PART 4 — STRUCTURAL DESIGNUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
4.2.5.8.Backfilling
(1) Where an excavation is backfilled, the backfill shall be placed so as to
(a) provide lateral support to the soil adjacent to the excavation, and
(b) prevent detrimental movements.
(2) The material used as backfill or fill supporting a footing, foundation or a floor on grade shall be of a type that is not
subject to detrimental volume change with changes in moisture content and temperature.
← Previous4.2.5.7. Protection and Maintenance at ExcavationsNext →4.2.6.1. Design of Shallow Foundations
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.