PART 8 — SEWAGE SYSTEMSUpdated for the 2024 Ontario Building Code

8.9.3.5.Pressurized Distribution Systems

(1) The pressure head at the furthest point from the pump in all distribution pipes shall be checked for compliance with Articles 8.7.6.1. and 8.7.8.2. and the design specification at least every 36 months.

Understand this provision in seconds

BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.

Try BUILDAiD Beta

Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.