OBC DIVISION B · PART 5 — ENVIRONMENTAL SEPARATIONUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
Section 5.5 — Vapour Diffusion
Full text of Section 5.5 (Vapour Diffusion) — Division B, Part 5 (Environmental Separation) of the 2024 Ontario Building Code, with every article reproduced below.
5.5.1.Vapour Barriers
5.5.1.1.Required Resistance to Vapour Diffusion (See Note A-5.5.1.1.) permalink →
(1) Where a building component or assembly is subjected to differentials in temperature and water vapour pressure, the
properties and position of the materials and components in those components or assemblies shall be such that they control
vapour diffusion or permit venting to the exterior so as to minimize accumulation of condensation in the building
component or assembly.
(2) Except as provided in Sentence (3), a vapour barrier shall be installed to provide the principal resistance to water
vapour diffusion.
(3) A vapour barrier is not required where it can be shown that uncontrolled vapour diffusion will not adversely affect
any of
(a) the health or safety of building users,
(b) the intended use of the building, or
(c) the operation of building services.
5.5.1.2.Vapour Barrier Properties and Installation (See Note A-5.3.1.2.) permalink →
(1) The vapour barrier shall have sufficiently low permeance and shall be positioned in the building component or
assembly so as to
(a) minimize moisture transfer by diffusion, to surfaces within the assembly that would be cold enough to cause
condensation at the design temperature and humidity conditions, or
(b) reduce moisture transfer by diffusion, to surfaces within the assembly that would be cold enough to cause
condensation at the design temperature and humidity conditions, to a rate that will not allow sufficient accumulation
of moisture to cause deterioration or otherwise adversely affect any of,
(i) the health or safety of building users,
(ii) the intended use of the building, or
(iii) the operation of building services.
(See Note A-5.5.1.2.(1))
(2) Coatings applied to gypsum wallboard to provide required resistance to vapour diffusion shall conform to the
requirements of Sentence (1) when tested in accordance with CAN/CGSB-1.501-M, “Method for Permeance of Coated
Wallboard.”
(3) Coatings applied to materials other than gypsum wallboard to provide required resistance to vapour diffusion shall
conform to the requirements of Sentence (1) when tested in accordance with ASTM E96/E96M, “Standard Test Methods
for Water Vapor Transmission of Materials,” by the desiccant method (dry cup).
Understand any provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.