PART 7 — PLUMBINGUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
7.3.6.5.Air Pressure Tests
(1) Air pressure tests shall be conducted in accordance with the manufacturer’s instructions for the piping materials,
and,
(a) air shall be forced into the system until a gauge pressure of 35 kPa is created, and
(b) this pressure shall be maintained for at least 15 min without a drop in pressure.
(See Note A-7.3.6.5.(1))
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.