9.23.14.8.Ridge Support
(1) Except as provided in Sentence (4), roof rafters and joists shall be supported at the ridge of the roof by
(a) a loadbearing wall extending from the ridge to suitable bearing, or
(b) a ridge beam supported by not less than 89 mm length of bearing.
(2) Except as provided in Sentence (3), the ridge beam referred to in Sentence (1) shall conform to the sizes and spans
shown in Span Table 9.23.4.2.-L, provided
(a) the supported rafter or joist length does not exceed 4.9 m, and
(b) the roof does not support any concentrated loads.
(3) The ridge beam referred to in Sentence (1) need not comply with Sentence (2) where
(a) the beam is of not less than 38 mm by 140 mm material, and
(b) the beam is supported at intervals not exceeding 1.2 m by not less than 38 mm by 89 mm members extending
vertically from the ridge to suitable bearing.
(4) When the roof slope is 1 in 3 or steeper, ridge support need not be provided when the lower ends of the rafters are
adequately tied to prevent outward movement.
(5) Ties required in Sentence (4) are permitted to consist of tie rods or ceiling joists forming a continuous tie for
opposing rafters and nailed in accordance with Table 9.23.14.8.
(6) Except as permitted in Sentence (7), ceiling joists referred to in Sentence (5) shall be tied to the base of every rafter.
(7) Where ceiling joists referred to in Sentence (5) are raised above the base of the rafters, the connections between the
rafters and the ceiling joists shall be designed in accordance with Clause 9.4.1.1.(1)(b) or (c).
(8) Ceiling joists referred to in Sentence (5) that are spliced to make a continuous joist shall be fastened together at each
splice with at least one more nail than required for the rafter-to-joist connection shown in Table 9.23.14.8.
(9) Members referred to in Sentences (6) and (8) are permitted to be fastened together either directly or through a gusset
plate.
Table 9.23.14.8.
Rafter-to-Joist Nailing (Unsupported Ridge)
Forming Part of Sentences 9.23.14.8.(5) and (8)
Minimum Number of Nails not Less than 76 mm Long and 3.66 mm in Diameter(1)(2)(3)(4)
Rafter Building Width up to 4 m Building Width up to 6 m Building Width up to 8 m Building Width up to 10 m
Roof
Spacing, Specified Roof Snow Specified Roof Snow Specified Roof Snow Specified Roof Snow
Slope
mm Load, kPa Load, kPa Load, kPa Load, kPa
1.0 1.5 2.0 1.0 1.5 2.0 1.0 1.5 2.0 1.0 1.5 2.0
300 3 4 5 5 6 7 6 8 10 7 10 (5)
1 in 3 400 4 5 7 6 8 10 8 10 (5) 10 (5) (5)
600 6 8 10 9 (5) (5) (5) (5) (5) (5) (5) (5)
300 3 3 4 4 5 6 5 6 8 6 8 10
1 in 2.4 400 3 4 5 5 6 8 6 8 10 8 10 (5)
600 5 6 8 7 9 (5) 9 (5) (5) (5) (5) (5)
300 2 3 4 3 4 5 4 5 7 5 7 8
1 in 2 400 3 4 5 4 5 7 5 7 9 7 9 (5)
600 4 5 7 6 8 10 8 10 (5) 10 (5) (5)
300 2 3 3 3 4 4 4 5 6 4 6 7
1 in 1.71 400 3 3 4 4 5 6 5 6 8 6 7 9
600 4 5 6 5 7 8 7 9 (5) 8 (5) (5)
300 2 3 3 3 4 4 4 5 6 4 6 7
1 in 1.5 400 2 3 4 3 4 5 4 5 7 5 7 8
600 3 4 5 5 6 7 6 8 10 7 10 (5)
300 2 2 3 2 3 4 3 4 5 4 5 6
1 in 1.33 400 2 3 3 3 4 5 4 5 6 5 6 7
600 3 4 5 4 5 7 5 7 9 7 9 (5)
300 2 2 2 2 3 3 3 3 4 3 4 5
1 in 1.2 400 2 2 3 3 3 4 3 4 5 4 5 7
600 3 3 4 4 5 6 5 6 8 6 8 10
300 2 2 2 2 2 3 2 3 4 3 4 4
1 in 1 400 2 2 3 2 3 4 3 4 5 4 5 6
600 2 3 4 3 4 5 4 5 7 5 7 8
Notes to Table 9.23.14.8.:
(1) Nails with a diameter less than 3.66 mm are permitted to be used, provided the minimum number of nails stated in the Table is
modified as follows:
• For a nail diameter greater than or equal to 2.86 mm and less than 3.25 mm, add 3 nails to the minimum number of nails, up
to a maximum of 10 nails.
• For a nail diameter greater than or equal to 3.25 mm and less than 3.66 mm, add 2 nails to the minimum number of nails, up
to a maximum of 10 nails.
Where more than 10 nails are required, the connections between the rafters and the ceiling joists shall be designed in accordance
with Clause 9.4.1.1.(1)(b) or (c).
(2) The minimum number of nails stated in the Table is applicable to Spruce-Pine-Fir, Douglas Fir-Larch and Hem-Fir members. For
Northern Species members, add 2 nails to the minimum number of nails, up to a maximum of 10 nails. Where more than 10 nails are
required, the connections between the rafters and the ceiling joists shall be designed in accordance with Clause 9.4.1.1.(1)(b) or (c).
(3) To accommodate nail spacing, not less than 38 mm × 140 mm joists shall be used where 6 or more nails are required, and not less
than 38 mm × 184 mm joists shall be used where 8 or more nails are required.
(4) The minimum number of nails in the Table is applicable for a maximum roof dead load of 0.5 kPa.
(5) The connections between the rafters and the ceiling joists shall be designed in accordance with Clause 9.4.1.1.(1)(b) or (c).
This provision includes a table — formatting is preserved from the source; refer to the official code for the authoritative layout.
← Previous9.23.14.7. Intermediate Support for Rafters and JoistsNext →9.23.14.9. Restraint of Joist Bottoms
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.