PART 8 — SEWAGE SYSTEMSUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
8.7.4.1.Loading Requirements
(1) The area described in Sentence 8.7.4.2.(1) shall be designed such that the loading rate does not exceed, for soil
having a percolation time set out in Column 1 of Table 8.7.4.1., the maximum value set out opposite it in Column 2 of
Table 8.7.4.1.
Table 8.7.4.1.
Loading Rates for Fill Based Absorption Trenches and Filter Beds
Forming Part of Sentences 8.7.4.1.(1) and 8.7.5.2.(2)
Percolation Time (T) of Soil, min Loading Rates, (L/m2)/day
1 < T ≤ 20 10
20 < T ≤ 35 8
35 < T ≤ 50 6
T > 50 4
Column 1 2
This provision includes a table — formatting is preserved from the source; refer to the official code for the authoritative layout.
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.