PART 9 — HOUSING AND SMALL BUILDINGSUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
9.15.4.9.Crack Control Joints
(1) Crack control joints shall be provided in foundation walls more than 25 m long at intervals of not more than 15 m.
(2) Joints required in Sentence (1) shall be designed to resist moisture penetration and shall be keyed to prevent relative
displacement of the wall portions adjacent to the joint.
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.