PART 3 — FIRE PROTECTION, OCCUPANT SAFETY AND ACCESSIBILITYUpdated for the 2024 Ontario Building Code
Try BUILDAiD Beta
3.2.5.6.Access Route Design
(1) A portion of a roadway or yard provided as a required access route for fire department use shall
(a) have a clear width not less than 6 m, unless it can be shown that lesser widths are satisfactory,
(b) have a centre line radius not less than 12 m,
(c) have an overhead clearance not less than 5 m,
(d) have a change of gradient not more than 1 in 12.5 over a minimum distance of 15 m,
(e) be designed to support the expected loads imposed by firefighting equipment and be surfaced with concrete, asphalt
or other material designed to permit accessibility under all climatic conditions,
(f) have turnaround facilities for any dead-end portion of the access route more than 90 m long, and
(g) be connected with a public thoroughfare.
(See Note A-3.2.5.6.(1))
(2) For buildings conforming to Article 3.2.2.51. or 3.2.2.60., no portion of the access route described in Sentence
3.2.2.10.(3) shall be more than 20 m below the uppermost floor level.
Understand this provision in seconds
BUILDAiD Assist explains any article of the building code in plain English — with exact citations, exceptions and related requirements.
Code text is reproduced for reference from the Ontario Building Code (O. Reg. 163/24, 2024 Building Code Compendium). This page is provided for general information and is not an official copy. Always verify requirements against the official Ontario Building Code and confirm with your local building department.