PART 9 — HOUSING AND SMALL BUILDINGSUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
9.13.2.3.Preparation of Surface
(1) The area in which dampproofing is to be carried out shall be kept free of water during the application and curing of
the dampproofing system.
(2) The surface to be dampproofed shall be prepared in accordance with the instructions of the dampproofing material
manufacturer.
(3) Where the dampproofing material is to be applied on insulating concrete form (ICF) walls, the instructions of the
ICF wall manufacturer shall be followed.
(4) Unit masonry walls to be dampproofed shall be parged on the exterior face below ground level with not less than
6 mm of mortar conforming to Section 9.20. coved over the footing.
(5) Concrete walls to be dampproofed shall have holes and recesses sealed with cement mortar or a mastic or sealant
that is suitable for vertical applications and compatible with the dampproofing material.
(6) The surface required to be dampproofed shall be clean and dry and free of ice, snow, frost, dust, dirt, oil, grease,
cracks, projections, depressions, loose particles and debris that could be detrimental to the performance of the membrane
to be applied.
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.