PART 9 — HOUSING AND SMALL BUILDINGSUpdated for the 2024 Ontario Building Code

9.23.7.2.Levelling and Sealing of Sill Plates

(1) Sill plates shall be (a) levelled by setting them on a full bed of mortar, or (b) laid directly on the foundation where the top of the foundation is level. (See also Article 9.23.2.3.) (2) The joint between the sill plate for exterior walls and the foundation shall be sealed in accordance with Subsection 9.25.3.

Understand this provision in seconds

BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.

Try BUILDAiD Beta

Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.