PART 8 — SEWAGE SYSTEMSUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
8.5.1.2.Application
(1) A Class 3 sewage system shall not be constructed where the daily design sanitary sewage flow to the system exceeds
1 000 L/day.
(2) A Class 3 sewage system shall be designed to receive only the contents of a Class 1 sewage system or effluent from a
Class 1 sewage system for disposal.
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.