PART 7 — PLUMBINGUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
7.3.3.2.Extracted Tees
(1) Tees may be extracted from the wall thickness of Types K and L copper tube used in a water distribution system,
provided that
(a) a tool specifically designed for the purpose is used,
(b) the branch is at least one NPS smaller than the tube in which the tee is formed,
(c) the end of the branch incorporates a means to prevent it from penetrating into the run and thereby obstructing flow,
and
(d) the joint at the tee is brazed with a filler metal having a melting point not below 540°C.
← Previous7.3.3.1. Drilled and Tapped JointsNext →7.3.3.3. Prohibition of Welding of Pipes and Fittings
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.