PART 9 — HOUSING AND SMALL BUILDINGSUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
9.9.6.8.Effort Required to Open
(1) Except as required by Sentence 3.8.3.3.(7), every exit door, except doors serving a single dwelling unit or a house
with a secondary suite, shall be designed and installed so that when the latch is released the door will open in the direction
of exit travel under a force of not more than 90 N applied to the door release hardware. (See Sentence 3.8.3.6.(8) for door
opening forces in a barrier-free path of travel.)
← Previous9.9.6.7. Door Latching, Locking and Opening MechanismsNext →9.9.7.1. Egress from Roof Area, Podiums, Terraces, Platfo
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.