PART 7 — PLUMBINGUpdated for the 2024 Ontario Building Code

7.4.10.12.Hydraulic Loads from Fixtures with a Semi-continuous Flow

(1) The hydraulic load from a fixture or equipment that produces a semi-continuous flow shall conform to Table 7.4.10.12. Table 7.4.10.12. Maximum Permitted Hydraulic Load from Fixtures with a Semi-continuous Flow Forming Part of Sentence 7.4.10.12.(1) Nominal Pipe Size of Trap, NPS Flow, L/s Hydraulic Load, fixture units 1½ 0.000 - 0.090 3 2 0.091 - 0.190 6 3 0.191 - 0.850 27 4 0.851 - 5.700 180

This provision includes a table — formatting is preserved from the source; refer to the official code for the authoritative layout.

Understand this provision in seconds

BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.

Try BUILDAiD Beta

Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.