PART 9 — HOUSING AND SMALL BUILDINGSUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
9.33.4.7.Structural Movement
(1) Mechanical systems and equipment shall be designed and installed to accommodate the maximum amount of
structural movement provided for in the construction of the building.
(2) Where the building is in a location where the spectral acceleration, Sa(0.2), is greater than 0.55, heating and air-
conditioning equipment with fuel or power connections shall be secured to the structure to resist overturning and
displacement. (See Note A-9.31.6.2.(3))
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.