PART 9 — HOUSING AND SMALL BUILDINGSUpdated for the 2024 Ontario Building Code

9.3.1.9.Cold Weather Requirements

(1) When the air temperature is below 5°C , concrete shall be (a) kept at a temperature of not less than 10°C or more than 25°C while being mixed and placed, and (b) maintained at a temperature of not less than 10°C for 72 h after placing. (2) No frozen material or ice shall be used in concrete described in Sentence (1).

Understand this provision in seconds

BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.

Try BUILDAiD Beta

Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.