PART 7 — PLUMBINGUpdated for the 2024 Ontario Building Code

7.3.2.1.Caulked Lead Drainage Joints

(1) Caulked lead drainage joints shall not be used except for cast-iron pipe in a drainage system or venting system, or between such pipe and (a) other ferrous pipe, (b) brass and copper pipe, (c) a caulking ferrule, or (d) a trap standard. (2) Every caulked lead drainage joint shall be firmly packed with oakum and tightly caulked with lead to a depth of not less than 25 mm. (3) No paint, varnish or other coating shall be applied on the lead until after the joint has been tested. (4) A length of hub and spigot pipe and pipe fittings in a drainage system shall be installed with the hub at the upstream end.

Understand this provision in seconds

BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.

Try BUILDAiD Beta

Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.