PART 7 — PLUMBINGUpdated for the 2024 Ontario Building Code

7.2.5.8.CPVC Pipe, Fittings and Solvent Cements

(1) CPVC hot and cold water pipe, fittings and solvent cements shall be conform to CSA B137.6, “Chlorinated polyvinylchloride (CPVC) pipe, tubing and fittings for hot and cold water distribution systems.” (2) The design temperature and design pressure of a CPVC piping system shall conform to Table 7.2.5.8. Table 7.2.5.8. Maximum Permitted Pressure for CPVC Piping at Various Temperatures Forming Part of Sentence 7.2.5.8.(2) Maximum Temperature of Water, °C Maximum Permitted Pressures, kPa 10 3150 20 2900 30 2500 40 2100 50 1700 60 1300 70 1000 82 690

This provision includes a table — formatting is preserved from the source; refer to the official code for the authoritative layout.

Understand this provision in seconds

BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.

Try BUILDAiD Beta

Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.