PART 7 — PLUMBINGUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
7.5.8.1.Hydraulic Loads Draining to Wet Vents
(1) The hydraulic load that drains to a wet vent shall conform to Table 7.5.8.1.
(2) When determining the nominal pipe size of a wet vent, the hydraulic load from the most downstream fixture or
symmetrically connected fixtures shall not be included.
Table 7.5.8.1.
Maximum Permitted Hydraulic Loads Drained to a Wet Vent
Forming Part of Sentences 7.5.7.3.(2) and 7.5.8.1.(1)
Maximum Hydraulic Load, Fixture Units
Nominal Pipe Size of Wet Vent, NPS Fixtures, Other Than Water Closets, That
Not Serving Water Closets
Serve Not More Than 2 Water Closets
1½ 2 n/a
2 4 3
3 12 8
4 36 14
5 n/a 18
6 n/a 23
This provision includes a table — formatting is preserved from the source; refer to the official code for the authoritative layout.
← Previous7.5.7.7. Vents for Sewage Sumps, Neutralizing and DilutioNext →7.5.8.2. Individual Vents and Dual Vents
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.