.20.12.2. Corbelling for Cavity Walls
[F20-OP2.1, OP2.3]
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator. [F80-OS1.2] Applies to assemblies required to provide fire
resistance.
[F20-OH4] Applies to floors and elements that support
floors. [F80-OS2.1, OS2.3]
[F20-OP2.1, OP2.4] 9.20.13.3. Location of Flashing
[F20-OP2.3] Applies to elements that support or are part of (1) [F61, F62-OH1.1, OH1.2, OH1.3]
environmental separator. [F61, F62-OP2.1, OP2.3]
[F20-OS2.1] [F61, F62-OS2.1, OS2.3]
[F20-OS2.3] Applies to elements that support or are part of (2) [F61, F62-OH1.1, OH1.2, OH1.3]
an environmental separator. [F61, F62-OP2.1, OP2.3]
[F20-OS3.1] Applies to floors and elements that support [F61, F62-OS2.1, OS2.3]
floors.
9.20.13.4. Extension of Flashing
(2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator. (1) [F61-OH1.1, OH1.2, OH1.3]
[F20-OH4] Applies to floors and elements that support [F61-OP2.1, OP2.3]
floors. [F61-OS1.2] Applies to assemblies required to provide fire
[F20-OP2.1, OP2.4] resistance.
[F20-OP2.3] Applies to elements that support or are part of [F61-OS2.1, OS2.3]
an environmental separator. 9.20.13.5. Flashing for Weep Holes in Masonry Veneer/Masonry
[F20-OS2.1] Walls
[F20-OS2.3] Applies to elements that support or are part of (1) [F61, F62-OH1.1, OH1.2, OH1.3]
an environmental separator. [F61, F62-OP2.1, OP2.3]
[F20-OS3.1] Applies to floors and elements that support [F61-OS1.2] Applies to assemblies required to provide fire
floors. resistance.
9.20.12.3. Corbelling for Masonry Veneer [F61, F62-OS2.1, OS2.3]
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that 9.20.13.6. Flashing for Weep Holes in Masonry Veneer
support or are part of an environmental separator. (2) [F61, F62-OH1.1, OH1.2, OH1.3]
[F20-OP2.1] [F61, F62-OP2.1, OP2.3]
[F20-OP2.3] Applies to elements that support or are part of
[F61-OS1.2] Applies to assemblies required to provide fire
an environmental separator.
resistance.
[F20-OS2.1] [F61, F62-OS2.1, OS2.3]
[F20-OS2.3] Applies to elements that support or are part of
an environmental separator. (3) [F61-OH1.1, OH1.2, OH1.3]
(2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that [F61-OP2.1, OP2.3]
support or are part of an environmental separator. [F61-OS1.2] Applies to assemblies required to provide fire
resistance.
[F20-OP2.1]
[F20-OP2.3] Applies to elements that support or are part of [F61-OS2.1, OS2.3]
an environmental separator. 9.20.13.7. Flashing Joints
[F20-OS2.1] (1) [F61, F62-OH1.1, OH1.2, OH1.3]
[F20-OS2.3] Applies to elements that support or are part of [F61, F62-OP2.1, OP2.3]
an environmental separator. [F61-OS1.2] Applies to assemblies required to provide fire
9.20.13.1. Materials for Flashing resistance.
(1) [F80-OH1.1, OH1.2, OH1.3] [F61, F62-OS2.1, OS2.3]
[F20-OP2.1, OP2.3] 9.20.13.8. Required Weep Holes
[F80-OS1.2] Applies to assemblies required to provide fire (1) [F62-OH1.1, OH1.2, OH1.3]
resistance. [F62-OP2.1, OP2.3]
Page 120 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F62-OS1.2] Applies to assemblies required to provide fire [F20, F80-OS1.2] Applies to assemblies required to
resistance. provide fire resistance.
[F62-OS2.1, OS2.3] [F20, F80-OS1.3]
(3) [F61, F62-OH1.1, OH1.2, OH1.3] [F20, F80-OS2.1]
[F61, F62-OP2.1, OP2.3] [F20, F80-OS2.3] Applies to elements that support or are
[F61, F62-OS2.1, OS2.3] part of environmental separator or are exposed to
moisture.
9.20.13.9. Protection of Interior Finish
[F20, F80-OS3.1] Applies to floors and elements that
(1) [F61-OH1.1, OH1.2, OH1.3]
support floors.
[F61-OP2.1, OP2.3] [F20, F80-OS3.7] Applies to walls, and elements that
[F61-OS2.1, OS2.3] support walls, that contain doors or windows required for
(2) [F61, F62-OH1.1, OH1.2, OH1.3] emergency egress.
[F61, F62-OP2.1, OP2.3] 9.20.14.2. Protection from Weather
[F61, F62-OS2.1, OS2.3] (1) [F80-OP2.1, OP2.3]
9.20.13.10. Mortar Droppings [F80-OS2.1, OS2.3]
(1) [F61, F62-OH1.1, OH1.2, OH1.3] 9.20.15.1. Amount of Reinforcement
[F61, F62-OP2.1, OP2.3] (1) [F20-OP2.1, OP2.3]
[F61, F62-OS1.2] Applies to assemblies required to [F20-OS2.1, OS2.3]
provide fire resistance.
9.20.15.2. Installation Standard
[F61, F62-OS2.1, OS2.3]
(1) [F20-OP2.1, OP2.3]
9.20.13.12. Drips Beneath Window Sills
[F20-OS2.1, OS2.3]
(1) [F61, F62-OH1.1, OH1.2, OH1.3]
9.20.16.1. Corrosion Resistance of Connectors
[F61, F62-OP2.1, OP2.3]
(1) [F80-OH1.1, OH1.2, OH1.3] Applies to elements that
[F61, F62-OS1.2] Applies to assemblies required to support or are part of an environmental separator.
provide fire resistance.
[F80-OH4] Applies to floors and elements that support
[F61, F62-OS2.1, OS2.3]
floors.
9.20.14.1. Laying Temperature of Mortar and Masonry
[F80-OP2.1, OP2.4]
(1) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that [F80-OP2.3] Applies to elements that support or are part of
support or are part of an environmental separator. an environmental separator or are exposed to moisture.
[F20, F80-OH4] Applies to floors and elements that [F80-OS1.2] Applies to assemblies required to provide fire
support floors. resistance.
[F20, F80-OP2.1, OP2.4] [F80-OS2.1]
[F20, F80-OP2.3] Applies to elements that support or are [F80-OS2.3] Applies to elements that support or are part of
part of an environmental separator or are exposed to an environmental separator or are exposed to moisture.
moisture.
[F80-OS3.1] Applies to floors and elements that support
[F20, F80-OS1.2] Applies to assemblies required to
floors.
provide fire resistance. [F20, F80-OS1.3]
[F80-OS3.7] Applies to walls, and elements that support
[F20, F80-OS2.1] walls, that contain doors or windows required for
[F20, F80-OS2.3] Applies to elements that support or are emergency egress.
part of an environmental separator or are exposed to
moisture. 9.20.17.1. Thickness of Flat Insulating Concrete Form Walls
[F20, F80-OS3.1] Applies to floors and elements that (1) [F20-OP2.1]
support floors. [F22-OP2.4]
[F20, F80-OS3.7] Applies to walls, and elements that [F20, F22-OP2.3] Applies to elements that support or are
support walls, that contain doors or windows required for part of an environmental separator.
emergency egress. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
(2) [F20, F80-OH1.1, OH1.2, OH1.3] Applies to elements that support or are part of an environmental separator.
support or are part of an environmental separator. [F20, F22-OH4] Applies to floors and elements that
[F20, F80-OH4] Applies to floors and elements that support floors.
support floors. [F20-OS2.1]
[F20, F80-OP2.1, OP2.4] [F22-OS2.4]
[F20, F80-OP2.3] Applies to elements that support or are [F20, F22-OS2.3] Applies to elements that support or are
part of an environmental separator or are exposed to part of an environmental separator.
moisture. [F20, F22-OS3.1] Applies to floors and elements that
support floors.
SA-1 • Page 121
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OS3.7] Applies to walls, and elements that 9.20.17.3. Openings in Flat Non-Loadbearing Insulating
support walls, that contain doors or windows required for Concrete Form Walls
emergency egress. (1) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
9.20.17.2. Reinforcement for Flat Insulating Concrete Form [F20, F22-OH1.1, OH1.2, OH1.3]
Walls [F20, F22-OH4] Applies to floors and elements that
(1) [F20-OP2.1] support floors.
[F22-OP2.4] [F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4]
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OS3.1] Applies to floors and elements that
part of an environmental separator. support floors.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OS3.7] Applies to walls, and elements that
support or are part of an environmental separator. support walls, that contain doors or windows required for
[F20, F22-OH4] Applies to floors and elements that emergency.
support floors. (2) [F20-OP2.1]
[F20-OS2.1] [F22-OP2.4]
[F22-OS2.4] [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OS2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OS3.1] Applies to floors and elements that support or are part of an environmental separator.
support floors. [F20, F22-OH4] Applies to floors and elements that
[F20, F22-OS3.7] Applies to walls, and elements that support floors.
support walls, that contain doors or windows required for [F20-OS2.1]
emergency egress. [F22-OS2.4]
(2) [F20-OP2.1] [F20, F22-OS2.3] Applies to elements that support or are
[F22-OP2.4] part of an environmental separator.
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OS3.1] Applies to floors and elements that
part of an environmental separator. support floors.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OS3.7] Applies to walls, and elements that
support or are part of an environmental separator. support walls, that contain doors or windows required for
[F20, F22-OH4] Applies to floors and elements that emergency egress.
support floors. (3) [F20-OP2.1]
[F20-OS2.1] [F22-OP2.4]
[F22-OS2.4] [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OS2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OS3.1] Applies to floors and elements that support or are part of an environmental separator.
support floors. [F20, F22-OH4] Applies to floors and elements that
[F20, F22-OS3.7] Applies to walls, and elements that support floors.
support walls, that contain doors or windows required for [F20-OS2.1]
emergency egress. [F22-OS2.4]
(3) [F20-OP2.1] [F20, F22-OS2.3] Applies to elements that support or are
[F22-OP2.4] part of an environmental separator.
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OS3.1] Applies to floors and elements that
part of an environmental separator. support floors.
[F20-OS2.1] [F20, F22-OS3.7] Applies to walls, and elements that
[F22-OS2.4] support walls, that contain doors or windows required for
[F20, F22-OS2.3] Applies to elements that support or are emergency egress.
part of an environmental separator. (4) [F20-OP2.1] [F22-OP2.4]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OP2.3] Applies to elements that support or are
support or are part of an environmental separator. part of an environmental separator.
[F20, F22-OH4] Applies to floors and elements that [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support floors. support or are part of an environmental separator.
[F20, F22-OS3.1] Applies to floors and elements that [F20, F22-OH4] Applies to floors and elements that
support floors. support floors.
[F20, F22-OS3.7] Applies to walls, and elements that [F20-OS2.1]
support walls, that contain doors or windows required for [F22-OS2.4]
emergency egress.
Page 122 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OS3.7] Applies to walls, and elements that
part of an environmental separator. support walls, that contain doors or windows required for
[F20, F22-OS3.1] Applies to floors and elements that emergency egress.
support floors. (2) [F20-OP2.1]
[F20, F22-OS3.7] Applies to walls, and elements that [F22-OP2.4]
support walls, that contain doors or windows required for [F20, F22-OP2.3] Applies to elements that support or are
emergency egress. part of an environmental separator.
(5) [F20-OP2.1] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OP2.4] support or are part of an environmental separator.
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OH4] Applies to floors and elements that
part of an environmental separator. support floors.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.1]
support or are part of an environmental separator. [F22-OS2.4]
[F20, F22-OH4] Applies to floors and elements that [F20, F22-OS2.3] Applies to elements that support or are
support floors. part of an environmental separator.
[F20-OS2.1] [F20, F22-OS3.1] Applies to floors and elements that
[F22-OS2.4] support floors.
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OS3.7] Applies to walls, and elements that
part of an environmental separator. support walls, that contain doors or windows required for
[F20, F22-OS3.1] Applies to floors and elements that emergency egress.
support floors. (3) [F20-OP2.1]
[F20, F22-OS3.7] Applies to walls, and elements that [F22-OP2.4]
support walls, that contain doors or windows required for [F20, F22-OP2.3] Applies to elements that support or are
emergency egress. part of an environmental separator.
(6) [F20-OP2.1] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OP2.4] support or are part of an environmental separator.
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OH4] Applies to floors and elements that
part of an environmental separator. support floors.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.1]
support or are part of an environmental separator. [F22-OS2.4]
[F20, F22-OH4] Applies to floors and elements that [F20, F22-OS2.3] Applies to elements that support or are
support floors. part of an environmental separator.
[F20-OS2.1] [F20, F22-OS3.7] Applies to floors and elements that
[F22-OS2.4] support floors.
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OS3.7] Applies to walls, and elements that
part of an environmental separator. support walls, that contain doors or windows required for
[F20, F22-OS3.1] Applies to floors and elements that emergency egress.
support floors. (4) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OS3.7] Applies to walls, and elements that support or are part of an environmental separator.
support walls, that contain doors or windows required for [F20-OH4] Applies to floors and elements that support
emergency egress. floors.
9.20.17.4. Openings in Loadbearing Flat Insulating Concrete [F20-OP2.1]
Form Walls [F20-OP2.3] Applies to elements that support or are part of
(1) [F20-OP2.1] an environmental separator.
[F22-OP2.4] [F20-OS2.1]
[F20, F22-OP2.3] Applies to elements that support or are [F20-OS2.3] Applies to elements that support or are part of
part of an environmental separator. an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS3.1] Applies to floors and elements that support
support or are part of an environmental separator. floors.
[F20, F22-OH4] Applies to floors and elements that 9.20.17.5. Framing Supported on Flat Insulating Concrete Form
support floors. Walls
[F20-OS2.1] (1) [F20, F22-OH4]
[F22-OS2.4] [F20-OP2.1]
[F20, F22-OS2.3] Applies to elements that support or are [F22-OP2.4]
part of an environmental separator. [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OS3.1] Applies to floors and elements that part of an environmental separator.
support floors.
SA-1 • Page 123
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OS2.1] 9.21.1.4. Flue Pipes
[F22-OS2.4] (1) [F01-OP1.1] Applies to the walls of any chimney or flue
[F20, F22-OS2.3] Applies to elements that support or are pipe, which are required to be constructed to be flame-
part of an environmental separator. tight.
[F20, F22-OS3.1] [F01-OS1.1] Applies to the walls of any chimney or flue
(2) [F20, F22-OH4] pipe, which are required to be constructed to be flame-
[F20-OP2.1] tight.
[F22-OP2.4] [F44-OH1.1] Applies to the walls of any chimney or flue
[F20, F22-OP2.3] Applies to elements that support or are pipe, which are required to be constructed to be smoke-
part of an environmental separator. tight.
[F20-OS2.1] 9.21.2.1. Chimney Flue Limitations
[F22-OS2.4] (1) [F44-OH1.1]
[F20, F22-OS2.3] Applies to elements that support or are [F44-OS3.4]
part of an environmental separator.
(2) [F44-OH1.1]
[F20, F22-OS3.1]
[F44-OS3.4]
(3) [F20, F22-OH4]
(3) [F44-OH1.1]
[F20-OP2.1]
[F22-OP2.4] [F44-OS3.4]
[F20, F22-OP2.3] Applies to elements that support or are 9.21.2.2. Connections of More Than One Appliance
part of an environmental separator. (1) [F44-OH1.1]
[F20-OS2.1] [F44-OS3.4]
[F22-OS2.4] (2) [F44-OS3.4]
[F20, F22-OS2.3] Applies to elements that support or are (3) [F44-OH1.1]
part of an environmental separator.
[F44-OS3.4]
[F20, F22-OS3.1]
9.21.2.3. Inclined Chimney Flues
9.20.17.6. Anchoring of Roof Framing to Top of Flat Insulating
(1) [F44-OH1.1]
Concrete Form Walls
[F44-OS3.4]
(1) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
9.21.2.4. Size of Chimney Flues
[F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4]
(2) [F44-OH1.1]
[F20, F22-OH1.1, OH1.2, OH1.3]
[F44-OS3.4]
(2) [F20-OH1.1, OH1.2, OH1.3]
9.21.2.5. Fireplace Chimneys
[F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
(1) [F44-OH1.1]
[F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4]
[F44-OS3.4]
9.21.1.2. Chimney or Flue Pipe Walls
9.21.2.6. Oval Chimney Flues
(1) [F01-OP1.1] Applies to the walls of any chimney or flue
pipe, which are required to be constructed to be flame- (1) [F44-OH1.1]
tight. [F44-OS3.4]
[F01-OS1.1] Applies to the walls of any chimney or flue 9.21.3.1. Lining Materials
pipe, which are required to be constructed to be flame- (1) [F20-OH1.1]
tight. [F01-OS1.1]
[F44-OH1.1] Applies to the walls of any chimney or flue [F20-OS2.3]
pipe, which are required to be constructed to be smoke- [F44-OS3.4]
tight.
[F01, F20, F44-OP1.1]
9.21.1.3. Factory Built Chimneys
9.21.3.2. Joints in Chimney Liners
(1) [F01-OP1.1] Applies to the walls of any chimney or flue
(1) [F01-OP1.1]
pipe, which are required to be constructed to be flame-
tight. [F44-OH1.1]
[F01-OS1.1] Applies to the walls of any chimney or flue [F01-OS1.1]
pipe, which are required to be constructed to be flame- [F20, F44-OS2.3]
tight. [F01-OS3.4]
[F44-OH1.1] Applies to the walls of any chimney or flue (2) [F01-OP1.1]
pipe, which are required to be constructed to be smoke- [F44-OH1.1]
tight. [F01-OS1.1]
[F01-OS3.4]
Page 124 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.21.3.3. Clay Liners [F20-OS1.1]
(1) [F01-OS1.1] [F20-OS2.3]
[F20-OS2.2] [F44-OS3.4]
[F20, F44-OS3.4] 9.21.3.9. Mortar for Chimney Liners
[F01, F20-OP1.1] (1) [F20, F44-OH1.1]
[F20, F44-OH1.1] [F20, F44-OS3.4]
(2) [F01, F20-OP1.1] (a), (b) [F01, F20-OP1.1]
[F44-OH1.1] (a), (b) [F01, F20-OS1.1]
[F01, F20-OS1.1] (b) [F20-OS2.3]
[F20-OS2.3] Applies to the liners referred to in Sentence (2) [F01, F20-OP1.1]
(1), which are required to be not less than 15.9 mm thick. [F20, F44-OH1.1]
[F44-OS3.4] [F01, F20-OS1.1]
9.21.3.4. Firebrick Liners [F20-OS2.3]
(1) [F01-OP1.1] [F44-OS3.4]
[F01-OS1.1] 9.21.3.10. Extension of Chimney Liners
[F20, F44-OS3.4] (1) [F01-OP1.1]
[F44-OH1.1] [F01-OS1.1]
(2) [F01, F20-OP1.1] [F20-OS2.3]
[F20-OH1.1] [F44-OS3.4]
[F01, F20-OS1.1] [F20, F44-OH1.1]
[F20-OS2.2] 9.21.4.4. Height of Chimney Flues
[F20, F44-OS3.4] (1) (a), (b) [F44-OH1.1]
9.21.3.5. Concrete Liners (a), (b) [F44-OS3.4]
(1) [F01-OP1.1] 9.21.4.6. Chimney Caps
[F01, F20-OS1.1] (1) [F01-OP1.1]
[F20-OS2.3] [F20, F44-OH1.1]
[F20, F44-OS3.4] [F01-OS1.1]
[F44-OH1.1] [F20-OS2.3]
9.21.3.6. Metal Liners [F44-OS3.4]
(1) [F01, F20-OP1.1] (2) [F20-OS2.3]
[F20, F44-OH1.1] (3) [F01, F20-OP1.1]
[F01, F20-OS1.1] [F01, F20-OS1.1]
[F20-OS2.3] [F20-OS2.3]
[F20, F44-OS3.4] [F20, F44-OS3.4]
(2) [F20-OP1.1] (4) [F01, F20-OP1.1]
[F01, F20-OS1.1] [F20, F44-OH1.1]
[F20-OS2.3] [F01, F20-OS1.1]
[F20, F44-OS3.4] [F20-OS2.3]
[F44-OH1.1] [F20, F44-OS3.4]
9.21.3.7. Installation of Chimney Liners 9.21.4.7. Cleanout
(1) [F01-OP1.1] (1) [F01-OP1.1]
[F01-OS1.1] [F01-OS1.1]
[F20-OS2.3] 9.21.4.8. Wall Thickness
[F44-OS3.4] (1) [F01-OP1.1]
[F44-OH1.1] [F22-OP2.1]
9.21.3.8. Spaces Between Liners and Surrounding Masonry [F01-OS1.1]
(1) [F01-OP1.1] [F20, F22-OS2.1]
[F01-OS1.1] 9.21.4.9. Separation of Flue Liners
[F20-OS2.3] (1) [F01-OS1.1]
(2) [F01-OP1.1] [F20, F22-OS2.3]
[F44-OH1.1] [F44-OS3.4]
SA-1 • Page 125
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F01, F20-OP1.1] [F01-OS1.1]
[F20, F44-OH1.1] [F44-OS3.4]
(2) [F01-OS1.1] [F44-OH1.1]
[F20, F22-OS2.3] 9.22.3.1. Thickness of Walls
[F20, F44-OS3.4] (1) [F01-OP1.1]
[F20, F44-OH1.1] [F01-OS1.1]
9.21.4.10. Flashing (2) (a), (b) [F01-OP1.1]
(1) [F20, F61-OS2.3] (a), (b) [F01-OS1.1]
9.21.5.1. Clearance from Combustible Materials 9.22.4.1. Fire Chamber Dimensions
(1) (a), (b) [F01-OP1.1] (1) [F22-OH1.1]
(a), (b) [F01-OS1.1] [F44-OS3.4]
(2) [F01-OP1.1] 9.22.5.1. Hearth Extension
[F01-OS1.1] (1) [F01-OP1.1]
(3) [F01-OP1.1] [F01-OS1.1]
[F01-OS1.1] (2) (a), (b) [F01-OP1.1]
9.21.5.2. Sealing of Spaces (a), (b) [F01-OS1.1]
(1) [F01-OP1.1] 9.22.5.2. Support of Hearth
[F01-OS1.1] (1) [F01-OS1.1]
9.21.5.3. Support of Joists or Beams [F20-OS2.3]
(1) [F01-OP1.1] [F01, F20-OP1.1]
[F01-OS1.1] (2) [F01-OP1.1]
9.22.1.2. Masonry and Concrete [F01-OS1.1]
(2) [F22, F20-OS2.3] 9.22.6.1. Required Damper and Size
9.22.1.4. Combustion Air (1) [F01-OP1.1]
(0.1) [F50, F81-OH1.1] [F01-OS1.1]
[F44, F81-OS3.4] [F54-OH1.2]
(0.2) [F01, F80-OP1.1] [F03-OP1.2] 9.22.7.1. Slope of Smoke Chamber
[F01, F80-OS1.1] [F03-OS1.2] (1) [F44-OH1.1]
(0.3) [F50, F81-OH1.1] [F44-OS3.4]
[F44, F81-OS3.4] 9.22.7.2. Wall Thickness
(0.4) [F54-OH1.2] (1) [F01-OP1.1]
(0.5) [F50, F81-OH1.1] [F01-OS1.1]
[F44, F81-OS3.4] 9.22.8.1. Conformance to Standard
(0.6) (a) [F50, F81-OH1.1] (1) [F01-OP1.1]
(a) [F44, F81-OS3.4] [F01-OS1.1]
(b) [F03-OP1.2] [F44-OS3.4]
(b) [F03-OS1.2] [F44-OH1.1]
(1) [F01-OP1.1] 9.22.9.1. Clearance to the Fireplace Opening
[F01-OS1.1] (1) [F01-OP1.1]
9.22.2.1. Brick or Steel Liners [F01-OS1.1]
(1) [F01, F20-OP1.1] 9.22.9.2. Metal Exposed to the Interior
[F01, F20-OS1.1] (1) [F01-OP1.1]
9.22.2.2. Firebrick Liners [F01-OS1.1]
(1) (a), (b) [F01-OP1.1] 9.22.9.3. Clearance to Combustible Framing
(a), (b) [F01-OS1.1] (1) [F01-OP1.1]
(2) [F01-OP1.1] [F01-OS1.1]
[F01-OS1.1] (2) [F01-OP1.1]
(3) [F01-OP1.1] [F01-OS1.1]
[F01-OS1.1] 9.22.9.4. Heat Circulating Duct Outlets
9.22.2.3. Steel Liners (1) (a), (b) [F01-OS1.1]
(1) [F01-OP1.1] (a), (b) [F01-OP1.1]
Page 126 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.22.10.1. Appliance Standard [F81-OS1.2] Applies to assemblies required to provide fire
(1) [F01-OP1.1] resistance.
[F01-OS1.1] [F81-OS2.3]
[F44-OS3.4] [F81-OS3.1] Applies to floors and elements that support
[F44-OH1.1] floors.
9.22.10.2. Installation 9.23.2.3. Protection from Dampness
(1) [F01-OP1.1] (1) [F80-OP2.1, OP2.3, OP2.4]
[F01-OS1.1] [F80-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator.
[F44-OS3.4]
[F80-OH4] Applies to floors and elements that support
[F44-OH1.1]
floors.
(3) [F01-OP1.1]
[F80-OS1.2] Applies to assemblies required to provide fire
[F01-OS1.1] resistance.
[F44-OS3.4] [F80-OS2.1, OS2.3]
[F44-OH1.1] [F80-OS3.1] Applies to floors and elements that support
9.23.2.1. Strength and Rigidity floors.
(1) [F20-OP2.1] 9.23.2.4. Connection to Preservative Treated Wood
[F20, F22-OP2.4, OP2.5] (1) [F20,F80-OS2.3]
[F20, F22-OP2.3] Applies to elements that support or are
[F20,F80-OS2.3]
part of an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that (2) [F20,F80-OS2.3]
support or are part of an environmental separator. [F20,F80-OS2.3]
[F20, F22-OS1.2] Applies to assemblies required to (3) [F20,F80-OS2.3]
provide fire resistance. [F20,F80-OS2.3]
[F22-OH4] Applies to floors and elements that support 9.23.3.1. Standards for Nails and Screws
floors. (1) [F20-OP2.1]
[F20-OS2.1] [F20, F22-OP2.4, OP2.5]
[F20, F22-OS2.5] [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OS2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator. [F20, F22-OS1.2] Applies to assemblies required to
[F22-OS3.1] Applies to floors and elements that support provide fire resistance.
floors. [F20-OS2.1]
[F22-OS3.7] Applies to walls, and elements that support [F20, F22-OS2.5]
walls, that contain doors or windows required for [F20, F22-OS2.5] Applies to elements that support or are
emergency egress. part of an environmental separator.
9.23.2.2. Protection from Decay [F22-OS3.1] Applies to floors and elements that support
(1) [F80-OP2.3, OP2.4] floors.
[F80-OH1.1, OH1.2, OH1.3] Applies to elements that [F22-OS3.7] Applies to walls, and elements that support
support or are part of an environmental separator. walls, that contain doors or windows required for
[F80-OH4] Applies to floors and elements that support emergency egress.
floors. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F80-OS1.2] Applies to assemblies required to provide fire support or are part of an environmental separator.
resistance. [F22-OH4] Applies to floors and elements that support
[F80-OS2.3] floors.
[F80-OS3.1] Applies to floors and elements that support (2) [F20-OP2.1]
floors. [F20, F22-OP2.4, OP2.5]
[F80-OS3.7] Applies to walls, and elements that support [F20, F22-OP2.3] Applies to elements that support or are
walls, that contain doors or windows required for part of an environmental separator.
emergency egress. [F20, F22-OS1.2] Applies to assemblies required to
(2) [F81-OP2.3] provide fire resistance.
[F81-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.1]
support or are part of an environmental separator. [F20, F22-OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are
[F81-OH4] Applies to floors and elements that support
part of an environmental separator.
floors.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator.
SA-1 • Page 127
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F22-OH4] Applies to floors and elements that support [F20, F22-OP2.3] Applies to elements that support or are
floors. part of an environmental separator.
(3) [F20-OP2.1,OP2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F22-OP2.4,OP2.5] provide fire resistance.
[F20,F22-OP2.3] Applies to elements that support or are [F20-OS2.1]
part of an environmental separator [F20, F22-OS2.5]
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OS2.3] Applies to elements that support or are
provide fire resistance. part of an environmental separator.
[F20-OS2.1] [F22-OS3.1] Applies to floors and elements that support
[F20, F22-OS2.5] floors.
[F20, F22-OS2.3] Applies to elements that support or are [F22-OS3.7] Applies to walls, and elements that support
part of an environmental separator. walls, that contain doors or windows required for
[F22-OS3.1] Applies to floors and elements that support emergency egress.
floors. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OS3.7] Applies to walls, and elements that support support or are part of an environmental separator.
walls, that contain doors or windows required for [F22-OH4] Applies to floors and elements that support
emergency egress. floors.
9.23.3.2. Length of Nails (2) [F20-OP2.1, OP2.5]
(1) [F20-OP2.1, OP2.5] [F22-OP2.4, OP2.5]
[F22-OP2.4, OP2.5] [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OP2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator. [F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OS1.2] Applies to assemblies required to provide fire resistance.
provide fire resistance. [F20-OS2.1]
[F20-OS2.1] [F20, F22-OS2.5]
[F20, F22-OS2.5] [F20, F22-OS2.3] Applies to elements that support or are
[F20, F22-OS2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator. [F22-OS3.1] Applies to floors and elements that support
[F22-OS3.1] Applies to floors and elements that support floors.
floors. [F22-OS3.7] Applies to walls, and elements that support
[F22-OS3.7] Applies to walls, and elements that support walls, that contain doors or windows required for
walls, that contain doors or windows required for emergency egress.
emergency egress. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that support or are part of an environmental separator.
support or are part of an environmental separator. [F22-OH4] Applies to floors and elements that support
[F22-OH4] Applies to floors and elements that support floors.
floors. 9.23.3.5. Fastening for Sheathing or Subflooring
9.23.3.3. Prevention of Splitting (1) [F22-OH4] Applies to floors and elements that support
(1) [F80-OH1.1, OH1.2, OH1.3] Applies to elements that floors.
support or are part of an environmental separator. [F20,F22-OS1.2] Applies to assemblies required to
[F80-OH4] Applies to floors and elements that support provide fire resistance.
floors. [F22-OS3.1] Applies to floors and elements that support
[F80-OP2.1, OP2.4] floors.
[F80-OP2.3] Applies to elements that support or are part of [F22-OS3.7] Applies to walls, and elements that support
an environmental separator. walls, that contain doors or windows required for
[F80-OS1.2] Applies to assemblies required to provide fire emergency egress.
resistance. [F20-OS2.1]
[F80-OS2.1] [F20,F22-OS2.5]
[F80-OS2.3] Applies to elements that support or are part of [F20,F22-OS2.3] Applies to elements that support or are
an environmental separator. part of an environmental separator.
[F80-OS3.1] Applies to floors and elements that support [F20-OP2.1,OP2.5]
floors. [F22-OP2.4,OP2.5]
9.23.3.4. Nailing of Framing [F20,F22-OP2.3] Applies to elements that support or are
part of an environmental separator.
(1) [F20-OP2.1, OP2.5]
[F22-OP2.4, OP2.5] [F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that
support or are part of an environmental separator.
Page 128 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F22-OH4] Applies to floors and elements that support [F20, F22-OS2.5]
floors. [F20, F22-OS2.3] Applies to elements that support or are
[F22-OS3.1] Applies to floors and elements that support part of an environmental separator.
floors. [F22-OS3.1] Applies to floors and elements that support
[F22-OS3.7] Applies to walls, and elements that support floors.
walls, that contain doors or windows required for [F22-OS3.7] Applies to walls, and elements that support
emergency egress. walls, that contain doors or windows required for
[F20-OS2.1][F20, F22-OS2.5] emergency egress.
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
part of an environmental separator. support or are part of an environmental separator.
[F20-OP2.1][F20, F22-OP2.5] [F22-OH4] Applies to floors and elements that support
[F20, F22-OP2.3] Applies to elements that support or are floors.
part of an environmental separator. (7) [F20,F22-OS2.1]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OP2.1] [F22-OP2.4]
support or are part of an environmental separator. [F22-OH4] Applies to floors and elements that support
(3) [F22-OH4] Applies to floors and elements that support floors.
floors. [F22-OS3.1] Applies to floors and elements that support
[F22-OS3.1] Applies to floors and elements that support floors.
floors. [F20-OS1.2] Applies to assemblies required to provide
[F22-OS3.7] Applies to walls, and elements that support fire resistance.
walls, that contain doors or windows required for
emergency egress. (7.1) [F20-OP2.1, OP2.5] [F22-OP2.4, OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are
[F20-OS2.1][F20, F22-OS2.5] part of an environmental separator.
[F20, F22-OS2.3] Applies to elements that support or are
part of an environmental separator. [F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance.
[F20-OP2.1][F20, F22-OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are [F20-OS2.1]
part of an environmental separator. [F20, F22-OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that part of an environmental separator.
support or are part of an environmental separator.
F22-OS3.1] Applies to floors and elements that support
(5) [F20-OP2.1, OP2.5]
floors.
[F22-OP2.4, OP2.5]
[F22-OS3.7] Applies to walls, and elements that support
[F20, F22-OP2.3] Applies to elements that support or are
walls, that contain doors or windows required for
part of an environmental separator.
emergency egress.
[F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
provide fire resistance.
support or are part of an environmental separator.
[F20-OS2.1]
[F20, F22-OS2.5] [F22-OH4] Applies to floors and elements that support
[F20, F22-OS2.3] Applies to elements that support or are floors.
part of an environmental separator. (8) [F20-OS2.1] [F20,F22-OS2.5]
[F22-OS3.1] Applies to floors and elements that support [F20,F22-OS2.3] Applies to elements that support or are
floors. part of an environmental separator.
[F22-OS3.7] Applies to walls, and elements that support [F20-OP2.1,OP2.5] [F22-OP2.4,OP2.5]
walls, that contain doors or windows required for [F20,F22-OP2.3] Applies to elements that support or are
emergency egress. part of an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that
support or are part of an environmental separator. support or are part of an environmental separator.
[F22-OH4] Applies to floors and elements that support 9.23.4.2. Spans for Joists, Rafters and Beams
floors. (1) [F20-OP2.1, OP2.5]
(6) [F20-OP2.1, OP2.5] [F22-OP2.4, OP2.5]
[F22-OP2.4, OP2.5] [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OP2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OS1.2] Applies to assemblies required to support or are part of an environmental separator.
provide fire resistance. [F22-OH4] Applies to floors and elements that support
[F20-OS2.1] floors.
SA-1 • Page 129
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OP2.3] Applies to elements that support or are
provide fire resistance. part of an environmental separator.
[F20-OS2.1, OS2.5] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OS2.4, OS2.5] support or are part of an environmental separator.
[F20, F22-OS2.3] Applies to elements that support or are [F22-OH4] Applies to floors and elements that support
part of an environmental separator. floors.
[F22-OS3.1] Applies to floors and elements that support [F20, F22-OS1.2] Applies to assemblies required to
floors. provide fire resistance.
[F22-OS3.7] Applies to walls, and elements that support [F20-OS2.1, OS2.5]
walls, that contain doors or windows required for [F22-OS2.4, OS2.5]
emergency egress. [F20, F22-OS2.3] Applies to elements that support or are
(2) [F20-OP2.1, OP2.5] part of an environmental separator.
[F22-OP2.4, OP2.5] [F22-OS3.1] Applies to floors and elements that support
[F20, F22-OP2.3] Applies to elements that support or are floors.
part of an environmental separator. [F22-OS3.7] Applies to walls, and elements that support
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that walls, that contain doors or windows required for
support or are part of an environmental separator. emergency egress.
[F22-OH4] Applies to floors and elements that support 9.23.4.4. Concrete Topping
floors. (1) [F20-OP2.1, OP2.5]
[F20, F22-OS1.2] Applies to assemblies required to [F22-OP2.4, OP2.5]
provide fire resistance. [F20, F22-OP2.3] Applies to elements that support or are
[F20-OS2.1, OS2.5] part of an environmental separator.
[F22-OS2.4, OS2.5] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OS2.3] Applies to elements that support or are support or are part of an environmental separator.
part of an environmental separator.
[F22-OH4] Applies to floors and elements that support
[F22-OS3.1] Applies to floors and elements that support floors.
floors.
[F20, F22-OS1.2] Applies to assemblies required to
[F22-OS3.7] Applies to walls, and elements that support
provide fire resistance.
walls, that contain doors or windows required for
emergency egress. [F20-OS2.1, OS2.5]
[F22-OS2.4, OS2.5]
(3) [F20-OP2.1, OP2.3, OP2.5]
[F20, F22-OS2.3] Applies to elements that support or are
[F20-OS2.1, OS2.3, OS2.5] part of an environmental separator.
(4) [F20-OP2.1, OP2.3, OP2.5] [F22-OS3.1] Applies to floors and elements that support
[F20-OS2.1, OS2.3, OS2.5] floors.
9.23.4.3. Steel Beams [F22-OS3.7] Applies to walls, and elements that support
(1) [F20-OP2.1, OP2.5] walls, that contain doors or windows required for
[F22-OP2.4, OP2.5] emergency egress.
[F20, F22-OP2.3] Applies to elements that support or are (2) [F20-OP2.1, OP2.5]
part of an environmental separator. [F22-OP2.4, OP2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OP2.3] Applies to elements that support or are
support or are part of an environmental separator. part of an environmental separator.
[F22-OH4] Applies to floors and elements that support [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
floors. support or are part of an environmental separator.
[F20, F22-OS1.2] Applies to assemblies required to [F22-OH4] Applies to floors and elements that support
provide fire resistance. floors.
[F20-OS2.1, OS2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F22-OS2.4, OS2.5] provide fire resistance.
[F20, F22-OS2.3] Applies to elements that support or are [F20-OS2.1, OS2.5]
part of an environmental separator. [F22-OS2.4, OS2.5]
[F22-OS3.1] Applies to floors and elements that support [F20, F22-OS2.3] Applies to elements that support or are
floors. part of an environmental separator.
[F22-OS3.7] Applies to walls, and elements that support [F22-OS3.1] Applies to floors and elements that support
walls, that contain doors or windows required for floors.
emergency egress. [F22-OS3.7] Applies to walls, and elements that support
(2) [F20-OP2.1, OP2.5] walls, that contain doors or windows required for
[F22-OP2.4, OP2.5] emergency egress.
Page 130 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(3) [F20-OP2.1, OP2.5] [F22-OS3.7] Applies to walls, and elements that support
[F22-OP2.4, OP2.5] walls, that contain doors or windows required for
[F20, F22-OP2.3] Applies to elements that support or are emergency egress.
part of an environmental separator. 9.23.5.2. Notching of Framing Members
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that (1) [F20-OP2.1, OP2.5]
support or are part of an environmental separator. [F22-OP2.4, OP2.5]
[F22-OH4] Applies to floors and elements that support [F20, F22-OP2.3] Applies to elements that support or are
floors. part of an environmental separator.
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
provide fire resistance. support or are part of an environmental separator.
[F20-OS2.1, OS2.5] [F22-OH4] Applies to floors and elements that support
[F22-OS2.4, OS2.5] floors.
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OS1.2] Applies to assemblies required to
part of an environmental separator. provide fire resistance.
[F22-OS3.1] Applies to floors and elements that support [F20-OS2.1, OS2.5]
floors. [F22-OS2.5]
[F22-OS3.7] Applies to walls, and elements that support [F20, F22-OS2.3] Applies to elements that support or are
walls, that contain doors or windows required for part of an environmental separator.
emergency egress. [F22-OS3.1] Applies to floors and elements that support
9.23.4.5. Heavy Roofing Materials floors.
(1) [F20-OP2.1, OP2.5] [F22-OS3.7] Applies to walls, and elements that support
[F22-OP2.4, OP2.5] walls, that contain doors or windows required for
[F20, F22-OP2.3] Applies to elements that support or are emergency egress.
part of an environmental separator. 9.23.5.3. Wall Studs
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that (1) [F20-OP2.1, OP2.5]
support or are part of an environmental separator. [F22-OP2.4, OP2.5]
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OP2.3] Applies to elements that support or are
provide fire resistance. part of an environmental separator.
[F20-OS2.1, OS2.5] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OS2.4, OS2.5] support or are part of an environmental separator.
[F20, F22-OS2.3] Applies to elements that support or are [F22-OH4] Applies to floors and elements that support
part of an environmental separator. floors.
[F22-OS3.1] Applies to floors and elements that support [F20, F22-OS1.2] Applies to assemblies required to
floors. provide fire resistance.
[F22-OS3.7] Applies to walls, and elements that support [F20-OS2.1, OS2.5]
walls, that contain doors or windows required for [F22-OS2.5]
emergency egress. [F20, F22-OS2.3] Applies to elements that support or are
9.23.5.1. Holes Drilled in Framing Members part of an environmental separator.
(1) [F20-OP2.1, OP2.5] [F22-OS3.1] Applies to floors and elements that support
[F22-OP2.4, OP2.5] floors.
[F20, F22-OP2.3] Applies to elements that support or are [F22-OS3.7] Applies to walls, and elements that support
part of an environmental separator. walls, that contain doors or windows required for
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that emergency egress.
support or are part of an environmental separator. 9.23.5.4. Top Plates
[F22-OH4] Applies to floors and elements that support (1) [F20-OP2.1, OP2.5]
floors. [F22-OP2.4, OP2.5]
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OP2.3] Applies to elements that support or are
provide fire resistance. part of an environmental separator.
[F20-OS2.1, OS2.5] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OS2.5] support or are part of an environmental separator.
[F20, F22-OS2.3] Applies to elements that support or are [F22-OH4] Applies to floors and elements that support
part of an environmental separator. floors.
[F22-OS3.1] Applies to floors and elements that support [F20, F22-OS1.2] Applies to assemblies required to
floors. provide fire resistance.
[F20-OS2.1, OS2.5]
[F22-OS2.5]
SA-1 • Page 131
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator. part of an environmental separator.
[F22-OS3.1] Applies to floors and elements that support [F20-OS2.1, OS2.5]
floors. [F22-OS2.5]
[F22-OS3.7] Applies to walls, and elements that support [F20, F22-OS2.3] Applies to elements that support or are
walls, that contain doors or windows required for part of an environmental separator.
emergency egress. [F20-OS3.1] Applies to floors and elements that support
9.23.5.5. Roof Trusses floors.
(1) [F20-OP2.1, OP2.5] (4) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OP2.4, OP2.5] support or are part of an environmental separator.
[F20, F22-OP2.3] Applies to elements that support or are [F22-OH4] Applies to floors and elements that support
part of an environmental separator. floors
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OP2.1, OP2.5]
support or are part of an environmental separator. [F22-OP2.4, OP2.5]
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OP2.3] Applies to elements that support or are
provide fire resistance. part of an environmental separator.
[F20-OS2.1, OS2.5] [F20-OS2.1, OS2.5]
[F22-OS2.5] [F22-OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OS2.3] Applies to elements that support or are
part of an environmental separator. part of an environmental separator.
9.23.6.1. Anchorage of Building Frames [F20-OS3.1] Applies to floors and elements that support
(1) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that floors.
support or are part of an environmental separator. (5) [F20-OS2.1,OS2.5]
[F22-OH4] Applies to floors and elements that support [F22-OS2.5]
floors. [F20,F22-OS2.3] Applies to elements that support or are
part of an environmental separator.
[F20-OP2.1, OP2.5]
[F22-OP2.4, OP2.5] [F20-OP2.1,OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are [F22-OP2.4,OP2.5]
part of an environmental separator. [F20,F22-OP2.3] Applies to elements that support or are
part of an environmental separator.
[F20-OS2.1, OS2.5]
[F22-OS2.5] [F20-OH1.1,OH1.2,OH1.3] Applies to elements that
[F20, F22-OS2.3] Applies to elements that support or are support or are part of an environmental separator.
part of an environmental separator. [F22-OH4] Applies to floors and elements that support
[F20-OS3.1] Applies to floors and elements that support floors.
floors. [F20,F22-OS3.1] Applies to floors and elements that
(2) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that support floors.
support or are part of an environmental separator. (6) [F20-OS2.1,OS2.5] [F22-OS2.5]
[F22-OH4] Applies to floors and elements that support [F20,F22-OS2.3] Applies to elements that support or are
floors. part of an environmental separator.
[F20-OP2.1, OP2.5] [F20-OP2.1,OP2.5] [F22-OP2.4,OP2.5]
[F22-OP2.4, OP2.5] [F20,F22-OP2.3] Applies to elements that support or are
[F20, F22-OP2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator. [F20-OH1.1,OH1.2,OH1.3] Applies to elements that
[F20-OS2.1, OS2.5] support or are part of an environmental separator.
[F22-OS2.5] [F22-OH4] Applies to floors and elements that support
[F20, F22-OS2.3] Applies to elements that support or are floors.
part of an environmental separator. [F20-OS3.1] Applies to floors and elements that support
[F20-OS3.1] Applies to floors and elements that support floors.
floors. 9.23.6.2. Anchorage of Columns and Posts
(3) [F20-OH1.1, OH1.2, OH1.3] Applies to elements that (1) [F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator. support or are part of an environmental separator.
[F22-OH4] Applies to floors and elements that support [F22-OH4] Applies to floors and elements that support
floors. floors.
[F20-OP2.1, OP2.5] [F22-OP2.4, OP2.5]
[F22-OP2.4, OP2.5] [F22-OP2.3] Applies to elements that support or are part of
an environmental separator.
Page 132 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F22-OS2.4, OS2.5] [F20, F22-OS3.1] Applies to floors and elements that
[F22-OS2.3] Applies to elements that support or are part of support floors.
an environmental separator. 9.23.8.1. Bearing for Beams
[F22-OS3.1] Applies to floors and elements that support (1) [F20-OP2.1, OP2.5]
floors. [F22-OP2.4, OP2.5]
[F22-OS3.7] Applies to walls, and the elements that [F20, F22-OP2.3] Applies to elements that support or are
support walls, that contain doors or windows required for part of an environmental separator.
emergency egress. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
(2) [F22-OH1.1, OH1.2, OH1.3] Applies to elements that support or are part of an environmental separator.
support or are part of an environmental separator. [F22-OH4] Applies to floors and elements that support
[F22-OH4] Applies to floors and elements that support floors.
floors. [F22-OS1.2] Applies to assemblies required to provide fire
[F22-OP2.4, OP2.5] resistance.
[F22-OP2.3] Applies to elements that support or are part of [F20-OS2.1, OS2.5]
an environmental separator. [F22-OS2.5]
[F22-OS2.4, OS2.5] [F20, F22-OS2.3] Applies to elements that support or are
[F22-OS2.3] Applies to elements that support or are part of part of an environmental separator.
an environmental separator. [F22-OS3.1] Applies to floors and elements that support
[F22-OS3.1] floors.
[F22-OS3.7] Applies to floors and elements that support [F22-OS3.7] Applies to walls, and elements that support
floors. walls, that contain doors or windows required for
9.23.6.3. Anchorage of Smaller Buildings emergency egress.
(1) [F22-OS2.3, OS2.5] 9.23.8.2. Priming of Steel Beams
9.23.7.1. Size of Sill Plates (1) [F80-OH1.1, OH1.2, OH1.3] Applies to elements that
(1) [F20-OP2.1, OP2.5] support or are part of an environmental separator.
[F22-OP2.4, OP2.5] [F80-OH4] Applies to floors and elements that support
[F20, F22-OP2.3] Applies to elements that support or are floors.
part of an environmental separator. [F80-OP2.1, OP2.4]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F80-OP2.3] Applies to elements that support or are part of
support or are part of an environmental separator. an environmental separator.
[F22-OH4] Applies to floors and elements that support [F80-OS1.2] Applies to assemblies required to provide fire
floors. resistance.
[F22-OS1.2] Applies to assemblies required to provide fire [F80-OS2.1]
resistance. [F80-OS2.3] Applies to floors and elements that support
[F20-OS2.1, OS2.5] floors.
[F22-OS2.5] [F80-OS3.1] Applies to floors and elements that support
[F20, F22-OS2.3] Applies to elements that support or are floors.
part of an environmental separator. 9.23.8.3. Built-up Wood Beams
[F22-OS3.1] Applies to floors and elements that support (1) [F20-OP2.1]
floors. [F20-OS2.1]
[F22-OS3.7] Applies to walls, and elements that support
(2) [F20-OP2.1]
walls, that contain doors or windows required for
emergency egress. [F20-OS2.1]
9.23.7.2. Levelling of Sill Plates (3) [F20-OP2.1]
(1) [F20-OP2.1, OP2.5] [F20-OS2.1]
[F22-OP2.4, OP2.5] (4) [F20-OP2.1]
[F20, F22-OP2.3] Applies to elements that support or are [F20-OS2.1]
part of an environmental separator. (5) [F20-OP2.1]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.1]
support or are part of an environmental separator. (6) [F20-OP2.1]
[F20, F22-OH4] Applies to floors and elements that [F20-OS2.1]
support floors.
(7) [F20-OP2.1]
[F20-OS2.1, OS2.5] [F20-OS2.1]
[F22-OS2.4, OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are (8) [F20-OP2.1]
part of an environmental separator. [F20-OS2.1]
SA-1 • Page 133
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.23.9.1. End Bearing for Joists [F20-OS2.1, OS2.5]
(1) [F20-OP2.1, OP2.5] [F22-OS2.5]
[F22-OP2.4, OP2.5] [F20, F22-OS2.3] Applies to elements that support or are
[F20, F22-OP2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator. [F22-OS3.1]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F22-OS3.7] Applies to walls, and elements that support
support or are part of an environmental separator. walls, that contain doors or windows required for
[F22-OH4] emergency egress.
[F20, F22-OS1.2] Applies to assemblies required to (3) [F20-OP2.1, OP2.5]
provide fire resistance. [F22-OP2.4, OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are
[F20-OS2.1, OS2.5]
part of an environmental separator.
[F22-OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are [F22-OH4]
part of an environmental separator. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OS3.1] support or are part of an environmental separator.
(2) [F20-OP2.1, OP2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F22-OP2.4, OP2.5] provide fire resistance.
[F20, F22-OP2.3] Applies to elements that support or are [F20-OS2.1, OS2.5]
part of an environmental separator. [F22-OS2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OS2.3] Applies to elements that support or are
support or are part of an environmental separator. part of an environmental separator.
[F22-OH4] [F22-OS3.1]
[F22-OS3.7] Applies to walls, and elements that support
[F20, F22-OS1.2] Applies to assemblies required to
walls, that contain doors or windows required for
provide fire resistance.
emergency egress.
[F20-OS2.1, OS2.5]
(4) [F20-OP2.1, OP2.5]
[F22-OS2.5]
[F22-OP2.4, OP2.5]
[F20, F22-OS2.3] Applies to elements that support or are
[F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator.
part of an environmental separator.
[F22-OS3.1]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
9.23.9.2. Joists Supported by Beams support or are part of an environmental separator.
(1) [F20-OP2.1, OP2.5] [F22-OH4]
[F22-OP2.4, OP2.5]
[F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OP2.3] Applies to elements that support or are
provide fire resistance.
part of an environmental separator.
[F20-OS2.1, OS2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OS2.5]
support or are part of an environmental separator.
[F20, F22-OS2.3] Applies to elements that support or are
[F22-OH4] part of an environmental separator.
[F20, F22-OS1.2] Applies to assemblies required to [F22-OS3.1]
provide fire resistance. [F22-OS3.7] Applies to walls, and elements that support
[F20-OS2.1, OS2.5] walls, that contain doors or windows required for
[F22-OS2.5] emergency egress.
[F20, F22-OS2.3] Applies to elements that support or are (5) [F20-OP2.1, OP2.5]
part of an environmental separator. [F22-OP2.4, OP2.5]
[F22-OS3.1] [F20, F22-OP2.3] Applies to elements that support or are
[F22-OS3.7] Applies to walls, and elements that support part of an environmental separator.
walls, that contain doors or windows required for [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
emergency egress. support or are part of an environmental separator.
(2) [F20-OP2.1, OP2.5] [F22-OH4]
[F22-OP2.4, OP2.5]
[F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OP2.3] Applies to elements that support or are
provide fire resistance.
part of an environmental separator.
[F20-OS2.1, OS2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OS2.5]
support or are part of an environmental separator.
[F20, F22-OS2.3] Applies to elements that support or are
[F22-OH4] part of an environmental separator.
[F20, F22-OS1.2] Applies to assemblies required to [F22-OS3.1]
provide fire resistance.
Page 134 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F22-OS3.7] Applies to walls, and elements that support [F22-OS3.7] Applies to walls, and elements that support
walls, that contain doors or windows required for walls, that contain doors or windows required for
emergency egress. emergency egress.
9.23.9.3. Restraint of Joist Bottoms (3) [F20-OS2.1,OS2.5]
(1) [F20-OP2.1, OP2.5] [F22-OS2.5]
[F22-OP2.4, OP2.5] [F20,F22-OS2.3] Applies to elements that support or are
[F20, F22-OP2.3] Applies to elements that support or are part of an environmental separator
part of an environmental separator. [F20-OP2.1,OP2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F22-OP2.4,OP2.5]
support or are part of an environmental separator. [F20,F22-OP2.3] Applies to elements that support or are
[F22-OH4] part of an environmental separator.
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
provide fire resistance. support or are part of an environmental separator.
[F20-OS2.1, OS2.5] [F22-OH4]
[F22-OS2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OS2.3] Applies to elements that support or are provide fire resistance.
part of an environmental separator.
[F22-OS3.1]
[F22-OS3.1]
[F22-OS3.7] Applies to walls, and elements that support
[F22-OS3.7] Applies to walls, and elements that support
walls, that contain doors or windows required for
walls, that contain doors or windows required for
emergency egress. emergency egress.
9.23.9.4. Strapping, Bridging, Furring and Ceilings in Span (4) [F20-OS2.1, OS2.5]
Tables 9.23.4.2.-A and 9.23.4.2.-B [F22-OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are
(1) [F20-OP2.1, OP2.5]
part of an environmental separator.
[F22-OP2.4, OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are [F20-OP2.1,OP2.5]
part of an environmental separator. [F22-OP2.4,OP2.5]
[F20-OP2.1,OP2.5] [F20,F22-OP2.3] Applies to elements that support or are
[F22-OP2.4,OP2.5] part of an environmental separator.
[F20,F22-OP2.3] Applies to elements that support or are [F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that
part of an environmental separator. support or are part of an environmental separator.
[F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that [F22-OH4]
support or are part of an environmental separator. [F20, F22-OS1.2] Applies to assemblies required to
[F22-OH4] provide fire resistance.
[F20, F22-OS1.2] Applies to assemblies required to [F22-OS3.1]
provide fire resistance. [F22-OS3.7] Applies to walls, and elements that support
[F22-OS3.1] walls, that contain doors or windows required for
[F22-OS3.7] Applies to walls, and elements that support emergency egress.
walls, that contain doors or windows required for (5) [F20-OS2.1, OS2.5]
emergency egress. [F22-OS2.5]
(2) [F20-OS2.1,OS2.5] [F20, F22-OS2.3] Applies to elements that support or are
[F22-OS2.5] part of an environmental separator.
[F20,F22-OS2.3] Applies to elements that support or are
[F20-OP2.1,OP2.5]
part of an environmental separator
[F22-OP2.4,OP2.5]
[F20-OP2.1, OP2.5] [F20,F22-OP2.3] Applies to elements that support or are
[F22-OP2.4, OP2.5] part of an environmental separator.
[F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator. [F22-OH4]
[F22-OH4] [F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance.
[F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance. [F22-OS3.1]
[F22-OS3.7] Applies to walls, and elements that support
[F22-OS3.1]
walls, that contain doors or windows required for
emergency egress.
SA-1 • Page 135
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(6) [F20-OS2.1, OS2.5] 9.23.9.7. Support of Tail and Header Joists
[F22-O2.5] (1) [F20-OP2.1, OP2.5]
[F20, F22-OS2.3] Applies to elements that support or are [F22-OP2.4, OP2.5]
part of an environmental separator. [F20, F22-OP2.3] Applies to elements that support or are
[F20-OP2.1,OP2.5] part of an environmental separator.
[F22-OP2.4,OP2.5] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20,F22-OP2.3] Applies to elements that support or are support or are part of an environmental separator.
part of an environmental separator. [F22-OH4]
[F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that [F20, F22-OS1.2] Applies to assemblies required to
support or are part of an environmental separator. provide fire resistance.
[F22-OH4] [F20-OS2.1, OS2.5]
[F20, F22-OS1.2] Applies to assemblies required to [F22-OS2.5]
provide fire resistance. [F20, F22-OS2.3] Applies to elements that support or are
[F22-OS3.1] part of an environmental separator.
[F22-OS3.7] Applies to walls, and elements that support [F22-OS3.1]
walls, that contain doors or windows required for [F22-OS3.7] Applies to walls, and elements that support
emergency egress. walls, that contain doors or windows required for
9.23.9.5. Header Joists emergency egress.
(1) [F20-OP2.1, OP2.5] 9.23.9.8. Support of Walls
[F22-OP2.4, OP2.5] (1) [F20-OP2.1, OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are [F22-OP2.4, OP2.5]
part of an environmental separator. [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that part of an environmental separator.
support or are part of an environmental separator. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OH4] support or are part of an environmental separator.
[F20, F22-OS1.2] Applies to assemblies required to [F22-OH4]
provide fire resistance. [F20, F22-OS1.2] Applies to assemblies required to
[F20-OS2.1, OS2.5] provide fire resistance.
[F22-OS2.5] [F20-OS2.1, OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are [F22-OS2.5]
part of an environmental separator. [F20, F22-OS2.3] Applies to elements that support or are
[F22-OS3.1] part of an environmental separator.
[F22-OS3.7] Applies to walls, and elements that support [F22-OS3.1]
walls, that contain doors or windows required for [F22-OS3.7] Applies to walls, and elements that support
emergency egress. walls, that contain doors or windows required for
9.23.9.6. Trimmer Joists emergency egress.
(1) [F20-OP2.1, OP2.5] (2) [F20-OP2.1, OP2.5]
[F22-OP2.4, OP2.5] [F22-OP2.4, OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator. part of an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator. support or are part of an environmental separator.
[F22-OH4] [F22-OH4]
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance.
provide fire resistance.
[F20-OS2.1, OS2.5]
[F20-OS2.1, OS2.5]
[F22-OS2.5]
[F22-OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are
[F20, F22-OS2.3] Applies to elements that support or are
part of an environmental separator.
part of an environmental separator.
[F22-OS3.1]
[F22-OS3.1] [F22-OS3.7] Applies to walls, and elements that support
[F22-OS3.7] Applies to walls, and elements that support walls, that contain doors or windows required for
walls, that contain doors or windows required for emergency egress.
emergency egress.
(4) [F20-OP2.1, OP2.5]
[F22-OP2.4, OP2.5]
Page 136 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OS1.2] Applies to assemblies required to
part of an environmental separator. provide fire resistance.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.1, OS2.5]
support or are part of an environmental separator. [F22-OS2.5]
[F22-OH4] [F20, F22-OS2.3] Applies to elements that support or are
[F20, F22-OS1.2] Applies to assemblies required to part of an environmental separator.
provide fire resistance. [F22-OS3.1]
[F20-OS2.1, OS2.5] [F22-OS3.7] Applies to walls, and elements that support
[F22-OS2.5] walls, that contain doors or windows required for
[F20, F22-OS2.3] Applies to elements that support or are emergency egress.
part of an environmental separator. (2) [F20-OP2.1, OP2.5]
[F22-OS3.1] [F22-OP2.4, OP2.5]
[F22-OS3.7] Applies to walls, and elements that support [F20, F22-OP2.3] Applies to elements that support or are
walls, that contain doors or windows required for part of an environmental separator.
emergency egress. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
(5) [F20-OP2.1, OP2.5] support or are part of an environmental separator.
[F22-OP2.4, OP2.5] [F22-OH4]
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OS1.2] Applies to assemblies required to
part of an environmental separator. provide fire resistance.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.1, OS2.5]
support or are part of an environmental separator. [F22-OS2.5]
[F22-OH4] [F20, F22-OS2.3] Applies to elements that support or are
[F20, F22-OS1.2] Applies to assemblies required to part of an environmental separator.
provide fire resistance. [F22-OS3.1]
[F20-OS2.1, OS2.5] [F22-OS3.7] Applies to walls, and elements that support
[F22-OS2.5] walls, that contain doors or windows required for
[F20, F22-OS2.3] Applies to elements that support or are emergency egress.
part of an environmental separator. (3) [F20-OP2.1, OP2.5]
[F22-OS3.1] [F22-OP2.4, OP2.5]
[F22-OS3.7] Applies to walls, and elements that support [F20, F22-OP2.3] Applies to elements that support or are
walls, that contain doors or windows required for part of an environmental separator.
emergency egress. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
(6) [F22-OS3.1] support or are part of an environmental separator.
[F22-OS3.7] Applies to walls, and elements that support [F22-OH4]
walls, that contain doors or windows required for [F20, F22-OS1.2] Applies to assemblies required to
emergency egress. provide fire resistance.
[F20,F22-OS1.2] Applies to assemblies required to [F20-OS2.1, OS2.5]
provide fire resistance. [F22-OS2.5]
[F20-OP2.1,OP2.5] [F22-OP2.4,OP2.5] [F20, F22-OS2.3] Applies to elements that support or are
[F20,F22-OP2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator. [F22-OS3.1]
[F22-OH4] [F22-OS3.7] Applies to walls, and elements that support
[F20-OS2.1,OS2.5] [F22-OS2.5] walls, that contain doors or windows required for
[F20,F22-OS2.3] Applies to elements that support or are emergency egress.
part of an environmental separator. 9.23.10.1. Stud Size and Spacing
[F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that (1) [F20-OP2.1, OP2.5]
support or are part of an environmental separator. [F22-OP2.4, OP2.5]
9.23.9.9. Cantilevered Floor Joists [F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator.
(1) [F20-OP2.1, OP2.5]
[F22-OP2.4, OP2.5] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OP2.3] Applies to elements that support or are support or are part of an environmental separator.
part of an environmental separator. [F22-OH4] Applies to floors and elements that support
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that floors.
support or are part of an environmental separator. [F20, F22-OS1.2] Applies to assemblies required to
[F22-OH4] provide fire resistance.
[F20-OS2.1, OS2.5]
SA-1 • Page 137
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F22-OS2.5] (0.4) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OH1.1, OH1.2, OH1.3]
part of an environmental separator. [F20, F22-OH4] Applies to walls that support floors.
[F22-OS3.1] Applies to floors and elements that support [F20, F22-OS1.2] Applies to assemblies required to
floors. provide fire resistance.
[F22-OS3.7] Applies to walls, and elements that support
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.4, OS2.5]
walls, that contain doors or windows required for
emergency egress. [F22-OS3.1] Applies to walls that support floors.
[F22-OS3.7] Applies to walls that contain doors or
(2) [F20-OP2.1, OP2.5]
windows required for emergency egress.
[F22-OP2.4, OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are (1) [F20-OP2.1, OP2.5]
part of an environmental separator. [F22-OP2.4, OP2.5]
[F20, F22-OP2.3] Applies to walls that support or are part
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
of an environmental separator.
support or are part of an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to walls that
[F22-OH4] Applies to floors and elements that support
support of are part of an environmental separator.
floors.
[F22-OH4] Applies to walls that support floors.
[F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance. [F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance.
[F20-OS2.1, OS2.5]
[F22-OS2.5] [F20-OS2.1, OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are [F22-OS2.5]
part of an environmental separator. [F20, F22-OS2.3] Applies to walls that support or are part
of an environmental separator.
[F22-OS3.1] Applies to floors and elements that support
floors. [F22-OS3.1] Applies to walls that support floors.
[F22-OS3.7] Applies to walls, and elements that support [F22-OS3.7] Applies to walls that contain doors or
walls, that contain doors or windows required for windows required for emergency egress.
emergency egress. 9.23.10.3. Orientation of Studs
9.23.10.2. Bracing and Lateral Support (1) [F20-OP2.1, OP2.5]
(0.1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5] [F22-OP2.4, OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OH1.1, OH1.2, OH1.3]
part of an environmental separator.
[F20, F22-OH4] Applies to walls that support floors.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OS1.2] Applies to assemblies required to support or are part of an environmental separator.
provide fire resistance.
[F22-OH4] Applies to floors and elements that support
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.4, OS2.5] floors.
[F22-OS3.1] Applies to walls that support floors. [F20-OS2.1, OS2.5]
[F22-OS3.7] Applies to walls that contain doors or [F22-OS2.5]
windows required for emergency egress. [F20, F22-OS2.3] Applies to elements that support or are
(0.2) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5] part of an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] [F22-OS3.1] Applies to floors and elements that support
[F20, F22-OH4] Applies to walls that support floors. floors.
[F20, F22-OS1.2] Applies to assemblies required to [F22-OS3.7] Applies to walls, and elements that support
provide fire resistance. walls, that contain doors or windows required for
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.4, OS2.5] emergency egress.
[F22-OS3.1] Applies to walls that support floors. (3) [F20-OP2.1, OP2.5]
[F22-OS3.7] Applies to walls that contain doors or [F22-OP2.4, OP2.5]
windows required for emergency egress. [F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator.
(0.3) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OH1.1, OH1.2, OH1.3] support or are part of an environmental separator.
[F20, F22-OH4] Applies to walls that support floors. [F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OS1.2] Applies to assemblies required to provide fire resistance.
provide fire resistance. [F20-OS2.1, OS2.5]
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.4, OS2.5] [F22-OS2.5]
[F22-OS3.1] Applies to walls that support floors. [F20, F22-OS2.3] Applies to elements that support or are
[F22-OS3.7] Applies to walls that contain doors or part of an environmental separator.
windows required for emergency egress.
Page 138 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F22-OS3.1] Applies to floors and elements that support [F22-OS2.5]
floors. [F20, F22-OS2.3] Applies to elements that support or are
[F22-OS3.7] Applies to walls, and elements that support part of an environmental separator.
walls, that contain doors or windows required for [F22-OS3.1] Applies to floors and elements that support
emergency egress. floors.
9.23.10.4. Continuity of Studs [F22-OS3.7] Applies to walls, and elements that support
(1) [F20-OP2.1, OP2.5] walls, that contain doors or windows required for
[F22-OP2.4, OP2.5] emergency egress.
[F20, F22-OP2.3] Applies to elements that support or are 9.23.10.6. Studs at Sides of Openings
part of an environmental separator. (1) [F20-OS2.1, OS2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F22-OS2.5]
support or are part of an environmental separator. [F20, F22-OS2.3] Applies to elements that support or are
[F22-OH4] Applies to floors and elements that support part of an environmental separator.
floors. [F20-OP2.1,OP2.5]
[F20, F22-OS1.2] Applies to assemblies required to [F22-OP2.4,OP2.5]
provide fire resistance. [F20,F22-OP2.3] Applies to elements that support or are
[F20-OS2.1, OS2.5] part of an environmental separator.
[F22-OS2.5] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OS2.3] Applies to elements that support or are support or are part of an environmental separator.
part of an environmental separator. [F20, F22-OH4] Applies to floors and elements that
[F22-OS3.1] Applies to floors and elements that support support floors.
floors. [F20,F22-OS3.1] Applies to floors and elements that
[F22-OS3.7] Applies to walls, and elements that support support floors.
walls, that contain doors or windows required for [F20,F22-OS3.7] Applies to walls, and elements that
emergency egress. support walls, that contain doors or windows required
9.23.10.5. Support for Cladding Materials for emergency egress.
(1) [F20-OP2.1, OP2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F22-OP2.4, OP2.5] provide fire resistance.
[F20, F22-OP2.3] Applies to elements that support or are (2) [F20-OS2.1, OS2.5]
part of an environmental separator. [F22-OS2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OS2.3] Applies to elements that support or are
support or are part of an environmental separator. part of an environmental separator.
[F22-OH4] Applies to floors and elements that support [F20-OP2.1,OP2.5]
floors. [F22-OP2.4,OP2.5]
[F20, F22-OS1.2] Applies to assemblies required to [F20,F22-OP2.3] Applies to elements that support or are
provide fire resistance. part of an environmental separator.
[F22-OS2.1, OS2.5] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OS2.5] support or are part of an environmental separator.
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OH4] Applies to floors and elements that
part of an environmental separator. support floors.
[F22-OS3.1] Applies to floors and elements that support [F20,F22-OS3.1] Applies to floors and elements that
floors. support floors.
[F22-OS3.7] Applies to walls, and elements that support [F20,F22-OS3.7] Applies to walls, and elements that
walls, that contain doors or windows required for support walls, that contain doors or windows required
emergency egress. for emergency egress.
(2) [F20-OP2.1, OP2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F22-OP2.4, OP2.5] provide fire resistance.
[F20, F22-OP2.3] Applies to elements that support or are (3) (b) [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements
part of an environmental separator. that support or are part of an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that (b) [F20, F22-OH4] Applies to floors and elements that
support or are part of an environmental separator. support floors
[F22-OH4] Applies to floors and elements that support (b) [F20, F22-OS1.2] Applies to assemblies required to
floors. provide fire resistance.
[F20, F22-OS1.2] Applies to assemblies required to (b) [F20, F22-OS3.1] Applies floors and elements that
provide fire resistance. support floors
[F22-OS2.1, OS2.5]
SA-1 • Page 139
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(b) [F20, F22-OS3.7] Applies walls, and elements that [F20, F22-OP2.3] Applies to elements that support or are
support walls, that contain doors or windows required for part of an environmental separator.
emergency egress. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20-OP2.1] support or are part of an environmental separator.
(b) [F20-OP2.5] [F22-OH4] Applies to floors and elements that support
(b) [F20-OP2.4, OP2.5] floors.
(b) [F20, F22-OP2.3] Applies to elements that support or [F20, F22-OS1.2] Applies to assemblies required to
are part of an environmental separator. provide fire resistance.
F20-OS2.1] [F20-OS2.1, OS2.5]
(b) [F20, F22-OS2.5] [F22-OS2.5]
(b) [F20, F22-OS2.3] Applies to elements that support or [F20, F22-OS2.3] Applies to elements that support or are
are part of an environmental separator. part of an environmental separator.
9.23.10.7. Stud Posts Built into Walls [F22-OS3.1] Applies to floors and elements that support
(2) [F20-OP2.1, OP2.5] floors.
[F22-OP2.4, OP2.5] [F22-OS3.7] Applies to walls, and elements that support
[F20, F22-OP2.3] Applies to elements that support or are walls, that contain doors or windows required for
part of an environmental separator. emergency egress.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that (2) [F20-OP2.1, OP2.5]
support or are part of an environmental separator. [F22-OP2.4, OP2.5]
[F22-OH4] Applies to floors and elements that support [F20, F22-OP2.3] Applies to elements that support or are
floors. part of an environmental separator.
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
provide fire resistance. support or are part of an environmental separator.
[F22-OS2.1, OS2.5] [F22-OH4] Applies to floors and elements that support
[F22-OS2.5] floors.
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OS1.2] Applies to assemblies required to
part of an environmental separator. provide fire resistance.
[F22-OS3.1] Applies to floors and elements that support [F20-OS2.1, OS2.5]
floors. [F22-OS2.5]
[F22-OS3.7] Applies to walls, and elements that support [F20, F22-OS2.3] Applies to elements that support or are
walls, that contain doors or windows required for part of an environmental separator.
emergency egress. [F22-OS3.1] Applies to floors and elements that support
(3) [F20-OP2.1, OP2.5] floors.
[F22-OP2.4, OP2.5] [F22-OS3.7] Applies to walls, and elements that support
[F20, F22-OP2.3] Applies to elements that support or are walls, that contain doors or windows required for
part of an environmental separator. emergency egress.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that 9.23.11.2. Bottom Wall Plates
support or are part of an environmental separator. (1) [F20-OP2.1, OP2.5]
[F22-OH4] Applies to floors and roofs and elements that [F22-OP2.4, OP2.5]
support floors and roofs. [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OS1.2] Applies to assemblies required to part of an environmental separator.
provide fire resistance. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OS2.1, OS2.5] support or are part of an environmental separator.
[F22-OS2.5] [F22-OH4] Applies to floors and elements that support
[F20, F22-OS2.3] Applies to elements that support or are floors.
part of an environmental separator. [F20, F22-OS1.2] Applies to assemblies required to
[F22-OS3.1] Applies to floors and roofs and elements that provide fire resistance.
support floors and roofs. [F20-OS2.1, OS2.5]
[F22-OS3.7] Applies to walls, and elements that support [F22-OS2.5]
walls, that contain doors or windows required for [F20, F22-OS2.3] Applies to elements that support or are
emergency egress. part of an environmental separator.
9.23.11.1. Size of Wall Plates [F22-OS3.1] Applies to floors and elements that support
(1) [F20-OP2.1, OP2.5] floors.
[F22-OP2.4, OP2.5] [F22-OS3.7] Applies to walls, and elements that support
walls, that contain doors or windows required for
emergency egress.
Page 140 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5] [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OH1.1, OH1.2, OH1.3] support or are part of an environmental separator.
[F22-OH4] Applies to floors and elements that support [F22-OH4] Applies to floors and elements that support
floors. floors.
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance. provide fire resistance.
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5] [F20-OS2.1, OS2.5]
[F22-OS3.1] Applies to floors and elements that support [F22-OS2.5]
floors. [F20, F22-OS2.3] Applies to elements that support or are
[F22-OS3.7] Applies to walls, and elements that support part of an environmental separator.
walls, that contain doors or windows required for [F22-OS3.1] Applies to floors and elements that support
emergency egress. floors.
9.23.11.3. Top Plates [F22-OS3.7] Applies to walls, and elements that support
walls, that contain doors or windows required for
(1) [F20-OP2.1, OP2.5]
emergency egress.
[F22-OP2.4, OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are (4) [F20-OP2.1, OP2.5]
part of an environmental separator. [F22-OP2.4, OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
part of an environmental separator.
support or are part of an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OH4] Applies to floors and elements that support
support or are part of an environmental separator.
floors.
[F22-OH4] Applies to floors and elements that support
[F20, F22-OS1.2] Applies to assemblies required to
floors.
provide fire resistance.
[F20, F22-OS1.2] Applies to assemblies required to
[F20-OS2.1, OS2.5]
provide fire resistance.
[F22-OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are [F20-OS2.1, OS2.5]
part of an environmental separator. [F22-OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are
[F22-OS3.1] Applies to floors and elements that support
part of an environmental separator.
floors.
[F22-OS3.7] Applies to walls, and elements that support [F22-OS3.1] Applies to floors and elements that support
walls, that contain doors or windows required for floors.
emergency egress. [F22-OS3.7] Applies to walls, and elements that support
walls, that contain doors or windows required for
(2) [F20-OP2.1, OP2.5]
emergency egress.
[F22-OP2.4, OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are 9.23.11.4. Joints in Top Plates
part of an environmental separator. (1) [F20-OP2.1, OP2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F22-OP2.4, OP2.5]
support or are part of an environmental separator. [F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator.
[F22-OH4] Applies to floors and elements that support
floors. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator.
[F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance. [F22-OH4] Applies to floors and elements that support
floors.
[F20-OS2.1, OS2.5]
[F22-OS2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OS2.3] Applies to elements that support or are provide fire resistance.
part of an environmental separator. [F20-OS2.1, OS2.5]
[F22-OS3.1] Applies to floors and elements that support [F22-OS2.5]
floors. [F20, F22-OS2.3] Applies to elements that support or are
[F22-OS3.7] Applies to walls, and elements that support part of an environmental separator.
walls, that contain doors or windows required for [F22-OS3.1] Applies to floors and elements that support
emergency egress. floors.
(3) [F20-OP2.1, OP2.5] [F22-OS3.7] Applies to walls, and elements that support
[F22-OP2.4, OP2.5] walls, that contain doors or windows required for
[F20, F22-OP2.3] Applies to elements that support or are emergency egress.
part of an environmental separator. (2) [F20-OP2.1, OP2.5]
[F22-OP2.4, OP2.5]
SA-1 • Page 141
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OP2.3] Applies to elements that support or are [F20, F22-OS2.3] Applies to elements that support or are
part of an environmental separator. part of an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OP2.1, OP2.5]
support or are part of an environmental separator. [F22-OP2.4, OP2.5]
[F22-OH4] Applies to floors and elements that support [F20, F22-OP2.3] Applies to elements that support or are
floors. part of an environmental separator.
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
provide fire resistance. support or are part of an environmental separator.
[F20-OS2.1, OS2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F22-OS2.5] provide fire resistance.
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OS1.2] Applies to assemblies required to
part of an environmental separator. provide fire resistance.
[F22-OS3.1] Applies to floors and elements that support [F22-OS3.1] Applies to floors and elements that support
floors. floors.
[F22-OS3.7] Applies to walls, and elements that support [F22-OS3.7] Applies to walls, and elements that support
walls, that contain doors or windows required for walls, that contain doors or windows required for
emergency egress. emergency egress.
(3) [F20-OP2.1, OP2.5] 9.23.12.1. Openings in Non-Loadbearing Walls
[F22-OP2.4, OP2.5] (1) [F20-OP2.1, OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are [F22-OP2.4, OP2.5]
part of an environmental separator. [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that part of an environmental separator.
support or are part of an environmental separator. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F22-OH4] Applies to floors and elements that support support or are part of an environmental separator.
floors. [F20-OS2.1, OS2.5]
[F20, F22-OS1.2] Applies to assemblies required to [F22-OS2.5]
provide fire resistance. [F20, F22-OS2.3] Applies to elements that support or are
[F20-OS2.1, OS2.5] part of an environmental separator.
[F22-OS2.5] [F22-OS3.1] Applies to floors and elements that support
[F20, F22-OS2.3] Applies to elements that support or are floors.
part of an environmental separator. [F22-OS3.7] Applies to walls, and elements that support
[F22-OS3.1] Applies to floors and elements that support walls, that contain doors or windows required for
floors. emergency egress.
[F22-OS3.7] Applies to walls, and elements that support (2) [F20, F22-OS1.2]
walls, that contain doors or windows required for 9.23.12.2. Openings in Loadbearing Walls
emergency egress. (1) [F20-OP2.1, OP2.5]
(4) [F20-OP2.1, OP2.5] [F22-OP2.4, OP2.5]
[F22-OP2.4, OP2.5] [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OP2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that support or are part of an environmental separator.
support or are part of an environmental separator. [F22-OH4] Applies to floors and elements that support
[F22-OH4] Applies to floors and elements that support floors.
floors. [F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OS1.2] Applies to assemblies required to provide fire resistance.
provide fire resistance. [F20-OS2.1, OS2.5]
[F20-OS2.1, OS2.5] [F22-OS2.5]
[F22-OS2.5] [F20, F22-OS2.3] Applies to elements that support or are
[F20, F22-OS2.3] Applies to elements that support or are part of an environmental separator.
part of an environmental separator. [F22-OS3.1] Applies to floors and elements that support
[F22-OS3.1] Applies to floors and elements that support floors.
floors. [F22-OS3.7] Applies to walls, and elements that support
[F22-OS3.7] Applies to walls, and elements that support walls, that contain doors or windows required for
walls, that contain doors or windows required for emergency egress.
emergency egress. (2) [F20-OP2.1, OP2.5]
(5) [F20-OS2.1, OS2.5] [F22-OP2.4, OP2.5]
[F22-OS2.5]
Page 142 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OP2.3] Applies to elements that support or are [F22-OS3.7] Applies to walls, and elements that support
part of an environmental separator. walls, that contain doors or windows required for
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that emergency egress.
support or are part of an environmental separator. (3) [F20-OP2.1, OP2.5]
[F22-OH4] Applies to floors and elements that support [F22-OP2.4, OP2.5]
floors. [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OS1.2] Applies to assemblies required to part of an environmental separator.
provide fire resistance. [F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
[F20-OS2.1, OS2.5] support or are part of an environmental separator.
[F22-OS2.5] [F22-OH4] Applies to floors and elements that support
[F20, F22-OS2.3] Applies to elements that support or are floors.
part of an environmental separator. [F20, F22-OS1.2] Applies to assemblies required to
[F22-OS3.1] Applies to floors and elements that support provide fire resistance.
floors. [F20-OS2.1, OS2.5]
[F22-OS3.7] Applies to walls, and elements that support [F22-OS2.5]
walls, that contain doors or windows required for [F20, F22-OS2.3] Applies to elements that support or are
emergency egress. part of an environmental separator.
(3) [F22-OS3.1] Applies to floors and elements that support
9.23.12.3. Lintel Spans and Sizes floors.
(1) [F20-OP2.1, OP2.5] [F22-OS3.7] Applies to walls, and elements that support
[F22-OP2.4, OP2.5] walls, that contain doors or windows required for
[F20, F22-OP2.3] Applies to elements that support or are emergency egress.
part of an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator.
[F22-OH4] Applies to floors and elements that support
floors.
[F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance.
[F20-OS2.1, OS2.5]
[F22-OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are
part of an environmental separator.
[F22-OS3.1] Applies to floors and elements that support
floors.
[F22-OS3.7] Applies to walls, and elements that support
walls, that contain doors or windows required for
emergency egress.
(2) [F20-OP2.1, OP2.5]
[F22-OP2.4, OP2.5]
[F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator.
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator.
[F22-OH4] Applies to floors and elements that support
floors.
[F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance.
[F20-OS2.1, OS2.5]
[F22-OS2.5]
[F20, F22-OS2.3] Applies to elements that support or are
part of an environmental separator.
[F22-OS3.1] Applies to floors and elements that support
floors.
SA-1 • Page 143
2024 MMAH Supplementary Standard SA-1
Acceptable
Objectives and Functional Statements
Solutions
9.23.13.1 Requirements for Low to Moderate Wind and Seismic
Forces
(2) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5]
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
[F20,F22-OH1.1,OH1.2,OH1.3]
[F20,F22-OS1.2] Applies to assemblies required to provide
fire resistance.
[F22-OS3.1] Applies to walls that support floors.
[F22-OS3.7] Applies to walls that contain doors or windows
required for emergency egress.
[F20,F22-OH4] Applies to walls that support floors
9.23.13.4. Braced Wall Bands
(1) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5]
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
[F20,F22-OS1.2] Applies to assemblies required to provide
fire resistance.
[F22-OS3.1] Applies to walls that support floors.
[F22-OS3.7] Applies to walls that contain doors or windows
required for emergency egress.
[F20,F22-OH4] Applies to walls that support floors.
[F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that
support or are part of an environmental separator.
(2) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5]
F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
F20,F22-OH1.1,OH1.2,OH1.3]
[F20,F22-OS1.2] Applies to assemblies required to provide
fire resistance.
F22-OS3.1] Applies to walls that support floors.
[F22-OS3.7] Applies to walls that contain doors or windows
required for emergency egress.
F20,F22-OH4] Applies to walls that support floors.
(3) F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5]
F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
F20,F22-OS1.2] Applies to assemblies required to provide
fire resistance.
[F22-OS3.1] Applies to walls that support floors.
[F22-OS3.7] Applies to walls that contain doors or windows
required for emergency egress.
[F20,F22-OH4] Applies to walls that support floors.
F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that
support or are part of an environmental separator
9.23.13.5 Braced Wall Panels in Braced Wall Bands
(1) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5]
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
[F20,F22-OS1.2] Applies to assemblies required to provide
fire resistance.
[F22-OS3.1] Applies to walls that support floors.
[F22-OS3.7] Applies to walls that contain doors or windows
required for emergency egress.
[F20,F22-OH4] Applies to walls that support floors.
[F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that
support or are part of an environmental separator
(2) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5]
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
Page 144 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable
Objectives and Functional Statements
Solutions
[F20,F22-OS1.2] Applies to assemblies required to provide
fire resistance.
[F22-OS3.1] Applies to walls that support floors.
[F22-OS3.7] Applies to walls that contain doors or windows
required for emergency egress.
[F20,F22-OH4] Applies to walls that support floors.
[F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that
support or are part of an environmental separator.
9.23.13.6 Materials in Braced Wall Panels
(1) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5]
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
[F20,F22-OS1.2] Applies to assemblies required to provide
fire resistance.
[F22-OS3.1] Applies to walls that support floors.
[F22-OS3.7] Applies to walls that contain doors or windows
required for emergency egress.
[F20,F22-OH4] Applies to walls that support floors.
[F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that
support or are part of an environmental separator.
(2) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5]
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
[F20,F22-OS1.2] Applies to assemblies required to provide
fire resistance.
[F22-OS3.1] Applies to walls that support floors.
[F20,F22-OH4] Applies to walls that support floors
(4) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5]
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
[F20,F22-OS1.2] Applies to assemblies required to provide
fire resistance.
[F22-OS3.1] Applies to walls that support floors.
[F22-OS3.7] Applies to walls that contain doors or windows
required for emergency egress.
[F20,F22-OH4] Applies to walls that support floors.
[F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that
support or are part of an environmental separator
(5) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5]
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
[F20,F22-OS1.2] Applies to assemblies required to provide
fire resistance.
[F22-OS3.1] Applies to walls that support floors.
[F22-OS3.7] Applies to walls that contain doors or windows
required for emergency egress.
[F20,F22-OH4] Applies to walls that support floors.
[F20,F22-OH1.1,OH1.2,OH1.3]
(6) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5]
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
[F20,F22-OS1.2] Applies to assemblies required to provide
fire resistance.
[F22-OS3.1] Applies to walls that support floors.
[F22-OS3.7] Applies to walls that contain doors or windows
required for emergency egress
[F20,F22-OH4] Applies to walls that support floors.
[F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that
support or are part of an environmental separator.
SA-1 • Page 145
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.23.13.7 Additional System Considerations [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
(7) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5] (2) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5]
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5] [F20, F22-OH1.1, OH1.2, OH1.3]
[F20,F22-OS1.2] Applies to assemblies required to provide [F20, F22-OS1.2] Applies to assemblies required to
fire resistance. provide fire resistance.
[F22-OS3.1] Applies to walls that support floors. [F22- [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
OS3.7] Applies to walls that contain doors or windows (3) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5]
required for emergency egress. [F20, F22-OH1.1, OH1.2, OH1.3]
[F20,F22-OH4] Applies to walls that support floors. [F20, F22-OS1.2] Applies to assemblies required to
[F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that provide fire resistance.
support or are part of an environmental separator. [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
9.23.14.1. Continuity of Rafters and Joists 9.23.14.5. Shaping of Rafters
(1) [F20-OP2.1, OP2.5] (1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5]
[F22-OP2.5] [F20, F22-OH1.1, OH1.2, OH1.3]
[F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OS1.2] Applies to assemblies required to
part of an environmental separator.
provide fire resistance.
[F20-OS2.1, OS2.5]
[F22-OS2.5] [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
[F20, F22-OS1.3] Applies to elements that support or are 9.23.14.6. Hip and Valley Rafters
part of an environmental separator. (1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
support or are part of an environmental separator. [F20, F22-OH1.1, OH1.2, OH1.3]
[F20, F22-OS1.2] Applies to assemblies required to 9.23.14.7. Intermediate Support for Rafters and Joists
provide fire resistance. (1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5]
9.23.14.2. Framing around Openings [F20, F22-OH1.1, OH1.2, OH1.3]
(1) [F20-OP2.1, OP2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F22-OP2.5] provide fire resistance.
[F20, F22-OP2.3] Applies to elements that support or are [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
part of an environmental separator.
(2) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that
support or are part of an environmental separator. [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
[F20-OS2.1, OS2.5] (4) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5]
[F22-OS2.5] [F20, F22-OH1.1, OH1.2, OH1.3]
[F20, F22-OS2.3] Applies to elements that support or are [F20, F22-OS1.2] Applies to assemblies required to
part of an environmental separator. provide fire resistance.
[F20, F22-OS1.2] Applies to assemblies required to [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
provide fire resistance. (5) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5]
9.23.14.3. End Bearing Length [F20, F22-OH1.1, OH1.2, OH1.3]
(1) [F20-OP2.1, OP2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F22-OP2.5] provide fire resistance.
[F20, F22-OP2.3] Applies to elements that support or are [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
part of an environmental separator. (6) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to elements that [F20, F22-OH1.1, OH1.2, OH1.3]
support or are part of an environmental separator.
[F22-OH4]
[F20-OS2.1, OS2.5]
[F20, F22-OS1.2] Applies to assemblies required to
[F22-OS2.5]
provide fire resistance.
[F20, F22-OS2.3] Applies to elements that support or are
part of an environmental separator. [F22-OS3.1] Applies to floors and elements that support
[F20, F22-OS1.2] Applies to assemblies required to floors.
provide fire resistance. [F22-OS3.7] Applies to walls, and elements that support
walls, that contain doors or windows required for
9.23.14.4. Location and Attachment of Rafters emergency egress.
(1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5] [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] 9.23.14.8. Ridge Support
[F20, F22-OS1.2] Applies to assemblies required to (1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
provide fire resistance.
[F20, F22-OH1.1, OH1.2, OH1.3]
Page 146 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OS1.2] Applies to assemblies required to (9) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
provide fire resistance. [F20, F22-OH1.1, OH1.2, OH1.3]
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5] [F20, F22-OS1.2] Applies to assemblies required to
[F22-OS3.7] Applies to walls, and elements that support provide fire resistance.
walls, that contain doors or windows required for [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
emergency egress. [F22-OS3.7] Applies to walls, and elements that support
(3) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5] walls, that contain doors or windows required for
[F20, F22-OH1.1, OH1.2, OH1.3] emergency egress.
[F20, F22-OS1.2] Applies to assemblies required to 9.23.14.9. Restraint of Joist Bottoms
provide fire resistance. (1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5]
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5] [F20, F22-OH1.1, OH1.2, OH1.3]
[F22-OS3.7] Applies to walls, and elements that support [F20, F22-OS1.2] Applies to assemblies required to
walls, that contain doors or windows required for provide fire resistance.
emergency egress. [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
(4) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5] 9.23.14.10. Ceiling Joists Supporting Roof Load
[F20, F22-OH1.1, OH1.2, OH1.3] (1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5]
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OH1.1, OH1.2, OH1.3]
provide fire resistance.
[F20, F22-OS1.2] Applies to assemblies required to
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5] provide fire resistance.
[F22-OS3.7] Applies to walls, and elements that support [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
walls, that contain doors or windows required for
emergency egress. (2) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.5]
(5) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5] [F20, F22-OH1.1, OH1.2, OH1.3]
[F20, F22-OH1.1, OH1.2, OH1.3] [F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance.
[F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance. [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5] 9.23.14.11. Roof Trusses
[F22-OS3.7] Applies to walls, and elements that support (1) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.5]
walls, that contain doors or windows required for [F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.5]
emergency egress. [F20,F22-OH1.1,OH1.2,OH1.3]
(6) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.5] [F20,F22-OS1.2] Applies to assemblies required to
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5] provide fire resistance.
[F20,F22-OH1.1,OH1.2,OH1.3] (3) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.5]
[F20,F22-OS1.2] Applies to assemblies required to [F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.5]
provide fire resistance. 9.23.15.1. Subflooring Required
[F22-OS3.7] Applies to walls, and elements that support (1) [F20-OS2.1]
walls, that contain doors or windows required for 9.23.15.2. Material Standards
emergency egress.
(1) [F22-OH4]
(7) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.5]
[F22-OP2.4]
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
[F20-OS2.1]
[F20,F22-OH1.1,OH1.2,OH1.3]
[F22-OS3.1]
[F20,F22-OS1.2] Applies to assemblies required to
(2) [F80-OH4]
provide fire resistance.
[F80-OP2.4]
[F22-OS3.7] Applies to walls, and elements that support
walls, that contain doors or windows required for [F80-OS2.1]
emergency egress. [F80-OS3.1]
(8) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5] (3) [F22-OH4]
[F20, F22-OH1.1, OH1.2, OH1.3] [F22-OP2.4]
[F20, F22-OS1.2] Applies to assemblies required to [F20-OS2.1]
provide fire resistance. [F22-OS3.1]
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5] (4) [F80-OH4]
[F22-OS3.7] Applies to walls, and elements that support [F80-OP2.4]
walls, that contain doors or windows required for [F80-OS2.1]
emergency egress. [F80-OS3.1]
SA-1 • Page 147
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.23.15.3. Edge Support [F20, F22-OS1.2] Applies to assemblies required to
(1) [F22-OH4] provide fire resistance.
[F22-OP2.4] [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.4, OS2.5]
[F22-OS3.1] (2) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
9.23.15.4. Direction of Installation [F20, F22-OH1.1, OH1.2, OH1.3]
(1) [F22-OH4] [F20, F22-OS1.2] Applies to assemblies required to
[F22-OP2.4] provide fire resistance.
[F22-OS3.1] [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.4, OS2.5]
(2) [F22-OH4] 9.23.16.4. Joints in Panel-Type Sheathing
[F22-OP2.4] (1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
[F22-OS3.1] [F20, F22-OH1.1, OH1.2, OH1.3]
9.23.15.5. Subfloor Thickness or Rating [F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance.
(1) [F22-OH4]
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.4, OS2.5]
[F22-OP2.4]
(2) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
[F20-OS2.1]
[F20, F22-OH1.1, OH1.2, OH1.3]
[F22-OS3.1]
[F20, F22-OS1.2] Applies to assemblies required to
(2) [F22-OH4] provide fire resistance.
[F22-OP2.4]
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.4, OS2.5]
[F20-OS2.1]
9.23.16.5. Lumber Roof Sheathing
[F22-OS3.1]
(1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
(3) [F22-OH4]
[F20, F22-OH1.1, OH1.2, OH1.3]
[F22-OP2.4]
[F20, F22-OS1.2] Applies to assemblies required to
[F20-OS2.1] provide fire resistance.
[F22-OS3.1] [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.4, OS2.5]
9.23.15.6. Annular Grooved Nails 9.23.16.6. Edge Support
(1) [F81-OH1.1] (1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
[F81-OP2.3] [F20, F22-OH1.1, OH1.2, OH1.3]
[F81-OS2.3] [F20, F22-OS1.2] Applies to assemblies required to
9.23.15.7. Lumber Subflooring provide fire resistance.
(1) [F22-OH4] [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.4, OS2.5]
[F22-OP2.4] (2)
[F22-OS3.1] 9.23.16.7. Thickness or Rating
(2) [F22-OH4] (1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
[F22-OP2.4] [F20, F22-OH1.1, OH1.2, OH1.3]
[F22-OS3.1] [F22-OH4]
(3) [F22-OP2.4] [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
[F22-OS3.1] [F22-OS3.1]
9.23.16.1. Required Roof Sheathing (2) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
(1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5] [F20, F22-OH1.1, OH1.2, OH1.3]
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.4, OS2.5] [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] [F20, F22-OS1.2] Applies to assemblies required to
9.23.16.2. Material Standards provide fire resistance.
(1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5] (3) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
[F20, F22-OH1.1, OH1.2, OH1.3] [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
[F20, F22-OS1.2] Applies to assemblies required to [F20, F22-OH1.1, OH1.2, OH1.3]
provide fire resistance. (4) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.4, OS2.5] [F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5]
9.23.16.3. Direction of Installation [F20, F22-OH1.1, OH1.2, OH1.3]
(1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5] 9.23.17.1. Required Sheathing
[F20, F22-OH1.1, OH1.2, OH1.3] (1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
[F20, F22-OH1.1, OH1.2, OH1.3]
Page 148 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OH4] Applies to floors and elements that [F80, F81-OH4] Applies to floors and elements that
support floors. support floors.
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5] [F80, F81-OP2.3, OP2.4]
[F22-OS3.1] Applies to floors and elements that support [F80, F81-OS2.3]
floors. [F80, F81-OS3.1] Applies to floors and elements that
[F22-OS3.7] Applies to walls, and elements that support support floors.
walls, that contain doors or windows required for 9.24.1.2. Material Standards
emergency egress.
(1) [F20, F22, F80-OH1.1, OH1.2, OH1.3]
9.23.17.2. Thickness, Rating and Material Standards
[F20-OP2.1, OP2.4]
(1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5] [F22, F80-OP2.4]
[F20, F22-OH1.1, OH1.2, OH1.3] [F20, F22, F80-OP2.3] Applies to elements that support or
[F20, F22-OH4] Applies to floors and elements that are part of an environmental separator.
support floors. [F20-OS2.1, OS2.4]
[F20, F22-OS1.2] Applies to assemblies required to [F22, F80-OS2.4]
provide fire resistance. [F20, F22, F80-OS2.3] Applies to elements that support or
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5] are part of an environmental separator.
[F20, F22-OS3.1] Applies to floors and elements that [F20, F22, F80-OS1.2] Applies to assemblies required to
support floors. provide fire resistance.
9.23.17.3. Attachment of Cladding to Sheathing [F22, F80-OS3.7] Applies to walls, and elements that
(2) [F20, F22, F80-OH1.1, OH1.2, OH1.3] support walls, that contain doors or windows required for
emergency egress.
[F20, F22, F80-OP2.3] Applies to elements that support or
are part of an environmental separator. 9.24.1.4. Screws
[F20, F22, F80-OS1.2] Applies to assemblies required to (1) [F20, F22, F80-OH1.1, OH1.2, OH1.3]
provide fire resistance. [F20-OP2.1, OP2.4]
[F20, F22, F80-OS2.1] Applies to elements that support or [F22, F80-OP2.4]
are part of an environmental separator. [F20, F22, F80-OP2.3] Applies to elements that support or
are part of an environmental separator.
[F22, F80-OS3.7] Applies to walls, and elements that
support walls, that contain doors or windows required for [F20, F22, F80-OS1.2] Applies to assemblies required to
emergency egress. provide fire resistance.
9.23.17.4. Lumber Sheathing [F20-OS2.1, OS2.4]
[F22, F80-OS2.4]
(1) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5]
[F20, F22, F80-OS2.3] Applies to elements that support or
[F20, F22-OH1.1, OH1.2, OH1.3] are part of an environmental separator.
[F20, F22-OH4] Applies to floors and elements that [F22, F80-OS3.7] Applies to walls, and elements that
support floors. support walls, that contain doors or windows required for
[F20, F22-OS1.2] Applies to assemblies required to emergency egress.
provide fire resistance. 9.24.1.5. Cladding, Sheathing and Interior Finish Required
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5] (1) [F20, F22, F80-OH1.1, OH1.2, OH1.3]
[F20, F22-OS3.1] Applies to floors and elements that [F20, F22, F80-OP2.3] Applies to elements that support or
support floors. are part of an environmental separator.
(2) [F20-OP2.1, OP2.3, OP2.5] [F22-OP2.3, OP2.4, OP2.5] [F20, F22, F80-OS1.2] Applies to assemblies required to
[F20, F22-OH1.1, OH1.2, OH1.3] provide fire resistance.
[F20, F22-OH4] Applies to floors and elements that [F20, F22, F80-OS2.1] Applies to elements that support or
support floors. are part of an environmental separator.
[F20, F22-OS1.2] Applies to assemblies required to [F22, F80-OS3.7] Applies to walls, and elements that
provide fire resistance. support walls, that contain doors or windows required for
[F20-OS2.1, OS2.3, OS2.5] [F22-OS2.3, OS2.5] emergency egress.
[F22-OS3.1] Applies to floors and elements that support 9.24.2.1. Size and Spacing of Studs in Interior Walls
walls. (1) [F20-OP2.1, OP2.4] [F22-OP2.4]
[F22-OS3.7] Applies to walls, and elements that support
[F20-OS2.1, OS2.4] [F22-OS2.4]
walls, that contain doors or windows required for
emergency egress. [F22-OS3.7] Applies to walls, and elements that support
walls, that contain doors or windows required for
9.23.17.5. Joints in Panel-Type Sheathing emergency egress.
(1) [F80, F81-OH1.1, OH1.2, OH1.3]
9.24.2.2. Thickness of Studs
(1) [F20-OP2.1, OP2.4] [F22-OP2.4]
SA-1 • Page 149
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OS2.1, OS2.4] [F22-OS2.4] [F20, F22-OS1.2] Applies to assemblies required to
[F22-OS3.7] Applies to walls, and elements that support provide fire resistance.
walls, that contain doors or windows required for [F22, F80-OS3.7] Applies to walls, and elements that
emergency egress. support walls, that contain doors or windows required for
9.24.2.3. Runners emergency egress.
(1) [F20, F22-OH1.1, OH1.2, OH1.3] (3) [F20, F22-OH1.1, OH1.2, OH1.3]
[F20-OP2.1, OP2.4] [F20-OP2.1, OP2.4]
[F22-OP2.4] [F20, F22-OP2.3] Applies to elements that support or are
[F20, F22-OP2.3] Applies to elements that support or are a part of an environmental separator.
part of an environmental separator. [F20, F22-OS1.2] Applies to assemblies required to
[F20-OS2.1, OS2.4] provide fire resistance.
[F22-OS2.4] [F20-OS2.1, OS2.4]
[F20, F22-OS2.3] Applies to elements that support or are a [F22-OS2.4]
part of an environmental separator. [F20, F22-OS2.3] Applies to elements that support or are
[F20, F22-OS1.2] Applies to assemblies required to part of an environmental separator.
provide fire resistance. [F22, F80-OS3.7] Applies to walls, and elements that
9.24.2.4. Openings in Fire Separations support walls, that contain doors or windows required for
(1) [F20-OS1.2] emergency egress.
(2) [F20-OS1.2] (4) [F20, F22-OH1.1, OH1.2, OH1.3]
(3) [F20-OS1.2] [F20-OP2.1, OP2.4]
[F22-OP2.4]
(4) [F20-OS1.2]
[F20, F22-OP2.3] Applies to elements that support or are
9.24.2.5. Size and Spacing of Studs in Exterior Walls part of an environmental separator.
(1) [F20-OP2.1, OP2.3, OP2.4] [F22-OP2.3, OP2.4] [F20, F22-OS1.2] Applies to assemblies required to
[F20, F22-OH1.1, OH1.2, OH1.3] provide fire resistance.
[F20, F22-OS1.2] Applies to assemblies required to [F20-OS2.1, OS2.4]
provide fire resistance. [F22-OS2.4]
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4] [F20, F22-OS2.3] Applies to elements that support or are
[F22, F80-OS3.7] Applies to walls, and elements that part of an environmental separator.
support walls, that contain doors or windows required for [F22, F80-OS3.7] Applies to walls, and elements that
emergency egress. support walls, that contain doors or windows required for
9.24.3.1. Installation of Runners emergency egress.
(1) [F20, F22-OH1.1, OH1.2, OH1.3] 9.24.3.2. Fire-Rated Walls
[F20-OP2.1, OP2.4] (1) [F21-OS1.2]
[F22-OP2.4] (2) [F21-OS1.2]
[F20, F22-OP2.3] Applies to elements that support or are (3) [F20-OS1.2]
part of an environmental separator. (4) [F20-OS1.2]
[F20, F22-OS1.2] Applies to assemblies required to 9.24.3.3. Orientation of Studs
provide fire resistance.
(1) [F20, F22-OH1.1, OH1.2, OH1.3]
[F20-OS2.1, OS2.4]
[F20-OP2.1, OP2.4]
[F22-OS2.4]
[F22-OP2.4]
[F20, F22-OS2.3] Applies to elements that support or are
[F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator.
part of an environmental separator.
[F22, F80-OS3.7] Applies to walls, and elements that
[F20, F22-OS1.2] Applies to assemblies required to
support walls, that contain doors or windows required for
provide fire resistance.
emergency egress.
[F20-OS2.1, OS2.4]
(2) [F20, F22-OH1.1, OH1.2, OH1.3]
[F22-OS2.4]
[F20-OP2.1, OP2.4] [F20, F22-OS2.3] Applies to elements that support or are
[F22-OP2.4] part of an environmental separator.
[F20, F22-OP2.3] Applies to elements that support or are
[F22, F80-OS3.7] Applies to walls, and elements that
part of an environmental separator.
support walls, that contain doors or windows required for
[F20-OS2.1, OS2.4] emergency egress.
[F22-OS2.4]
9.24.3.4. Support for Cladding Materials
[F20, F22-OS2.3] Applies to elements that support or are
part of an environmental separator. (1) [F20-OH1.1, OH1.2, OH1.3]
[F20-OP2.1, OP2.4]
Page 150 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OP2.3] Applies to elements that support or are part of (2) [F20-OS1.2]
an environmental separator. (3) [F03-OS1.2]
[F20-OS1.2] Applies to assemblies required to provide fire 9.25.1.1. Scope and Application
resistance. (2) [F51, F63-OH1.1, OH1.2] [F55, F63-OS2.3]
[F20-OS2.1, OS2.4] 9.25.2.1. Required Insulation
[F20-OS2.3] Applies to elements that support or are part of (1) [F51, F63-OH1.1, OH1.2]
an environmental separator. [F63-OS2.3]
[F22-OS3.7] Applies to walls, and elements that support 9.25.2.2. Insulation Materials
walls, that contain doors or windows required for
(1) [F51, F63, F80-OH1.1, OH1.2]
emergency egress.
[F63, F80-OS2.3]
9.24.3.5. Framing around Openings
(3) [F51, F63-OH1.1, OH1.2]
(1) [F20, F22-OH1.1, OH1.2, OH1.3]
[F63-OS2.3]
[F20-OP2.1, OP2.4] (4) [F51, F63, F80-OH1.1, OH1.2]
[F22-OP2.4]
[F63, F80-OS2.3]
[F20, F22-OP2.3] Applies to elements that support or are
part of an environmental separator. 9.25.2.3. Installation of Thermal Insulation
[F20, F22-OS1.2] Applies to assemblies required to (1) [F51, F63-OH1.1, OH1.2]
provide fire resistance. [F63-OS2.3]
[F20-OS2.1, OS2.4] (2) [F51, F63-OH1.1, OH1.2]
[F22-OS2.4] [F63-OS2.3]
[F20, F22-OS2.3] Applies to elements that support or are (3) [F55-OH1.1, OH1.2]
part of an environmental separator. [F55-OS2.3]
[F22, F80-OS3.7] Applies to walls, and elements that (4) [F51, F63, F80-OH1.1, OH1.2]
support walls, that contain doors or windows required for [F63, F80-OS2.3]
emergency egress. (5) [F21-OH1.1, OH1.2, OH1.3]
(2) [F20, F22-OH1.1, OH1.2, OH1.3] [F21-OS2.2, OS2.3]
[F20-OP2.1, OP2.4] (6) [F80-OH1.1, OH1.2]
[F22-OP2.4]
[F20, F22-OP2.3] Applies to elements that support or are [F80-OS2.3]
part of an environmental separator. (7) [F80-OH1.1, OH1.2]
[F20-OS2.1, OS2.4] [F80-OS2.3]
[F22-OS2.4] (8) [F21-OH1.1, OH1.2]
[F20, F22-OS2.3] Applies to elements that support or are [F21-OS2.3]
part of an environmental separator.
9.25.2.4. Installation of Loose-Fill Insulation
[F20, F22-OS1.2] Applies to assemblies required to
provide fire resistance. (1) [F51, F63-OH1.1, OH1.2]
[F22, F80-OS3.7] Applies to walls, and elements that [F63-OS2.3]
support walls, that contain doors or windows required for (2) [F51-OH1.1, OH1.2, OH1.3]
emergency egress. [F51-OS2.3]
9.24.3.6. Attachment of Studs to Runners (4) (a) [F21, F51-OH1.1, OH1.2]
(1) [F20, F22-OH1.1, OH1.2, OH1.3] (a) [F21, F51-OS2.3]
[F20-OP2.1, OP2.4] (c) [F81-OH1.1, OH1.2]
[F22-OP2.4] (c) [F81-OH1.1, OH1.2, OH1.3] Applies where the interior
[F20, F22-OP2.3] Applies to elements that support or are finish provide the required bracing.
part of an environmental separator.
(c) [F81-OH4] Applies where the interior finish provides the
[F20-OS2.1, OS2.4]
required bracing of walls that support floors.
[F22-OS2.4]
[F20, F22-OS2.3] Applies to elements that support or are (c) [F81-OP2.1, OP2.3, OP2.4, OP2.5] Applies where the
part of an environmental separator. interior finish provides the required bracing.
[F20, F22-OS1.2] Applies to assemblies required to (c) [F81-OP3.1] Applies where the interior finish
provide fire resistance. contributes to the required fire resistance of the wall.
[F22, F80-OS3.7] Applies to walls, and elements that (c) [F81-OS2.1, OS2.3]
support walls, that contain doors or windows required for (c) [F81-OS2.1, OS2.3, OS2.4, OS2.5] Applies where the
emergency egress. interior finish provides the required bracing.
(2) [F21-OS1.2] (c) [F81-OS3.7] Applies where the interior finish provides
9.24.3.7. Openings for Fire Dampers the required bracing.
(1) [F20-OS1.2] (c) [F81-OS3.1] Applies where the interior finish provides
the required bracing of walls that support floors.
SA-1 • Page 151
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(d) [F80-OH1.1, OH1.2, OH1.3] [F44-OS3.4] Applies where the air barrier system
(d) [F80-OS2.3] separates a garage, or suite containing a garage, from
(5) [F51, F63-OH1.1, OH1.2] residential space.
[F63-OS2.3] (2) [F55-OH1.1, OH1.2, OH1.3] [F40-OH1.1]
(6) (a) [F51, F62-OH1.1, OH1.2, OH1.3] [F55-OS2.3]
(a) [F62, F51-OS2.3] (a) [F44-OS1.1] Applies where the air barrier system
(b) [F51, F63-OH1.1, OH1.2] separates a garage, or suite containing a garage, from
(b) [F51, F63-OS2.3] residential space.
9.25.2.5. Installation of Spray-Applied Polyurethane (a) [F44-OS3.4] Applies where the air barrier system
(1) [F41, F51, F63-OH1.1] [F51, F63-OH1.2] separates a garage, or suite containing a garage, from
[F63-OS2.3] residential space.
9.25.3.1. Required Barrier to Air Leakage (2.1) [F55-OH1.1, OH1.2, OH1.3] [F40-OH1.1]
(1) [F55-OH1.1, OH1.2, OH1.3] [F55-OS2.3]
[F44-OS1.1] Applies where the air barrier system (a) [F44-OS1.1] Applies where the air barrier system
separates a garage, or suite containing a garage, from separates a garage, or suite containing a garage, from
residential space. residential space.
[F55-OS2.3] (a) [F44-OS3.4] Applies where the air barrier system
[F44-OS3.4] Applies where the air barrier system separates a garage, or suite containing a garage, from
separates a garage, or suite containing a garage, from residential space.
residential space. (5) [F55-OH1.1, OH1.2, OH1.3] [F40-OH1.1]
(2) [F55-OH1.1, OH1.2, OH1.3] [F44-OS1.1] Applies where the air barrier system
[F44-OS1.1] Applies where the air barrier system separates a garage, or suite containing a garage, from
separates a garage, or suite containing a garage, from residential space.
residential space.
[F55-OS2.3]
[F55-OS2.3]
[F44-OS3.4] Applies where the air barrier system
[F44-OS3.4] Applies where the air barrier system
separates a garage, or suite containing a garage, from
separates a garage, or suite containing a garage, from
residential space.
residential space.
9.25.3.2. Air Barrier System Properties (5.1) [F55-OH1.1, OH1.2, OH1.3] [F40-OH1.1]
(1) [F20, F55-OH1.1, OH1.2, OH1.3] [F44-OS1.1] Applies where the air barrier system
separates a garage, or suite containing a garage, from
[F20, F44-OS1.1] Applies where the air barrier system
separates a garage, or suite containing a garage, from residential space.
residential space. [F55-OS2.3]
[F55-OS2.3] [F44-OS3.4] Applies where the air barrier system
[F20, F44-OS3.4] Applies where the air barrier system separates a garage, or suite containing a garage, from
separates a garage, or suite containing a garage, from residential space.
residential space. (6) [F55-OH1.1, OH1.2, OH1.3] [F40-OH1.1]
(2) [F20, F55-OH1.1, OH1.2, OH1.3] [F44-OS1.1] Applies where the air barrier system
[F20, F44-OS1.1] Applies where the air barrier system separates a garage, or suite containing a garage, from
separates a garage, or suite containing a garage, from residential space.
residential space. [F55-OS2.3]
[F55-OS2.3]
[F44-OS3.4] Applies where the air barrier system
[F20, F44-OS3.4] Applies where the air barrier system separates a garage, or suite containing a garage, from
separates a garage, or suite containing a garage, from
residential space.
residential space.
(6.1) [F55-OH1.1, OH1.2, OH1.3] [F40-OH1.1]
9.25.3.3. Continuity of the Air Barrier System
[F44-OS1.1] Applies where the air barrier system
(1) [F55-OH1.1, OH1.2, OH1.3] separates a garage, or suite containing a garage, from
[F44-OS1.1] Applies where the air barrier system residential space.
separates a garage, or suite containing a garage, from [F55-OS2.3]
residential space. [F44-OS3.4] Applies where the air barrier system
[F55-OS2.3] separates a garage, or suite containing a garage, from
residential space.
(6.2) [F55-OH1.1, OH1.2, OH1.3] [F40-OH1.1]
Page 152 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F44-OS1.1] Applies where the air barrier system 9.26.2.1. Material Standards
separates a garage, or suite containing a garage, from (1) [F61-OH1.1, OH1.2, OH1.3]
residential space. [F61-OS2.3]
[F55-OS2.3] (2) [F61-OH1.1, OH1.2, OH1.3]
[F44-OS3.4] Applies where the air barrier system [F61-OS2.3]
separates a garage, or suite containing a garage, from
residential space. 9.26.2.2. Installation of Materials
(7) [F55-OH1.1, OH1.2, OH1.3] (1) [F61-OH1.1, OH1.2, OH1.3]
[F55-OS2.3] [F61-OS2.3]
(8) [F01-OS1.1] 9.26.2.3. Nails
(9) [F55-OH1.1, OH1.2, OH1.3] (1) [F20, F80-OH1.1, OH1.2, OH1.3]
(10) [F55-OH1.1, OH1.2, OH1.3] [F40-OH1.1] [F20, F80-OS2.3]
[F55-OS2.3] (2) [F20-OH1.1, OH1.2, OH1.3]
9.25.4.1. Required Barrier to Vapour Diffusion [F20-OS2.3]
(1) [F63-OH1.1, OH1.2] (3) [F20-OH1.1, OH1.2, OH1.3]
[F63-OS2.3] [F20-OS2.3]
(4) [F20, F80-OH1.1, OH1.2, OH1.3]
9.25.4.2. Vapour Barrier Materials
[F20, F80-OS2.3]
(1) [F63-OH1.1, OH1.2]
[F63-OS2.3] 9.26.2.4. Staples
(2) [F63-OH1.1, OH1.2, OH1.3] (1) [F20, F80-OH1.1, OH1.2, OH1.3]
[F63-OS2.3] [F20, F80-OS2.3]
(3) [F62, F63-OH1.1, OH1.2, OH1.3] (2) [F20-OH1.1, OH1.2, OH1.3]
[F62, F63-OS2.3] [F20-OS2.3]
(4) [F63, F80-OH1.1, OH1.2] (3) [F20, F80-OH1.1, OH1.2, OH1.3]
[F63, F80-OS2.3] [F20, F80-OS2.3]
(5) [F63, F80-OH1.1, OH1.2] 9.26.3.1. Slope
[F63, F80-OS2.3] (1) [F20, F61, F80-OH1.1, OH1.2, OH1.3]
(6) [F63, F80-OH1.1, OH1.2] [F20-OS2.1, OS2.3] [F61, F80-OS2.3]
[F63, F80-OS2.3] (2) [F20, F61, F80-OH1.1, OH1.2, OH1.3]
(7) [F63-OH1.1, OH1.2] [F20, F61, F80-OS2.3]
[F63-OS2.3] (3) [F61, F80-OH1.1, OH1.2, OH1.3]
(8) [F63-OH1.1, OH1.2] [F61, F80-OS2.3]
[F63-OS2.3] (4) [F61, F80-OH1.1, OH1.2, OH1.3]
9.25.4.3. Installation of Vapour Barriers [F61, F80-OS2.3]
(1) [F63-OH1.1, OH1.2] (5) [F21-OH1.1, OH1.2, OH1.3]
[F63-OS2.3] [F21-OS2.3]
(2) [F63-OH1.1, OH1.2] 9.26.4.1. Required Flashing at Intersections
[F63-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
(3) [F63-OS2.3] [F61-OS2.3]
[F63-OH1.1,OH1.2] 9.26.4.2. Materials
9.25.5.1. General (1) [F61, F62, F80-OH1.1, OH1.2, OH1.3]
(2) [F62, F63-OS2.3] [F61, F62, F80-OS2.3]
[F62, F63-OH1.1, OH1.2] 9.26.4.3. Valley Flashing
9.25.5.2. Position of Low Permeance Materials (1) [F61-OH1.1, OH1.2, OH1.3]
(1) [F62, F63-OS2.3] [F61-OS2.3]
[F62, F63-OH1.1, OH1.2] (2) [F20, F22-OH1.1, OH1.2, OH1.3]
9.26.1.2. Required Protection [F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4]
(1) [F61-OH1.1, OH1.2, OH1.3] (3) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS2.3] [F61-OS2.3]
(3.1) [F20, F61, F80-OH1.1, OH1.2, OH1.3]
9.26.1.3. Alternate Installation Methods
[F20, F61, F80-OS2.3]
(1) [F61-OH1.1, OH1.2, OH1.3]
(4) [F20, F61, F80-OH1.1, OH1.2, OH1.3]
[F61-OS2.3]
SA-1 • Page 153
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F61, F80-OS2.3] [F61-OS3.4] Applies where a built-up roof intersects with a
(5) [F20, F61, F80-OH1.1, OH1.2, OH1.3] masonry chimney.
[F20, F61, F80-OS2.3] (2) [F61-OH1.1, OH1.2, OH1.3]
(6) [F20, F61, F80-OH1.1, OH1.2, OH1.3] [F61-OP1.1] Applies where counter flashing is installed
[F20, F61, F80-OS2.3] between a built-up roof and a masonry chimney.
9.26.4.4. Intersection of Shingle Roofs and Masonry [F61-OS1.1] Applies where counter flashing is installed
between a built-up roof and a masonry chimney.
(1) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS2.3]
[F61-OP1.1] Applies where a shingle roof intersects with a
masonry chimney. [F61-OS3.4] Applies where counter flashing is installed
between a built-up roof and a masonry chimney.
[F61-OS1.1] Applies where a shingle roof intersects with a
masonry chimney. 9.26.4.7. Intersection of Built-Up Roofs and Walls Other Than
Masonry
[F61-OS2.3]
(1) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS3.4] Applies where a shingle roof intersects with a
masonry chimney. [F61-OS2.3]
(2) [F61-OH1.1, OH1.2, OH1.3] (2) [F61-OH1.1, OH1.2, OH1.3]
[F61-OP1.1] Applies where counter flashing is installed [F61-OS2.3]
between a shingle roof and a masonry chimney. (3) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS1.1] Applies where counter flashing is installed [F61-OS2.3]
between a shingle roof and a masonry chimney. 9.26.4.8. Chimney Saddles
[F61-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS3.4] Applies where counter flashing is installed [F61-OP1.1]
between a shingle roof and a masonry chimney. [F61-OS1.1]
(3) [F61-OH1.1, OH1.2, OH1.3] [F61-OS2.3]
[F61-OP1.1] Applies where flashing is installed between a [F61-OS3.4]
shingle roof and a masonry chimney. (2) [F20, F80-OH1.1, OH1.2, OH1.3]
[F61-OS1.1] Applies where flashing is installed between a [F20, F80-OP1.1]
shingle roof and a masonry chimney.
[F20, F80-OS1.1]
[F61-OS2.3]
[F20, F80-OS2.3]
[F61-OS3.4] Applies where flashing is installed between a
[F20, F80-OS3.4]
shingle roof and a masonry chimney.
(3) [F61-OH1.1, OH1.2, OH1.3]
(4) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS2.3]
[F61-OP1.1] Applies where a shingle roof slopes upward
from a masonry chimney. (5) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS1.1] Applies where a shingle roof slopes upward [F61-OP1.1]
from a masonry chimney. [F61-OS1.1]
[F61-OS2.3] [F61-OS2.3]
[F61-OS3.4] Applies where a shingle roof slopes upward [F61-OS3.4]
from a masonry chimney. 9.26.5.1. Required Eave Protection
9.26.4.5. Intersection of Shingle Roofs and Walls Other Than (1) [F61-OH1.1, OH1.2, OH1.3]
Masonry [F61-OS2.3]
(1) [F61-OH1.1, OH1.2, OH1.3] 9.26.5.2. Materials
[F61-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
(2) [F61-OH1.1, OH1.2, OH1.3] [F61-OS2.3]
[F61-OS2.3] 9.26.6.1. Materials
(3) [F61-OH1.1, OH1.2, OH1.3] (1) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS2.3] [F61-OS2.3]
9.26.4.6. Intersection of Built-Up Roofs and Masonry (2) [F62-OH1.1, OH1.2, OH1.3]
(1) [F61-OH1.1, OH1.2, OH1.3] [F62-OS2.3]
[F61-OP1.1] Applies where a built-up roof intersects with a 9.26.6.2. Installation
masonry chimney.
(1) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS1.1] Applies where a built-up roof intersects with a
[F61-OS2.3]
masonry chimney.
(2) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS2.3]
[F61-OS2.3]
Page 154 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(3) [F61-OH1.1, OH1.2, OH1.3] 9.26.8.5. Hips and Ridges
[F61-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
9.26.7.1. Coverage [F61-OS2.3]
(1) [F61, F80-OH1.1, OH1.2, OH1.3] (2) [F61, F80-OH1.1, OH1.2, OH1.3]
[F61, F80-OS2.1] [F61, F80-OS2.3]
9.26.7.2. Starter Strip 9.26.9.2. Grade
(1) [F61-OH1.1, OH1.2, OH1.3] (1) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS2.3] [F61-OS2.3]
(2) [F61, F80-OH1.1, OH1.2, OH1.3] (2) [F61-OH1.1, OH1.2, OH1.3]
[F61, F80-OS2.3] [F61-OS2.3]
(3) [F61-OH1.1, OH1.2, OH1.3] 9.26.9.3. Size
[F61-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
9.26.7.3. Head Lap [F61-OS2.3]
(1) [F61-OH1.1, OH1.2, OH1.3] 9.26.9.4. Spacing and Joints
[F61-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
9.26.7.4. Fasteners [F61-OS2.3]
(1) [F20, F61-OH1.1, OH1.2, OH1.3] 9.26.9.5. Fastening
[F20, F61-OS2.3] (1) [F20, F80-OH1.1, OH1.2, OH1.3]
(2) [F20-OH1.1, OH1.2, OH1.3] [F20, F80-OS2.3]
[F20-OS2.3] 9.26.9.6. Exposure
(3) [F20-OH1.1, OH1.2, OH1.3] (1) [F61-OH1.1, OH1.2, OH1.3]
[F20-OS2.3] [F61-OS2.3]
(4) [F20-OH1.1, OH1.2, OH1.3] 9.26.10.1. Size and Thickness
[F20-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
(5) [F20-OH1.1, OH1.2, OH1.3] [F61-OS2.3]
[F20-OS2.3] 9.26.10.2. Underlay
9.26.7.5. Securing of Tabs (1) [F61-OH1.1, OH1.2, OH1.3]
(1) [F20, F61-OH1.1, OH1.2, OH1.3] [F61-OS2.3]
[F20, F61-OS2.3] (2) [F61-OH1.1, OH1.2, OH1.3]
9.26.7.6. Hips and Ridges [F61-OS2.3]
(1) [F61-OH1.1, OH1.2, OH1.3] (3) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS2.3] [F61-OS2.3]
(2) [F20-OH1.1, OH1.2, OH1.3] 9.26.10.3. Spacing and Joints
[F20-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
9.26.8.1. Coverage [F61-OS2.3]
(1) [F61-OH1.1, OH1.2, OH1.3] 9.26.10.4. Fastening
[F61-OS2.3] (1) [F20, F80-OH1.1, OH1.2, OH1.3]
9.26.8.2. Starter Strip [F20, F80-OS2.3]
(2) [F61-OH1.1, OH1.2, OH1.3] 9.26.10.5. Exposure
[F61-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
9.26.8.3. Securing of Tabs [F61-OS2.3]
(1) [F61-OH1.1, OH1.2, OH1.3] 9.26.10.8. Grade
[F61-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
9.26.8.4. Securing of Shingle Courses [F61-OS2.3]
(1) [F61-OH1.1, OH1.2, OH1.3] 9.26.11.1. Quantity of Materials
[F61-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
(2) [F61-OH1.1, OH1.2, OH1.3] [F61-OS2.3]
[F61-OS2.3] 9.26.11.2. Coal-Tar and Asphalt Products
(3) [F61-OH1.1, OH1.2, OH1.3] (1) [F61, F80-OH1.1, OH1.2, OH1.3]
[F61-OS2.3] [F61, F80-OS2.3]
SA-1 • Page 155
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.26.11.3. Roof Felts 9.26.13.2. Support
(1) [F20-OH1.1, OH1.2, OH1.3] (1) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4]
[F20-OS2.3] [F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4]
9.26.11.4. Aggregate Surfacing [F20, F22-OH1.1, OH1.2, OH1.3]
(1) [F61-OH1.1, OH1.2, OH1.3] 9.26.14.1. Support
[F61-OS2.3] (1) [F20-OS2.1, OS2.3] [F22-OS2.3, OS2.4]
(2) [F61-OH1.1, OH1.2, OH1.3] [F20, F22-OH1.1, OH1.2, OH1.3]
[F61-OS2.3] 9.26.15.1. Installation
9.26.11.6. Number of Layers (1) [F61, F80-OH1.1, OH1.2, OH1.3]
(1) [F20, F80-OH1.1, OH1.2, OH1.3] [F61, F80-OS2.3]
[F20, F80-OS2.3] 9.26.16.1. Installation
9.26.11.7. Installation of Layers (1) [F61, F80-OH1.1, OH1.2, OH1.3]
(1) [F20-OH1.1, OH1.2, OH1.3] [F61, F80-OS2.3]
[F20-OS2.3] 9.26.17.1. Installation
(2) [F61, F81-OH1.1, OH1.2, OH1.3] (1) [F61-OH1.1, OH1.2, OH1.3]
[F61, F81-OS2.3] [F61-OS2.3]
(3) [F20-OH1.1, OH1.2, OH1.3] 9.26.18.2. Downspouts
[F20-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
9.26.11.8. Roofing over Wood-Based Sheathing [F61-OS2.3]
(1) [F61-OH1.1, OH1.2, OH1.3] 9.27.2.1. Minimizing and Preventing Ingress and Damage
[F61-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
(2) [F61-OH1.1, OH1.2, OH1.3] [F61-OS2.3]
[F61-OS2.3] (2) [F80, F81-OH1.1, OH1.2, OH1.3]
9.26.11.9. Attachment to Decking [F80, F81-OS2.3]
(1) [F61-OH1.1, OH1.2, OH1.3] 9.27.2.2. Minimum Protection from Precipitation Ingress
[F61-OS2.3] (4) [F61-OH1.1, OH1.2, OH1.3]
9.26.11.10. Cant Strips [F61-OS2.3]
(1) [F61-OH1.1, OH1.2, OH1.3] 9.27.2.3. First and Second Planes of Protection
[F61-OS2.3] (1) [F61, F62-OH1.1, OH1.2, OH1.3]
[F61-OS3.1] [F61, F62-OS2.3]
(2) [F61-OH1.1, OH1.2, OH1.3] 9.27.2.4. Protection of Cladding from Moisture
[F61-OS2.3] (1) [F61, F80-OH1.1, OH1.2, OH1.3]
(3) [F61-OH1.1, OH1.2, OH1.3] [F61, F80-OS2.3]
[F61-OS2.3] (2) [F61-OH1.1, OH1.2, OH1.3]
(4) [F61-OH1.1, OH1.2, OH1.3] [F61, F80-OS2.3]
[F61-OS2.3] 9.27.3.1. Elements of the Second Plane of Protection
[F61-OS3.1] (1) [F61, F62-OH1.1, OH1.2, OH1.3]
(5) [F61-OH1.1, OH1.2, OH1.3] [F61, F62-OS2.3]
[F61-OS2.3] (3) [F61, F62-OH1.1, OH1.2, OH1.3]
(6) [F61-OH1.1, OH1.2, OH1.3] [F61, F62-OS2.3]
[F61-OS2.3] 9.27.3.2. Sheathing Membrane Material Standard
9.26.12.1. Coverage (1) [F20, F55, F61, F62-OH1.1, OH1.2, OH1.3]
(1) [F61, F80-OH1.1, OH1.2, OH1.3] [F20, F55, F61, F62-OS2.3]
[F61, F80-OS2.3] 9.27.3.3. Required Sheathing Membrane and Installation
9.26.12.2. Joints (1) [F55, F61-OH1.1, OH1.2, OH1.3]
(1) [F61-OH1.1, OH1.2, OH1.3] [F55, F61-OS2.3]
[F61-OS2.3] (2) [F55, F61-OH1.1, OH1.2, OH1.3]
9.26.13.1. Thickness [F55, F61-OS2.3]
(1) [F61, F80-OH1.1, OH1.2, OH1.3] (3) [F61-OH1.1, OH1.2, OH1.3]
[F61, F80-OS2.3] [F61-OS2.3]
Page 156 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.27.3.4. Insulating Sheathing in Lieu of Sheathing Membrane [F20, F22-OH1.1, OH1.2, OH1.3] Applies where panel-
(2) [F55, F61-OH1.1, OH1.2, OH1.3] type cladding is installed to provide the required bracing.
[F55, F61-OS2.3] [F20-OP2.1, OP2.3, OP2.4] [F22-OP2.3, OP2.4, OP2.5]
9.27.3.5. Sheathing Membranes in Lieu of Sheathing Applies where panel-type cladding is installed to provide
the required bracing.
(1) [F55, F61-OH1.1, OH1.2, OH1.3]
[F20-OS2.1, OS2.3]
[F55, F61-OS2.3] [F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5]
(2) [F55, F61-OH1.1, OH1.2, OH1.3] Applies where panel-type cladding is installed to provide
[F55, F61-OS2.3] the required bracing.
9.27.3.6. Face Sealed Cladding [F20, F22-OH4] Applies where panel-type cladding is
(2) [F20, F55, F61-OH1.1, OH1.2, OH1.3] installed to provide the required bracing of walls that
[F20, F55, F61-OS2.3] support floors.
(3) [F55, F61-OH1.1, OH1.2, OH1.3] [F20, F22-OS3.1] Applies where panel-type cladding is
installed to provide the required bracing of walls that
[F55, F61-OS2.3]
support floors.
9.27.3.7. Flashing Materials [F20, F22-OS3.7] Applies where panel-type cladding is
(1) [F61, F62, F80-OH1.1, OH1.2, OH1.3] installed to provide bracing of walls that contain doors or
[F61, F62, F80-OS2.3] windows required for emergency egress.
9.27.3.8. Flashing Installation (2) [F20-OH1.1, OH1.2, OH1.3]
(1) (a), (b), (c)(i) [F61-OH1.1, OH1.2, OH1.3] [F20-OS2.1, OS2.3]
(a), (b), (c)(i) [F61-OS2.3] (3) [F20-OH1.1, OH1.2, OH1.3]
(c)(ii) [F61, F62-OH1.1, OH1.2, OH1.3] [F20-OS2.3]
(c)(ii) [F61, F62-OS2.3] (4) [F20-OH1.1, OH1.2, OH1.3]
(2) (a), (b)(ii), (c)(i) [F61-OH1.1, OH1.2, OH1.3] Applies to [F20-OS2.1, OS2.3]
detailing of horizontal joints. 9.27.5.2. Blocking
(a), (b)(ii), (c)(i) [F61-OS2.3] Applies to detailing of (1) [F20-OH1.1, OH1.2, OH1.3]
horizontal joints. [F20, F22-OH1.1, OH1.2, OH1.3] Applies where panel-
(b)(i), (c)(ii) [F61, F62-OH1.1, OH1.2, OH1.3] Applies to type cladding is installed to provide the required bracing.
cladding installed outboard of a drained and vented air [F20-OP2.1, OP2.3, OP2.4][F22-OP2.3, OP2.4, OP2.5]
space. Applies where panel-type cladding is installed to provide
(b)(i), (c)(ii) [F61, F62-OS2.3] Applies to cladding installed the required bracing.
outboard of a drained and vented air space. [F20-OS2.1, OS2.3]
(3) [F61, F62-OH1.1, OH1.2, OH1.3] [F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5]
[F61, F62-OS2.3] Applies where panel-type cladding is installed to provide
(4) [F61, F62-OH1.1, OH1.2, OH1.3] the required bracing.
[F61, F62-OS2.3] 9.27.5.3. Furring
(5) [F61, F62-OH1.1, OH1.2, OH1.3] (1) [F20-OH1.1, OH1.2, OH1.3]
[F61, F62-OS2.3] [F20-OS2.1, OS2.3]
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5]
9.27.4.1. Required Sealants
Applies where furring is used for the attachment if panel-
(1) [F61-OH1.1, OH1.2, OH1.3] type cladding installed to provide the required bracing.
[F61-OS2.3] (2) [F20-OH1.1, OH1.2, OH1.3]
(2) [F61-OH1.1, OH1.2, OH1.3] [F20, F22-OH1.1, OH1.2, OH1.3] Applies where furring is
[F61-OS2.3] used for the attachment of panel-type cladding installed to
(3) [F61-OH1.1, OH1.2, OH1.3] provide the required bracing.
[F61-OS2.3] [F20-OS2.1, OS2.3] [F20-OS2.1, OS2.3, OS2.4] [F22-
9.27.4.2. Materials OS2.3, OS2.4, OS2.5] Applies where furring is used for
(1) [F80-OH1.1, OH1.2, OH1.3] the attachment of panel-type cladding installed to provide
the required bracing.
[F80-OS2.3]
(3) [F20-OH1.1, OH1.2, OH1.3]
(2) [F80-OH1.1, OH1.2, OH1.3]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies where furring is
[F80-OS2.3] used for the attachment of panel-type cladding installed to
(3) [F80-OH1.1, OH1.2, OH1.3] provide the required bracing.
[F80-OS2.3] [F20-OS2.1, OS2.3]
9.27.5.1. Attachment
(1) [F20-OH1.1, OH1.2, OH1.3]
SA-1 • Page 157
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5] [F21, F61-OS2.3]
Applies where furring is used for the attachment of panel- 9.27.7.1. Materials
type cladding installed to provide the required bracing. (1) [F61-OH1.1, OH1.1, OH1.3]
9.27.5.4. Size and Spacing of Fasteners [F61-OS2.3]
(1) [F20-OH1.1, OH1.2, OH1.3] (2) [F20, F61-OH1.1, OH1.2, OH1.3]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies to the [F20, F61-OS2.3]
attachment of panel-type cladding installed to provide the
(3) [F20, F61-OH1.1, OH1.2, OH1.3]
required bracing.
[F20, F61-OS2.3]
[F20-OS2.1, OS2.3] [F20-OS2.1, OS2.3, OS2.4] [F22-
OS2.3, OS2.4, OS2.5] Applies where panel-type cladding 9.27.7.2. Width
is installed to provide the required bracing. (1) [F20, F61-OH1.1, OH1.2, OH1.3]
(2) [F20-OH1.1,OH1.2,OH1.3] [F20, F61-OS2.3]
[F20-OS2.1,OS2.3] 9.27.7.3. Fasteners
9.27.5.5. Fastener Materials (1) [F20, F61-OH1.1, OH1.2, OH1.3]
(1) [F80-OH1.1, OH1.2, OH1.3] [F20, F61-OS2.3]
[F80-OP2.1, OP2.3, OP2.4, OP2.5] Applies where panel- 9.27.7.4. Offsetting of Joints
type cladding is installed to provide the required bracing. (1) [F61-OH1.1, OH1.2, OH1.3]
[F80-OS2.3] [F61-OS2.3]
[F80-OS2.3, OS2.4] Applies where panel-type cladding is (2) [F61-OH1.1, OH1.2, OH1.3]
installed to provide required bracing. [F61-OS2.3]
9.27.5.6. Expansion and Contraction 9.27.7.5. Fastening to Lath
(1) [F21-OH1.1, OH1.2, OH1.3] (1) [F81-OH1.1, OH1.2, OH1.3]
[F21-OS2.3] [F81-OS2.3]
9.27.5.7. Penetration of Fasteners (2) [F62-OH1.1, OH1.2, OH1.3]
(1) [F20-OH1.1, OH1.2, OH1.3] [F62-OS2.3]
[F20-OS2.1, OS2.3] (3) [F20-OH1.1, OH1.2, OH1.3]
(2) [F20-OH1.1, OH1.2, OH1.3] [F20-OS2.3]
[F20-OS2.1, OS2.3] (4) [F20-OH1.1, OH1.2, OH1.3]
(3) [F20-OH1.1, OH1.2, OH1.3] [F20, F22-OH1.1, OH1.2, [F20-OS2.3]
OH1.3] Applies where panel-type cladding is installed to (5) [F62-OH1.1, OH1.2, OH1.3]
provide the required bracing. [F62-OS2.3]
[F20-OP2.1, OP2.3, OP2.4] [F22-OP2.3, OP2.4, OP2.5] 9.27.7.6. Exposure and Thickness
Applies where panel-type cladding is installed to provide (1) [F20, F62-OH1.1, OH1.2, OH1.3]
the required bracing.
[F20, F62-OS2.3]
[F20-OS2.1, OS2.3]
9.27.8.1. Material Standards
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5]
Applies where panel-type cladding is installed to provide (1) [F20-OP2.1, OP2.3, OP2.4] [F22-OP2.3, OP2.4, OP2.5]
the required bracing. Applies where panel-type cladding is installed to provide
the required bracing.
9.27.6.1. Materials
[F20-OS2.1, OS2.3]
(1) [F20, F61-OH1.1, OH1.2, OH1.3] [F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5]
[F20, F62-OS2.3] Applies where panel-type cladding is installed to provide
9.27.6.2. Thickness and Width required bracing.
(1) [F20-OH1.1, OH1.2, OH1.3] [F20, F22-OH1.1, OH1.2, OH1.3]
[F20-OS2.3] 9.27.8.2. Thickness
(2) [F20-OH1.1, OH1.2, OH1.3] (1) [F20, F22-OH1.1, OH1.2, OH1.3]
[F20-OS2.3] [F20, F22-OS2.1, OS2.3]
(3) [F20-OH1.1, OH1.2, OH1.3] [F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5]
Applies where panel-type cladding is installed to provide
[F20-OS2.3]
required bracing.
9.27.6.3. Joints
(2) [F20-OP2.1, OP2.3] [F22-OP2.3, OP2.4, OP2.5] Applies
(1) [F61-OH1.1, OH1.2, OH1.3] where panel-type cladding is installed to provide the
[F61-OS2.3] required bracing.
(2) [F21, F61-OH1.1, OH1.2, OH1.3] [F20-OS2.1, OS2.3]
Page 158 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5] [F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5]
Applies where panel-type cladding is installed to provide Applies where panel-type cladding is installed to provide
the required bracing. the required bracing.
[F20, F22-OH1.1, OH1.2, OH1.3] (3) [F20-OP2.1, OP2.3, OP2.4] [F22-OP2.3, OP2.4, OP2.5]
9.27.8.3. Edge Treatment Applies where panel-type cladding is installed to provide
(1) [F61-OH1.1, OH1.2, OH1.3] the required bracing.
[F61-OP2.3, OP2.4, OP2.5] Applies where panel-type [F20, F22-OH1.1, OH1.2, OH1.3]
cladding is installed to provide the required bracing. [F20, F22-OS2.1, OS2.3]
[F61-OS2.3] [F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5]
[F61-OS2.3, OS2.4, OS2.5] Applies where panel-type Applies where panel-type cladding is installed to provide
cladding is installed to provide the required bracing. the required bracing.
9.27.8.4. Panel Cladding 9.27.9.3. Panel Cladding
(1) [F20, F22-OH1.1, OH1.2, OH1.3] (1) [F20-OP2.1, OP2.3, OP2.4] [F22-OP2.3, OP2.4, OP2.5]
Applies where panel-type cladding is installed to provide
[F20-OP2.1, OP2.3, OP2.4] [F22-OP2.3, OP2.4, OP2.5]
the required bracing.
Applies where panel-type cladding is installed to provide
the required bracing. [F20, F21, F22-OH1.1, OH1.2, OH1.3]
[F20, F22-OS2.1, OS2.3] [F20, F21, F22-OS2.1, OS2.3]
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5] [F20-OS2.1, OS2.3, OS2.4] [F33-OS2.3, OS2.4, OS2.5]
Applies where panel-type cladding is installed to provide Applies where panel-type cladding is installed to provide
the required bracing. the required bracing.
(2) [F21-OH1.1, OH1.2, OH1.3] (2) [F61-OH1.1, OH1.2, OH1.3]
[F21-OS2.3] [F61-OS2.3]
(3) [F61-OH1.1, OH1.2, OH1.3] (3) [F61-OH1.1, OH1.2, OH1.3]
[F61-OS2.3] [F61-OS2.3]
(4) [F61-OH1.1, OH1.2, OH1.3] 9.27.9.4. Lapped Strip Siding
[F61-OS2.3] (1) [F61-OH1.1, OH1.2, OH1.3]
9.27.8.5. Lapped Strip Siding [F61-OS2.3]
(1) [F21, F61-OH1.1, OH1.2, OH1.3] (2) [F61-OH1.1, OH1.2, OH1.3]
[F21, F61-OS2.3] [F61-OS2.3]
(2) [F61-OH1.1, OH1.2, OH1.3] 9.27.9.5. Clearance
[F61-OS2.3] (1) [F21-OH1.1, OH1.2, OH1.3]
(3) [F61-OH1.1, OH1.2, OH1.3] [F21-OP2.1, OP2.3, OP2.4, OP2.5] Applies where panel-
type cladding is installed to provide the required bracing.
[F61-OS2.3]
[F21-OS2.1, OS2.3]
9.27.9.1. Material Standards
[F21-OS2.1, OS2.3, OS2.4, OS2.5] Applies where panel-
(1) [F20, F22-OH1.1, OH1.2, OH1.3] type cladding is installed to provide the required bracing.
[F20-OS2.1, OS2.3] 9.27.10.1. Material Standard
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5]
(1) [F20, F22-OH1.1, OH1.2, OH1.3]
Applies where panel-type cladding is installed to provide
the required bracing. [F20-OS2.1, OS2.3] [F20-OS2.1, OS2.3, OS2.4] Applies
where panel-type cladding is installed to provide required
9.27.9.2. Thickness
bracing.
(1) [F20, F22-OH1.1, OH1.2, OH1.3]
9.27.10.2. Thickness
[F20-OP2.1, OP2.3, OP2.4] [F22-OP2.3, OP2.4, OP2.5]
(1) [F20, F22-OH1.1, OH1.2, OH1.3]
Applies where panel-type cladding is installed to provide
the required bracing. [F20, 22-OS2.1, OS2.3]
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5]
[F20, F22-OS2.1, OS2.3]
Applies where panel-type cladding is installed to provide
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5]
the required bracing.
Applies where panel-type cladding is installed to provide
the required bracing. (2) [F20-OP2.1, OP2.3, OP2.4] [F22-OP2.3, OP2.4, OP2.5]
Applies where panel-type cladding is installed to provide
(2) [F20, F22-OH1.1, OH1.2, OH1.3]
the required bracing.
[F20-OP2.1, OP2.3, OP2.4] [F22-OP2.3, OP2.4, OP2.5]
[F20, F22-OH1.1, OH1.2, OH1.3]
Applies where panel-type cladding is installed to provide
the required bracing. [F20, F22-OS2.1, OS2.3]
[F20, F22-OS2.1, OS2.3]
SA-1 • Page 159
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5] (3) [F62,F61,F20,F42-OH1.1,OH1.2,OH1.3]
Applies where panel-type cladding is installed to provide [F62,F61,F20,F42-OS2.3]
the required bracing. (4) [F02-OS1.2]
(3) [F20, F22-OH1.1, OH1.2, OH1.3] [F02-OP1.2]
[F20, 22-OS2.1, OS2.3]
9.27.13.1. Material Standard
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5]
Applies where panel-type cladding is installed to provide (1) [F62,F61,F20-OH1.1,OH1.2,OH1.3]
the required bracing. [F62,F61,F20-OS2.3]
(4) [F20-OP2.1, OP2.3, OP2.4] [F22-OP2.3, OP2.4, OP2.5] (2) [F02-OS1.2]
Applies where panel-type cladding is installed to provide [F02-OS1.2]
the required bracing.
9.27.14.2. Materials
[F20, F22-OH1.1, OH1.2, OH1.3]
(1) [F20, F61, F62-OH1.1, OH1.2, OH1.3]
[F20, F22-OS2.1, OS2.3]
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5] [F20, F61, F62-OH2.3]
Applies where panel-type cladding is installed to provide (2) [F20, F22-OH1.1, OH1.2, OH1.3]
the required bracing. [F20, F22-OS2.3]
9.27.10.3. Panel Cladding 9.27.14.3 Design and Installation
(1) [F20, F22, F80-OH1.1, OH1.2, OH1.3] (1) [F20,F61,F62-OH1.1,OH1.2,OH1.3]
[F20, F22, F80-OS2.1, OS2.3] [F20,F61,F62-OS2.3]
[F20, F80-OS2.1, OS2.3, OS2.4] [F22, F80-OS2.3, OS2.4,
9.28.1.1. Sheathing Beneath Stucco
OS2.5] Applies where panel-type cladding is installed to
provide the required bracing. (1) [F20, F22-OH1.1, OH1.2, OH1.3]
(2) [F21-OH1.1, OH1.2, OH1.3] [F20, F22-OS2.3]
[F21-OS2.3] 9.28.1.2. Lath and Reinforcing
(3) [F61-OH1.1, OH1.2, OH1.3] (1) [F20-OH1.1, OH1.2, OH1.3]
[F61-OS2.3] [F20-OS2.3]
(4) [F61-OH1.1, OH1.2, OH1.3] (2) [F20-OH1.1, OH1.2, OH1.3]
[F61-OS2.3] [F20-OS2.3]
9.27.10.4. Clearance (3) [F20, F21-OH1.1]
(1) [F21-OH1.1, OH1.2, OH1.3] [F20, F21-OP1.1]
[F21-OP2.1, OP2.3, OP2.4, OP2.5] Applies where panel- [F20, F21-OS1.1]
type cladding is installed to provide the required bracing. [F20, F21-OS2.3]
[F21-OS2.1, OS2.3] [F20, F21-OS3.4]
[F21-OS2.1, OS2.3, OS2.4, OS2.5] Applies where panel-
9.28.1.3. Concrete Masonry Units
type cladding is installed to provide the required bracing.
(1) [F80-OH1.1, OH1.2, OH1.3]
9.27.11.1. Material Standards
[F80-OP1.1] Applies where stucco is applied to masonry
(1) [F20,F22,F61-OH1.1,OH1.2,OH1.3] chimneys.
[F20-OS2.1,OS2.3] [F22,F61-OS2.3] [F80-OS1.1] Applies where stucco is applied to masonry
[F20-OS2.1,OS2.3,OS2.4] [F22-OS2.3,OS2.4,OS2.5] chimneys.
Applies where panel-type cladding is installed to provide [F80-OS2.3]
the required bracing. [F80-OS3.4] Applies where stucco is applied to masonry
(2) [F20, F22, F61-OH1.1, OH1.2, OH1.3] chimneys.
[F20-OS2.1, OS2.3] [F22, F61-OS2.3] 9.28.1.4. Clearance over Ground Level
(3) [F20, F22, F61-OH1.1, OH1.2, OH1.3] (1) [F80-OH1.1, OH1.2, OH1.3]
[F20-OS2.1, OS2.3] [F22, F61-OS2.3] [F80-OS2.3]
[F20-OS2.1, OS2.3, OS2.4] [F22-OS2.3, OS2.4, OS2.5] 9.28.1.5. Flashing and Caulking
Applies where panel-type cladding is installed to provide (1) [F80-OH1.1, OH1.2, OH1.3] Applies to the separation of
the required bracing. aluminum flashing from stucco.
9.27.12.1. Material Standard [F80-OS2.3] Applies to the separation of aluminum
(1) [F62,F61,F20-OH1.1,OH1.2,OH1.3] flashing from stucco.
[F62,F61,F20-OS2.3] 9.28.2.1. Portland Cement
(2) [F62,F61,F20-OH1.1,OH1.2,OH1.3] (1) [F20-OH1.1, OH1.2, OH1.3]
[F62,F61,F20-OS2.3]
Page 160 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OP1.1] Applies where stucco is applied to masonry [F20-OP1.1] Applies where stucco is applied to masonry
chimneys. chimneys.
[F20-OS1.1] Applies where stucco is applied to masonry [F20-OS1.1] Applies where stucco is applied to masonry
chimneys. chimneys.
[F20-OS2.3] [F20-OS2.3]
[F20-OS3.4] Applies where stucco is applied to masonry [F20-OS3.4] Applies where stucco is applied to masonry
chimneys. chimneys.
9.28.2.2. Aggregate (4) [F20-OS2.1]
(1) [F80-OH1.1, OH1.2, OH1.3] 9.28.4.1. Materials
[F80-OP1.1] Applies where stucco is applied to masonry (1) [F80-OH1.1, OH1.2, OH1.3]
chimneys. [F80-OP1.1] Applies where stucco is applied to masonry
[F80-OS1.1] Applies where stucco is applied to masonry chimneys.
chimneys. [F80-OS1.1] Applies where stucco is applied to masonry
[F80-OS2.3] chimneys.
[F80-OS3.4] Applies where stucco is applied to masonry [F80-OS2.3]
chimneys. [F80-OS3.4] Applies where stucco is applied to masonry
(2) [F20, F80-OH1.1, OH1.2, OH1.3] chimneys.
[F20, F80-OP1.1] Applies where stucco is applied to (2) [F80-OH1.1, OH1.2, OH1.3]
masonry chimneys. [F80-OP1.1] Applies where stucco is applied to masonry
[F20, F80-OS1.1] Applies where stucco is applied to chimneys.
masonry chimneys. [F80-OS1.1] Applies where stucco is applied to masonry
[F20, F80-OS2.3] chimneys.
[F20, F80-OS3.4] Applies where stucco is applied to [F80-OS2.3]
masonry chimneys. [F80-OS3.4] Applies where stucco is applied to masonry
9.28.2.3. Water chimneys.
(1) [F80-OH1.1, OH1.2, OH1.3] 9.28.4.2. No Sheathing Required
[F80-OP1.1] Applies where stucco is applied to masonry (1) [F20-OH1.1, OH1.2, OH1.3]
chimneys. [F20-OS2.3]
[F80-OS1.1] Applies where stucco is applied to masonry 9.28.4.3. Stucco Lath Specifications
chimneys. (1) [F20-OH1.1, OH1.2, OH1.3]
[F80-OS2.3] [F20-OP1.1] Applies where stucco is applied to masonry
[F80-OS3.4] Applies where stucco is applied to masonry chimneys.
chimneys. [F20-OS1.1] Applies where stucco is applied to masonry
9.28.3.1. Materials chimneys.
(1) [F80-OH1.1, OH1.2, OH1.3] [F20-OS2.3]
[F80-OP1.1] Applies where stucco is applied to masonry [F20-OS3.4] Applies where stucco is applied to masonry
chimneys. chimneys.
[F80-OS1.1] Applies where stucco is applied to masonry 9.28.4.4. Self-Furring Devices
chimneys. (1) [F20, F80-OH1.1, OH1.2, OH1.3]
[F80-OS2.3] [F20, F80-OP1.1] Applies where stucco is applied to
[F80-OS3.4] Applies where stucco is applied to masonry masonry chimneys.
chimneys. [F20, F80-OS1.1] Applies where stucco is applied to
9.28.3.2. Nails and Staples masonry chimneys.
(1) [F20-OH1.1, OH1.2, OH1.3] [F20, F80-OS2.3]
[F20-OP1.1] Applies where stucco is applied to masonry [F20, F80-OS3.4] Applies where stucco is applied to
chimneys. masonry chimneys.
[F20-OS1.1] Applies where stucco is applied to masonry 9.28.4.5. Application of Stucco Lath
chimneys. (1) [F20-OH1.1, OH1.2, OH1.3]
[F20-OS2.3] [F20-OP1.1] Applies where stucco is applied to masonry
[F20-OS3.4] Applies where stucco is applied to masonry chimneys.
chimneys. [F20-OS1.1] Applies where stucco is applied to masonry
(2) [F20-OH1.1, OH1.2, OH1.3] chimneys.
[F20-OS2.3] [F20-OS2.3]
(3) [F20-OH1.1, OH1.2, OH1.3]
SA-1 • Page 161
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OS3.4] Applies where stucco is applied to masonry [F20, F80-OS3.4] Applies where stucco is applied to
chimneys. masonry chimneys.
(2) [F20-OH1.1, OH1.2, OH1.3] (2) [F20, F80-OH1.1, OH1.2, OH1.3]
[F20-OP1.1] Applies where stucco is applied to masonry [F20, F80-OS2.3]
chimneys. 9.28.5.3. Mixing
[F20-OS1.1] Applies where stucco is applied to masonry (1) [F20, F80-OH1.1, OH1.2, OH1.3]
chimneys. [F20, F80-OP1.1] Applies where stucco is applied to
[F20-OS2.3] masonry chimneys.
[F20-OS3.4] Applies where stucco is applied to masonry [F20, F80-OS1.1] Applies where stucco is applied to
chimneys. masonry chimneys.
(3) [F20-OH1.1, OH1.2, OH1.3] [F20, F80-OS2.3]
[F20-OS2.3] [F20, F80-OS3.4] Applies where stucco is applied to
(4) [F20-OH1.1, OH1.2, OH1.3] masonry chimneys.
[F20-OP1.1] Applies where stucco is applied to masonry (2) [F20, F80-OH1.1, OH1.2, OH1.3]
chimneys. [F20, F80-OP1.1] Applies where stucco is applied to
[F20-OS1.1] Applies where stucco is applied to masonry masonry chimneys.
chimneys. [F20, F80-OS1.1] Applies where stucco is applied to
[F20-OS2.3] masonry chimneys.
[F20-OS3.4] Applies where stucco is applied to masonry [F20, F80-OS2.3]
chimneys. [F20, F80-OS3.4] Applies where stucco is applied to
9.28.4.6. Fastening masonry chimneys.
(2) [F20-OH1.1, OH1.2, OH1.3] 9.28.6.1. Low Temperature Conditions
[F20-OP1.1] Applies where stucco is applied to masonry (1) [F20, F80-OH1.1, OH1.2, OH1.3]
chimneys. [F20, F80-OP1.1] Applies where stucco is applied to
[F20-OS1.1] Applies where stucco is applied to masonry masonry chimneys.
chimneys. [F20, F80-OS1.1] Applies where stucco is applied to
[F20-OS2.3] masonry chimneys.
[F20-OS3.4] Applies where stucco is applied to masonry [F20, F80-OS2.3].
chimneys. [F20, F80-OS3.4] Applies where stucco is applied to
(3) [F20-OH1.1, OH1.2, OH1.3] masonry chimneys.
[F20-OP1.1] Applies where stucco is applied to masonry (2) [F20, F80-OH1.1, OH1.2, OH1.3]
chimneys. [F20, F80-OP1.1] Applies where stucco is applied to
[F20-OS1.1] Applies where stucco is applied to masonry masonry chimneys.
chimneys. [F20, F80-OS1.1] Applies where stucco is applied to
[F20-OS2.3] masonry chimneys.
[F20-OS3.4] Applies where stucco is applied to masonry [F20, F80-OS2.3]
chimneys. [F20, F80-OS3.4] Applies where stucco is applied to
(4) [F20-OS2.1] masonry chimneys.
9.28.5.1. Mixes 9.28.6.2. Number of Coats and Total Thickness
(1) [F20, F61, F80-OH1.1, OH1.2, OH1.3] (1) [F20, F80-OH1.1, OH1.2, OH1.3]
[F20, F61, F80-OP1.1] Applies where stucco is applied to [F20, F80-OP1.1] Applies where stucco is applied to
masonry chimneys. masonry chimneys.
[F20, F61, F80-OS1.1] Applies where stucco is applied to [F20, F80-OS1.1] Applies where stucco is applied to
masonry chimneys. masonry chimneys.
[F20, F61, F80-OS2.3] [F20, F80-OS2.3]
[F20, F61, F80-OS3.4] Applies where stucco is applied to [F20, F80-OS3.4] Applies where stucco is applied to
masonry chimneys. masonry chimneys.
9.28.5.2. Pigments 9.28.6.3. First Coat
(1) [F20, F80-OH1.1, OH1.2, OH1.3] (1) [F20, F80-OH1.1, OH1.2, OH1.3]
[F20, F80-OP1.1] Applies where stucco is applied to [F20, F80-OP1.1] Applies where stucco is applied to
masonry chimneys. masonry chimneys.
[F20, F80-OS1.1] Applies where stucco is applied to [F20, F80-OS1.1] Applies where stucco is applied to
masonry chimneys. masonry chimneys.
[F20, F80-OS2.3] [F20, F80-OS2.3]
Page 162 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F80-OS3.4] Applies where stucco is applied to [F80, F81-OS2.3]
masonry chimneys. [F80, F81-OH1.1, OH1.2] Applies where interior finishes
(2) [F20-OH1.1, OH1.2, OH1.3] support or serve as required environmental separation
[F20-OP1.1] Applies where stucco is applied to masonry elements.
chimneys. [F80, F81-OS1.2] Applies where interior finishes are
[F20-OS1.1] Applies where stucco is applied to masonry required to act as fire protection for foamed plastics or to
chimneys. contribute to the required fire resistance of assemblies.
[F20-OS2.3] 9.29.2.2. Materials
[F20-OS3.4] Applies where stucco is applied to masonry (1) [F80-OP2.3, OP2.4]
chimneys. [F80-OS1.2] Applies where interior finishes are required to
9.28.6.4. Second Coat act as fire protection for foamed plastics or to contribute to
(1) [F20-OH1.1, OH1.2, OH1.3] the required fire resistance of assemblies.
[F20-OP1.1] Applies where stucco is applied to masonry [F80-OS2.3]
chimneys. [F80, F81-OH1.1, OH1.2] Applies where interior finishes
[F20-OS1.1] Applies where stucco is applied to masonry support or serve as required environmental separation
chimneys. elements.
[F20-OS2.3] 9.29.3.1. Size and Spacing of Furring
[F20-OS3.4] Applies where stucco is applied to masonry (1) [F20, F22-OP2.1, OP2.4]
chimneys. [F20, F22-OH1.1, OH1.2] Applies where interior finishes
(2) [F20-OH1.1, OH1.2, OH1.3] support or serve as required environmental separation
elements.
[F20-OP1.1] Applies where stucco is applied to masonry
chimneys. [F20, F22-OS1.2] Applies where interior finishes are
required to act as fire protection for foamed plastics or to
[F20-OS1.1] Applies where stucco is applied to masonry
contribute to the required fire resistance of assemblies.
chimneys.
[F20, F22-OS2.1]
[F20-OS2.3]
9.29.3.2. Fastening
[F20-OS3.4] Applies where stucco is applied to masonry
chimneys. (1) [F20-OP2.1, OP2.4]
9.28.6.5. Finish Coat [F20-OH1.1, OH1.2] Applies where interior finishes
support or serve as required environmental separation
(1) [F80-OH1.1, OH1.2, OH1.3]
elements.
[F80-OP1.1] Applies where stucco is applied to masonry
[F20-OS1.2] Applies where interior finishes are required to
chimneys.
act as fire protection for foamed plastics or to contribute to
[F80-OS1.1] Applies where stucco is applied to masonry the required fire resistance of assemblies.
chimneys.
[F20-OS2.1]
[F80-OS2.3]
9.29.4.1. Application
[F80-OS3.4] Applies where stucco is applied to masonry
(1) [F20, F80-OS2.1, OS2.3]
chimneys.
[F20, F80-OP2.1, OP2.3] [F22, F80-OP2.4]
(2) [F20-OH1.1, OH1.2, OH1.3]
[F20, F22, F81, F90-OH1.1, OH1.2] Applies where interior
[F20-OP1.1] Applies where stucco is applied to masonry
finishes support or serve as required environmental
chimneys.
separation elements.
[F20-OS1.1] Applies where stucco is applied to masonry
[F20, F80-OS1.2] Applies where interior finishes are
chimneys.
required to act as fire protection for foamed plastics or to
[F20-OS2.3] contribute to the required fire resistance of assemblies.
[F20-OS3.4] Applies where stucco is applied to masonry
9.29.5.1. Application
chimneys.
(1) [F20, F80-OP2.1, OP2.3] [F22, F80-OP2.4]
(3) [F80-OH1.1, OH1.2, OH1.3]
[F20, F22, F80-OS1.2] Applies where interior finishes are
[F80-OP1.1] Applies where stucco is applied to masonry
required to act as fire protection for foamed plastics or to
chimneys. contribute to the required fire resistance of assemblies.
[F80-OS1.1] Applies where stucco is applied to masonry [F20, F80-OS2.1, OS2.3]
chimneys.
[F20, F22, F80, F81-OH1.1, OH1.2] Applies where interior
[F80-OS2.3]
finishes support or serves as required environmental
[F80-OS3.4] Applies where stucco is applied to masonry separation elements.
chimneys.
(3) [F20, F80-OP2.1, OP2.3] [F22, F80-OP2.4]
9.29.2.1. Where Required
(1) [F80, F81-OP2.3, OP2.4]
SA-1 • Page 163
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22, F80-OS1.2] Applies where interior finishes are [F20-OH1.1, OH1.2] Applies where interior finishes
required to act as fire protection for foamed plastics or to support or serve as required environmental separation
contribute to the required fire resistance of assemblies. elements.
[F20, F80-OS2.1, OS2.3] [F20-OS1.2] Applies where interior finishes are required to
[F20, F22, F80, F81-OH1.1, OH1.2] Applies where interior act as fire protection for foamed plastics or to contribute to
finishes support or serves as required environmental the required fire resistance of assemblies.
separation elements. [F20-OS2.1]
9.29.5.2. Materials 9.29.5.8. Spacing of Nails
(1) [F20, F80-OP2.1, OP2.3] [F22, F80-OP2.4] (1) [F20-OH1.1, OH1.2] Applies where interior finishes
[F20, F22, F80-OS1.2] Applies where interior finishes are support or serve as required environmental separation
required to act as fire protection for foamed plastics or to elements.
contribute to the required fire resistance of assemblies. [F20-OP1.2] Applies where interior finishes are required to
[F20, F80-OS2.1, OS2.3] act as fire protection for foamed plastics or to contribute to
[F20, F22, F80, F81-OH1.1, OH1.2] Applies where interior the required fire resistance of assemblies.
finishes support or serves as required environmental [F20-OP2.1]
separation elements. [F20-OP2.3] Applies where interior finishes support or
9.29.5.3. Maximum Spacing of Supports serve as required environmental separation elements.
(1) [F20-OP2.1] [F20, F22-OP2.4] [F20-OS1.2] Applies where interior finishes are required to
[F20, F22-OH1.1, OH1.2] Applies where interior finishes act as fire protection for foamed plastics or to contribute to
support or serve as required environmental separation the required fire resistance of assemblies.
elements. [F20-OS2.1]
[F20, F22-OS1.2] Applies where interior finishes are [F20-OS2.3] Applies where interior finishes support or
required to act as fire protection for foamed plastics or to serve as required environmental separation elements.
contribute to the required fire resistance of assemblies. (3) [F20-OH1.1, OH1.2] Applies where interior finishes
[F20-OS2.1] support or serve as required environmental separation
9.29.5.4. Support of Insulation elements.
(1) [F20-OS2.1] [F20-OP2.1]
[F20-OP2.1] [F20, F22-OP2.4] [F20-OP2.3] Applies where interior finishes support or
[F20, F22-OH1.1, OH1.2] Applies where interior finishes serve as required environmental separation elements.
support or serve as required environmental separation [F20-OS2.1]
elements. [F20-OS2.3] Applies where interior finishes support or
[F20, F22-OS1.2] Applies where interior finishes are serve as required environmental separation elements.
required to act as fire protection for foamed plastics or to (4) [F20-OP1.2] Applies where interior finishes are required to
contribute to the required fire resistance of assemblies. act as fire protection for foamed plastics or to contribute to
9.29.5.5. Length of Fasteners the required fire resistance of assemblies.
(1) [F20-OP2.1, OP2.4] [F20-OP2.1]
[F20-OH1.1, OH1.2] Applies where interior finishes [F20-OP2.5] [F22-OP2.4, OP2.5] Applies where interior
support or serve as required environmental separation finishes contribute to the required bracing or lateral
elements. support for studs.
[F20-OS1.2] Applies where interior finishes are required to [F20, F22-OP2.3] Applies where interior finishes support or
act as fire protection for foamed plastics or to contribute to serve as required environmental separation elements.
the required fire resistance of assemblies. [F20-OP3.1] Applies where interior finishes are installed to
[F20-OS2.1] contribute to the required fire resistance of exterior walls.
9.29.5.6. Nails [F20-OS1.2] Applies where interior finishes are required to
(1) [F20-OP2.1, OP2.4] act as fire protection for foamed plastics or to contribute to
the required fire resistance of assemblies.
[F20-OH1.1, OH1.2] Applies where interior finishes
support or serve as required environmental separation [F20-OS2.1]
elements. [F20-OS2.5] [F22-OS2.4, OS2.5] Applies where interior
finishes contribute to the required bracing or lateral
[F20-OS1.2] Applies where interior finishes are required to
support for studs.
act as fire protection for foamed plastics or to contribute to
the required fire resistance of assemblies. [F20, F22-OS2.3] Applies where interior finishes support or
serve as required environmental separation elements.
[F20-OS2.1]
9.29.5.7. Screws
(1) [F20-OP2.1, OP2.4]
Page 164 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OS3.1, OS3.7] Applies where walls support [F20-OS1.2] Applies where interior finishes are required to
floors and where interior finishes contribute to the required act as fire protection for foamed plastics or to contribute to
bracing or lateral support studs or where interior support or the required fire resistance of assemblies.
serve as required environmental separation elements. [F20-OS2.1]
[F20, F22-OH1.1, OH1.2, OH1.3] Applies where interior [F20-OS2.5] [F22-OS2.4, OS2.5] Applies where interior
finishes contribute to the required bracing or lateral finishes contribute to the required bracing or lateral
support for studs or where finishes support or serve as support for studs.
required environmental separation elements. [F20, F22-OS2.3] Applies where interior finishes support or
[F20, F22-OH4] Applies where walls support floors and serve as required environmental separation elements.
where interior finishes contribute to the required bracing or [F20-OS3.1, OS3.7] Applies where walls support floors
lateral support studs or where interior support or serve as and where interior finishes contribute to the required
required environmental separation elements. bracing or lateral support for studs or where interior
(5) [F20-OP1.2] Applies where interior finishes are required to finishes support or serve as required environmental
act as fire protection for foamed plastics or to contribute to separation elements.
the required fire resistance of assemblies. [F20, F22-OH1.1, OH1.2, OH1.3] Applies where interior
[F20-OP2.1] finishes support or serve as required environmental
[F20-OP2.5] [F22-OP2.4, OP2.5] Applies where interior separation elements.
finishes contribute to the required bracing or lateral [F20-OH4] Applies where walls support floors and where
support for studs. interior finishes contribute to the required bracing or lateral
[F20, F22-OP2.3] Applies where interior finishes support or support for studs or where interior support or serve as
serve as required environmental separation elements. required environmental separation elements.
[F20-OP3.1] Applies where interior finishes are installed to (7) [F20-OP1.2] Applies where interior finishes are required to
contribute to the required fire resistance of exterior walls. act as fire protection for foamed plastics or to contribute to
[F20-OS1.2] Applies where interior finishes are required to the required fire resistance of assemblies.
act as fire protection for foamed plastics or to contribute to [F20-OP2.1]
the required fire resistance of assemblies. [F20-OP2.5] [F22-OP2.4, OP2.5] Applies where interior
[F20-OS2.1] finishes contribute to the required bracing or lateral
[F20-OS2.5] [F22-OS2.4, OS2.5] Applies where interior support for studs.
finishes contribute to the required bracing or lateral [F20, F22-OP2.3] Applies where interior finishes support or
support for studs. serve as required environmental separation elements.
[F20, F22-OS2.3] Applies where interior finishes support or [F20-OP3.1] Applies where interior finishes are installed to
serve as required environmental separation elements. contribute to the required fire resistance of exterior walls.
[F20-OS3.1, OS3.7] Applies where walls support floors [F20-OS1.2] Applies where interior finishes are required to
and where interior finishes contribute to the required act as fire protection for foamed plastics or to contribute to
bracing or lateral support for studs or where interior the required fire resistance of assemblies.
finishes support or serve as required environmental [F20-OS2.1]
separation elements. [F20-OS2.5] [F22-OS2.4, OS2.5] Applies where interior
[F20, F22-OH1.1, OH1.2, OH1.3] Applies where interior finishes contribute to the required bracing or lateral
finishes contribute to the required bracing or lateral support for studs.
support for studs or where interior finishes support or [F20, F22-OS2.3] Applies where interior finishes support or
serve as required environmental separation elements. serve as required environmental separation elements.
[F20-OH4] Applies where walls support floors and where [F20-OS3.1, OS3.7] Applies where walls support floors
interior finishes contribute to the required bracing or lateral and where interior finishes contribute to the required
support for studs or where interior support or serve as bracing or lateral support for studs or where interior
required environmental separation elements. finishes support or serve as required environmental
separation elements.
(6) [F20-OP1.2] Applies where interior finishes are required to
act as fire protection for foamed plastics or to contribute to [F20, F22-OH1.1, OH1.2, OH1.3] Applies where interior
the required fire resistance of assemblies. finishes contribute to the required bracing or lateral
support for studs or where interior finishes support or
[F20-OP2.1]
serve as required environmental separation elements.
[F20-OP2.5] [F22-OP2.4, OP2.5] Applies where interior
finishes contribute to the required bracing or lateral [F20-OH4] Applies where walls support floors and where
support for studs. interior finishes contribute to the required bracing or lateral
[F20, F22-OP2.3] Applies where interior finishes support or support for studs or where interior finishes support or
serve as required environmental separation elements. serve as required environmental separation elements.
SA-1 • Page 165
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.29.5.9. Spacing of Screws [F20, F22-OS3.1, OS3.7] Applies where the walls support
(1) [F20-OH1.1, OH1.2] Applies where interior finishes floors and where interior finishes contribute to the required
support or serve as required environmental separation bracing or lateral support for studs or where interior
elements. finishes support or serve as required environmental
separation elements.
[F20-OP1.2] Applies where interior finishes are required to
act as fire protection for foamed plastics or to contribute to [F20, F22-OH1.1, OH1.2, OH1.3] Applies where interior
the required fire resistance of assemblies. finishes contribute to the required bracing or lateral
support for studs or where interior finishes support or
[F20-OP2.1]
serve as required environmental separation elements.
[F20-OP2.3] Applies where interior finishes support or
serve as required environmental separation elements. [F20, F22-OH4] Applies where the walls support floors and
where interior finishes contribute to the required bracing or
[F20-OS1.2] Applies where interior finishes are required to lateral support for studs or where interior finishes support
act as fire protection for foamed plastics or to contribute to or serve as required environmental separation elements.
the required fire resistance of assemblies.
(6) [F20-OP1.2] Applies where interior finishes are required to
[F20-OS2.1] act as fire protection for foamed plastics or to contribute to
[F20-OS2.3] Applies where interior finishes support or the required fire resistance of assemblies.
serve as required environmental separation elements.
[F20-OP2.1]
(3) [F20-OH1.1, OH1.2, OH1.3] Applies where interior finishes [F20-OP2.5] [F22-OP2.4, OP2.5] Applies where interior
support or serve as required environmental separation finishes contribute the required bracing or lateral support
elements. for studs.
[F20-OP1.2] Applies where gypsum board is required to [F20, F22-OP2.3] Applies where interior finishes support or
provide the fire resistance and the rating of the assembly serve as required environmental separation elements.
is determined according to Table 1 in SB-3. [F20-OP3.1] Applies where interior finishes are installed to
[F20-OP2.1] contribute to the required fire resistance of exterior walls.
[F20-OP2.3] Applies where interior finishes support or [F20-OS1.2] Applies where interior finishes are required to
serve as required environmental separation elements. act as fire protection for foamed plastics or to contribute to
[F20-OP3.1] Applies where interior finishes are installed to the required fire resistance of assemblies.
contribute to the required fire resistance of exterior walls. [F20-OS2.1]
[F20-OS1.2] Applies where gypsum board is required to [F20-OS2.5] [F22-OS2.4, OS2.5] Applies where interior
provide the fire resistance and the rating of the assembly finishes contribute the required bracing or lateral support
is determined according to Table 1 in SB-3. for studs.
[F20-OS2.1] [F20, F22-OS2.3] Applies where interior finishes support or
[F20-OS2.3] Applies where interior finishes support or serve as required environmental separation elements.
serve as required environmental separation elements. [F20-OS3.1, OS3.7] Applies where the walls support floors
[F20-OS2.1] and where interior finishes contribute to the required
[F20-OS2.3] Applies where interior finishes support or bracing or lateral support for studs or where interior
serve as required environmental separation elements. finishes support or serve as required environmental
(4) [F20-OP1.2] Applies where interior finishes are required to separation elements.
act as fire protection for foamed plastics or to contribute to [F20, F22-OH1.1, OH1.2, OH1.3] Applies where interior
the required fire resistance of assemblies. finishes contribute to the required bracing or lateral
[F20-OP2.1] support for studs or where interior finishes support or
[F20-OP2.5] [F22-OP2.4, OP2.5] Applies where interior serve as required environmental separation elements.
finishes contribute to the required bracing or lateral [F20-OH4] Applies where walls support floors and where
support for studs. interior finishes contribute to the required bracing or lateral
[F20, F22-OP2.3] Applies where interior finishes support or support for studs or where interior finishes support or
serve as required environmental separation elements. serve as required environmental separation elements.
[F20-OP3.1] Applies where interior finishes are installed to (7) [F20-OP1.2] Applies where interior finishes are required to
contribute to the required fire resistance of exterior walls. act as fire protection for foamed plastics or to contribute to
[F20-OS1.2] Applies where interior finishes are required to the required fire resistance of assemblies.
act as fire protection for foamed plastics or to contribute to [F20-OP2.1]
the required fire resistance of assemblies. [F20-OP2.5] [F22-OP2.4, OP2.5] Applies where interior
[F20-OS2.1] finishes contribute the required bracing or lateral support
[F20-OS2.5] [F22-OS2.4, OS2.5] Applies where interior for studs.
finishes contribute to the required bracing or lateral [F20, F22-OP2.3] Applies where interior finishes support or
support for studs. serve as required environmental separation elements.
[F20, F22-OS2.3] Applies where interior finishes support or [F20-OP3.1] Applies where interior finishes are installed to
serve as required environmental separation elements. contribute to the required fire resistance of exterior walls.
Page 166 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OS1.2] Applies where interior finishes are required to provide fire resistance.
act as fire protection for foamed plastics or to contribute to [F22-OS3.1] Applies to walls that support floors.
the required fire resistance of assemblies. [F22-OS3.7] Applies to walls that contain doors or
[F20-OS2.1] windows required for emergency egress.
[F20-OS2.5] [F22-OS2.4, OS2.5] Applies where interior [F20,F22-OH4] Applies to walls that support floors.
finishes support or serve as required environmental [F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that
separation elements. support or are part of an environmental separator.
[F20, F22-OS2.3] Applies where interior finishes support or
9.29.6.4. Edge Support
serve as required environmental separation elements.
(1) [F20-OP2.1] [F20, F22-OP2.4]
[F20-OS3.1, OS3.7] Applies where the walls support floors
and where interior finishes contribute to the required [F20, F22-OH1.1, OH1.2] Applies where interior finishes
bracing or lateral support for studs or where interior support or serve as required environmental separation
finishes support or serve as required environmental elements.
separation elements. [F20, F22-OS1.2] Applies where interior finishes are
[F20, F22-OH1.1, OH1.2, OH1.3] Applies where interior required to act as fire protection for foamed plastics or to
finishes contribute to the required bracing or lateral contribute to the required fire resistance of assemblies.
support for studs or where interior finishes support or [F20-OS2.1]
serve as required environmental separation elements. 9.29.7.1. Material Standard
[F20-OH4] Applies where walls support floors and where (1) [F20, F80-OP2.1, OP2.3] [F20, F22-OP2.4]
interior finishes contribute to the required bracing or lateral [F20, F22, F80-OS1.2] Applies where interior finishes are
support for studs or where interior finishes support or required to act as fire protection for foamed plastics or to
serve as required environmental separation elements. contribute to the required fire resistance of assemblies.
9.29.5.10. Low Temperature Conditions [F20, F80-OS2.1, OS2.3]
(1) [F81-OS1.2] Applies where the finishing of joints is [F20, F22, F80-OH1.1, OH1.2] Applies where interior
required to maintain required fire-resistance ratings. finishes support or serve as required environmental
9.29.6.1. Thickness separation elements.
(1) [F20-OP2.1] [F20, F22-OP2.4] 9.29.7.2. Thickness
[F20, F22-OH1.1, OH1.2] Applies where interior finishes (1) [F20-OP2.1] [F20, F22-OP2.4]
support or serve as required environmental separation [F20, F22-OH1.1, OH1.2] Applies where interior finishes
elements. support or serve as required environmental separation
[F20, F22-OS1.2] Applies where interior finishes are elements.
required to act as fire protection for foamed plastics or to [F20-OS2.1]
contribute to the required fire resistance of assemblies. [F20, F22-OS1.2] Applies where interior finishes are
[F20-OS2.1] required to act as fire protection for foamed plastics or to
9.29.6.2. Grooved Plywood contribute to the required fire resistance of assemblies.
(1) [F20, F22-OS1.2] Applies where interior finishes are 9.29.7.3. Nails
required to act as fire protection for foamed plastics or to (1) [F20-OP2.1] [F20, F22-OP2.4]
contribute to the required fire resistance of assemblies. [F20, F22-OH1.1, OH1.2] Applies where interior finishes
[F20-OS2.1] support or serve as required environmental separation
[F20-OP2.1] [F20, F22-OP2.4] elements.
[F20, F22-OH1.1, OH1.2] Applies where interior finishes [F20, F22-OS1.2] Applies where interior finishes are
support or serve as required environmental separation required to act as fire protection for foamed plastics or to
elements. contribute to the required fire resistance of assemblies.
9.29.6.3. Nails and Staples [F20-OS2.1]
(1) [F20-OP2.1] [F20, F22-OP2.4] 9.29.7.4. Edge Support
[F20, F22-OH1.1, OH1.2] Applies where interior finishes (1) [F20-OP2.1] [F20, F22-OP2.4]
support or serve as required environmental separation [F20, F22-OH1.1, OH1.2] Applies where interior finishes
elements. support or serve as required environmental separation
[F20, F22-OS1.2] Applies where interior finishes are elements.
required to act as fire protection for foamed plastics or to [F20, F22-OS1.2] Applies where interior finishes are
contribute to the required fire resistance of assemblies. required to act as fire protection for foamed plastics or to
[F20-OS2.1] contribute to the required fire resistance of assemblies.
(2) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5] [F20-OS2.1]
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5] 9.29.8.1. Material Standard
[F20,F22-OS1.2] Applies to assemblies required to (1) [F20F80-OP2.1, OP2.3]
SA-1 • Page 167
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OP2.4] [F20, F22-OS1.2] Applies where interior finishes are
[F20, F22, F80-OS1.2] Applies where interior finishes are required to act as fire protection for foamed plastics or to
required to act as fire protection for foamed plastics or to contribute to the required fire resistance of assemblies.
contribute to the required fire resistance of assemblies. [F20-OS2.1]
[F20, F80-OS2.1, OS2.3] [F20, F22-OH1.1, OH1.2] Applies where interior finishes
[F20, F22, F80, F81-OH1.1, OH1.2] Applies where interior support or serve as required environmental separation
finishes support or serve as required environmental elements.
separation elements. (2) [F20-OP2.1] [F20, F22-OP2.4]
9.29.8.2. Thickness [F20, F22-OS1.2] Applies where interior finishes are
(1) [F20-OP2.1] [F20, F22-OP2.4] required to act as fire protection for foamed plastics or to
[F20, F22-OS1.2] Applies where interior finishes are contribute to the required fire resistance of assemblies.
required to act as fire protection for foamed plastics or to [F20-OS2.1]
contribute to the required fire resistance of assemblies. [F20, F22-OH1.1, OH1.2] Applies where interior finishes
[F20-OS2.1] support or serve as required environmental separation
[F20, F22-OH1.1, OH1.2] Applies where interior finishes elements.
support or serve as required environmental separation 9.29.9.2. Minimum Thickness
elements. (1) [F20-OP2.1] [F20, F22-OP2.4]
(2) [F20-OP2.1] [F20, F22-OP2.4] [F20, F22-OS1.2] Applies where interior finishes are
[F20, F22-OS1.2] Applies where interior finishes are required to act as fire protection for foamed plastics or to
required to act as fire protection for foamed plastics or to contribute to the required fire resistance of assemblies.
contribute to the required fire resistance of assemblies. [F20-OS2.1]
[F20-OS2.1] [F20, F22-OH1.1, OH1.2] Applies where interior finishes
[F20, F22-OH1.1, OH1.2] Applies where interior finishes support or serve as required environmental separation
support or serve as required environmental separation elements.
elements. (4) [F20-OP2.1] [F20, F22-OP2.4]
9.29.8.3. Nails [F20, F22-OS1.2] Applies where interior finishes are
(1) [F20-OP2.1] [F20, F22-OP2.4] required to act as fire protection for foamed plastics or to
[F20, F22-OS1.2] Applies where interior finishes are contribute to the required fire resistance of assemblies.
required to act as fire protection for foamed plastics or to [F20-OS2.1]
contribute to the required fire resistance of assemblies. [F20, F22-OH1.1, OH1.2] Applies where interior finishes
[F20-OS2.1] support or serve as required environmental separation
[F20, F22-OH1.1, OH1.2] Applies where interior finishes elements.
support or serve as required environmental separation (5) [F20-OP2.1]
elements. [F20-OP2.5] [F22-OP2.4, OP2.5] Applies where interior
(2) [F20-OP2.1] [F20, F22-OP2.4] finishes contribute to the required bracing or lateral
support for studs.
[F20, F22-OS1.2] Applies where interior finishes are
[F20, F22-OP2.3] Applies where interior finishes support or
required to act as fire protection for foamed plastics or to
serve as required environmental separation elements.
contribute to the required fire resistance of assemblies.
[F20, F22-OS1.2] Applies where interior finishes are
[F20-OS2.1]
required to act as fire protection for foamed plastics.
[F20, F22-OH1.1, OH1.2] Applies where interior finishes
[F20-OS2.1]
support or serve as required environmental separation
[F20-OS2.5] [F22-OS2.4, OS2.5] Applies where interior
elements.
finishes contribute to the required bracing or lateral
9.29.8.4. Edge Support support for studs.
(1) [F20-OP2.1] [F20, F22-OP2.4] [F20, F22-OS2.3] Applies where interior finishes support or
[F20, F22-OS1.2] Applies where interior finishes are serve as required environmental separation elements.
required to act as fire protection for foamed plastics or to [F20, F22-OH1.1, OH1.2, OH1.3] Applies where interior
contribute to the required fire resistance of assemblies. finishes support or serve as required environmental
[F20-OS2.1] separation elements, or where interior finishes contribute
[F20, F22-OH1.1, OH1.2] Applies where interior finishes to the required bracing of exterior walls.
support or serve as required environmental separation 9.29.9.3. Nails
elements. (1) [F20-OP2.1] [F20, F22-OP2.4]
9.29.9.1. Material Standard [F20, F22-OH1.1, OH1.2] Applies where interior finishes
(1) [F20-OP2.1] [F20, F22-OP2.4] support or serve as required environmental separation
elements.
Page 168 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F22-OS1.2] Applies where interior finishes are [F20-OS2.1]
required to act as fire protection for foamed plastics or to [F20-OS2.5] [F22-OS2.4, OS2.5] Applies where the
contribute to the required fire resistance of assemblies. substrate for the tile contributes to the required bracing or
[F20-OS2.1] lateral support for studs.
(2) [F20-OS2.1,OS2.3,OS2.5] [F22-OS2.3,OS2.4,OS2.5] [F20-OS2.3] Applies where the substrate for the tile serves
as a required environmental separation element or where
[F20-OP2.1,OP2.3,OP2.5] [F22-OP2.3,OP2.4,OP2.5]
the tile is installed to provide the required waterproof wall
[F20,F22-OS1.2] Applies to assemblies required to finish.
provide fire resistance.
[F20, F81-OH1.1, OH1.2] Applies where the substrate
[F22-OS3.1] Applies to walls that support floors. serves as a required environmental separation element.
[F22-OS3.7] Applies to walls that contain doors or
9.29.10.2. Mortar Base
windows required for emergency egress.
(1) [F20-OP2.1]
[F20,F22-OH4] Applies to walls that support floors.
[F20-OP2.5] [F22-OP2.4, OP2.5] Applies where the
[F20,F22-OH1.1,OH1.2,OH1.3] Applies to elements that substrate for the tile contribute to the required bracing or
support or are part of an environmental separator. lateral support for studs.
9.29.9.4. Edge Support [F20-OP2.3] Applies where the substrate for the tile serves
(1) [F20-OP2.1] [F20, F22-OP2.4] as a require environmental separation element or where
[F20, F22-OH1.1, OH1.2] Applies where interior finishes the tile is installed to provide the required waterproof wall
support or serve as required environmental separation finish.
elements. [F20-OS1.2] Applies where the substrate is required to act
[F20, F22-OS1.2] Applies where interior finishes are as fire protection for foamed plastics or to contribute to the
required to act as fire protection for foamed plastics or to required fire resistance of assemblies.
contribute to the required fire resistance of assemblies. [F20-OS2.1]
[F20-OS2.1] [F20-OS2.5] [F22-OS2.4, OS2.5] Applies where the
9.29.10.1. Tile Application substrate for the tile contributes to the required bracing or
lateral support for studs.
(1) [F20-OP2.1]
[F20-OS2.3] Applies where the substrate for the tile serves
[F20-OP2.5] [F22-OP2.4, OP2.5] Applies where the
as a required environmental separation element or where
substrate for the tile contribute to the required bracing or
the tile is installed to provide the required waterproof wall
lateral support for studs.
finish.
[F20-OP2.3] Applies where the substrate for the tile serves
as a require environmental separation element or where [F20, F81-OH1.1, OH1.2] Applies where the substrate
the tile is installed to provide the required waterproof wall serves as a required environmental separation element.
finish. (2) [F20-OP2.1]
[F20-OS1.2] Applies where the substrate is required to act [F20-OP2.5] [F22-OP2.4, OP2.5] Applies where the
as fire protection for foamed plastics or to contribute to the substrate for the tile contribute to the required bracing or
required fire resistance of assemblies. lateral support for studs.
[F20-OP2.3] Applies where the substrate for the tile serves
[F20-OS2.1]
as a require environmental separation element or where
[F20-OS2.5] [F22-OS2.4, OS2.5] Applies where the
the tile is installed to provide the required waterproof wall
substrate for the tile contributes to the required bracing or
finish.
lateral support for studs.
[F20-OS2.3] Applies where the substrate for the tile serves [F20-OS1.2] Applies where the substrate is required to act
as a required environmental separation element or where as fire protection for foamed plastics or to contribute to the
the tile is installed to provide the required waterproof wall required fire resistance of assemblies.
finish. [F20-OS2.1]
[F20, F81-OH1.1, OH1.2] Applies where the substrate [F20-OS2.5] [F22-OS2.4, OS2.5] Applies where the
serves as a required environmental separation element. substrate for the tile contributes to the required bracing or
lateral support for studs.
(2) [F20-OP2.1]
[F20-OS2.3] Applies where the substrate for the tile serves
[F20-OP2.5] [F22-OP2.4, OP2.5] Applies where the
as a required environmental separation element or where
substrate for the tile contribute to the required bracing or
the tile is installed to provide the required waterproof wall
lateral support for studs.
finish.
[F20-OP2.3] Applies where the substrate for the tile serves
as a require environmental separation element or where [F20, F81-OH1.1, OH1.2] Applies where the substrate
the tile is installed to provide the required waterproof wall serves as a required environmental separation element.
finish. (3) [F20-OP2.1]
[F20-OS1.2] Applies where the substrate is required to act [F20-OP2.5] [F22-OP2.4, OP2.5] Applies where the
as fire protection for foamed plastics or to contribute to the substrate for the tile contribute to the required bracing or
required fire resistance of assemblies. lateral support for studs.
SA-1 • Page 169
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20-OP2.3] Applies where the substrate for the tile serves [F81-OH1.1, OH1.2] Applies where the substrate serves
as a require environmental separation element or where as a required environmental separation element.
the tile is installed to provide the required waterproof wall [F81-OS1.2] Applies where the substrate is required to act
finish. as fire protection for foamed plastics or to contribute to the
[F20-OS1.2] Applies where the substrate is required to act required fire resistance of assemblies.
as fire protection for foamed plastics or to contribute to the [F81-OS2.3]
required fire resistance of assemblies. 9.30.1.1. Required Finish Flooring
[F20-OS2.1] (1) [F30-OS3.1]
[F20-OS2.5] [F22-OS2.4, OS2.5] Applies where the
[F40, F41-OH2.4]
substrate for the tile contributes to the required bracing or
lateral support for studs. 9.30.1.2. Water Resistance
[F20-OS2.3] Applies where the substrate for the tile serves (1) [F41, F81-OH1.1] Applies where finished flooring is
as a required environmental separation element or where required to provide water resistance.
the tile is installed to provide the required waterproof wall [F80-OS2.3] Applies where finished flooring is required to
finish. provide water resistance.
[F20, F81-OH1.1, OH1.2] Applies where the substrate 9.30.1.3. Sleepers
serves as a required environmental separation element. (1) [F20, F80-OS3.1]
(4) [F20-OP2.1] [F80-OH1.1] Applies to portion of Code text: “Wood
[F20-OP2.5] [F22-OP2.4, OP2.5] Applies where the sleepers support finished flooring over a concrete base
substrate for the tile contribute to the required bracing or supported on the ground ... shall be treated with a wood
lateral support for studs. preservative.”
[F20-OP2.3] Applies where the substrate for the tile serves
9.30.2.1. Required Underlay
as a require environmental separation element or where
the tile is installed to provide the required waterproof wall (1) [F81-OH1.1] Applies where finished flooring is required to
finish. provide water resistance.
[F20-OS1.2] Applies where the substrate is required to act [F81-OS2.3] Applies where finished flooring is required to
as fire protection for foamed plastics or to contribute to the provide water resistance.
required fire resistance of assemblies. [F81-OS3.1]
[F20-OS2.1] (2) [F81-OH1.1] Applies where finished flooring is required to
[F20-OS2.5] [F22-OS2.4, OS2.5] Applies where the provide water resistance.
substrate for the tile contributes to the required bracing or [F81-OS2.3] Applies where finished flooring is required to
lateral support for studs. provide water resistance.
[F20-OS2.3] Applies where the substrate for the tile serves [F81-OS3.1]
as a required environmental separation element or where (3) [F81-OH1.1] Applies where finished flooring is required to
the tile is installed to provide the required waterproof wall provide water resistance.
finish.
[F81-OS2.3] Applies where finished flooring is required to
[F20-OH1.1, OH1.2] Applies where the substrate serves provide water resistance.
as a required environmental separation element.
[F81-OS3.1]
9.29.10.3. Adhesives (4) [F81-OH1.1] Applies where finished flooring is required to
(1) [F20-OP2.3, OP2.4] provide water resistance.
[F20-OH1.1, OH1.2] Applies where the substrate serves [F81-OS2.3] Applies where finished flooring is required to
as a required environmental separation element. provide water resistance.
[F20-OS1.2] Applies where the substrate is required to act [F81-OS3.1]
as fire protection for foamed plastics or to contribute to the
9.30.2.2. Materials and Thickness
required fire resistance of assemblies.
(1) [F81-OH1.1] Applies where finished flooring is required to
[F20-OS2.3]
provide water resistance.
9.29.10.4. Moisture Resistant Backing [F81-OS2.3] Applies where finished flooring is required to
(1) [F81-OP2.3, OP2.4] provide water resistance.
[F20-OS1.2] Applies where the substrate is required to act [F81-OS3.1]
as fire protection for foamed plastics or to contribute to the
9.30.2.3. Fastening
required fire resistance of assemblies.
(1) [F81-OH1.1] Applies where finished flooring is required to
[F20-OS2.3]
provide water resistance.
[F81-OH1.1, OH1.2] Applies where the substrate serves
[F81-OS2.3] Applies where finished flooring is required to
as a required environmental separation element.
provide water resistance.
9.29.10.5. Joints between Tiles and Bathtub [F81-OS3.1]
(1) [F81-OP2.3, OP2.4]
Page 170 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F81-OH1.1] Applies where finished flooring is required to 9.31.2.2. Corrosion Protection
provide water resistance. (1) [F80-OH2.1]
[F81-OS2.3] Applies where finished flooring is required to [F80-OS2.3]
provide water resistance. 9.31.2.3. Grab Bars
[F81-OS3.1] (1) [F20-OS3.1]
(3) [F81-OH1.1] Applies where finished flooring is required to
9.31.3.1. Required Water Supply
provide water resistance.
(1) [F70, F71-OH2.2, OH2.3]
[F81-OS2.3] Applies where finished flooring is required to
provide water resistance. 9.31.3.2. Required Connections
[F81-OS3.1] (1) [F70, F71-OH2.3]
9.30.2.4. Joints Offset (2) [F70, F71-OH2.3]
(1) [F81-OH1.1] Applies where finished flooring is required to 9.31.4.1. Required Fixtures
provide water resistance. (1) [F70, F71, F72-OH2.1, OH2.3]
[F81-OS3.1] 9.31.4.2. Hot Water Supply
[F81-OS2.3] Applies where finished flooring is required to (1) [F40-OH2.1, OH2.4]
provide water resistance. [F71-OH2.3] applies to “a hot water supply shall be
9.30.2.5. Surface Defects provided”
(1) [F81-OH1.1] Applies where finished flooring is required to 9.31.4.3. Floor Drains
provide water resistance. (1) [F40, F41, F62-OH1.2, OH1.3] [F62-OH1.1]
[F81-OS2.3] Applies where finished flooring is required to 9.31.6.1. Hot Water Supply
provide water resistance. (1) (a) [F40-OH2.1,OH2.4] [F71-OH2.3]
[F81-OS3.1] 9.31.6.1A. Hot Water Temperature
9.30.3.1. Thickness (1) [F31-OS2.3] Applies to hot water supply equipment.
(1) [F20-OS2.1] [F41-OH2.2] Applies to hot water supply equipment.
[F30-OS3.1] (2) [F41-OH2.2]
9.30.3.2. Strip Direction and End Joints 9.31.6.2. Equipment and Installation
(1) [F30-OS3.1] (3) [ F23-OS3.4]
(2) [F20-OS2.1] [F01-OS1.1]
(3) [F20-OS2.1] 9.31.6.3. Corrosion-Resistant Coating
9.30.3.3. Nailing (1) [F80, F81-OH2.3]
(1) [F30-OS3.1] 9.31.6.4. Fuel-Burning Heaters
(2) [F30-OS3.1] (1) [F01-OS1.1]
9.30.3.4. Staples [F41-OH1.1]
(1) [F30-OS3.1] 9.31.6.5. Heating Coils
(2) [F30-OS3.1] (1) [F31-OS2.3]
9.30.4.1. Adhesive [F71-OH2.3]
(1) [F81-OS3.1] 9.32.1.2. Required Ventilation
9.30.5.1. Materials (1) [F40, F50, F52-OH1.1] [F51, F52-OH1.2]
(1) [F41, F80-OH1.1] (2) [F40, F50, F52-OH1.1] [F51, F52-OH1.2]
[F80-OS3.1] 9.32.1.3. Venting of Laundry-Drying Equipment
(2) [F41-OH1.1] (1) [F40, F44, F50, F52-OH1.1]
[F81, F80-OS3.1] [F01-OS1.1]
9.30.6.1. Substrate [F01-OP1.1]
(1) [F81-OH1.1] Applies where finished flooring is required to (2) [F40, F80-OH1.1]
provide water resistance. [F81-OS1.1]
[F81-OS2.3] Applies where finished flooring is required to [F63, F80-OS2.3]
provide water resistance.
[F81-OP1.1]
[F81-OS3.1]
(3) [F40, F44, F50, F52-OH1.2]
(2) [F81-OH1.1] Applies where finished flooring is required to
[F01-OS1.1]
provide water resistance.
[F01-OP1.1]
[F81-OS2.3] Applies where finished flooring is required to
provide water resistance. 9.32.2.1. Required Ventilation
[F81-OS3.1] (1) [F40, F50, F52-OH1.1] [F51, F52-OH1.2]
SA-1 • Page 171
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.32.2.2. Non-Heating Season Ventilation (9) (c) [F53,F63-OH1.1]
(1) [F51,F52-OH1.2] [F40,F52,F50-OH1.1] (a),(b) [F43,F50,F53-OS3.4]
(3) [F42-OH2.5] (c) [F53,F63-OS2.3]
[F61,F42-OH1.1] (10) [F53-OH1.1]
[F61,F42-OS2.3] [F43,F50,F53-OS3.4]
(4) [F80-OH2.5] [F53,F63-OS2.3]
[F80,F42-OH1.1,OH1.2] (11) [F53-OH1.1]
9.32.2.3 Non Heating Season Mechanical Ventilation (12) [F81-OH1.2]
(1) [F40,F50,F52-OH1.1] 9.32.3.5. Ventilation Systems Not Used in Conjunction with
(3) [F40,F50,F52-OH1.1] [F51,F52-OH1.2] Forced Air Heating Systems
(2) [F53-OH1.1]
(4) [F40,F50,F52-OH1.1] [F51,F52-OH1.2]
[F43,F50,F53-OS3.4]
9.32.3.1. Required Ventilation
(3) (a) [F43,F53-OH1.1]
(1) [F40,F50,F53-OS3.4]
(b) [F53,F63-OH1.1]
[F40,F50,F52-OH1.1] [F51,F52-OH1.2] (a) [F43, F50, F53, F81-OS3.4]
(2) (a),(b) [F40,F50,F52-OH1.1] (b) [F53,F63-OS2.3]
(a),(b) [F51,F52-OH1.2]
(4) [F40, F43, F50, F52-OH1.1]
(c) [F53-OH1.1]
[F43,F50,F53-OS3.4]
(c) [F53-OS3.4]
(5) [F53-OH1.1]
9.32.3.2. Design and Installation
[F53,F63-OS2.3]
(1) [F52-OS2.3]
[F43,F50,F53-OS3.4]
[F40,F52,F50-OH1.1] [F52,F51-OH1.2]
(6) [F53-OH1.1]
(2) [F81-OH1.1]
[F53,F63-OS2.3]
(3) [F81-OH1.1]
[F43,F50,F53-OS3.4]
[F81-OS3.4] (7) [F53-OH1.1]
(4) [F40,F43,F50,F53-OH1.1] (8) [F51,F54-OH1.2]
[F43,F53,F82-OS3.4] (9) [F54-OH1.2]
(5) [F82-OH1.1] (10) [F40, F50, F52-OH1.1]
(6) [F63,F81-OH1.1] (12) [F40, F50, F52-OH1.1]
9.32.3.3. Principal Ventilation System (13) [F51,F54-OH1.2]
(1) [F40, F50, F52-OH1.1] [F51, F52-OH1.2] (14) [F40, F50, F52-OH1.1]
(2) [F40,F50,F52-OH1.1] [F51,F52-OH1.2] 9.32.3.6. Exhaust Only Ventilation Systems
(4) [F80,F81-OH1.1] (1) [F40,F50,F52-OH1.1]
(5) [F81-OH1.1] [F43-OS3.4]
(6) [F81-OH1.1] (2) [F40,F50,F52-OH1.1]
(7) [F81-OH1.1] (3) [F40,F50,F52-OH1.1]
(8) [F81-OH1.1] 9.32.3.7. Supplemental Exhaust
(9) [F40,F50,F52-OH1.1] (1) [F40, F52-OH1.1]
(10) [F40-OH1.1] (3) [F40, F52-OH1.1]
9.32.3.4. Ventilation Systems Used in Conjunction with Forced (4) [F40, F52-OH1.1]
Air Heating Systems
(5) [F40, F52-OH1.1]
(2) [F50,F51,F81-OH1.1] [F51,F81-OH1.2]
(6) [F81-OH1.1]
[F43,F50,F81-OS3.4]
(7) [F81-OH1.1]
(5) [F40,F43,F50,F52-OH1.1]
(8) [F81-OH1.1]
(a) [F43,F50,F53-OS3.4]
(b) [F43,F50,F81-OS3.4] 9.32.3.8. Protection Against Depressurization
(7) [F40,F50,F52,F53-OH1.1] (2) [F53-OH1.1]
[F43,F50,F53-OS3.4] (a)[F43, F50, F53-OS3.4]
(8) (a),(b) [F81-OH1.1] (b) [F53,F63-OS2.3]
(c) [F53-OH1.1] (3) [F53,F81-OH1.1]
(c) [F53,F63-OS2.3] [F43,F50,F53,F81-OS3.4]
(a),(b) [F43,F53-OH1.1] (4) [F81-OS3.4
Page 172 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F81-OH1.1,OH1.2] (9) [F40, F50, F52, F53-OH1.1]
(5) [F53-OH1.1] [F53-OS3.4]
[F81-OS1.1] (12) [F40, F50, F52, F53-OH1.1]
[F80,F81-OS3.4] [F53-OS3.4]
(7) [F43,F50,F53-OS3.4] 9.32.3.12. Heat Recovery Ventilators
[F53-OH1.1] (2) [F40,F50,F52-OH1.1]
9.32.3.9A. Location of Carbon Monoxide Alarms (3) [F40,F50,F52-OH1.1]
(1) [F44-OS3.4] (4) [F53-OH1.1,OH1.2]
(2) [F44-OS3.4] [F53,F63-OS2.3]
(3) [F44-OS3.4] [F43,F53-OS3.4]
(5) [F62-OH1.1]
(4) [F44-OS3.4]
(6) [F81-OH1.1]
(5) [F44-OS3.4]
9.32.3.13. Outdoor Intake and Exhaust Openings
(6) [F44-OS3.4]
(1) [F40, F50, F52-OH1.1]
9.32.3.9B. Location of Carbon Monoxide Alarms in All Buildngs
[F40, F44, F50-OS3.4]
(1) [F44-OS3.4]
(2) [F40, F50, F52, F53-OH1.1]
9.32.3.9C. Installation and Conformance Standards
[F43, F53-OS3.4]
(1) [F44-OS3.4]
(3) [F40, F50, F52-OH1.1]
(a), (e) [F81-OS3.4] [F40, F50, F44-OS3.4]
(3) [F11, F81-OS1.5] (4) [F62,F63-OS2.3]
[F74-OA2] [F62,F63-OP2.3]
(4) [F11, F81-OS1.5] (5) [F62,F63-OS2.3]
[F74-OA2] [F62,F63-OP2.3]
(6) [F44-OS3.4] (6) [F62,F63-OS2.3]
9.32.3.10. Fans [F62,F63-OP2.3]
(1) [F40, F50, F52, F53-OH1.1] [F51, F52-OH1.2] (7) [F40,F50,F52-OH1.1]
[F53, F63-OS2.3] [F40,F44,F50,F53-OS3.4]
(2) [F81-OH1.1, OH1.2] (8) [F40,F53-OH1.1]
(3) [F53-OH1.1, OH1.2] (9) [F61-OH1.1]
[F53-OS3.4] [F61-OS2.3]
(4) [F40,F50,F52,F53-OH1.1] [F51,F52-OH1.2] (10) [F42-OH1.1]
(5) [F81-OH1.1,OH1.2] [F01,F42-OS1.1]
(6) [F81-OS3.4] [F42-OH2.5]
[F81-OH1.1,OH1.2] (11) [F42,F63-OH1.1]
(7) [F40, F50, F52, F53-OH1.1] [F51, F52-OH1.2] [F01,F42-OS1.1]
[F81-OS3.4] (12) [F42-OH1.1]
9.32.3.11. Ducts [F01,F42-OS1.1]
(1) [F81-OH1.1] (13) [F53,F82-OH1.1]
(2) [F40, F52, F63-OH1.1] [F43,F53,F82-OS3.4]
[F52, F63-OS2.3] (14) [F53,F82-OH1.1]
(3) [F63-OH1.1] [F43,F53-OS3.4]
[F63, F80-OS2.3] (15) [F42,F80-OH2.5]
(4) [F63-OH1.1] [F01,F42,F80-OS1.1]
(5) [F41,F82-OH1.1] 9.33.1.1. Application
[F01,F82-OS1.1] (3) [F40-OH1.1]
(6) (a),(b),(c) [F02,F03-OS1.1] [F40-OS3.4]
(a) [F80-OS1.1] 9.33.2.1. Residential Heating Systems
(c) [F82-OS1.1]
(1) [F51, F52-OH1.2] [F63-OH1.1]
(7) [F41,F53,F80-OH1.1]
[F63-OS2.3]
(8) [F40, F41-OH1.1]
9.33.3.1. Indoor Design Temperatures
[F40, F63-OS2.3]
(1) [F51-OH1.2]
SA-1 • Page 173
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.33.4.1 Design of Heating and Air-Conditioning Systems [F43-OS3.4]
(1) [F41,F63-OH1.1] [F51,F52-OH1.2] [F01-OS1.1]
[F63-OS2.3] Applies only to heating systems. [F01-OP1.1]
[F44-OS3.4] Applies only to heating systems. (2) [F10-OE
9.33.4.2 Installation of Hydronic Heating Systems 9.33.6.2 Materials in Air Duct Systems
(1) [F01-OS1.1] (1) [F01-OS1.1]
[F01-OP1.1] [F01-OP1.1]
[F63-OH1.1] [F51,F52-OH1.2] (2) (a),(b),(c),(d) [F01-OS1.1]
[F63-OS2.3] (a),(b),(c),(d) [F01-OP1.1]
[F44-OS3.4] Applies to heating equipment. (3) [F01-OS1.1]
9.33.4.3. Heating System Control [F01-OP1.1]
(1) [F51,F52-OH1.2] [F63-OH1.1] (4) (a),(b),(c),(d) [F01-OS1.1]
9.33.4.4. Access a),(b),(c),(d) [F01-OP1.1]
(1) [F82-OH1.1,OH1.2] (6.1) [F81-OH1.1]
[F82-OS2.3] Applies only to heating systems [F44, F81-OS3.4
[F82-OS1.1] (6.2) F20, F80-OH1.1,OH1.2]
[F82-OP1.1] (7) (a),(b) [F41,F63-OH1.1] [F50,F51,F52-OH1.2]
9.33.4.5 Protection from Freezing (a),(b) [F63-OS2.3]
(1) [F81-OH1.1,OH1.2] 9.33.6.3. Tape
[F81-OS2.3] Applies only to heating systems. (1) [F01-OS1.1]
9.33.4.6. Expansion, Contraction and System Pressure [F01-OP1.1]
(1) [F20-OH1.1,OH1.2] 9.33.6.4. Covering, Linings, Adhesives and Insulation
[F20-OS3.2] (5) [F01-OS1.1]
[F20-OS2.3] Applies only to heating systems. [F01-OP1.1]
9.33.4.7. Structural Movement (6) [F01-OS1.1]
(1) [F23-OS3.4] (c) [F01,F02,F05-OS1.5]
[F23-OH1.1,OH1.2] [F01-OP1.1]
[F23-OS1.1] (7) [F01-OP1.1]
[F23-OP1.1] [F01-OP1.1]
(2) [F20-OS3.3,OS3.4] (9) [F63-OH1.1] Applies to ventilation ducts and their fittings.
[F20-OS1.1] [F51,F52-OH1.2] Applies to air duct distribution systems
9.33.4.8. Asbestos serving heating systems.
(1) [F43-OH1.1] [F03-OS1.1] Applies to air duct distribution systems.
9.33.4.9 Contaminant Transfer [F03-OP1.1] Applies to air duct distribution systems.
(1) [F44-OH1.1] [F63-OS2.3] Applies to air duct distribution systems.
[F44-OS3.4] 9.33.6.5. Galvanized Steel or Aluminum Supply Ducts
9.33.5.1 Capacity of Heating Appliances (1) [F20-OH1.1,OH1.2]
(1) [F131, F132, F133, F150-OR1.2] [F01-OS1.1]
(2) [F131, F132, F133, F150-OR1.2] [F01-OP1.1]
(3) [F131, F132, F133, F150-OR1.2] (2) [F20,F63-OH1.1] [F20,F51,F52-OH1.2]
9.33.5.2. Installation Standards [F20,F63-OS2.3]
(1) [F41,F50, F63-OH1.1][F51, F52-OH1.2] 9.33.6.6 Construction of Ducts and Plenums
[F63-OS2.3] (1) [F03-OS1.1]
[F44-OS3.4] [F03-OP1.1]
(2) [F41,F50, F63-OH1.1][F51, F52-OH1.2] (2) [F01-OS1.1]
[F63-OS2.3] [F20-OS3.1]
[F44-OS3.4] [F63-OH1.1] [F51,F52-OH1.2]
9.33.5.3 Design, Construction and Installation Standard for [F20,F63-OS2.3]
Solid-Fuel-Burning Appliances (3) [F43,F63-OH1.1] [F51,F52-OH1.2]
(1) [F41,F43-OH1.1] [F51-OH1.2] [F01-OS1.1]
[F51-OS2.3] [F63-OS2.3]
[F01-OP1.1]
Page 174 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(4) [F43,F63-OH1.1] [F51,F52-OH1.2] [F81-OH1.2]
[F63-OS2.3] (2) [F81-OH1.1]
[F01-OS1.1] [F81,F44-OS3.4]
[F01-OP1.1] [F41,F44-OH1.1]
(4.1) [F20-OH4] (3) [F81-OH1.1]
[F20-OP2.4] [F82,F81-OH1.1]
[F20-OS2.3] (4) [F82-OS3.4]
(5) [F63-OH1.1] [F51,F52-OH1.2] 9.33.6.11. Warm Air Supply Outlets
[F63-OS2.3] (1) [F40,F63-OH1.1] [F51,F52-OH1.2]
[F01-OS1.1] [F63-OS2.3]
[F01-OP1.1] (2) [F63-OH1.1] [F51-OH1.2]
9.33.6.7. Installation fo Ducts and Plenums [F63-OS2.3]
(1) [F40-OH1.1] (3) [F40,F63-OH1.1] [F51-OH1.2]
[F40-OS3.4] (4) [F40,F63-OH1.1] [F51-OH1.2]
(2) [F63-OH1.1] [F51,F52-OH1.2] [F63-OS2.3]
[F63-OS2.3] (5) [F40,F63-OH1.1] [F51-OH1.2]
[F01-OS1.1] [F63-OS2.3]
[F01-OP1.1] (6) [F40,F63-OH1.1] [F51-OH1.2]
(3) [F63-OH1.1] [F51,F52-OH1.2] [F63-OS2.3
[F63-OS2.3] (8) [F31-OS3.2]
[F20-OS3.1] (9) [F40,F63-OH1.1] [F51-OH1.2]
(4) [F51,F52-OH1.2] [F63,F50-OH1.1] [F63-OS2.3] Applies to warm-air supply outlets located in
[F63,F80-OS2.3] finished areas.
(5) [F01-OS1.1] (10) [F40-OH1.1]
[F01-OP1.1] [F40-OS3.4]
(6) [F80-OH1.1,OH1.2] 9.33.6.12. Return-Air Inlets
[F80-OS2.3] (1) [F44,F40-OH1.1]
(7) (a) [F44,F81-OH1.2,OH1.3] [F44,F40-OS3.4]
(b),(c) [F44,F81-OH1.1] (2) [F63-OH1.1] [F51-OH1.2]
(8) [F44, F81-OH1.1][F81-OH1.2] (3) [F63-OH1.1] [F51-OH1.2]
(9) [F44, F81-OH1.1][F81-OH1.2] [F63-OS2.3]
(10) [F131-OR2] 9.33.6.13. Return-Air System
(11) [F81-OH1.1, OH1.2, OH1.3] (1) [F63-OH1.1][F51-OH1.2]
9.33.6.8 Clearances of Ducts and Plenums [F63-OS2.3]
(2) (a),(b) [F01-OS1.1] (1.1) [F01, F02-OP1.1]
(a),(b) [F01-OP1.1] [F01, F02-OS1.1]
(3) (a),(b) [F01-OS1.1] (2) [F01-OS1.1]
(a),(b) [F01-OP1.1] [F01-OP1.1]
(4) (a),(b),(c) [F01-OS1.1] (3) [F01-OS1.1]
(a),(b),(c) [F01-OP1.1] [F01-OP1.1]
(5) [F01-OS1.1] (4) (a),(b),(c) [F01-OS1.1]
[F01-OP1.1] (a),(b),(c) [F01-OP1.1]
9.33.6.9 Adjustable Dampers and Balance Stops (5) [F51,F52-OH1.1,OH1.2]
(1) [F40,F63-OH1.1] [F51,F52-OH1.2] [F51,F52-OS2.3]
[F63-OS2.3] Applies to branch supply ducts that are not (6) [F63-OH1.1] [F51-OH1.2]
fitted with diffusers with adjustable balance stops. [F63-OS2.3]
9.33.6.10 Warm-Air Supply Outlets and Return Inflets – General (7) (a),(b) [F44-OH1.1]
(2) (a),(b) [F01,F02-OS1.1] (a),(b) [F44-OS3.4]
(a),(b) [F01,F02-OP1.1] 9.33.6.14. Filters and Odour Removal Equipment
9.33.6.10A. Supply, Return, Intake and Exhaust Openings (1) [F01-OS1.1]
(1) [F30-OS3.1 [F01-OP1.1]
SA-1 • Page 175
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
(2) [F32-OS3.3] 9.34.2.3. Stairways
[F41-OH1.1] (1) [F30-OS3.1]
(3) (a),(b) [F81-OH1.1] (2) [F30-OS3.1]
9.33.7.1. Recessed Radiators and Convectors 9.34.2.4. Basements
(1) [F01-OS1.1] (1) [F30-OS3.1]
[F01-OP1.1] (2) [F30-OS3.1]
9.33.7.2. Surface Temperature 9.34.2.5. Storage Rooms
(1) [F31-OS3.2] (1) [F30-OS3.1]
9.33.8.1. Piping Materials and Installation 9.34.2.6. Garages and Carports
(1) [F20-OS3.2] (1) [F30-OS3.1]
[F20-OH1.1,OH1.2] (2) [F30-OS3.1]
(2) [F21,F40-OH1.1] [F21,F51-OH1.2] (3) [F30-OS3.1]
(3) [F20-OS2.2] 9.34.2.7. Public and Service Areas
(1) [F30-OS3.1]
9.33.8.2. Insulation and Coverings
(2) [F30-OS3.1]
(1) [F80-OH1.2]
(3) [F30-OS3.1]
[F80-OS3.2]
9.35.2.2. Garage Floor
(2) (a),(b) [F01-OS1.1]
(1) [F40-OS1.1]
(a),(b) [F01-OP1.1]
9.35.3.2. Protection from Damage due to Soil Movement
(3) (a),(b) [F01,F02-OS1.1,OS1.2]
(1) [F21-OH1.1, OH1.2, OH1.3]
(a),(b) [F01,F02-OP1.1,OP1.2]
[F21-OH4] Applies to floors and elements that support
(4) [F01,F02-OS1.1,OS1.2]
floors.
[F01,F02-OP1.1]
[F21-OP2.3, OP2.4]
(5) [F31-OS3.2]
[F21-OS2.3]
9.33.8.3. Clearances
[F21-OS3.1] Applies to floors and elements that support
(1) [F01-OS1.1] floors.
[F01-OP1.1] (2) [F21-OH1.1, OH1.2, OH1.3]
9.33.8.4. Protection [F21-OH4] Applies to floors and elements that support
(1) [F01-OS1.1] floors.
[F01-OP1.1] [F21-OP2.3, OP2.4]
(2) [F01-OS1.1] [F21-OS2.3]
[F01-OP1.1] [F21-OS3.1] Applies to floors and elements that support
9.33.9.1. Cooling Units floors.
(1) (a),(b),(c) [F43-OH1.1] [F51-OH1.2] 9.35.3.4. Column Piers
9.33.10.2. Factory-Built Chimneys (1) [F80-OP2.3]
(1) [F01-OS1.1] [F80-OS2.3]
[F44-OS3.4] (2) [F20-OP2.1, OP2.2]
[F44,F41-OH1.1] [F20-OS2.1, OS2.2]
[F01-OP1.1] 9.35.4.2. Columns
9.34.1.3. Location of Equipment in Public Areas (1) [F20-OP2.1]
(1) [F10-OS3.1] [F32, F81-OS3.3] [F20-OS2.1]
9.34.1.4. Recessed Lighting Fixtures 9.35.4.3. Anchorage
(1) [F01-OS1.1] (1) [F22-OP2.4, OP2.5]
9.34.1.5. Wiring and Cables [F22-OS2.4, OS2.5]
(1) [F02-OS1.2]
9.37.2.1. Exclusions
[F02-OP1.2]
(2) [F42-OH2.5]
9.34.2.1. Lighting of Entrances
[F20-OP2.1]
(1) [F30-OS3.1]
[F20-OS2.1] [F30-OS3.1]
[F34-OS4.2]
9.37.2.2. Foundations
9.34.2.2. Outlets in Houses and Dwelling Units
(2) [F20-OP2.1]
(1) [F30-OS3.1]
(2) [F30-OS3.1] [F20-OS2.1]
Page 176 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
9.38.1.1. Material Requirements (2) [F20, F21, F55, F61, F80-OH1.1, OH1.2]
(1) [F20-OP2.1] [F20, F21, F61, F80-OH1.3] Applies where concrete
[F20-OS2.1] supports or is used in an environmental separator.
9.38.1.2. Requirement for Wood Preservative [F20, F21, F80-OH4]
(1) [F80-OH4] [F20-OP2.1, OP2.4]
[F21-OP2.3, OP2.4]
[F80-OP2.1, OP2.3] [F80-OP2.3]
[F80-OS2.3, OS3.1] [F20-OP2.3] Applies to elements that support or are part of
9.38.1.3. Exterior Joints an environmental separator.
(1) [F61-OH1.3] [F20-OS2.1]
[F42-OH2.5] [F21, F80-OS2.3]
[F61-OP2.3] [F20-OS2.3] Applies to elements that support or are part of
an environmental separator.
9.38.2.2. Attachment of Logs
[F20, F21, F80-OS3.1]
(1) [F61-OH1.3]
(3) [F20, F21-OH4]
[F42-OH2.5]
[F20-OP2.1, OP2.4]
[F61-OP2.3]
[F21-OP2.4]
9.38.2.3. Joining Logs
[F20-OS2.1]
(1) [F22-OP2.5]
(4) [F22-OP2.5]
[F22-OS2.5]
[F22-OS2.5]
9.38.2.4. Vertical Logs (5) [F61, F62-OH1.1, OH1.2, OH1.3]
(1) [F22-OP2.5] [F61, F62, F80-OP2.3]
[F22-OS2.5] [F61, F62, F80-OS2.3]
9.38.2.5. Plates [F30-OS3.1]
(1) [F20-OP2.1] 9.41.2.1. Change of Use and Compensating Construction
[F20-OS2.1] (1) 9.5
9.38.3.1. Support Over Openings Applies to the design of areas and spaces in buildings.
(1) [F22-OP2.5] [F74-OA2]
[F22-OS2.5] [F70, F71-OH2.3]
9.38.3.2. Clearance [F101-OH6]
[F30-OS3.1]
(1) [F21-OP2.4]
[F10-OS3.7]
[F21-OS2.4]
9.7
9.39.3.3. Foundations and Anchorage Applies to windows and skylights in Part 9 buildings.
(1) [F20, F22-OS2.1, OS2.2, OS2.5] [F55, F61, F62, F63, F80, F81, F82-OH1.1]
[F20, F22-OP2.1, OP2.2, OP2.4, OP2.5] [F51, F53, F54, F55, F61, F62, F63, F80, F82-OH1.2]
9.40.1.3. Reinforcing Steel [F61, F62, F63-OH1.3]
(1) [F20, F21-OH4] [F102-OH7]
[F42-OP2.3]
[F20-OP2.1, OP2.4] [F21-OP2.4]
[F03, F20-OS1.2]
[F20-OS2.1] [F10-OS1.5]
9.40.1.4. Slab Construction [F20-OS2.1]
(1) [F20, F21, F55, F61, F80-OH1.1, OH1.2] [F20, F21, F42, F61, F63-OS2.3]
[F20, F21, F61, F80-OH1.3] Applies where concrete [F30-OS3.1]
supports or is used in an environmental separator. [F10, F30-OS3.7]
[F20, F21, F80-OH4] [F34-OS4.1]
[F131-OR2]
[F20-OP2.1, OP2.4]
[F21-OP2.3, OP2.4] 9.10.17.
[F80-OP2.3] Applies to flame-spread limits in Part 9 buildings.
[F20-OP2.3] Applies to elements that support or are part of [F01, F02-OS1.2]
an environmental separator. [F01, F02, F05-OS1.5]
[F20-OS2.1] 9.31.
[F21, F80-OS2.3] Applies to plumbing facilities serving Part 9 dwelling units.
[F20-OS2.3] Applies to elements that support or are part of [F44, F62-OH1.1]
an environmental separator. [F40, F41, F62-OH1.2, OH1.3]
[F20, F21, F80-OS3.1] [F70, F71, F72, F80-OH2.1]
[F41-OH2.2]
SA-1 • Page 177
2024 MMAH Supplementary Standard SA-1
Acceptable
Objectives and Functional Statements
Solutions
[F70, F71, F72, F80, F81-OH2.3]
[F01-OS1.1]
[F31, F80-OS2.3]
[F20-OS3.1]
[F23-OS3.4]
9.32.
Applies to ventilation in Part 9 residential occupancies.
[F40, F42, F50, F52, F53, F61, F80, F81, F82-OH1.1]
[F42, F51, F52, F80, F81-OH1.2]
[F42, F80-OH2.5]
[F82-OP1.1]
[F131-OR2]
[F02, F03, F80, F82-OS1.1]
[F42, F53, F61, F63-OS2.3]
[F40, F43, F44, F50, F53, F81-OS3.4]
9.34.1.
[F01-OS1.1] [F10-OS3.1] [F32, F81-OS3.3] Applies to
electrical facilities in Part 9 buildings.
9.34.2.
[F30-OS3.1] Applies to lighting outlets for Part 9 buildings.
[F34-OS4.2] Applies to lighting outlets for Part 9 buildings.
9.34.3.
[F30-OS3.1] [F10-OS3.7] Applies to emergency lighting for
Part 9 buildings.
9.41.2.2. Performance Level Evaluation and Compensating
Construction
(1) [F140-OC]
Page 178 • SA-1
2024 MMAH Supplementary Standard SA-1
Table 10
Objectives and Functional Statements Attributed to the Acceptable Solutions in Part 10 of Division B
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solution Solution
10.3.1.1. General [F34-OS4.1]
(1) 3.2.6. [F131-OR2]
Applies to additional requirements for high buildings. 9.10.17.
[F03, F06, F12, F13, F82-OP1.2] Applies to flame spread limits in Part 9 buildings.
[F03-OP3.1] [F01, F02-OS1.2] [F01, F02, F05-OS1.5]
[F02, F03, F06, F12, F13, F82-OS1.2] [F02, F03, F05, 9.31.
F06, F10, F11, F12, F82-OS1.5] Applies to plumbing facilities serving Part 9 dwelling units.
[F30-OS3.1] [F11, F12-OS3.7] [F44, F62-OH1.1] [F40, F41, F62-OH1.2, OH1.3]
3.7. [F70, F71, F72, F80-OH2.1] [F41-OH2.2] [F70, F71, F72,
Applies to health requirements for buildings. F80, F81-OH2.3]
[F74-OA2] [F01-OS1.1]
[F50-OH1.1] [F31, F80-OS2.3]
[F40, F72-OH2.1] [F70-OH2.2] [F71-OH2.3] [F40, F41- [F20-OS3.1] [F23-OS3.4]
OH2.4] 9.32.
[F101-OH6] Applies to ventilation in Part 9 residential occupancies.
[F102-OH7] [F40, F42, F50, F52, F53, F61, F80, F81, F82-OH1.1]
[F01-OP1.1] [F42, F51, F52, F80, F81-OH1.2]
[F01-OS1.1] [F42, F80-OH2.5]
[F20, F30-OS3.1] [F32-OS3.3] [F43, F44-OS3.4] [F82-OP1.1]
3.11. [F131-OR2]
Applies to public pools. [F02, F03, F80, F82-OS1.1]
[F74-OA2] [F42, F53, F61, F63-OS2.3]
[F50-OH1.1] [F40, F43, F44, F50, F53, F81-OS3.4]
[F72-OH2.1] [F46, F70-OH2.2] [F40, F41, F45, F71, F122- 9.34.1.
OH2.3] [F40, F41-OH2.4] [F01-OS1.1]
[F101-OH6] [F10-OS3.1] [F32, F81-OS3.3] Applies to electrical
[F01-OS1.1] [F04-OS1.3] facilities in Part 9 buildings.
[F03-OS2.1] 9.34.2.
[F12, F30, F34, F36, F120, F121, F123, F124-OS3.1] [F30-OS3.1] Applies to lighting outlets for Part 9 buildings.
[F31-OS3.2] [F32, F34-OS3.3] [F34, F43, F44, F81, [F34-OS4.2] Applies to lighting outlets for Part 9 buildings.
F122-OS3.4] [F10, F11, F12, F34, F123-OS3.7] 9.34.3.
3.12. [F30-OS3.1] [F10-OS3.7] Applies to emergency lighting for
Applies to public spas. Part 9 buildings.
[F74-OA2]
10.3.2.1. General
[F46-OH2.2] [F40, F41, F70, F71, F72, F81, F122-OH2.3]
[F40, F41-OH2.4] (1) [F140-OC]
[F11, F12, F13, F30, F34, F36, F81, F120, F121, F123,
F124-OS3.1] [F43, F81, F122-OS3.4] [F10, F34,
F123-OS3.7]
9.5.
Applies to the design of areas and spaces in buildings.
[F74-OA2]
[F70, F71-OH2.3]
[F101-OH6]
[F30-OS3.1] [F10-OS3.7]
9.7.
Applies to windows and skylights in Part 9 buildings.
[F55, F61, F62, F63, F80, F81, F82-OH1.1] [F51, F53,
F54, F55, F61, F62, F63, F80, F82-OH1.2] [F61, F62,
F63-OH1.3]
[F102-OH7]
[F42-OP2.3]
[F03, F20-OS1.2] [F10-OS1.5]
[F20-OS2.1] [F20, F21, F42, F61, F63-OS2.3]
[F30-OS3.1] [F10, F30-OS3.7]
SA-1 • Page 179
2024 MMAH Supplementary Standard SA-1
Table 11
Objectives and Functional Statements Attributed to the Acceptable Solutions in Part 11 of Division B
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
11.2.1.3. Prohibition of Occupancy Combinations As applied to lighting of exits, lighting of access to exits and
(1) [F41-OH2.1] emergency lighting in Subsection 3.2.7.:
[F02, F03-OS1.2] [F10-OS1.5] [F40-OH2.4]
11.3.1.1. Material Alteration or Repair of a Building System [F12-OH5] Applies to the requirement for a suitably
identified shut-off valve outside the building.
(1) [F140-OC]
[F01-OP1.1] [F01, F02, F03, F06, F12, F81-OP1.2]
11.3.3.2. Extensive Renovation [F02-OP3.1]
(4) [F02, F04-OP1.2, OP1.3] [F12-OS1.1] Applies to the requirement for a suitably
(5) [F02, F04-OS1.2, OS1.3] identified shut-off valve outside the building.
11.3.5.2. Vertical Separations and Existing Sewage Systems [F02, F03, F06, F10, F11, F12, F81-OS1.2] [F02, F03, F06,
(1) [F110-OE] F10, F11, F12, F81-OS1.5]
[F02, F06, F30, F81-OS3.1] [F36-OS3.6] [F10, F11, F12,
[F113- OH2.1,OH5]
F81-OS3.7]
11.4.1.1. Performance Level
As applied to access to exit widths based on occupant load
(1) [F140-OC] in Article 3.3.1.16.:
11.4.3.2. Structural [F10-OS3.7]
(1) [F110-OE] Applies to manure storage tanks. As applied to door release hardware in Article 3.3.1.12.:
[F21, F22, F61, F80, F81-OH4] [F73-OA1]
[F04-OP1.2] [F30-OS3.1] [F10, F12-OS3.7]
[F20-OP2.1, OP2.2, OP2.3, OP2.4, OP2.6] As applied to travel distance in Article 3.4.2.4.:
[F21-OP2.1, OP2.2, OP2.4, OP2.5, OP2.6] [F10-OS3.7]
[F22-OP2.1, OP2.3, OP2.4, OP2.5] As applied to number of exits in Articles 3.4.2.3. and
[F81-OP2.1, OP2.4] 3.4.2.5.:
[F82-OP2.3] [F05, F10-OS1.5]
[F61-OP2.3, OP2.4] [F10-OS3.7]
[F80-OP2.3, OP2.4, OP2.6] As applied to exit widths based on occupant load in Article
[F04-OP3.1] 3.4.3.2.:
[F21-OP4.1, OP4.4] [F12-OP1.2]
[F20-OP4.3] [F12-OS1.2]
[F04-OS1.2] [F30-OS3.1] [F10, F12-OS3.7]
[F20-OS2.1, OS2.2, OS2.3, OS2.4] As applied to exit signs in Articles 3.4.5.1. and 3.4.5.2.:
[F21-OS2.1, OS2.2, OS2.3, OS2.5, OS2.6] [F10, F81-OS3.7]
[F61-OS2.3] As applied to door release hardware in Article 3.4.6.15.:
[F80-OS2.3] [F73-OA1]
[F81-OS2.3] [F02-OS1.2]
[F82-OS2.3] [F10, F81-OS1.5] [F10, F81-OS3.7]
[F30-OS3.1] As applied to access to exit widths based on occupant load
[F43-OS3.4] Applies to manure storage tanks. in Subsection 9.9.3.:
11.4.3.3. Increase in Occupant Load [F30-OS3.1] [F10-OS3.7]
(1) As applied to fire alarm systems in Subsection 3.2.4.: As applied to exit widths based on occupant load in
[F12, F13, F81, F82-OP1.2] Subsection 9.9.3.:
[F02, F03, F11, F12, F13, F81, F82-OS1.2] [F11, F13- [F30-OS3.1] [F10-OS3.7]
OS1.4] [F10, F11, F12, F13, F81, F82-OS1.5] As applied to travel distance in Article 9.9.9.1.:
[F11, F12-OS3.7] Applies to voice communication systems. [F10-OS3.7]
As applied to smoke control measures, and at least one As applied to number of exits in Articles 9.9.8.2. and
elevator to permit transport of firefighters to all floors in 9.9.9.2.:
hotels whose floor level is more than 18 m high measured [F10-OS3.7]
between grade and floor level of the top storey in As applied to exit signs in Subsection 9.9.10.:
Subsection 3.2.6.: [F73-OA1]
[F02, F03, F06, F12, F13, F82-OP1.2] [F10-OS1.5]
[F03-OP3.1] [F10-OS3.7]
[F02, F03, F06, F12, F13, F82-OS1.2] [F02, F03, F05, F06, As applied to lighting of exits, lighting of access to exits and
F10, F12-OS1.5] emergency lighting in Article 9.9.11.:
[F30-OS3.1] [F30-OS3.1] [F10-OS3.7]
Page 180 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
As applied to fire alarm systems in Subsection 9.10.18.: [F40, F72-OH2.1] [F70-OH2.2] [F71-OH2.3] [F40, F41-
[F02-OS1.2] Applies to a sprinklered building. OH2.4] [F101-OH6]
[F03, F11-OS1.2] [F11-OS1.5] [F102-OH7] [F01-OP1.1] [F01-OS1.1]
As applied to smoke alarms in Subsection 9.10.19.: [F20, F30-OS3.1] [F32-OS3.3] [F43, F44-OS3.4]
[F11, F81-OS1.4] As applied to public pools in Section 3.11.:
[F11, F81, F82-OS1.5] [F74-OA2]
(3) As applied to required ventilation for buildings in Sentence [F50-OH1.1]
6.2.2.1.(2): [F72-OH2.1] [F46, F70-OH2.2] [F40, F41, F45, F71, F122-
[F50-OH1.1] OH2.3] [F40, F41-OH2.4]
As applied to plumbing facilities for buildings in Subsection [F101-OH6]
3.7.4.: [F01-OS1.1] [F04-OS1.3]
[F74-OA2] [F03-OS2.1]
[F50-OH1.1] [F12, F30, F34, F36, F120, F121, F123, F124-OS3.1] [F31-
[F72-OH2.1] [F70-OH2.2] [F71-OH2.3] [F40-OH2.4] OS3.2] [F32, F34-OS3.3] [F34, F43, F44, F81,
[F101-OH6] F122-OS3.4] [F10, F11, F12, F34, F123-OS3.7]
[F20, F30-OS3.1] As applied to public spas in Section 3.12.:
[F74-OA2]
As applied to plumbing facilities serving Part 9 dwelling
[F46-OH2.2] [F40, F41, F70, F71, F72, F81, F122-OH2.3]
units in Article 9.31.1.1.:
[F40, F41-OH2.4]
[F44, F62-OH1.1] [F40, F41, F62-OH1.2, OH1.3]
[F11, F12, F13, F30, F34, F36, F81, F120, F121, F123,
[F70, F71, F72, F80-OH2.1] [F41-OH2.2] [F70, F71, F72,
F124-OS3.1] [F43, F81, F122-OS3.4] [F10, F34,
F80, F81-OH2.3]
F123-OS3.7]
[F01-OS1.1]
[F31, F80-OS2.3] As applied to required ventilation for buildings in Sentence
[F20-OS3.1] [F23-OS3.4] 6.2.2.1.(2):
[F50-OH1.1]
11.4.3.4. Change in Major Occupancy
As applied to Sentence 6.2.3.9.(1):
(1) [F02, F03, F04-OP1.2, OP1.3] Applies to increase in
[F40-OH1.1]
construction index.
[F44-OS1.1]
[F02, F04-OP1.2, OP1.3] Applies where the building is
required to be sprinklered. As applied to Sentence 6.2.4.7.(10):
[F02, F03, F04-OS1.2, OS1.3] Applies to increase in [F40-OH1.1]
construction index. [F44-OS1.1]
[F02, F04-OS1.2, OS1.3] Applies where the building is As applied to Subsection 9.5.1.:
required to be sprinklered. [F10-OS3.7]
Applies where an Early Warning system is provided for a As applied to Articles 9.5.3.1. to 9.5.10.1.:
Part 3 building, in accordance with Subsection 3.2.4.: [F70, F71-OH2.3]
[F12, F13, F81, F82-OP1.2] [F101-O H6]
[F02, F03, F11, F12, F13, F81, F82-OS1.2] [F11, F13- [F30-OS3.1] [F10-OS3.7]
OS1.4] [F10, F11, F12, F13, F81, F82-OS1.5] As applied to windows and skylights in Part 9 buildings in
[F11, F12-OS3.7] Applies to voice communication systems. Section 9.7.:
Applies where an Early Warning system is provided for a [F55, F61, F62, F63, F80, F81, F82-OH1.1] [F51, F53, F54,
Part 9 building, in accordance with Subsection 9.10.18.: F55, F61, F62, F63, F80, F82-OH1.2] [F61, F62,
[F02-OS1.2] Applies to a sprinklered building. F63-OH1.3]
[F03, F11-OS1.2] [F11-OS1.5] [F102-OH7]
Applies where an Early Warning system is provided for a [F42-OP2.3]
Part 9 building, in accordance with Subsection 9.10.19.: [F03, F20-OS1.2] [F10-OS1.5]
[F11, F81-OS1.4] [F11, F81, F82-OS1.5] [F20-OS2.1] [F20, F21, F42, F61, F63-OS2.3]
(2) As applied to additional requirements for high buildings in [F30-OS3.1] [F10, F30-OS3.7]
Subsection 3.2.6.: [F34-OS4.1]
[F03, F06, F12, F13, F82-OP1.2] [F131-OR2]
[F03-OP3.1] As applied to flame spread limits in Part 9 buildings
[F02, F03, F06, F12, F13, F82-OS1.2] [F02, F03, F05, F06, Subsection 9.10.17.:
F10, F11, F12, F82-OS1.5] [F01, F02-OS1.2] [F01, F02, F05-OS1.5]
[F30-OS3.1] [F11, F12-OS3.7] As applied to plumbing facilities serving Part 9 dwelling
As applied to health requirements for buildings in Section units in Section 9.31.:
3.7.: [F44, F62-OH1.1] [F40, F41, F62-OH1.2, OH1.3]
[F74-OA2] [F70, F71, F72, F80-OH2.1] [F41-OH2.2] [F70, F71, F72,
[F50-OH1.1] F80, F81-OH2.3]
[F01-OS1.1]
SA-1 • Page 181
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F31, F80-OS2.3] As applied to number of exits in Articles 3.4.2.3. and
[F20-OS3.1] 3.4.2.5.:
As applied to ventilation in Part 9 residential occupancies in [F05, F10-OS1.5]
Section 9.32.: [F10-OS3.7]
[F40, F42, F50, F52, F53, F61, F80, F81, F82-OH1.1] [F42, As applied to exit widths based on occupant load in Article
F51, F52, F80, F81-OH1.2] 3.4.3.2.:
[F42, F80-OH2.5] [F12-OP1.2]
[F82-OP1.1] [F12-OS1.2]
[F131-OR2] [F30-OS3.1] [F10, F12-OS3.7]
[F02, F03, F80, F82-OS1.1] As applied to exit signs in Articles 3.4.5.1. and 3.4.5.2.:
[F42, F53, F61, F63-OS2.3] [F10, F81-OS3.7]
[F40, F43, F44, F50, F53, F81-OS3.4] As applied to door release hardware in Article 3.4.6.15.:
As applied to Subsection 9.34.1.: [F73-OA1]
[F01-OS1.1] [F02-OS1.2]
[F10-OS3.1] [F32, F81-OS3.3] Applies to electrical facilities [F10, F81-OS1.5]
in Part 9 buildings. [F10, F81-OS3.7]
As applied to Subsection 9.34.2.: As applied to access to exit widths based on occupant load
[F30-OS3.1] Applies to lighting outlets for Part 9 buildings. in Subsection 9.9.3.:
[F34-OS4.2] Applies to lighting outlets for Part 9 buildings. [F30-OS3.1] [F10-OS3.7]
As applied to Subsection 9.34.3.: As applied to exit widths based on occupant load in
[F30-OS3.1] [F10-OS3.7] Applies to emergency lighting for Subsection 9.9.3.:
Part 9 buildings. [F30-OS3.1] [F10-OS3.7]
(3) As applied to fire alarm systems in Subsection 3.2.4.: As applied to travel distance in Article 9.9.9.1.:
[F12, F13, F81, F82-OP1.2] [F10-OS3.7]
[F02, F03, F11, F12, F13, F81, F82-OS1.2] [F11, F13- As applied to number of exits in Articles 9.9.8.2. and
OS1.4] [F10, F11, F12, F13, F81, F82-OS1.5] 9.9.9.2.:
[F11, F12-OS3.7] Applies to voice communication systems. [F10-OS3.7]
As applied to smoke control measures, and at least one As applied to exit signs in subsection 9.9.10.:
elevator to permit transport of fire fighters to all floors in [F10-OS1.5]
hotels whose floor level is more than 18 m high, measured [F10-OS3.7]
between grade and the floor level of the top storey in [F73-OA1]
Subsection 3.2.6.:
As applied to lighting of exits, lighting of access to exits and
[F02, F03, F06, F12, F13, F82-OP1.2]
emergency lighting in Article 9.9.11.:
[F03-OP3.1]
[F30-OS3.1] [F10-OS3.7]
[F02, F03, F06, F12, F13, F82-OS1.2] [F02, F03, F05, F06,
F10, F12-OS1.5] As applied to fire alarm systems in Subsection 9.10.18.:
[F30-OS3.1] [F02-OS1.2] Applies to a sprinklered building.
[F03, F11-OS1.2] [F11-OS1.5]
As applied to lighting of exits, lighting of access to exits and
emergency lighting in Subsection 3.2.7.: As applied to smoke alarms in Subsection 9.10.19.:
[F40-OH2.4] Applies to the requirement for a suitably [F11, F81-OS1.4] [F11, F81, F82-OS1.5]
identified shut-off valve outside the building. (4) As applied to fire separations in Article 3.1.3.1.:
[F01-OP1.1] [F01, F02, F03, F06, F12, F81-OP1.2] [F03-OP1.2]
[F02-OP3.1] [F03-OS1.2]
[F12-OS1.1] Applies to the requirement for a suitably As applied to Table 11.4.3.4.B.:
identified shut-off valve outside the building. [F140-OC]
[F02, F03, F06, F10, F11, F12, F81-OS1.2] [F02, F03, F06, (6) [F02, F04-OP1.2, OP1.3]
F10, F11, F12, F81-OS1.5] [F02, F04-OS1.2, OS1.3]
[F02, F06, F30, F81-OS3.1] [F36-OS3.6] [F10, F11, F12, 11.4.3.5. Plumbing
F81-OS3.7]
(1) [F140-OC]
As applied to access to exit widths based on occupant load
[F20-OE]
in Article 3.3.1.16.:
[F20-OE] Applies to drainage piping.
[F10-OS3.7]
[F20-OE] Applies to underground drainage piping.
As applied to door release hardware in Article 3.3.1.12.: [F20, F81, F113-OE]
[F73-OA1] [F40-OE]
[F30-OS3.1] [F44-OE]
[F10, F12-OS3.7] [F44-OE] Applies to oil interceptors.
As applied to travel distance in Article 3.4.2.4.: [F44, F81, F112-OE]
[F10-OS3.7] [F81-OE] Applies to underground drainage piping.
Page 182 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F81, F112-OE] [F20, F46, F80, F81-OH2.2]
[F111-OE] Applies to drainage systems served by a sewage [F20, F46, F80, F81-OH2.2] Applies to water piping.
system. [F20, F46, F80, F81-OH2.2] Applies to Supply Fittings.
[F20-OH1.1] [F20, F46, F81-OH2.2] Applies to water piping.
[F20-OH1.1] Applies to vent piping. [F20, F80, F81-OH2.2]
[F20, F43, F81-OH1.1] [F20, F81-OH2.2]
[F20, F43, F81-OH1.1] Applies to venting system. [F21-OH2.2]
[F20, F43, F81-OH1.1] Applies to bell and spigot joints in [F41, F46-OH2.2]
venting systems. [F46-OH2.2]
[F20, F81-OH1.1] [F46-OH2.2] Applies to Water Systems.
[F21-OH1.1] [F40-OH1.1] [F46, F70-OH2.2]
[F40, F41, F50-OH1.1] Applies to the requirement for [F46, F70, F81-OH2.2]
ventilation. [F46, F80, F81-OH2.2]
[F40, F81-OH1.1] [F46, F80, F81-OH2.2] Applies to water piping.
[F41-OH1.1] [F46, F81-OH2.2]
[F41, F81-OH1.1] Applies to vent pipes. [F46, F81-OH2.2] Applies to water piping.
[F43-OH1.1] [F70-OH2.2]
[F43, F80, F81-OH1.1] Applies to venting system. [F70, F80-OH2.2]
[F43, F81-OH1.1] Applies to venting system. [F70, F81-OH2.2]
[F44, F81-OH1.1] [F80-OH2.2]
[F80-OH1.1] [F81-OH2.2] Applies to the size of air break.
[F81-OH1.1] [F81-OH2.2] Applies to water service pipe.
[F81-OH1.1] Applies to venting system. [F81-OH2.2] Applies to private water supply.
[F31-OH1.2] [F81-OH2.2] Applies to water system.
[F20-OH1.3] [F82-OH2.2]
[F20, F80, F81-OH1.3] [F71-OH2.3]
[F61-OH1.3] [F71, F72-OH-2.3] Applies to equipment.
[F61, F80-OH1.3] [F72-OH2.3]
[F62-OH1.3] [F40-OH2.4]
[F62, F81-OH1.3] [F40, F46-OH2.4]
[F80, F81-OH1.3] [F41-OH2.4]
[F81-OH1.3] Applies to water pipes. [F41-OH2.4] Applies to floor drains in garbage rooms.
[F20-OH2.1] [F41, F81-OH2.4]
[F20-OH2.1] Applies to drainage piping. [F63-OH2.4]
[F20, F80, F81, F113-OH2.1] [F81-OH2.4]
[F20, F80, F81, F113-OH2.1] Applies to building sewer. [F42-OH2.5]
[F20, F80, F81, F113-OH2.1] Applies to drainage system. [F81-OH2.6] Applies to drainage pipe.
[F20, F80, F81, F113-OH2.1] Applies to Waste Fittings. [F81-OH2.6] Applies to private sewers.
[F20, F81-OH2.1] Applies to drainage piping. [F20-OH2.1, OH2.2]
[F20, F81-OH2.1] Applies to bell and spigot joints in [F20, F46, F80, F81, F113-OH2.1, OH2.2]
drainage systems. [F80-OH2.1, OH2.2]
[F21-OH2.1] [F80-OH2.1, OH2.2 ,OH2.3, OH2.4]
[F40-OH2.1] [F82-OH2.1, OH2.2, OH2.3, OH2.4] Applies to the need for
[F41, F81-OH2.1] maintenance.
[F43-OH2.1] [F81-OH2.1, OH2.2, OH2.4]
[F45-OH2.1] [F20, F81-OH2.1, OH2.3]
[F62-OH2.1] [F20, F81, F113-OH2.1, OH2.3]
[F62, F70-OH2.1] [F80-OH2.1, OH2.3] Applies to Drainage Systems.
[F70-OH2.1] [F81-OH2.1, OH2.3, OH2.4]
[F72-OH2.1] [F81, F82-OH2.1, OH2.3, OH2.4]
[F80-OH2.1] [F40-OH2.1, OH2.4]
[F80, F81-OH2.1] Applies to drainage system. [F40, F41-OH2.1, OH2.4]
[F80, F81, F113-OH2.1] [F41, F43-OH2.1, OH2.4]
[F80, F81, F113-OH2.1] Applies to drainage system. [F41, F81-OH2.1, OH2.4]
[F81-OH2.1] [F43-OH2.1, OH2.4]
[F81-OH2.1] Applies to drainage system. [F80-OH2.1, OH2.4]
[F81, F113-OH2.1] [F80, F81-OH2.1, OH2.4]
[F20-OH2.2] [F81-OH2.1, OH2.4]
[F20-OH2.2] Applies to water piping. [F82-OH2.1, OH2.4]
SA-1 • Page 183
2024 MMAH Supplementary Standard SA-1
Acceptable Acceptable
Objectives and Functional Statements Objectives and Functional Statements
Solutions Solutions
[F20, F80, F81-OH2.1, OH2.6] [F01-OS1.1] Applies to oil interceptors. [F01, F40, F81-
[F20, F80, F81, F113-OH2.1, OH2.6] OS1.1]
[F20, F81-OH2.1, OH2.6] [F01, F81-OS1.1]
[F81-OH2.2, OH2.4] [F20, F81-OS1.1]
[F41, F81-OH2.4, OH2.5] [F81-OS1.1]
[F20-OH4] [F02, F12, F81-OS1.2]
[F43-OH5] [F12-OS1.4]
[F44-OH5] [F20, F81-OS2.1]
[F44-OH5] Applies to oil interceptors. [F81-OH5] [F20, F81-OS2.3]
[F20-OS2.2, OS2.3] [F20-OS3.1]
[F01-OP1.1] [F20, F30, F80-OS3.1]
[F01-OP1.1] Applies to oil interceptors. [F01, F40, F81- [F30-OS3.1]
OP1.1] [F30-OS3.1] Applies to the requirement for lighting. [F80-
[F20, F81-OP1.1] OS3.1]
[F02, F12, F81-OP1.2] [F81-OS3.1]
[F12-OP1.4] [F20, F81-OS3.2]
[F31-OS3.2]
[F61-OP2.3]
[F31, F81-OS3.2]
[F61, F80-OP2.3]
[F31, F81-OS3.2] Applies to pipes containing hot water.
[F61, F81-OP2.3]
[F31, F81-OS3.2] Applies to pressure vessels containing
[F62-OP2.3]
hot water. [F81-OS3.2]
[F63-OP2.3]
[F80-OP2.3] [F32-OS3.3]
[F81-OP2.3] [F40, F80-OS3.4]
[F43-OS3.4] Applies to equipment. [F44-OS3.4]
[F20-OP5]
[F81-OS3.4]
[F20, F31, F46, F80, F81-OP5]
[F36-OS3.6]
[F20, F46, F80, F81-OP5]
[F20, F46, F80, F81-OP5] Applies to Supply Fittings. [F20, [F40-OR1]
F46, F80, F81-OP5] Applies to water piping. [F20, F46, [F130-OR1]
F80, F81, F113-OP5] 11.4.3.6. Sewage Systems
[F20, F46, F81-OP5] (1) [F81, F110, F111-OE]
[F20, F46, F81-OP5] Applies to water piping. [F20, F80, [F81, F111-OE]
F81-OP5] [F82-OE]
[F20, F80, F81-OP5] Applies to drainage system. [F20, F80, [F82, F110-OE]
F81, F113-OP5] [F82, F111-OE]
[F20, F80, F81, F113-OP5] Applies to drainage system. [F104, F110, F111-OE]
[F20, F80, F81, F113-OP5] Applies to Waste Fittings. [F20, [F110-OE]
F81-OP5] [F110, F111-OE]
[F20, F81-OP5] Applies to drainage system. [F110, F111, F112-OE]
[F20, F81-OP5] Applies to bell and spigot joints in drainage [F110, F112-OE]
systems. [F20, F81, F113-OP5] [F111-OE]
[F21-OP5] [F111, F112-OE]
[F21, F61, F81-OP5] [F111, F113-OE]
[F40-OP5] [F112-OE]
[F46-OP5] [F50-OH1.1]
[F46, F80, F81-OP5] [F82-OH2.1]
[F46, F80, F81-OP5] Applies to water piping. [F62-OP5] [F82, F111-OH2.1]
[F62, F72-OP5] [F104, F110, F111-OH2.1]
[F72-OP5] [F110-OH2.1]
[F80-OP5] [F110, F111-OH2.1]
[F80, F81-OP5] [F110, F111, F112 -OH2.1]
[F80, F81-OP5] Applies to drainage system. [F80, F81, [F110, F112-OH2.1]
F113-OP5] [F111-OH2.1]
[F80, F81, F113-OP5] Applies to drainage system. [F81- [F111, F112-OH2.1]
OP5] [F40-OH2.4]
[F81-OP5] Applies to water pipes. [F42-OH2.5]
[F81-OP5] Applies to Drainage Systems. [F81, F113-OP5] [F113-OH2.6]
[F81, F113-OP5] Applies to drainage pipes. [F82-OP5] [F81, F110, F111-OH5]
[F01-OS1.1] [F81, F111-OH5]
Page 184 • SA-1
2024 MMAH Supplementary Standard SA-1
Acceptable
Objectives and Functional Statements
Solutions
[F82-OH5]
[F82, F110-OH5]
[F82, F111-OH5]
[F104, F110, F111-OH5]
[F110-OH5]
[F110, F111-OH5]
[F110, F111, F112-OH5]
[F110, F112-OH5]
[F111-OH5]
[F111, F112-OH5]
[F111, F113-OH5]
[F112-OH5]
[F101-OH6]
[F20-OP2.3]
[F81-OP2.6]
[F104, F110, F111-OR2]
[F20-OS2.1]
[F20-OS2.2]
[F30-OS3.1]
SA-1 • Page 185
2024 MMAH Supplementary Standard SA-1
Table 12
Objectives and Functional Statements Attributed to the
Acceptable Solutions in Part 12 of Division B
Acceptable
Objectives and Functional Statements
Solutions
12.2.1.1. Energy Efficiency Design
(1) [F131-OR2] [F131-OR1, OR1.2]
(2) [F131-OR2] [F131-OR1, OR1.2]
(3) [F131-OR2] [F131-UR1, OR1.2]
12.2.2.1. Carbon Dioxide Equivalents
(1) [F131-OR1, OR1.2]
(2) [F131-OR1, OR1.2]
12.2.3.1. Peak Electric Demand
(1) [F131-OR1, OR1.2] [F133-OR2.1]
12.2.4.1. Motion Sensors
(2) [F30-OS3.1] [F10-OS3.7]
(3) [F30-OS3.1] [F10-OS3.7]
12.3.1.2. Windows and Sliding Glass Doors
(1) [F131-OR1.2]
12.3.1.3. Temperature Control in Houses and Dwelling Units
(1) [F131-OR1.2]
(2) (a) [F131-OR1.2] [F133-OR2.1]
(b) [F131-OR1.2] [F133-OR2.1]
[c) [F131-OR1.2] [F133-OR2.1]
(3) [F131-OR1.2] [F132-OR2.1]
12.3.1.4. Hot Water Piping Insulation
(1) [F131-OR1.2] [F132-OR2.1]
(2) [F131-OR1.2] [F132-OR2.1]
(3) [F131-OR1.2] [F132-OR2.1]
12.3.1.5. Residential Furnaces
(1) [F131-OR1.2] [F132-OR2.1]
[F150-OE1.1]
12.3.1.6. Energy Supply for Kitchen and Laundry Facilities
(1) [F131-OR1.2]
Page 186 • SA-1
Ministry of Municipal Affairs and Housing
Building and Development Branch
MMAH Supplementary Standard SB-1
MMAH Supplementary Standard SB-1
Climatic and Seismic Data
January 1, 2024
2024 MMAH Supplementary Standard SB-1
COMMENCEMENT
MMAH Supplementary Standard SB-1 comes into force on the 1st day of January, 2025.
© Copyright
©
Copyright King's Printer for Ontario 2024
All rights reserved.
Questions regarding copyright, including reproduction and distribution, may be directed to the Director,
Building and Development Branch of the Ministry of Municipal Affairs and Housing.
This provision includes a table — formatting is preserved from the source; refer to the official code for the authoritative layout.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.